DRP001 OUF INC GMD Z 000 045 Rev.S2 Code 4 TRA For Scaffolding Erection
DRP001 OUF INC GMD Z 000 045 Rev.S2 Code 4 TRA For Scaffolding Erection
SUBCONTRACTOR DESCRIPTION : Engineering, Procurement & Construction of Tank Works (Package TP3)
SUBCONTRACTOR NAME : INCO Engineering Manufacturing Trading & Civil Contracting Co. LLC
DOCUMENT CLASS: 2
DOCUMENT DESCRIPTION / TITLE : Task Risk Assessment (TRA) for Scaffolding Erection
DUQM REFINERY
Company Approval Status
Status :
Signed :
Dept :
Date :
COMMENT STATUS CODE: A-Accepted; B-Accepted With Comments
C-Reviewed with Comments; D-No Comments; E-Rejected
PURCHASER APPROVAL STATUS
Approval
Status Contractor Approval Code Description
Code
1 REJECTED. REVISE & RESUBMIT. WORK MAY NOT PROCEED.
Reviewing Engineer’s Full Name (IN BLOCK LETTERS), Sign and Date
Purchaser’s review of this document does not relieve Vendor of the responsibility for correctness under the Subcontractor Order. Permission to
proceed does not constitute acceptance of design, detail and calculations, test methods or materials developed or selected by the Subcontractor
and does not relieve the Subcontractor from full compliance with the Subcontractor Order or any other obligations, nor detract from any of the
Purchaser’s rights.
Risk Assessment Task Risk Assessment Scaffolding Erection, Dismantling Risk Assessment Number : DRP001-OUF-INC-GMD-Z- Revision : S2
000-045
Title : and Modification
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 2 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 3 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 4 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
1.3 Dismantling Falls from height to Injury to personnel, 4 4 16 Prior to dismantling scaffolds all low
scaffold lower levels; damage to levels must be inspected for
Incorrect sequence of High potential dropped objects. These
equipment
removing scaffold inspection shall be carried out by
handrails and boards scaffold and construction
which exposes supervision, in conjunction with
scaffolders to additional HSE. Check if any items have
risk of falling to levels been removed.
below When stripping multiple bay and
multiple lift scaffolds (independent
scaffold) start from one end and
move along through each bay until
complete and then move to lower
lift.
Remove handrails, kick boards and
lower down.
Open ties on boards, ensuring no
personnel below and tip over to
remove any remaining sand, weld
slag or grinding debris
Page 5 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 6 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 7 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 8 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 9 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
1.7 Seismic Instability of scaffold Injury to personnel, 4 3 12 After any seismic activity low
activity structures, uneven or damage to scaffolding supervision shall
unstable ground Medium inspect scaffold structures for
equipment
conditions. damage and instability. Load
bearing points and general ground
conditions shall also be inspected
1.8 Barriers and Unauthorized access to Injury to personnel, 3 3 9 Prior to the job the work area will b low
Signs drop zone and being damage to e assessed for the potential drop z
exposed to dropped Medium one. An exclusion area will be ident
equipment
objects ified using red and white barrier tap
e (orange mesh) and warning signs
will be posted stating KEEP OUT –
SCAFFOLDING OPERATIONS IN
PROGRESS
1.9 Working at Falls from height and Injury to personnel, 4 4 16 All scaffolders will wear a safety low
Height dropped objects. damage to harness with twin lanyard or inertia
High reel when working at height.
equipment.
Scaffolders will visually inspect fall
arrest PPE for damage before
commencing work.
Where a fall potential exists at any
height scaffolders shall be hooked
onto an adequate anchor point.
Where movement at height is
required 100% hook-on must be
maintained by using twin lanyard.
Only trained and competent
scaffolders will work at height.
Page 10 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 11 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 12 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
2.1 Access and Unreasonable access Injury to personnel 3 3 9 Establish safe access / egress low
Egress and egress to the work routes to the area of operations,
place, slips trips and Medium and to scaffold storage areas.
falls. Care must be taken when
transporting long tubes and boards
in enclosed areas or in the vicinity
of corners.
Materials will be kept clear of
stairways, walkways and access
and egress routes for fork lifts.
Regular checks of access and
egress will be conducted by safety
and scaffold supervision.
2.2 Use of hand Improper use of hand Injury to personnel 3 3 9 All hand tools will be visually low
tools tools, damaged hand inspected by the user prior to use
tools Medium Damaged hand tools will be given
to the supervisor (discarded from
site, not given to supervisor) and
replaced with new ones
When tools are not in use they will
be secured by tool lanyards in the
frog on the scaffolders belt
Gloves will be worn at all times
when working with hand tools.
2.3 Housekeeping Slips trips and falls, Injury to personnel 3 3 9 As scaffold dismantled will be low
obstructing access and stacked in a tidy and orderly
egress Medium manner.
Where possible material will be
stacked directly into stillage’s and
Page 13 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 14 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Constant supervision to be
supplied and coordination within
the crew to be consolidated.
2.6 Manual Improper lifting Injury to personnel 3 3 9 All involved to wear full PPE low
handling techniques used when including gloves. Correct manual
handling scaffold Medium handling techniques to be followed.
material Extra care to be taken when
maneuvering large pieces of
material in areas of restricted
movement.
All to be vigilant of others when
moving around the scaffold
carrying materials not to strike
anyone.
2.7 End of job Failure to remove all Injury to personnel 3 3 9 On completion of the job all low
clear up materials from site, poor materials will be removed to
housekeeping Medium dedicated storage areas.
Failure to remove A check around the area will be
barriers and signs from made for materials left on the
site ground.
Any found will be picked up
and stored in the appropriate
place
All barriers and signs will be
removed
Site will be visited and
inspected by PTW
holder/applicant and Area
Page 15 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 16 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 17 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 18 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
4 COVID 19
COVID 19 All persons are at risk of Potential risks vary 4 4 16 Ensure a 2-metre Physical distancing
infection that may have from mild cold rule shall always be followed.
various outcomes symptom to death. High No unauthorized or unnecessary
including transmission visitors shall visit the site.
to others both at the Prevention and awareness to
work environment and COVID-19 shall be highlighted in
outside of it. daily TBT or Onsite training.
Ensures all personnel shall always
adhere to mandatory use of face
mask.
Any personnel that are having high
temperature, (fever) or suffering from
cold like symptoms shall not attend
the site unless receives a medical
clearance certificate confirming
negative result from MOH.
Any personnel that developed high
temperature (fever) or suffered cold
like symptoms at site must be
isolated and shall be subjected to
undergo medical examination.
Personnel that have high
temperature (fever) or suffer cold like
symptoms will be asked to follow
current MOH isolation guidelines and
protocols.
Page 19 of 20
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 20 of 20
P.O. Box 8508, Dubai, U.A.E.
Telephone : +971-4-228-2168
Fax : +971-4-222-2179
E-mail : sales@tradex.ae
Website : www.tradexscaffolding.com sales@tradex.ae
www.tradexscaffolding.com
I. LOAD COMPUTATION
QUANTITY WEIGHT
DESCRIPTION OF ITEMS UNIT WEIGHT (KG/PC)
(PC) (KG)
Standard 3.0m 15.70 4 62.80
Standard 2.00m 10.30 1 10.30
Standard 1.50m 7.70 1 7.70
TOTAL DEAD LOAD OF CUPLOCK STANDARD 80.80
QUANTITY WEIGHT
DESCRIPTION OF ITEMS UNIT WEIGHT (KG/PC)
(PC) (KG)
WEIGHT
WEIGHT (KG)
(KN)
TOTAL DEAD LOAD PER
1117.41 10.96
STANDARD
Page 1 of 3
P.O. Box 8508, Dubai, U.A.E.
Telephone : +971-4-228-2168
Fax : +971-4-222-2179
E-mail : sales@tradex.ae
Website : www.tradexscaffolding.com sales@tradex.ae
www.tradexscaffolding.com
Allowable Standard
40 kN
Capacity
Design Criteria
Dead Load 10.96 kN
Live Load 1.50 kN/m²
Level of Working Platform 5.00 Levels
Grid Bay 2.50m x 2.50m
For 7 Level Working Platform, Total Load = 21.88kN < 40kN ; Therefore SAFE!
Page 2 of 3
P.O. Box 8508, Dubai, U.A.E.
Telephone : +971-4-228-2168
Fax : +971-4-222-2179
E-mail : sales@tradex.ae
Website : www.tradexscaffolding.com sales@tradex.ae
www.tradexscaffolding.com
Design Criteria
Dead Load 0.25 kN/m²
Live Load 1.50 kN/m²
Grid Bay 2.50m x 2.50m
Intermediate Transom Spacing 1.25 m
1.75 kN/m^2 X 1.25m = 2.19 kN/m < 4.93 kN/m Therefore, SAFE!
2.50m Ledger
1 Utilize Scaffolding Equipment with specifications complying with standards used in this calculation.
2 Implement Layout based on the provided Design Drawings and Calculations
3 Ensure Scaffolding Specifications used in this calculations are the actual specs of formworks to be utilized.
4 Ensure Sacffolding connections are all secured and tightly fastened
5 Only items identified critical on failure are presented in this Design Calculation
Page 3 of 3