Formwork Inspection Check List: Rev - No. 0

The document contains inspection checklists for formwork, reinforcement, and concrete activities on a railway construction project. The formwork checklist contains 14 items to inspect formwork design, alignment, dimensions, joints, and safety. The reinforcement checklist has 11 items to check bar schedules, sizes, spacing, laps, cover, and assembly. The concrete checklists have 9 items each to inspect pouring arrangements, finishing, defects, curing, and compliance with specifications.

Uploaded by

Sahil Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
6K views4 pages

Formwork Inspection Check List: Rev - No. 0

The document contains inspection checklists for formwork, reinforcement, and concrete activities on a railway construction project. The formwork checklist contains 14 items to inspect formwork design, alignment, dimensions, joints, and safety. The reinforcement checklist has 11 items to check bar schedules, sizes, spacing, laps, cover, and assembly. The concrete checklists have 9 items each to inspect pouring arrangements, finishing, defects, curing, and compliance with specifications.

Uploaded by

Sahil Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

[Link].

0
FORMWORK INSPECTION CHECK LIST
DATE OF REV .

QF Max EX 01 PAGE 1 OF 1

Project : New Railway line between Bhanupali- Bilaspur - Beri


Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No:-
Date :- From To

Checked Remarks
Sr. no Description of Activity/Item
Yes No
Check Formwork design / Drawing approved including de
1 shuttering arrangement

2 Check Formwork alignment as per drawing

3 Check Formwork Level as per drawing.

4 Check Formwork dimension as per drawing

Check Formwork member spacing as per drawing.


5
Check Joints between Panels closed ( No gaps)
6
Check Joints between Panels Flush ( No Steps/Lips)
7

8 Check Tie rod fastened

Check Spacers between shutter surface tightly fitting


9
Check Formwork clean & Free from loose materials/Dust.
10

11 Check Formwork properly Oiled.

12 Safe access constructed

Adequate work space provided for labour / equipment


13
Shutter vibrators ( if required ) location and fixing
14 arrangement approved
Remarks/Notes/HSE Observation:

PERFORMED By (Max Infra ) CHECKED BY ( Max Infra) APPROVED BY (AECOM )

Name:........................ Name:............................. Name:..............................

Sign.: ………………………… Sign.: ………………………… Sign.: …………………………

Date : ………………………… Date : ………………………… Date : …………………………


REINFORCEMENT INSPECTION AND [Link]. 0
CHECK LIST
DATE OF REV .
QF Max EX 02 PAGE 01 of 01
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.

Location :- Chainage/Block No :-
Date :- From To

Checked Remarks
Sr. no Description of Activity/Item
Yes No

1
Check Bar bending Schedules approved

2
Construction drawing checked & approved

3 Reinforcement Material approved

4 Check Bar Size as per drawing.

5 Check Bar spacing as per drawing.

6 Check Bar lap length as per drawing.

7 Check Bar tied as specified

8 Check Bar assembly rigid and adequately


supported

9
Check Cover to bottom bar as per drawing

10
Check Cover to side bars as per drawing

11
Check Cover to top bars as per drawing
Remarks/Notes/HSE Observation:

PERFORMED By (Max Infra) CHECKED BY (Max Infra) APPROVED BY (AECOM)

Name :- Name :- Name :-

Sign.: ………………………… Sign.: ………………………… Sign.: …………………………

Date : ………………………… Date : ………………………… Date : …………………………


[Link]. 0
CONCRETE PREPOUR CHECK LIST
DATE OF REV .
QF Max EX 03(A) PAGE 01 of 01
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No :-
Date :- From To

Sr. Checked Remarks


Description of Activity/Item
no
Yes No

1 Mix Design is approved.

Chiping, roughening & cleaning of previously laid


2
concrete is done.

3 Check the pouring arrangements are completed.

Adequate vibrators for concrete compaction are


4
available.

Adequate cube moulds and slump cones are


5
available.

Is Formwork / Shuttering as per drawing/


6
speciications ?

7 Adequate working space is avaliable ?

Adequate lighting arrangments are done ? (If


8
concreting is being done in night)

9 All safty arrangments are done.


Remarks/Notes/HSE Observation:

Performed By (Max Infra) Checked BY (Max Infra) APPROVED BY (AECOM)

Name :- Name :- Name :-

Sign.: ………………………… Sign.: ………………………… Sign.: …………………………

Date : ………………………… Date : ………………………… Date : …………………………


[Link]. 0
CONCRETE POST POUR CHECK LIST
DATE OF REV .
QF Max EX 03(B) PAGE 01 of 01
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No :-
Date :- From To

Sr. Checked Remarks


Description of Activity/Item
no
Yes No

1 Finishing as per Drawing/ Contract Specification

2 Is there any impression/ exposure of reinforcment.

Are there any defects such as honeycombing /


3
sand runs / cracks observable.

Are remedial measures being taken to repair


4
defects as observed in point no 3.

Dimensional tolerances as per Drawing/ Contract


5
Specification

Proper / Adequate curing of concrete is being


6
done.

Remarks/Notes/HSE Observation:

PERFORMED By (Max Infra) CHECKED BY (Max Infra) APPROVED BY (AECOM)

Name :- Name :- Name :-

Sign.: ………………………… Sign.: ………………………… Sign.: …………………………

Date : ………………………… Date : ………………………… Date : …………………………

REV.NO.
0
DATE OF REV .
PAGE 
1 OF 1
Project        :
Client         :
RAIL VIKAS NIGAM LIMITED
Contractor  :
MAX INFRA (I) L
REV.NO.
0
DATE OF REV .
PAGE 
01 of 01
Project        :
Client         :
RAIL VIKAS NIGAM LIMITED
Contractor  :
MAX INFRA (I)
REV.NO.
0
DATE OF REV .
PAGE 
01 of 01
Project        :
Client         :
RAIL VIKAS NIGAM LIMITED
Contractor  :
MAX INFRA (I)
REV.NO.
0
DATE OF REV .
PAGE 
01 of 01
Project        :
Client         :
RAIL VIKAS NIGAM LIMITED
Contractor  :
MAX INFRA (I)

You might also like