FORMWORK INSPECTION CHECK LIST
DATE OF REV .
QF Max EX 01 PAGE 1 OF 1
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No:-
Date :- From To
Checked Remarks
Sr. no Description of Activity/Item
Yes No
Check Formwork design / Drawing approved including de
1 shuttering arrangement
2 Check Formwork alignment as per drawing
3 Check Formwork Level as per drawing.
4 Check Formwork dimension as per drawing
Check Formwork member spacing as per drawing.
5
Check Joints between Panels closed ( No gaps)
6
Check Joints between Panels Flush ( No Steps/Lips)
7
8 Check Tie rod fastened
Check Spacers between shutter surface tightly fitting
9
Check Formwork clean & Free from loose materials/Dust.
10
11 Check Formwork properly Oiled.
12 Safe access constructed
Adequate work space provided for labour / equipment
13
Shutter vibrators ( if required ) location and fixing
14 arrangement approved
Remarks/Notes/HSE Observation:
PERFORMED By (Max Infra ) CHECKED BY ( Max Infra) APPROVED BY (AECOM )
Name:........................ Name:............................. Name:..............................
Sign.: ………………………… Sign.: ………………………… Sign.: …………………………
Date : ………………………… Date : ………………………… Date : …………………………
REINFORCEMENT INSPECTION AND [Link]. 0
CHECK LIST
DATE OF REV .
QF Max EX 02 PAGE 01 of 01
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No :-
Date :- From To
Checked Remarks
Sr. no Description of Activity/Item
Yes No
1
Check Bar bending Schedules approved
2
Construction drawing checked & approved
3 Reinforcement Material approved
4 Check Bar Size as per drawing.
5 Check Bar spacing as per drawing.
6 Check Bar lap length as per drawing.
7 Check Bar tied as specified
8 Check Bar assembly rigid and adequately
supported
9
Check Cover to bottom bar as per drawing
10
Check Cover to side bars as per drawing
11
Check Cover to top bars as per drawing
Remarks/Notes/HSE Observation:
PERFORMED By (Max Infra) CHECKED BY (Max Infra) APPROVED BY (AECOM)
Name :- Name :- Name :-
Sign.: ………………………… Sign.: ………………………… Sign.: …………………………
Date : ………………………… Date : ………………………… Date : …………………………
[Link]. 0
CONCRETE PREPOUR CHECK LIST
DATE OF REV .
QF Max EX 03(A) PAGE 01 of 01
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No :-
Date :- From To
Sr. Checked Remarks
Description of Activity/Item
no
Yes No
1 Mix Design is approved.
Chiping, roughening & cleaning of previously laid
2
concrete is done.
3 Check the pouring arrangements are completed.
Adequate vibrators for concrete compaction are
4
available.
Adequate cube moulds and slump cones are
5
available.
Is Formwork / Shuttering as per drawing/
6
speciications ?
7 Adequate working space is avaliable ?
Adequate lighting arrangments are done ? (If
8
concreting is being done in night)
9 All safty arrangments are done.
Remarks/Notes/HSE Observation:
Performed By (Max Infra) Checked BY (Max Infra) APPROVED BY (AECOM)
Name :- Name :- Name :-
Sign.: ………………………… Sign.: ………………………… Sign.: …………………………
Date : ………………………… Date : ………………………… Date : …………………………
[Link]. 0
CONCRETE POST POUR CHECK LIST
DATE OF REV .
QF Max EX 03(B) PAGE 01 of 01
Project : New Railway line between Bhanupali- Bilaspur - Beri
Client : RAIL VIKAS NIGAM LIMITED
Contractor : MAX INFRA (I) LTD.
Location :- Chainage/Block No :-
Date :- From To
Sr. Checked Remarks
Description of Activity/Item
no
Yes No
1 Finishing as per Drawing/ Contract Specification
2 Is there any impression/ exposure of reinforcment.
Are there any defects such as honeycombing /
3
sand runs / cracks observable.
Are remedial measures being taken to repair
4
defects as observed in point no 3.
Dimensional tolerances as per Drawing/ Contract
5
Specification
Proper / Adequate curing of concrete is being
6
done.
Remarks/Notes/HSE Observation:
PERFORMED By (Max Infra) CHECKED BY (Max Infra) APPROVED BY (AECOM)
Name :- Name :- Name :-
Sign.: ………………………… Sign.: ………………………… Sign.: …………………………
Date : ………………………… Date : ………………………… Date : …………………………