Apr-20 May-20 Jun-20 1st Qtr Jul-20 Aug-20 Sep-20 2nd Qtr Oct-20 Nov-20

Exp 8280 5450 4700 18430 7906 8000 7800 23706 5800 3550
Dev 4400 6900 6250 17550 4400 5300 8200 17900 8800 6550
WDW 800 1000 1600 3400 700 900 1600 3200 400 1200
Total 13480 13350 12550 39380 13006 14200 16000 44806 14600 10100

121886 108886

MOU Target 2019-2020

Apr May Jun 1st Qtr Jul Aug Sept 2nd Qtr Oct Nov
Exp 1550 4666 6100 12316 6600 6600 5650 18850 5670 6850
Dev 4612 7650 7695 19957 5800 6400 5100 17300 5750 5050
WDW 1400 600 1200 3200 700 900 1400 3000 600 1200
Total 7562 12916 14995 35473 13100 13900 12150 39150 12020 13100
Dec-20 3rd Qtr Jan-20 Feb-20 Mar-20 4th Qtr Total
2800 12150 4300 6100 7200 17600 71886
B.E. Target
7200 22550 8100 9400 8000 25500 83600
2020-21
1400 3000 600 1200 1400 3200 12800
10000 37700 12400 15500 15200 46300 168286

9-2020

Dec 3rd Qtr Jan-15 Feb-15 Mar-15 4th Qtr Total


8050 20570 9000 7400 7050 23450 75186
B.E. Target
5100 15900 5200 5400 3750 14350 67507 2019-20
1600 3400 800 800 1600 3200 12800
14750 39870 15000 13600 12400 41000 155493
365
251
114

98786
TARGET V/S A

EXPLORATORY DEVELOPMENT
ANNUAL TARGET ( AT ), Mtrs. 71,886 83,600
WEEKLY ACHIEVEMENT, Mtrs. Err:509 597
E+D+N Err:509

PRO-RATA TARGET(BE),Mtrs. 71,654 83,242


PRO-RATA Target (RE) 8,280 4,400

CUMULATIVE ACHIEVEMENT, Mtrs. 492 2,006


CUMMULATIVE PRO-RATA
CUMULATIVE PRO-RATA ACHIEVEMENT
ACHIEVEMENT 0.69% 2.41%
(BASED ON TDP) %age 5.94% 45.59%

ACHIEVEMENT OF ANNUAL TARGET, %age 1.48%

POTENTIAL BUILD-UP PRO-RATA TARGET


(UPTO 29.11.2018 ) ACHIEVEMENT

ON STREAM PRODUCTION PRO-RATA TARGET


(UPTO 29.11.2018 ) ACHIEVEMENT

Work over Operation

ANNUAL TARGET (NO. OF JOBS) 200.0 Nos


CUMULATIVE PRORATA TARGET 16 Nos
CUMULATIVE ACHIEVEMENT 7 Nos
PRORATA PERCENTAGE 43.8%
OIL WINNING 35 Nos
GAS WELL 4.5 Nos
Miscellaneous 10 Nos
POTENTIAL BUILD UP TARGET 0 KLPD
ACTUAL ONSTREAM PRODUCTION 0 KLPD
ACHIVEMENT ON ANNUAL TARGET 0.0% KLPD
PRORATA OIL PRODUCTION TARGET 32 KLPD
TOTAL ON STREAM PRODUCTION 8171 KLS
TARGET V/S ACHIEVEMENT REPORT

NAG WDW TOTAL


0 12,800 168,286 1-May-20
0 0 Err:509 1-Apr-20
9 0 Err:509 30
Cum. %age on AT
0 12,755 167,651 99.62% 30
0 800 13,480 8.01% 30
(E+D+N) (E+D+N+WDW)
0 0 2,498 2,498
0.00% 0.00% 1.61% 1.49%
0.00% 0.00% 19.70% 18.53%

832.00 KLPD
84.13%
700 KLPD
Err:509
832.00 KLPD
78.00%
649 KLPD

175
164
Friday Report of General Manager(Drilling Services)

Status of Drilling Outfits as at 5:00 AM of

DAYS SINCE TARGET PRESENT WEEKLY


RIG LOC SPUD DATE DEPTH PROGRESS
SPUD (M) (M) (M)

S-1 HWZ(E) x #VALUE! 3800 2823 0

S-2 DIO(D) x #VALUE! 3600 3440 0

S-3 NLP(D) 20/Jun/18 681 3070 3955 0

S-4 HXO(E) 13/Mar/18 780 2950 252 0

S-5 MGI(D) x #VALUE! 3534 2366 597

S-6 MFZ(E) 11/Oct/18 568 4050 3754 0

S-7 NLN(E) 10/Sep/18 599 4815 3428 0

S-8 DGZ(D) 5/May/18 727 4700 4352 0

C/H(2) DIL(D) 12/Feb/18 809 4300 4178 0

C/H(3) CY(D) 5/Jun/18 696 4200 4235 60

C/H(4) TAY(D) 7/Jun/18 694 3250 4874 192

C/H(5) KAUR x #VALUE! 4087 2 0

DM-05 WDW-189 14/Jun/18 687 1500 1,565 0

V2 DIGE) 4/Jul/17 1032 4500 4,372 0

C/H(6) 0

C/H(6) 0

V1 DIM(E) 11/Jan/18 841 4500 1,957 0

CH1 TBI(D) 105 0

TOTAL WEEKLY PROGRESS 849


Drilling Services)

1-May-2020

PRESENT OPERATION LOC

waiting for forward location HWZ(E)

p/out bit for short trip DIO(D)

DRILLING NLP(D)

bandh HXO(E)

running in bit MGI(D)

bandh MFZ(E)

p/out bit NLN(E)

RUNNING IN BIT DGZ(D)

RUNNING IN BIT DIL(D)

waiting for service CY(D)

waiting for service TAY(D)

work on string KAUR

ILM WDW-189

DRILLING DIGE)

circulation DIM(E)
Workover Ops. Shut Down of various Locations from 23.04.2020 to 29.04.2020
Date Rig Well No. Hrs. Cum Reasons TYPE
WAITING
28.04.2020 RG-E BHJ#4 3.00 3.00 FOR NEW
TBG Waiting For Services

TOTAL 3.00
Drilling Ops. Shut Down of various Locations from 23.04.2020 TO 29.04.2020
Date Rig Well No. Hrs. Cum Reasons TYPE
23.04.2020 S-1 HZJ 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
24.04.2020 S-1 HZJ 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
25.04.2020 S-1 HZJ 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
26.04.2020 S-1 HZJ 24.00 168.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
27.04.2020 S-1 HZJ 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
28.04.2020 S-1 HZJ 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
29.04.2020 S-1 HZJ 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
23.04.2020 S2 DIT 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
24.04.2020 S2 DIT 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
25.04.2020 S2 DIT 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
144.00
26.04.2020 S2 DIT 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
27.04.2020 S2 DIT 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
28.04.2020 S2 DIT 24.00 WAITING FOR FORWAD LOCATION WAITING FOR LOCATION
OPERATION SUSPENDED SINCE 24.3.2020 DUE TO
V2 DGF1 24.00 ENVIRONMENTAL
23.04.2020 COVID-19 PANDEMIC
48.00
24.00 OPERATION SUSPENDED SINCE 24.3.2020 DUE TO ENVIRONMENTAL
24.04.2020 V2 DGF1 COVID-19 PANDEMIC
S3 MFY OPERATION SUSPENDED DUE TO COVID-19 ENVIRONMENTAL
23.04.2020 12.00 PANDEMIC
S3 MFY 12.00 RIG MMC CONTRACTOR DEPLYEDN CREW FOR ONE ENVIRONMENTAL
29.04.2020 24.00 SHIFT(12) OPERATION DUE TO COVID-19
OPERATION SUSPENDED DUE TO COVID-19
23.04.2020 DM5 WDW197 24.00 24.00 ENVIRONMENTAL
PANDEMIC
OPERATION SUSPENDED DUE TO LOCKDOWN
7.00 7.00 ENVIRONMENTAL
23.04.2020 CH5 KUAS AGAINSTCONVID-19

24.04.2020 V1 HZB 12.00 WELL OPERATION KEPT IN ABEYANCE UNTIL SURFACE


AVAILABILITY OF DIRECTIONAL SERVIC
WELL OPERATION KEPT IN ABEYANCE UNTIL
24.00 SURFACE
25.04.2020 V1 HZB AVAILABILITY OF DIRECTIONAL SERVIC

24.00 WELL OPERATION KEPT IN ABEYANCE UNTIL SURFACE


26.04.2020 V1 HZB AVAILABILITY OF DIRECTIONAL SERVIC
132.00
WELL OPERATION KEPT IN ABEYANCE UNTIL
27.04.2020 24.00 SURFACE
V1 HZB AVAILABILITY OF DIRECTIONAL SERVIC

28.04.2020 V1 HZB 24.00 WELL OPERATION KEPT IN ABEYANCE AWAITING SURFACE


DIRECTIONALSERVICES.
OPERATION KEPT IN ABEYANCE AWAITING
V1 HZB 24.00 SURFACE
29.04.2020 DIRECTIONAL SERVICE.
PCR BATTERY DISCHARGED CONSUMED TIM E TO
7.50 7.50 SURFACE
START RIG ENGINES
27.04.2020 V2 DGF1
LEAK IN MP STRINER AND LINE BETWEEN CHOKE
1.50 1.50 SURFACE
MANIFOLD AND MGS
29.04.2020 V2 DGF1 9.00 9.00 CATHED UNIT MALFUNCTIONED SURFACE
29.04.2020 CH1 TBI 20.25 20.25 REPAIRING OF SHALE SHAKAR MOTOR SURFACE
29.04.2020 CH3 TBM 7.50 7.50 SHUT DN DUE TO REPAIRING OF ENGINE NO.4 SURFACE

TOTAL 592.75
SUMMARY OF CHIEF GENERAL MANAGER(Drilling Services)'s REPORT
FOR WEEKLY MEETING ON 20/03/2020

The cumulative meterage drilled from 01/04/2019 to 30/04/2020 2498 mtrs

The total meterage drilled during the week (24/04/2020 to 30/04/2020) 849 mtrs
Explo+Dev. 849 Mtrs
WDW 0 Mtrs
The total meterage drilled during the last week week (17/04/2020 to 23/04/2020) 689 mtrs

RIG DEPLOYMENT:IN HOUSE DRILLING RIGS

Total Nos. of Rigs 11(ELEVEN) Rigs


Drilling Operation 07(Seven) (S3,S4,S5,S7,,V1,V2,)
Production Testing 1(Zero) (S6,S8)
Rig Up/ Rig Down/ILM 03(Three) (S1,S2,DM5)

RIG DEPLOYMENT:CHARTER HIRED DRILLING RIGS

Total Nos. of Rigs 07(Seven) Rigs


Drilling Operation 05(Five) (CH1,CH3,CH4,CH5,CH6,)
Production Testing
Rig Up/ Rig Down/ILM 1 CH2

DRILLING REPORT (OPERATED FROM DULIAJAN)

TARGET Vs. ACHIEVEMENT

No. Of Wells
(ACHV /Trgt Annual
Annual Target (BE) Prorata Achv %
Prorata Target (BE) Actual (m) Till 31st Achv % Mtg/Rigtype
(m) (BE)
March) (BE)

Exploratory 71886 8280 492 1/1 0.68% 5.94% Inhouse 2006


Development 83600 4400 2006 0/0 2.40% 45.59% MMC 0
WDW-Dev 12800 800 0 0/1 0.00% 0.00% Charted 492
Total 168286 13,480 2,498 1/2 1.48% 18.53% Total 2498

WORK OVER REPORT

Total nos. of job so far completed since1st April 2019


7 Nos
(Including WLD Mast & Production Setup)
Actual onstream production from work-over operations since 1st April 2019 135 klpd

CEMENTING REPORT

Jobs Done in FY19-20 226 nos


Jobs Done in the same period during FY18-19 219 nos
Jobs done during the week 02 nos

DRILLING NPT REPORT

Current Week Cumulative


( 23.04.2020 to 29.04.2020)
Shut Down
Type Shut Down Hours % NPT
Hours
% NPT

Surface 177.75 5.88% 218.75 1.69%

Sub-Surface 0.00 0.00% 0.00 0.00%


Absenteeism 0.00 0.00% 0.00 0.00%
Waiting for Material 0.00 0.00% 20.30 0.16%
Sub Total 0.00 0.00% 26.30 0.20%
Environmental 103.00 3.41% 5120.95 39.51%
Waiting for Services 0.00 0.00% 121.00 0.93% 16758.5
Waiting for Location 312.00 10.32% 1656.00 12.78%
Total 592.75 19.60% 7137.00 55.07%

WORKOVER NPT REPORT

Current Week_x000D_( 23.04.2020 to Cumulative


29.04.2020)
Shut Down
Type Shut Down Hours % NPT
Hours
% NPT

Surface 0.00 0.00% 12.00 0.07%


Sub-Surface 0.00 0.00% 0.00 0.00%
Absenteeism 0.00 0.00% 0.00 0.00%
Waiting for Material 0.00 0.00% 0.00 0.00%
Sub Total 0.00 0.00% 0.00 0.00%
Environmental 0.00 0.00% 2673.50 15.47%

Page 11 of 22
Waiting for Services 3.00 0.07% 246.00 1.42%
Waiting for Location 0.00 0.00% 0.00 0.00%
Total 3.00 0.07% 2934.50 16.98%

Page 12 of 22
RIG APR MAY JUN 1ST QTR JUL AUG
0
E1400 S1 0
HZJ(D )
0
E1400 S2 0
DIT (D)
0
E1400 S3 0
MFY (E)
0
E1400 S4 0
DHW (D )
2006
E1400 S5 2006
MGH (D)
0
E1400 S6 0
TAF(E)
0
E2000 S7 0
MGJ(E)
0
E3000 S8 0
DIJ (E )
0
C/HIRE-2000 (2) 0
BGX(D )
190
C/HIRE-2000 (3) 190
TBF (E )
302
C/HIRE-1500 (4) 302
MFF( E )
0
C/HIRE-2000 (5) 0
KUAS (D)
0
C/HIRE-Quippo (6) 0
0
DM-05 0
WDW -198
0
CH-6 0
0
V2 0
V2 0
DGF1 (D )
0
V1 0
HZB (E )
0
CH-1
TBI(D)
Total 2498

RE 2017-2018 0

EXPLORATORY 492 492


DEVELOPMENT 2006 2006
NAG 0
WDW 0 0

ACHIEVEMENT 2,498 2498

S1 S2 S3 S4 S5 S6
HZJ(D ) DIT (D) DIS (D) DHW (D ) MGF (D) TAF(E)
Present Depth 2823 3440 3955 252 2366 3754
Depth Upto 31st March
2823 3440 3955 252 360 3754
Last week Depth 2823 3440 3955 252 1769 3754
Weekly Progress 0 0 0 0 597 0
March Progress 0 0 0 0 -1409 0
April Progress 0 0 0 0 2006 0
SEPT 2ND QTR OCT NOV DEC 3RD QTR JAN FEB

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0
0 0
0 0
0 0

0 0

S7 S8 C/H (2) C/H (3) C/H (4) C/H (5) CH6-Quippo DM-05
MGJ(E) DIJ (E ) BGX(D ) TBF (E ) MFF( E ) KUAS (D) THNZL-1 WDW -198
3428 4352 4178 4235 4874 2 2 1565

3428 4352 4178 4045 4572 2 2 1565


3428 4352 4178 4175 4682 2 2 1565
0 0 0 60 192 0 0 0
0 0 0 -130 -110 0 0 0
0 0 0 190 302 0 0 0
MAR 4TH QTR TOTAL

0 0 S-1

0 0 S-2

0 0 S-3

0 0 S-4

0 2006 S-5

0 0 S-6
0
0 0 S-7

0 0 S-8

0 0 C/H(2)

0 190 C/H(3)

0 302 C/H(4)

0 0 C/H(5)

0 0 C/HIRE (6)-THN

0 0 DM-05

0 0 C/HIRE-(6)PHUL

0 0 V2
0 0 V2

0 0 V1
0
0
0 2498 cumm

0 0 Target

0 492 EXPLORATORY
0 2006 DEVELOPMENT
0 0 NAG
0 0 WDW

0 2,498 Total
`

CH6 V2 V1 CH#1
PHULMA DGF1 (D ) HZB (E ) TBI(D)
2 4372 1957 1,928

2 4372 1957 1,928


2 4372 1957 1,928
0 0 0 0
0 0 0 0
0 0 0 0
COMPARISON BETWEEN
FY2018-2019 & FY2019-2020

2018-2019 2019-2020

EXPLORATORY 31668 492

DEVELOPMENT 63840 2006

WDW 9676 0

No. OF WELLS 29 25

TOTAL 105184 2498

QUARTERLY COMPARISON BETWEEN


FY2018-2019 & FY2019-2020

2019-2020 2020-2021
Target Achv. %age Achv. Target Achv. %age Achv.

1st Quarter 7562 12,052 159.38% 13480 2,498 18.53%

2nd Quarter

3rd Quarter

4th Quarter(Current)

TOTAL 7562 12052 159.38% 13480 2498 18.53%


ANNUAL
ANNUAL PRORATA PRORATA
DETAIL ACHIEVEMENT ACHIEVEMENT
TARGET TARGET ACHIEVEMENT %
%
No. of Jobs (INT TARGET) 200 16 7 3.50% 43.8%
No. of Jobs (B.E TARGET) 170 14 7 4.12% 50.1%