You are on page 1of 1

Hazardous and Universal Construction Waste Process

Lead Based Paint


Debris and PPE Pass TCLP Disposal in C&D Landfill
Waste Determination
by TCLP
Mercury Fail TCLP Develop Contingency Plan
Contaminated Debris
– including casework, Notify Local Authorities
piping, p-traps, etc.
Document Weekly
>55 Gallons of inspections
Lead Paint Chips Containerize in
Hazardous Waste
Drums.
Training Records – keep
Mercury Containing Label, Date, and Keep on-site
Articles Closed. Create 90 Day Storage
Area – Requires Adequate Aisle Space
Store in a locked
Approval of EHS
PCB Ballasts area.
Director. Post Evacuation Plans

Spill Kits and Emergency


Non-PCB Ballasts Drum, Label, Date,
Equipment
and Recycle as Scrap Shipment of Waste
Metal through EHS
EHS must validate ultimate disposal site
Fluorescent Bulbs
Shipment of Waste via to protect UNC from future liabilities.
Contractor
EHS should be notified to help generate
Store in boxes. Label,
and sign waste profiles.
Date, and Keep Closed Store in a locked area
EHS MUST Be Present for and Sign
Any Manifest for Any Universal or
Hazardous Waste Shipment.

Contact Michael Long at 962-5723 or


Responsibilities Contractor EHS Shared
mdlong@ehs.unc.edu with questions.

You might also like