Fans static pressure calculations

TOHME ENGINEERING
TOTAL DEMAND WATER PIPE SIZING
FIXTURES FU Qty. TFU
Pub. WC (FV) 10 FV 0.5
Pub. WC (FT) 5
Pub. Pedestal UR (FV) 10 Pipe Size (inch)
Pub. Wall UR (FV) 5 FLUSH VALVE 24
Pub. Wall UR (FT) 3 FROM FU TO FU LPS 20
Pub. Lavatory (F) 2 0 250 0.0147 18
Pub. Bathtub (F) 4 250.1 750 4.25 16
Pub. Shower (MV) 4 0 750.1 3000 5.333 14
Office Serv. Sink (F) 3 3000.1 14900 8.588 12
Hotel Kitchen Sink (F) 4 0 14900.1 30000 18.166 10
Priv. WC (FV) 6 8
Priv. WC (FT) 3 0 6
Priv. Lavatory (F) 1 0 FLUSH TANK 5
Priv. Bathtub (F) 2 0 FROM FU TO FU LPS 4
Priv. Shower (MV) 2 0 250 0.01812 3
Priv. Group (FV) 8 0 250.1 750 2 2 1/2
Priv. Group (FT) 6 0 750.1 3000 5.333 2
Priv. Sep. Shower (MV) 2 3000.1 14900 8.588 1 1/2
Priv. Kitchen Sink (F) 2 0 14900.1 30000 18.166 1 1/4
Priv. Laundry (1-3 F) 3 0 1
Priv. Comb. Fixt. (F) 3 0 3/4
Miscellaneous 1 1/2
TOTAL FIXTURE UNITS RESULT FT
TOTAL DEMAND Lps FROM FU TO FU LPS 0
ADDITIONAL Lps 0 250 0.01812 0
TOTAL Lps 250 750 2 0
PIPE SIZE Inch 750 3000 5.333 0
3000 14900 8.588 0
FV: FLASH VALVE 14900 30000 18.166 0
FT: FLASH TANK
MV: MIXING VALVE

Prepared by MEGICON 15/6/99 Page 1


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

TOHME ENGINEERING
TOTAL DEMAND WATER PIPE SIZING
F: FAUCET

Prepared by MEGICON 15/6/99 Page 2


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

19
Steel Sch. 40
Flow (Lps)
800
520
430
330
260
220
150
100
50
30
18
8
4.8
2.5
1.5
1.15
0.65
0.4
0.24

Prepared by MEGICON 15/6/99 Page 3


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

TOHME ENGINEERING
COLD WATER PIPE SIZING
FIXTURES FU Qty. TFU
Pub. WC (FV) 10
Pub. WC (FT) 5
Pub. Pedestal UR (FV) 10
Pub. Wall UR (FV) 5
Pub. Wall UR (FT) 3
Pub. Lavatory (F) 1.5
Pub. Bathtub (F) 3
Pub. Shower (MV) 3
Office Serv. Sink (F) 2.25
Hotel Kitchen Sink (F) 3
Priv. WC (FV) 6
Priv. WC (FT) 3
Priv. Lavatory (F) 0.75
Priv. Bathtub (F) 1.5
Priv. Shower (MV) 1.5
Priv. Group (FV) 2.25
Priv. Group (FT) 2.25
Priv. Sep. Shower (MV) 1.5
Priv. Kitchen Sink (F) 1.5
Priv. Laundry (1-3 F) 2.25
Priv. Comb. Fixt. (F) 2.25
Miscellaneous 1
TOTAL FIXTURE UNITS
TOTAL DEMAND Lps
ADDITIONAL Lps
TOTAL Lps
PIPE SIZE Inch

FV: FLASH VALVE


FT: FLASH TANK
MV: MIXING VALVE

Prepared by MEGICON 15/6/99 Page 4


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

TOHME ENGINEERING
COLD WATER PIPE SIZING
F: FAUCET

Prepared by MEGICON 15/6/99 Page 5


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

FV 0.5

Pipe Size (inch)


FLUSH VALVE 24
FROM FU TO FU LPS 20
0 250 0.0147 18
250.1 750 4.25 16
750.1 3000 5.333 14
3000.1 14900 8.588 12
14900.1 30000 18.166 10
8
6
FLUSH TANK 5
FROM FU TO FU LPS 4
0 250 0.01812 3
250.1 750 2 2 1/2
750.1 3000 5.333 2
3000.1 14900 8.588 1 1/2
14900.1 30000 18.166 1 1/4
1
3/4
1/2
RESULT FT
FROM FU TO FU LPS 0
0 250 0.01812 0
250 750 2 0
750 3000 5.333 0
3000 14900 8.588 0
14900 30000 18.166 0

Prepared by MEGICON 15/6/99 Page 6


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

19
Steel Sch. 40
Flow (Lps)
800
520
430
330
260
220
150
100
50
30
18
8
4.8
2.5
1.5
1.15
0.65
0.4
0.24

Prepared by MEGICON 15/6/99 Page 7


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

TOHME ENGINEERING
HOT WATER PIPE SIZING
FIXTURES FU Qty. TFU
Pub. WC (FV) 0
Pub. WC (FT) 0
Pub. Pedestal UR (FV) 0
Pub. Wall UR (FV) 0
Pub. Wall UR (FT) 0
Pub. Lavatory (F) 1.5
Pub. Bathtub (F) 3
Pub. Shower (MV) 3
Office Serv. Sink (F) 2.25
Hotel Kitchen Sink (F) 3
Priv. WC (FV) 0
Priv. WC (FT) 0
Priv. Lavatory (F) 0.75
Priv. Bathtub (F) 1.5
Priv. Shower (MV) 1.5
Priv. Group (FV) 2.25
Priv. Group (FT) 2.25
Priv. Sep. Shower (MV) 1.5
Priv. Kitchen Sink (F) 1.5
Priv. Laundry (1-3 F) 2.25
Priv. Comb. Fixt. (F) 2.25
Miscellaneous 1
TOTAL FIXTURE UNITS
TOTAL DEMAND Lps
ADDITIONAL Lps
TOTAL Lps
PIPE SIZE Inch

FV: FLASH VALVE


FT: FLASH TANK
MV: MIXING VALVE

Prepared by MEGICON 15/6/99 Page 8


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

TOHME ENGINEERING
HOT WATER PIPE SIZING
F: FAUCET

Prepared by MEGICON 15/6/99 Page 9


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

FV

FLUSH TANK
FROM FU TO FU LPS
0 250 0.01812
250.1 750 2
750.1 3000 5.333
3000.1 14900 8.588
14900.1 30000 18.166

RESULT FT
FROM FU TO FU LPS 0
0 250 0.01812 0
250 750 2 0
750 3000 5.333 0
3000 14900 8.588 0
14900 30000 18.166 0

Prepared by MEGICON 15/6/99 Page 10


FACULTY OF PUBLIC HEALTH
Lebanese University Campus
Fans static pressure calculations

0.5 19
Steel Sch. 40
Pipe Size (inch) Flow (Lps)
24 800
20 520
18 430
16 330
14 260
12 220
10 150
8 100
6 50
5 30
4 18
3 8
2 1/2 4.8
2 2.5
1 1/2 1.5
1 1/4 1.15
1 0.65
3/4 0.4
1/2 0.24

Prepared by MEGICON 15/6/99 Page 11