Professional Documents
Culture Documents
Released On : 20/06/08
Written By : Wade
Review By :
Approved By :
Test Result Summary
Summary
Page 2 of 4
1. Full Loading Test (snack test)
Purpose: To see if full wire speed is achievable when each port of the DUT is running at
highest speed rate and bi-direction to any other port randomly with different frame sizes.
SMB 6000
DUT
15,16 15 Yes 15
Page 3 of 4
Port Link Port
1 ---
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 ---
Page 4 of 4