01. Adani Group Overview
Adani Group: A world class infrastructure & utility portfolio
Opportunity identification, development and beneficiation is intrinsic to diversification and growth of the group
1 . As on Feb 26, 2021, USD/INR – 72.6 | Note - Percentages denote promoter holding, 2. NQXT – North Queensland Export Terminal | Light blue color represent public traded listed verticals , 3. ATGL – Adani Total Gas Ltd,
4.AEL has announced JV with EdgeConneX, one of the largest datacenter operators in the world; 4
Adani Group: Decades long track record of industry best growth
rates across sectors
Port Cargo Throughput (MT) Renewable Capacity (GW) Transmission Network (ckm) CGD7 (GAs8 covered)
161% 45%
12% 21%
2.5x 1.5x
6x 3x 30%
5%
7%
25%
Industry Adani
APSEZ Industry AGELAdani Industry ATL Industry AGL
2014 972 MT 113 MT 2016 46 GW 0.3 GW 2016 320,000 ckm 6,950 ckm 2015 62 GAs 6 GAs
2020 1,339 MT 223 MT 2020 114 GW 14.2 GW6 2020 423,000 ckm 14,837 ckm 2020 228 GAs 38 GAs
India’s Largest Longest Private HVDC 648MW Ultra Mega World class state-of- In FY20 issued seven
Commercial Port Line in Asia (Mundra Solar Power Plant the art international bonds
Performance
(at Mundra) Mohindergarh) (at Kamuthi, Tamil Nadu) SCADA,DMS,GIS, OMS across the yield curve
& SAP integrated totalling~USD4Bn
Highest Margin Highest line Constructed and First in India to All listed entities
among Peers availability Commissioned in incorporate Auto maintain liquidity cover
nine months restoration of 33KV of 1.2x- 2x as a matter
feeders of policy.
14%
47% 33%
31% 55%
20%
• 15Km Aarey-Borivali with SAP • Promotion of digital • Raised USD 1,000 Million
Connectivity-Comm in • Rational mix of ST-PPA 10-year paper through 144A/
& LT-PPA payments
record time • Target renewable power REG S issuance to replace
tie -up to 60% by 2025 • Field force automation amortizing bank debt
• 100% AMR for Industrial • Daily & seasonal load
Consumer variation pattern • COP21 target to be • First & the only utility • USD 400 Mn. CAPEX
achieved 5 years ahead of offering interaction on revolver facility from 8
• Commissioning of 207MVA schedule virtual basis international banks to fully
• 1964 MW Peak : 536 fund capex program
PT in Pandemic and target MW Off Peak
for 300MVA till Mar 21-
highest in AEML’s history
De-bottlenecking leads Successfully operated Reduction in ABR by 22% 100% collection Qatar Investment
Performance
to supply reliability for Islanding Scheme on 12 th through effective Power efficiency Authority acquired 25%
1mn consumers Oct 20 (refer case study 2 Purchase strategy stake in AEML in 2020
on slide 19)
Contemporaneous -ECB
Highest Reliability Smart metering-25% Acquired –200 MU US$ 1.80 billion settlement
amongst peers consumers in 1st phase of premier consumer on single day
in Mumbai
Only Indian Discom with IG
rating from all 3 major
global rating agencies
AMR – Automatic Meter Reading, SCADA – Supervisory control and data acquisition, DMS – Distribution management system, GIS – Geographical information system; PT – Power transformer, MVA – Mega 7
volte ampere, MU – Million unit, PPA – Power purchase agreement, LT – Long term, ST – Short term, ABR – Average billing rate, ECB External commercial borrowings, IG- Investment grade
02. AEML – Integrated Utility
Adani Transmission: India's leading Transmission & Distribution portfolio
74.9% 25.1%
100%1 100% 100%
Transmission
HVDC AEML
TBCB(2) Assets Transmission
Assets
line
MERC - Regulator of
State of Maharashtra
Assured return on
regulated asset base Costs Power Procurement Costs
O&M Expenses
Return on
Normative costs – Return on Equity grossed up for tax
Capital
Pass-through
EBITDA
Return of Interest Costs (Term debt and
Depreciation
Efficiency linked Capital Working Capital)
incentives
Efficiency
Additional incentives linked to efficiencies
Gains
Regular True Up
mechanism
Notes: EBITDA – Earnings before interest, tax, depreciation and amortization, MERC – Maharashtra Electricity Regulatory Commission O&M – Operations and Maintenance, Source – MYT
Regulations 2019 10
AEML: Century old utility serving the “Gateway” city of India, faces
unique challenges
BHAYANDER CREEK
Key Statistics of Mumbai Key Challenges of Mumbai
THANE
MIRA BHAYANDER
Area Population
Houses the worlds largest slum
BORIVALI
MULUND
ANDHERI
BANDRA
E
BKC
SION
Monsoon & associated
E
DADAR
AN
waterlogging, challenge in
TH
Servicing 85% of Mumbai’s Nature of challenges due to size & scale of Mumbai, require
geography, touching 2 out of 3 unique solutions / adaptations to the mitigation philosophy
households in Mumbai
Notes: * - Others include BEST, MSEDCL & Tata Power, BKC – Bandra Kurla Complex, MW- Mega Watt, GDP, GDP – Gross Domestic Product, pu- per unit,Rs- Rupees, ABR- Average billing rate, Source – Population Of Mumbai 2020 11
(Demographic, Facts, Etc) – India Population 2020
03. AEML Operating Philosophy –
Reliability, Responsiveness and Sustainability
AEML responds to these Challenges with an O&M philosophy structured
around the triad of Reliability, Responsiveness & Sustainability
Reliability Responsiveness
– Pioneered adoption of advanced – Consumer-centric service delivery
technologies & state of the art model with wide spectrum of
integrated O&M systems consumer-focused initiatives
13
Notes: O&M- Operation & Maintenance
AEML’s Robust and Reliable Infrastructure Reliability Responsiveness Sustainability
2
Digital Enabler SCADA DMS AMI
3
Integrators G I S W M S O M S C R M
SAP
Features Advantage
• 100% Unmanned remote operated Stations with maintenance free • Auto Islanding schemes during grid disturbance
Dry type Transformer & Switchgears, Ester Oil filled Transformer • Auto restoration scheme for 33 kV Feeders
• Installed capacity is twice of maximum demand • 100% AMR for High end customers with Time of Day (TOD) tariff
• Redundancy built at three levels (N-1 -1 Cluster wise) • Technology enabled avenues for consumer interaction
• Mesh inter-connectivity and auto changeover facility • Outage management through interchangeability
• DER enabled Roof top solar installations with net-metering • Condition Based Maintenance
• Theft Proof Pillars ( TPPs) & Theft Aversion Boxes (TABs) • Theft Aversion
SCADA- Supervisory control and data acquisition, DMS- Distribution management system, AMI- Automatic metering interface, GIS- Geographical Information system, WMS- Work Management system, OMS- Outage management system, CRM- Customer 14
relationship management, EHV- Extra high voltage, HT- High tension, LT- Low tension, AMR- Automatic meter reading, DSS- distribution substation, CSS- Consumer substation, PT- Potential transformer, kV- Kilo Volt, DER- Distributed Energy Resource
AEML: Redundancy in Network design ensure Reliability Responsiveness Sustainability
Probability of Theft
LOW LOW MEDIUM LOW HIGH LOW HIGH HIGH FY15 FY16 FY17 FY18 FY19 FY20
HIGH
7.37%
11 KV Switching
Station at CSS CSP Home
Transformer FY20 FY25
System Highlights:
• Units comprising Load Break Switches, Small Capacity Transformers ( 50/100 KVA) , LT Breakers and Smart Metering inside Natural ester oil filled tank - Eliminating Low
tension 420 V network and access to miscreants for electricity Theft
• Input at 3Ph 11 kV or 1Ph 6.6. kV and output shall be individual consumer load wire at 420 / 240 V – Reduce Technical losses by improving HT/LT Ratio.
• Units will be installed in Consumer Premises / Street Light Poles – Electricity Consumer information to Consumer using Mobile App
• Integrated to SCADA Control Centre – Low TCO than Smart metering
• Unit Maintenance at Workshop – Help to optimise the maintenance cost related to Meter Cabin, LT Pillars, Main Line and Service Cable Faults.
16
Notes: kV: Kilo Volt, V: Volt, LT- Low tension,, HT- High tension, U/G- Under ground, Ph- Phase, CSP- Completely self protected transformer, SCADA- Supervisory control & data acquisition, TCO-Total cost of ownership; CSS- Consumer substation
Reliability Responsiveness Sustainability
Intelligence
• Consumer Portal
Software
Analysis
Business
• Streetlight Portal
Data
Gateways
• Automatic Reading
DMS RF • Remote Connect/ Discom.
Acquisition
Hardware
• Peak Shaving
• Real Time Energy Audit
RF Nodes • Power Quality & Reliability
18
Reliability Responsiveness Sustainability
Integrated SCADA & DMS system for Transmission & Distribution – Quick
isolation & Power Restoration
India’s 1st SCADA system certified under ISO 27001 – Cyber Security
Dedicated OFC ring network for entire SCADA system for reliable &
Scalable communication
Around 1.8 Lakh parameters are monitored & controlled from SCADA &
DMS system
First Utility in India to implement SCADA / DMS, FPI for prompt fault identification & Supply restoration
SCADA- Supervisory Control and Data Acquisition , DMS – Distribution Management System, AMI- Advanced meter interface, DSS- Distribution substation, CSS- Consumer substation, OFC- Optical fiber cable, FPI- Fault passage 19
indicator, KVA- Kilo Volt Ampere, MVA- Mega Volt Ampere, V- Volts, kV- Kilo Volts, NOP- Normally open points
Reliability Responsiveness Sustainability
SERVICE BUS
Pre-OMS
AEML: Improvement in response time 3
Integrators
reliability metrics
Reliability Indices Achievements
Challenges
SAIFI SAIDI CAIDI
70.00 • Unplanned Outages • Highest supply availability
among peers and high
56.10 reliability scores
50.13
39.15
• Grid Disruptions
31.57 • In-house team with vast
24.2 O&M experience and
• Voltage fluctuations predictive maintenance
0.8 2.07 1.24 through automated tools
• Frequency
PSEG EDF Energy AEML management • Redundancy at all voltage
levels
Lower the better
Renewable Energy %
• Cost of power • Only Co to be COP
33% compliant 5yrs before
mandated date
• Renewable mix in
230% power procurement • Using dry type power
10% transformers and dry type
• Higher RMUs
Decarbonisation
• Using ester oil
Industry # AEML capex
transformer
Higher the better
Notes: # - Comparison against top performing DISCOM in INDIA, data as on 30th Mar 20, * - Excluding Slum Area; SAIDI - System Average Interruption Duration Index, SAIFI - System Average Interruption Frequency Index,
22
CAIDI - Customer Average Interruption Duration Index, MU – Million Units, COP- Conference of parties, CO- Company, RMU- Ring main unit
Reliability Responsiveness Sustainability
- Maintaining grid’s stability within frequency - Triggered by the tripping of 2 lines at the MSETCL in
- Predicting accuracy as power demand vs supply 400 KV transmission system in Kalwa.
- Possibility of high voltage surge & line Tripping - Manual tripped by operator due to spark at CT, leads to
outage
- Load affected in Maharashtra 3500 MW out of which
Preparedness
2200 MW in Mumbai
- Existing Load Shedding schemes reviewed
- Resource arrangement i.e. DG sets, Back up system
- Simulation for Islanding scheme
- Operational Guidelines drafted for Back-up control team Successful Islanding
Notes: MSETCL - Maharashtra State Electricity Transmission Company Limited, ADTPS: Adani Dahanu Thermal Power Station , kV: Kilo Volt; MW: Mega Watts,; CT: Current Transformer, DG Diesel Generator 23
Reliability Responsiveness Sustainability
MUMBAI MAHARASHTRA
• Peak – Off Peak Ratio ~ 3.5:1 • Lower demand on Sundays & Holidays • Peak – Off Peak Ratio ~ 2:1 • Predictable demand pattern
Challenges Mitigation
• Demand varies based on holidays, seasonality, weather • Forecast and Decision-making through Artificial
parameters, special events Intelligence tools of SAS
• Planned outages, emergency shutdown, variation in • To ensure reliability planning at day ahead, monthly,
generations quarterly and annual basis
• Issue of Matching the Demand and Supply • Match demand-supply at every 15 min interval
24
Notes: Min – minute, SAS – Statistical Analysis System
AEML: Responsiveness aided by Technology- Reliability Responsiveness Sustainability
100% adoption of mobile app for Meter Reading, INC & Recovery
Mobile App • Improved productivity and manual error reduction
Mobile • Real time update and tracking/monitoring
App
Auto allocation of jobs based on priority & TAT with skillset mapping
Auto Work • Improved productivity and 100% meter reconciliation on same day
Allocation • Reduction of carbon footprint
Automation • Better planning & monitoring of resources
Chatbot Chatbot with features like submit reading, Redressal interface, bill details
• Reduction in calls at help centers (~15k chatbot visits)
Implementation
• Customer convenience
Bill pay and services like duplicate bill & no supply complaint through Kiosks
• Alternative to BPC
Kiosk Deployment
• On spot duplicate bills
• Extended working hours
25
Notes: E-NACH – Electronic National Automated Clearing House; TAT – Turn around time; BPC: Bill Payment Center; INC: Installation and Consumer; VDS: Voluntary Deposit Scheme; UPI: Unified Payment Interface;
AEML: Quality manpower for high reliability and Reliability Responsiveness Sustainability
responsiveness
in extreme events
Proactive Actions
Notes: DSM- Demand side management, SCADA- Supervisory Control and Data Acquisition DG- Diesel generator, DRT- Disaster response team, IoT- Internet of things 27
Reliability Responsiveness Sustainability
Environmental
E The commitment to raise the share of renewable power procurement from the current
Use of environment friendly dry and ester oil transformers
Replaced oil type switch gears with dry type maintenance free switch gears
Social
S Reliable Electricity Supply is critical for the enterprise to operate and grow
Reliability indices like SAIFI, SAIDI, CAIDI, and ASAI demonstrate our commitment
Consumers is Mumbai remained largely unaffected from 23 instances of National/Regional
Grid outages in the last 2 decades
Governance
Notes: SAIDI - System Average Interruption Duration Index, SAIFI - System Average Interruption Frequency Index, CAIDI - Customer Average Interruption Duration Index, ASAI- Average service availability Index 28
Reliability Responsiveness Sustainability
Adani Transmission owns and operates India’s 1st private HVDC line of 1,980 ckt km between
Mundra (Gujarat) and Mohindergarh (Haryana). This was constructed within a record time of 24 months.
Notes: MVA-Mega Volt Ampere, mn-million, LT- Low tension, km-Kilometer, ckt – Circuit, ckt km- Circuit Kilometer, HVDC – High voltage direct current, 29
Reliability Responsiveness Sustainability
SA-8000
Notes: ISO- International organization for Standardization, Mgmt- Management Certified Certification in progress 30
4. Conclusion
AEML: Value accreditation to ATL and pathway towards future
growth in distribution sector
Pre-acquisition of AEML Post-acquisition of AEML
- Cashflow profile of ATL
(In Rs. Crs) 4,519 has changed dramatically
post acquisition of AEML
2,937 3,113
2,770
1,997 2,005 - Self-funded growth
944 994
396 547 - Onboarding of marquee
investor - QIA
FY16 FY17 FY18 FY19 FY20
- Value creation for ATL
EBITDA Free Cash Flow for Growth