You are on page 1of 4

TESDA-OP-CO-03-F04

Rev. No.00-03/08/17

Checklist of tools, equipment, supplies and materials, and facilities

Name of Assessment
Center MSU - Maigo School of Arts and Trades
Qualification Dressmaking NC II
Item Specification Quantity Quantity Difference Inspectors Quantity onsite Quantity onsite
Required on Site Remarks during during
Compliance Compliance Audit
Audit Year 2
(1) (2) (3) (4) (5) (6) Year 1 (7)
(7)
FACILITY – 100 sq. m.
Consumable
1 Pattern paper 20 pcs
Dressmaking
2 2 packs
tracing (5/pack)
3 Index cards, 1/2 10 pcs
Fabric - for 15
4
Blouse (60 width) yards
Fabric - for
15
5 pants/skirt (60
yards
width)
6 Interlinings (soft ) 5 yards
Round buttons
7 50 pcs
with 1/2" diameter
hook and eye for
8 10 par
pants/skirt
Zipper 8"
9 polyester for 10 pcs
pants
Band roll, 1 1/2" 10
10
width yards
Machine oil (100
11 1 bottle
cc)
Reusable
Thread 1000
10
1 meters (high
spool
speed)
Thread 3000 6
2
meters (overlock) cone
Needle - DC x 1 10
3
no. 14 pcs
Needle - DB x 1 10
4
no. 11 or 14 pcs
5 spray bottle 3 pcs
10
6 Hand needle
pcs
10
7 Tailor’s chalk
pcs
dressmaker's
10
8 Pins with ball
packs
head 50s
10
9 seam ripper
pcs
10
10 Pencil#2
pcs
10
11 bobbin case
pcs
10
12 bobbin spool
pcs
Special Tools and Equipment

Specifications

body form 1 unit


Button sew 1 unit
machine
Buttonhole 1 unit
machine
calculator 1 pc
Flat Iron 3
units
french curve 10
metal pcs
hip curve 10
pcs
Ironing Board 3
units
life size mirror 1 pc
L-square 10
pcs
monoblock chairs 10
units
Overlock Machine 2
units
Pin cushion 10
pcs
Pins with head 10
pcs
Presser 10
foot/Zipper foot pcs
scissors, 8" blade 10
for paper pcs
Screw driver, flat, 5 pcs
12"
screw driver, flat, 5 pcs
6"
Sewing box 10
pcs
shears, 8" for 10
fabric pcs
Single Needle 10
Lock Stitch units
Machine
sleeve board/ham 5 pcs
Table, 45"x120" 10
units
Tape measure 10
pcs
Tracing wheel 10
pcs
transparent ruler 10
pcs
triangle, 45x90° 10
pcs
trimmer 10
pcs
Tweezer 1 pcs
NOTE: Columns 1-4 to be filled out by the Assessment Center; Columns 5-6 to be filled out by the
Inspectors; Column 7 to be filled out by the Compliance Auditors (additional sheets may be used)

TESDA-OP-CO-03-F04
(continued)
Rev. No.00-03/08/17

Submitted by:

ATTY. JAMALODEN A. BASAR ___________________


AC Manager Date
Inspected by:

_______________________ ___________________
Leader, Inspection Team Date

_______________________ ___________________
Member, Inspection Team Date

_______________________ ___________________
Member, Inspection Team Date
(For Compliance Audit use only)
YEAR 1

Audited by:
_______________________ ___________________
Lead Auditor Date

_______________________ ___________________
Auditor Date

_______________________ ___________________
Auditor Date

YEAR 2

Audited by:
_______________________ ___________________
Lead Auditor Date

_______________________ ___________________
Auditor Date

_______________________ ___________________
Auditor Date