Dok OPR-SOP-003-F01
High level bilge alarm not working when Perbaiakan High level bilge
6 P1 MTC 05-Jun-21 N/A 05/05/21 CLOSE
tested alarm
No spare PPE and PPE for visitor Menyediakan Spare PPE untuk
7 P1 HSE 05-Jun-21 N/A 10/05/21 CLOSE
supplied onboard visitor
No sighted fumigation record on board,
8 Dilakukan fumigasi P1 HSE 05-Jun-21 N/A OPEN
sighted sign of mouse in Engine Room
19 Crane Log book not provided on board Provide Crane Log Book P1 MTC 05-Jun-21 N/A 27/05/21 CLOSE
20 Marking SWL P1 MTC 05-Jun-21 N/A OPEN
Telah dilaksanakan
Revalidasi sertifikat bollard pull inspect dan
21 P1 OPR 05-Jun-21 N/A ON Progres
test menunggu sertifikat
terbit
Crane not equipped with warning device Provide signal lamp untuk
25 P1 MTC 05-Jun-21 N/A OPEN
(signal lamp) for crane movement crane
Present Muster list task and duty did Not Revisi Muster List sesuai
27 matched with present crew and dengan Jumlah crew dan P1 HSE 05-Jun-21 N/A 04/05/21 CLOSE
equipment onboard Peralatan dikapal
6.0
6.0
Safety and Fire Plan not up to the date Revisi safety Plan disesuaikan
30 P1 HSE 05-Jun-21 N/A 02/06/21 CLOSE
with present LSA and FFE onboard dengan LSA dan FFA terkini
Hydrant box in engine room was not Menyediakan Nozzle 1,5 inch
31 P1 HSE 05-Jun-21 N/A 27/05/21 CLOSE
provided with nozzles pcs
Duct body of Port side of Engine room
fire damper (mush room type) was
Perbaikan damper blower
32 wasted whilst starboard mush room P1 MTC 05-Jun-21 N/A 20/05/21 CLOSE
engine room kiri
ventilation fan had yet fitted with
damper/flap
Repair/Mengganti baterai
38 EPIRB was not working when tested P1 HSE 05-Jun-21 N/A 20/05/21 CLOSE
EPIRB
Menyediakan maintenance
No sighted Tow log and tow spared
41 program untuk Tow log dan tow P1 MTC 05-Jun-21 N/A OPEN
maintenance program in place
spared
Telah dilaksanakan
Bollard pull certificate had expired since Arrange Bollard Pull test untuk inspect dan
42 P1 OPR 05-Jun-21 N/A ON Progres
December 2020 perbaruan sertifikat menunggu sertifikat
terbit
8.0
8.0 44 Spare towing ropes were not available Menyediakan Spare tali towing P1 LOG/OPR 05-Jun-21 N/A 29/05/21 CLOSE
Menyediakan emergency
Emergency batteries for light and
54 Battery Emergency untuk P1 MTC 05-Jun-21 N/A 19/05/21 CLOSE
navigation equipment had yet fitted
lampu emergency dan navigasi
NOTE:
Open Qudsia Hari Satriyo
In Proggress
Clossed