You are on page 1of 3

TESDA-OP-CO-03-F04

Rev. No.00-03/08/17

Checklist of tools, equipment, supplies and materials, and facilities


Name of Assessment Perpetual Succour Academy, Inc.
Center
Qualification Shielded Metal Arc Welding 2
Item Specification Quantity Quantit Difference Inspector Quantity Quantity
Require y on s onsite onsite
d Site Remarks during during
Compliance Compliance
(1) (2) (5) Audit Audit
(3) (4) (6) Year 1 Year 2
(7) (7)
TOOLS
Chipping
1 12 pcs.
Hammer
2 Steel Brush 12 pcs.
Ballpeen
3 8 pcs.
hammer
4 Plier/tongs 12 pcs.
Files-bastard
5 10 pcs.
cut
Head
6 12 pcs.
shield/helmet
Leather gloves,
7 12 sets
long
Leather
8 12 sets
apron/jacket
Safety goggles,
9 wide vision, 2 pcs.
clear
Oxy-acetylene
10 2 pcs.
Goggles
Try square 300
11 12 pcs.
mm. long
Steel square
12 12 pcs.
300 mm. long
13 Files-half round 10 pcs.
14 Fillet gauge 2 pcs.
EQUIPMENT
Arc Weding
machine
1 8 units
AC/DC and
accesories
Welding table/
2 8 pcs.
positioners
3 Electrode oven 1 unit
4 Automatic gas 1 unit
cutting
machine
Portable disc
5 5 units
grinder
6 Exhaust fan 1 unit
Power
7 1 unit
hacksaw
8 Anvil 2 units
Work bench w/
9 bench vice on 2 units
4 corners
Oxy-
acetylene/Oxy-
10 2 sets
LPG cylinder
with content
Pedestal/bench
11 grinding 1 unit
machine
12 Industrial fan 1 unit
SUPPLIES AND MATERIALS
Electrode
6 boxes
3.2mm E6011
Electrode
3.2mm 6 boxes
E7018/6013
Mild steel plate
10mm X 20 pcs.
150mm X 6m
Mild steel plate
3.2mm X 20 pcs.
150mm X 6m
Carbon steel
pipe, schedule
2 pcs.
40 dia. 150 X
3m
Filter lens 20 pcs.
Lens clear
20 pcs.
glass
Cut off disc
6mm X 15mm 20 pcs.
X 100mm
Power saw
5 pcs.
blade
Metal Chalk 1 box
FACILITIES
Tool room
Assessment
room
Orientation
room
Comfort rooms
Wash area
NOTE: Columns 1-4 to be filled out by the Assessment Center; Columns 5-6 to be filled out by
the Inspectors; Column 7 to be filled out by the Compliance Auditors (additional sheets may be
used)

You might also like