3 Bored Pile Foundation

If bored pile is selected then, following types of bored pile is suitable to support
structural foundation. Bored pile can be different sizes to reduce number of pile
and smaller pile cap (single or double pile)

Borehole Reinforcement Total penetration below ground, m Allowable


Size, mm including socket length into hard /rock Capacity per
soil hard layer Total Pile, KN

500 6 T25 + R10spiral 10.0 5.0 15.0 1500


@ 200 c/c, G35
Concrete

600 8 T25 + R10spiral 10.0 6.0 16.0 2000


@ 250 c/c, G35 10.0 7.0 17.0 2250
Concrete

750 12 T25 + R10spiral 10.0 7.0 17.0 3000


@ 300 c/c, G35 10.0 9.0 19.0 3500
Concrete

At least 1 load test is required for maximum size uses to twice the working load
Project : CADANGAN MEMBINA BLOK TAMBAHAN JABATAN KIMIA MALAYSIA
CAWANGAN BINTULU, SARAWAK

Design Calculation of Bored FOR PROPOSED BUILDING

Item Description unit value

1 Basic Data:

1.1 Maximum Working Load : KN 2000

1.2 Borehole Diameter mm 600

1.3 Factor of Safety against soil bearing 2.5

1.4 Factor of safety against structural strength of pile 2.5

2 Structural Capacity :

2.1 Main reinforcement, 8-T25 no 8

2.2 Area of T25 mm2 490

2.3 Total area of main renforcement mm2 3920

2.4 Yeild Strength : 0.87fy = 0.87*460 n/mm2 400

2.5 Ultimate structural Capacity of steel bar KN 1569

2.6 Effective area of concrete mm2 159064

2.7 Concrete strength - G35 : 0.85*35 n/mm2 30

2.8 Ultimate structural Capacity of concrete KN 4732

2.9 Allowanle Structural Capacity KN 2520

3 Soil Bearing Capacity:

3.1 Borehole diameter into Rock mm 600

3.2 Bond between concrete and hard soil (N>50) n/mm2 0.3
3.3 Bond between grout and soil (N<50) 0.01N

3.4 Ultimate pile capacity per meter penetration into rock KN 566

3.5 Ultimate unit End Bearing , Hard soil (N>50) KN/m2 9000

3.6 Area of pile base mm2 282780

3.7 Ultimate end Bearing KN 2545

3.8 Allowable end Bearing ( allow FS = 3.0) KN 848

3.9 Pile Friction required KN 1152

3.10 Allowable pile capacity per meter penetration KN 226

3.11 Minimum penetration required into hard layer m 5.1

3.12 Total Penetration ( soil + Hard layer (rock)) m 16


BATAN KIMIA MALAYSIA

D BUILDING

Remarks

40

490.9375

297.54524

600-150

>2000 OK

weath. Sedimentary. Rock


use for long pile
ignored for short pile

weath. Sedimentary. Rock

provide 6.0m

refer to BH log
Project : CADANGAN MEMBINA BLOK TAMBAHAN JABATAN KIMIA MALAYSIA
CAWANGAN BINTULU, SARAWAK

Design Calculation of Bored FOR PROPOSED BUILDING

Item Description unit value

1 Basic Data:

1.1 Maximum Working Load : KN 3000

1.2 Borehole Diameter mm 750

1.3 Factor of Safety against soil bearing 2.5

1.4 Factor of safety against structural strength of pile 2.5

2 Structural Capacity :

2.1 Main reinforcement, 12-T25 no 12

2.2 Area of T25 mm2 490

2.3 Total area of main renforcement mm2 5880

2.4 Yeild Strength : 0.87fy = 0.87*460 n/mm2 400

2.5 Ultimate structural Capacity of steel bar KN 2353

2.6 Effective area of concrete mm2 282780

2.7 Concrete strength - G35 : 0.85*35 n/mm2 30

2.8 Ultimate structural Capacity of concrete KN 8413

2.9 Allowanle Structural Capacity KN 4306

3 Soil Bearing Capacity:

3.1 Borehole diameter into Rock mm 750

3.2 Bond between concrete and hard soil (N>50) n/mm2 0.3
3.3 Bond between grout and soil (N<50) 0.01N

3.4 Ultimate pile capacity per meter penetration into rock KN 707

3.5 Ultimate unit End Bearing , Hard soil (N>50) KN/m2 9000

3.6 Area of pile base mm2 441844

3.7 Ultimate end Bearing KN 3977

3.8 Allowable end Bearing ( allow FS = 3.0) KN 1326

3.9 Pile Friction required KN 1674

3.10 Allowable pile capacity per meter penetration KN 283

3.11 Minimum penetration required into hard layer m 5.9

3.12 Total Penetration ( soil + Hard layer (rock)) m 17


BATAN KIMIA MALAYSIA

D BUILDING

Remarks

40

490.9375

297.54524

750-150

>3000 OK

weath. Sedimentary. Rock


use for long pile
ignored for short pile

weath. Sedimentary. Rock

provide 7.0m

refer to BH log
Project : CADANGAN MEMBINA BLOK TAMBAHAN JABATAN KIMIA MALAYSIA
CAWANGAN BINTULU, SARAWAK

Design Calculation of Bored FOR PROPOSED BUILDING

Item Description unit value

1 Basic Data:

1.1 Maximum Working Load : KN 450

1.2 Borehole Diameter mm 200

1.3 Factor of Safety against soil bearing 2.5

1.4 Factor of safety against structural strength of pile 2.5

2 Structural Capacity :

2.1 Main reinforcement, 8-T25 no 6

2.2 Area of T25 mm2 201

2.3 Total area of main renforcement mm2 1206

2.4 Yeild Strength : 0.87fy = 0.87*460 n/mm2 400

2.5 Ultimate structural Capacity of steel bar KN 483

2.6 Effective area of concrete mm2 1964

2.7 Concrete strength - G35 : 0.85*35 n/mm2 30

2.8 Ultimate structural Capacity of concrete KN 58

2.9 Allowanle Structural Capacity KN 216

3 Soil Bearing Capacity:

3.1 Borehole diameter into Rock mm 200

3.2 Bond between concrete and hard soil (N>50) n/mm2 0.3
3.3 Bond between grout and soil (N<50) 0.01N

3.4 Ultimate pile capacity per meter penetration into rock KN 189

3.5 Ultimate unit End Bearing , Hard soil (N>50) KN/m2 9000

3.6 Area of pile base mm2 31420

3.7 Ultimate end Bearing KN 283

3.8 Allowable end Bearing ( allow FS = 3.0) KN 94

3.9 Pile Friction required KN 356

3.10 Allowable pile capacity per meter penetration KN 75

3.11 Minimum penetration required into hard layer m 4.7

3.12 Total Penetration ( soil + Hard layer (rock)) m 15


BATAN KIMIA MALAYSIA

D BUILDING

Remarks

40

490.9375

297.54524

600-150

>1500 OK

weath. Sedimentary. Rock


use for long pile
ignored for short pile

weath. Sedimentary. Rock

provide 5.0m

refer to BH log