Work Instructions: LCM Igbt Replacement Capstone Model C200 Microturbine /C1000 Series Purpose and Scope
Work Instructions: LCM Igbt Replacement Capstone Model C200 Microturbine /C1000 Series Purpose and Scope
Work Instructions
LCM IGBT Replacement
Capstone Model C200 MicroTurbine®/C1000 Series
Guidelines
Review entire procedure prior to performing. Ensure you have all material, tools/equipment,
and reference documents on hand.
Conduct maintenance in a clean, well-lighted area using normal shop tooling to avoid
damage to delicate components.
Retain all parts removed for use in re-assembly, unless otherwise specified.
Safety Procedures
Become familiar with general safety precautions in the C200 User’s Manual (400008) and/or
C1000 User’s Manual (400024). Follow all warnings and cautions in this work instruction.
Symbols
The following symbols are used throughout Capstone documents to alert you to potential
hazards to people or equipment and tips for proper operation of the equipment.
ELECTRICAL WARNING: Identifies an electrical hazard that can result in personal
injury or death.
Material Information
The part(s) being replaced is one or more of the following
Reference Documents
The following Capstone documents are referenced in these Work Instructions:
400003 Recommended Tools, Capstone MicroTurbine
440000 Microturbine Standard Maintenance Schedule
400008 Model C200 User’s Manual
400024 C1000 Series User’s Manual
512298 Field Service Report
Procedures
1. Prepare for procedure as follows.
WARNING: Fuel hazard! Shut off fuel supply. Failure to observe this warning can
result in personal injury, death, and/or equipment damage.
a. For C200 microturbine(s):
(1) Issue Stop command for affected microturbine.
(2) Shut off fuel inlet supply.
(3) Ensure that microturbine chassis remains properly grounded throughout
procedure.
(4) If microturbine is connected to grid, disconnect and lock out from utility in
accordance with local electrical regulations.
(5) If battery packs are installed, turn OFF and lock out main battery pack circuit
breakers, and disconnect battery cables.
(6) Fully isolate microturbine from any other power sources (for example, solid
state relays on user communications board).
(7) Wait at least ten minutes to fully discharge power from the system.
(8) Use DMM to verify that there is no voltage on DC bus and no voltage on high
voltage AC terminal block.
b. For C1000 Series:
(1) Issue Stop command for affected bay(s).
(2) Open C1000 Series Enclosure electrical panel door to access circuit breakers.
(3) Turn OFF and lock out main circuit breaker for affected bay(s).
(4) Turn OFF and lock out auxiliary circuit breaker for affected bay(s).
(5) Open engine-side door on affected bay(s) and prop open.
(6) Shut off fuel inlet supply to bay at ball valve located inside bay door.
(7) Ensure that C1000 enclosure remains properly grounded throughout
procedure.
(8) If battery packs are installed in affected bay, lock main battery pack circuit
breakers in OFF position and disconnect battery cables.
(9) Fully isolate microturbine from any other power sources (for example, solid
state relays on user communications board).
(10) Wait at least ten minutes to fully discharge power from the system.
(11) Use DMM to verify that there is no voltage on DC bus and no voltage on LCM
AC output.
NOTE: If wires/cables are not labeled, label or color-code them before disconnecting.
Ribbon cable
(1 of 4)
Ribbon cable
h. Remove screws, nuts, and washers from top and bottom of power board assembly.
See Figure 2.
NOTE: Nuts securing power board assembly include one washer on either side of
board. Use caution when removing assembly so as not to lose washers in LCM.
i. Disconnect IGBT and GND cables from top and bottom of power board assembly.
IGBT cable
GND cable
Nut (1 of 8) and
Washer (2 per
nut)
Screw (1 of 8)
Screw (1 of 8)
Nut (1 of 8) and
washer (2 per
nut)
GND cable
IGBT cable
Large DC
cables (2 of 4)
Small DC cable
(1 of 2)
J2
J3
J1
k. Remove bracket screws from both ends of power board assembly. See Figure 4.
Bracket screw
(1 of 4)
Isolating paper
Side bracket
screws (6 per
IGBT)
Side bracket
screws (6 per Flexibar screw
IGBT)
Bracket Bracket
mounting nut mounting nut
(1 of 2 per (1 of 2 per
bracket) bracket)
Responsibility
It is the responsibility of Capstone to:
• Make these procedures available to Authorized Service Providers so they can
successfully complete this task.
It is the responsibility of the Authorized Service Provider to:
• Read this document, understand its contents, and effectively complete procedures.
• Explain service benefits provided to end user.
• Upon completion of service, submit a Field Service Report (512298) to
@capstoneturbine.com.