You are on page 1of 8

ENGU2 – Module 3 Assignment

CABANTING, JOHN ROFER G. BSCE-CEM 3A

1.

Riser

Fixture
Load:
WC – 1 x 3 wsfu = 3 wsfu
SHO - 1 x 2 wsfu = 2 wsfu
LAV – 1 x 1 wsfu = 1 wsfu
______________________________________________________________________________
Total: 6 wsfu
Fixture Demand: 0.3 L/s
(From Chart A-3)

P100 = 392.32 KPa


Estimated Water Demand Flow = 0.3 L/s

CR branch

Fixture
Load:
WC – 1 x 3 wsfu = 3 wsfu
SHO - 1 x 2 wsfu = 2 wsfu
LAV – 1 x 1 wsfu = 1 wsfu
______________________________________________________________________________
Total: 6 wsfu
Fixture Demand: 0.3 L/s
(From Chart A-3)

P100 = 392.32 KPa


Estimated Water Demand Flow = 0.3 L/s
Kitchen branch

Fixture
Load:
KF – 1 x 2 wsfu = 2 wsfu
HB - 1 x 3 wsfu = 3 wsfu
______________________________________________________________________________
Total: 5 wsfu
Fixture Demand: 0.3 L/s
(From Chart A-3)

P100 = 392.32 KPa


Estimated Water Demand Flow = 0.3 L/s

CONCLUSION:

The inside diameter of pipe to be used is 15mm. If PPR Pipes is used, PN10 with diameter of 20mm will
satisfy the requirements. THEREFORE, use 20mm diameter PN10 PPR for each branch and riser.

2.

A.

Demand Factor Demand Factor


Ground Floor Second Floor
Fixture load: Fixture load:
WC = 1 x 3 wsfu = 3 wsfu WC = 2 x 3 wsfu = 6 wsfu
LAV = 1 x 1 wfu = 1 wsfu LAV = 2 x 1 wfu = 2wsfu
KF = 1 x 2 wsfu = 2 wsfu Bath = 2 x 2 wsfu = 4 wsfu
HB = 2 x 3 wsfu = 6 wsfu HB = 1 x 3 wsfu = 3 wsfu
____________________________ ____________________________
Total: 12 wsfu Total: 15 wsfu
Fixture Demand = 0.6 L/s Fixture Demand = 0.7 L/s

Total Fixture load = 12 + 15 = 27 wsfu


Total Flow/Demand = 1.3L/s
B.

Preliminary Information
Average Pressure of water main – 345 KPa (50PSI)
Total Fixture load – 27 wsfu
Estimated water demand – 1.3 L/s
Type of topmost fixture – 4m
Length of piping – 20.5 m
Fixture Pressure requirement at topmost fixture (Pfixture) – 104 KPa

C.

Static head (Pstatic)


Pstatic = 9.79 KPa/m (height of uppermost fixture)
Pstatic = 9.79 KPa/m (4m)
Pstatic = 39.16 KPa

D.

Pressure loss in water meter (Pwmeter)


The flow/water demand = 1.3 L/s
Assume size of water meter = 20mm
Pwmeter = 55.10 KPa

E.

Pressure Available for friction loss in the supply pipe

Pa = Pave – (Pfix + Pstatic + Pwmeter)


Pa = 345KPa – (104KPa + 39.16KPa + 55.10KPa)
Pa = 146 .74KPa

F.

DL = 20.5
TEL = DL + DL Gate Vale = 2 x 183 = 366
TEL = 20.5m + DL T Standard = 1 x 1524 = 1524
TEL = 20500 mm + 7922 mm T Straight = 2 x 274 = 548
TEL = 284222 mm or 28.42 m Elbow = 6 x 914 = 5484
____________________
Total: 7922 mm
G.

Average permissible friction loss per 100m length of pipe (P 100)

P100 = (Pa/TEL) 100


P100 = (146.74 / 28.42) 100
P100 = 516.29 KPa

H.

Estimated water demand = 1.3 L/s


Use 25mm

P100 = 516.29

Inside diameter to be used is 25 mm


therefore use 32 mm diameter PN10 PPR Pipe for the building supply or service pipe.

I.

P100 = 516.29

CR Branch (Ground Floor)

WC = 1 x 3 wsfu = 3 wsfu
Lav = 1 x 1 wsfu = 1 wsfu
____________________
Total: 4 wsfu
Fixture demand: 0.2 L/s

Kitchen Branch

KF = 1 x 2 wsfu = 2 wsfu
HB = 2 x 3 wsfu = 6 wsfu
____________________
Total: 8 wsfu
Fixture demand: 0.4 L/s

Riser 1 Masters Bedroom (Second Floor)

Lav = 1 x 1 wsfu = 1 wsfu


WC = 1 x 3 wsfu = 3 wsfu
Bath = 1 x 2 wsfu = 2 wsfu
_____________________
Total: 6 wsfu
Fixture demand: 0.3 L/s
Riser 2

HB = 1 x 2 wsfu = 2 wsfu
Total: 2 wsfu
Fixture demand: 0.1 L/s

Riser 3

Lav = 1 x 1 wsfu = 1 wsfu


WC = 1 x 3 wsfu = 3 wsfu
Bath = 1 x 2 wsfu = 2 wsfu
_____________________
Total: 6 wsfu
Fixture demand: 0.3 L/s
GROUND FLOOR
SECOND FLOOR
WATER SUPPLY RISER DIAGRAM