Facility Name:
Address:
Phone Number:
Fax Number: Type(s) of Molding Processes at this Facility:
Process Table A
Number of Molding Employees at this Facility: Injection Molding
Process Table E
Transfer Molding
Process Table F
Extrusion
Process Table G
Equipment
Process Table H
Part Inspection & Testing
Personnel Contacted:
Name: Title: Phone: Email:
Auditors/Assessors:
Name: Company: Phone: Email:
Assessment
Section 1-2, 2 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 3 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Are all molding related internal The molder should have a documented process and
1.6 and external best practices system for maintaining best practices obtained through
documented and maintained? lessons learned or from industry knowledge.
Section 1-2, 4 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 5 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 6 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 7 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 8 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 9 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Is the handling, storage and The molder's in-process handling and shipping
2.9 packaging adequate to process shall be assessed for risk of part damage or
preserve product quality? other quality concerns.
Section 1-2, 10 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Assessment
Section 1-2, 11 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Molding Requirements:
Related
Molding System Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
Assessment Requirement Documentation Requirement (Objective Evidence) / N/A
Question #
1.1
Is contract review and advanced quality
1.2
planning, FMEA, Control Plans, etc., in
3.1 1.3 N/A
place and performed by qualified
1.4
individuals?
1.6
Job Audit 13 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Molding Requirements:
Related
Molding System Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
Assessment Requirement Documentation Requirement (Objective Evidence) / N/A
Question #
Process #1:
Process #2:
1.5 Each part may have one or more requirements determined by the molding specification.
What are the product inspection
3.6 2.13 Parts must meet each requirement. List each requirement below and validate.
requirements?
2.14 (Listed below are some examples)
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Job Audit 14 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Molding Requirements:
Related
Molding System Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
Assessment Requirement Documentation Requirement (Objective Evidence) / N/A
Question #
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.4 Requirement: Flash
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Job Audit 15 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Molding Requirements:
Related
Molding System Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
Assessment Requirement Documentation Requirement (Objective Evidence) / N/A
Question #
3.6.5 Requirement: Dimension
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
3.6.7 Requirement: Customer Specific
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Job Audit 16 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Molding Requirements:
Related
Molding System Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
Assessment Requirement Documentation Requirement (Objective Evidence) / N/A
Question #
Operator or Inspector Responsibilities
1.4
1.6
Were appropriate process steps signed
3.7 2.2
off?
2.3
2.11
1.2
Were steps/operations performed that
3.9 1.4
were not documented in the Control Plan?
1.6
1.2
1.4
If additional steps were performed, were
3.10 1.6
they authorized?
1.10
1.16
Job Audit 17 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Molding Requirements:
Related
Molding System Customer or Internal Job (Shop) Order or Reference Actual Condition Pass / Fail
Question # Job Audit Question
Assessment Requirement Documentation Requirement (Objective Evidence) / N/A
Question #
If the order was certified, did the
2.11
3.12 certification accurately reflect the process
2.13
performed?
Packaging Requirements
2.6
3.15 Are packaging requirements identified? 2.7
2.9
Shipping Requirements
2.3
3.17 Were the parts properly identified?
2.9
2.3
3.18 Were the containers properly labeled?
2.9
Job Audit 18 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
2.3 Stock rotation system in place for First in/First out (FIFO) and shelf- FIFO - per Lot
A2.1 Automatic/Manual
2.11 life Shelf life - pull for use
2.12
1.4 Continuous monitoring by
A2.2 2.11 Environment temperature controlled Automatic controller or manual
2.12 verification daily
1.4
1.6
Handling of partial containers to ensure no contamination (closed
A2.3 2.7 Automatic/Manual Continuous
container, clean environment)
2.11
2.12
1.4
1.6
A2.4 2.7 Partial container quantity Automatic/Manual Per Container
2.11
2.12
PT A 19 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Continuous monitoring by
A3.1 2.11 Dryer temperature per resin manufacturer guidelines (per material) Automatic
controller
2.12
1.4
Per Resin Manufacturer
A3.2 2.11 Dryer time per resin manufacturer guidelines (per material) Manual
Guidelines
2.12
1.4
A3.3 2.11 Drying equipment (dryer dedicated or clean procedure in place) Manual Material change
2.12
1.4
Continuous monitoring by
A3.4 2.11 Dew point Automatic
controller
2.12
1.4
A3.5 2.11 Moisture analysis, if applicable, per Resin Manufacturer Guidelines Manual At start-up and once per shift*
2.12
1.4
1.11 Recycle ratio (per print, inspection standard or manufacturer Once every 8 hours and at
A4.1 Automatic
2.11 guidelines). Verified by feed pressure, weight or volume every part change over
2.13
1.4
1.11
A4.2 Dedicated regrind equipment or cleaning procedure in place Manual Material change
2.11
2.12
1.4
1.11
A4.3 Fines management (de-dusting) Automatic/Manual Material change
2.11
2.12
1.4
1.11
A4.4 Move regrind to IMM (contamination) Automatic/Manual Start-up and continuous
2.11
2.12
PT A 20 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
A5.1 2.11 Pigment blending - percent loading, if applicable Automatic/Manual Start-up and continuous
2.12
1.4
A5.2 2.11 Color change procedure Manual Continuous
2.12
1.4
1.15 There shall be a standardized startup procedure/checklist that Start-up and restart after long
A6.1 Manual
2.11 defines things to do at start-up down time event
2.12
1.4
1.15 Start-up and restart and after
A6.2 Production plan (machine, mold, materials, part style) Manual
2.11 long down time event
2.12
1.4
1.15 At start-up, and after long
A6.3 Startup check (verify process settings against setup sheet) Manual
2.11 down time event
2.12
1.4
1.15 Startup check - Secondary Equipment (De-gate, assembly At start-up, and after long
A6.4 Manual
2.11 equipment, welders, etc.) down time event
2.12
1.4
Continuous if automatic, or at
1.15
A6.5 Mold surface temperature Automatic/Manual start-up and after down time
2.11
event
2.12
1.4
1.15 Plastication - Temperature (barrel, nozzle, hot manifold if applicable),
A6.6 Automatic Continuous
2.11 screw RPM, and back pressure
2.12
PT A 21 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15
A6.7 Plastication - Melt temperature N/A Start-up
2.11
2.12
1.4
1.15
A6.8 Plastication - Screw recovery time N/A Continuous
2.11
2.12
1.4
1.15
A6.9 Fill - Screw velocity or velocity profile Automatic Continuous
2.11
2.12
1.4
1.15
A6.10 Fill - Fill time and peak pressure N/A Continuous
2.11
2.12
1.4
1.15
A6.11 Hold - Hold pressure and hold time Automatic Continuous
2.11
2.12
1.4
1.15
A6.12 Hold - Cushion N/A Continuous
2.11
2.12
1.4
1.15
A6.13 Hold - Cavity pressure (if applicable) N/A Continuous
2.11
2.12
1.4
1.15 Temperature Control Cooling - Coolant inlet temperature and cooling
A6.14 Automatic Continuous
2.11 time
2.12
PT A 22 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15
A6.15 Part weight (if applicable) Manual Once every 8 hours*
2.11
2.12
1.4
1.15 Start-up, and restart after
A6.16 First piece approval Manual
2.11 down time event
2.12
1.4
1.15 Material purge/evacuation of barrel - included in unplanned and
A6.17 Manual End of run or long downtime
2.11 downtime procedures
2.12
1.4
1.15
A6.18 Shut down procedures Manual End of production or run
2.11
2.12
1.4
Per cavity, start-up and once
A7.2 2.11 Dimensions Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
A7.3 2.11 Appearance (vs. boundary sample or per instruction) Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
A7.4 2.11 Physical properties (if applicable) Manual
every 8 hours
2.12
PT A 23 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
2.3 Stock rotation system in place for First in/First out (FIFO) and shelf- FIFO - per Lot
B2.1 Automatic/Manual
2.11 life Shelf life - pull for use
2.12
1.4
1.6
Partial container handling to ensure no contamination (closed
B2.3 2.7 Automatic/Manual Continuous
container, clean environment)
2.11
2.12
1.4
1.6
B2.4 2.7 Partial container quantity Automatic/Manual Per container
2.11
2.12
1.4
Start-up and continuous by
B3.1 2.11 Dryer temperature per resin manufacturer guidelines (per material) Automatic
controller
2.12
1.4
Start-up and once every 8
B3.2 2.11 Drying time per resin manufacturer guidelines (per material) Manual
hours
2.12
PT B 24 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
B3.3 2.11 Drying equipment (dryer dedicated or clean procedure in place) Manual Material change
2.12
1.4
B3.4 2.11 Dew point Automatic Continuous by controller
2.12
1.4
Start-up and once every 8
B3.5 2.11 Moisture content Manual
hours
2.12
1.4
Recycle ratio (per print, inspection standard or manufacturer
1.11 Once every 8 hours and at
B4.1 guidelines). Verified by feed pressure, weight or volume. No regrind Automatic
2.11 every part change-over
of fluorine-treated parts.
2.13
1.4
1.11
B4.2 Regrind equipment (dedicated or cleaning procedure in place) Manual Material change
2.11
2.12
1.4
1.11
B4.3 Ethylene Vinyl Alcohol (EVOH) particle size and distribution Manual Start-up
2.11
2.12
1.4
1.11
B4.4 Fines management (de-dusting) Automatic/Manual Material change
2.11
2.12
1.4
1.11 Prevention of contamination when transporting or feeding regrind to
B4.5 Automatic/Manual Start-up and continuous
2.11 the blow mold machine
2.12
PT B 25 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
B5.1 2.11 Pigment blending - percent loading Automatic/Manual Start-up and continuous
2.12
1.4
B5.2 2.11 Color change procedure Manual At color change
2.12
1.4
1.15 There shall be a standardized startup procedure/checklist that Start-up and restart after long
B6.1 Manual
2.11 defines things to do at start-up down time event
2.12
1.4
1.15 Start-up and restart and after
B6.2 Production plan (machine, mold, materials, part quantity) Manual
2.11 long down time event
2.12
1.4
1.15 Continuous by controller or
B6.3 Environment temperature for parison Automatic
2.11 manual verification daily
2.12
1.4 Verify molding machine settings including but not limited to barrel
1.15 and die/head temperature settings, parison thickness or thickness Start-up and restart after long
B6.4 Manual
2.11 profile, pre-blow pressure and time, blow air pressure and time, down time event
2.12 mold close speed and clamp pressure
1.4
1.15 Start-up and restart after long
B6.5 Verify secondary equipment Manual
2.11 down time event
2.12
1.4
Continuous if automatic, or at
1.15
B6.6 Cooling water temperature and flow rate Automatic/Manual start-up and after down time
2.11
event.
2.12
PT B 26 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15
B6.7 Verify post mold cooling temperature or pressure and time Manual Start-up
2.11
2.12
1.4
1.15 Start-up, and restart after
B6.8 First piece approval Manual
2.11 down time event
2.12
1.4
1.15
B6.9 Material purge/evacuation of barrel Manual End of run or long downtime
2.11
2.12
1.4
1.15
B6.10 Shut down procedures Manual End of production or run
2.11
2.12
1.4
1.15 Start-up and restart after long
B7.1 Start-up check Manual
2.11 down time event
2.12
1.4
1.15
B7.2 Carrier gas Automatic Continuous
2.11
2.12
1.4
1.15
B7.3 Volume Automatic Continuous
2.11
2.12
1.4
1.15
B7.4 Treatment time Automatic Continuous
2.11
2.12
PT B 27 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15 Start-up and once every 8
B7.5 Neutralization and wash cycle Manual
2.11 hours
2.12
PT B 28 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Start-up and once every 4
B8.2 2.11 Wall thickness (if applicable) Manual
hours
2.12
1.4
Start-up and once every 4
B8.3 2.11 Dimensions Manual
hours
2.12
1.4
Start-up and once every 4
B8.4 2.11 Appearance Manual
hours
2.12
1.4
Start-up and once every 4
B8.5 2.11 Physical properties (if applicable) Manual
hours
2.12
Start-up and once every 24
1.4
hours. For safety critical parts,
B8.6 2.11 Layer thickness and thickness uniformity - (multi-layer only) Manual
start-up and once every 8
2.12
hours
PT B 29 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
2.3 Stock rotation system in place for First in/First out (FIFO) and shelf- FIFO - per Lot
C2.1 Automatic/Manual
2.11 life. Shelf life - pull for use
2.12
1.4
Continuous by controller or
C2.2 2.11 Environment contamination (dust) controlled (if applicable) Automatic/Manual
manual verification daily
2.12
1.4
1.6
Continuous by controller or
C2.3 2.7 Environment humidity and temperature controlled (if applicable) Automatic
manual verification daily
2.11
2.12
1.4
1.6
Partial containers handling to ensure no contamination (closed
C2.4 2.7 Automatic/Manual Continuous
container, clean environment)
2.11
2.12
1.4
1.6
C2.5 2.7 Plastic Sheet Stacking Manual Continuous
2.11
2.12
1.4
1.15 There shall be a standardized startup procedure/checklist that Start-up and restart after long
C3.1 Manual
2.11 defines things to do at start-up down time event
2.12
PT C 30 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15 At start-up, and after long
C3.2 Production plan (machine, mold, materials, part quantity) Manual
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.3 Startup check (verify process settings against setup sheet) Automatic / Manual
2.11 down time event
2.12
1.4
1.15
C3.4 Heating distance (between heater and sheet) Manual At start-up
2.11
2.12
1.4
1.15
C3.5 Sheet heating time and temperature (heating cycle, intensity) Manual At start-up
2.11
2.12
1.4
1.15 At start-up, and after long
C3.6 Startup check - Secondary Equipment (trimming, assembly) Manual
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.7 Sheet forming temperature per film supplier guidelines Automatic/Manual
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.8 Mold temperature per film supplier guidelines Automatic/Manual
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.9 Clamping frame closing pressure Automatic
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.10 Mold close speed Automatic
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.11 Plug temperature, start time and speed (if applicable) Automatic
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.12 Sheet pre-stretching sequence and time (if applicable) Automatic
2.11 down time event
2.12
PT C 31 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15
C3.13 Vacuum level, start time, evacuation speed and duration Automatic At start-up and every 8 hours
2.11
2.12
1.4
1.15
C3.14 Pressure level, start time and duration (if applicable) Automatic At start-up and every 8 hours
2.11
2.12
1.4
1.15 At start-up, and after long
C3.15 Cooling temperature and time Automatic
2.11 down time event
2.12
1.4
1.15 At start-up, and after long
C3.16 Ejection air (compressed) pressure and time Automatic
2.11 down time event
2.12
1.4
1.15 Start-up, and restart after
C3.17 First piece approval Manual
2.11 down time event
2.12
1.4
1.15
C3.18 Shut down procedures Manual End of production or run
2.11
2.12
1.4
Per cavity, start-up and once
C4.1 2.11 Dimensions Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
C4.2 2.11 Appearance (vs. boundary sample or per instruction) Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
C4.3 2.11 Physical properties (if applicable) Manual
every 8 hours
2.12
PT C 32 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE D - Compression Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Incoming components assessment procedure, covering onsite
D1.2 2.1 Manual Once per lot
testing or acceptance of supplier testing, with criteria (if applicable).
2.13
1.4
Purging all equipment and feeding system to avoid cross End of run or long downtime,
D2.1 2.1 Manual
contamination. material change
2.13
Process parameter verification:
1.4 At start-up, and after long
- For SMC, Doctor box blade height, glass chopper speed, additives,
D2.2 2.1 Manual down time event, material
carrier film speed, compaction pressure etc.
2.13 change
- For rubber, mixer RPM, temperature, additives etc.
1.4
D2.3 2.1 Glass fiber distribution and density verification(for SMC). Manual Hourly
2.13
1.4
Using a FIFO (First In - First Out) system for compound/preform,
D3.1 2.11 Manual Pull for use
shelf life storage.
2.12
1.4
Environment temperature and humidity for preform storage (if Continuous and manually
D3.2 2.11 Automatic
applicable). verify daily
2.12
1.4
Compound floor time (e.g.., sheet rolls in SMC and rubber
D3.3 2.11 Manual Pull for use
compound).
2.12
PT D 33 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE D - Compression Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.6
Partial containers handling to ensure no contamination (closed
D3.5 2.7 Automatic/Manual Continuous
container, clean environment)
2.11
2.12
1.4
D3.6 2.11 Sheet shrinkage confirmation (for SMC) Manual Per lot (just before use)
2.12
1.4
1.15 There shall be a standardized startup procedure/checklist that Start-up and restart after long
D4.1 Manual
2.11 defines things to do at start-up down time event
2.12
1.4
1.15
D4.2 Production plan (machine, mold, materials, part style) Manual At start-up
2.11
2.12
1.4
1.15 At start-up, and after long
D4.3 Startup check (verify process settings against setup sheet) Manual
2.11 down time event
2.12
1.4
1.15
D4.4 Cavity surface temperature verification Automatic/Manual At startup and re-start
2.11
2.12
1.4
1.15
D4.5 Verification of preform size, or shape, or both Manual Each cycle
2.11
2.12
1.4
1.15
D4.6 Verification of charge pattern (for SMC) Manual Each cycle
2.11
2.12
1.4
1.15
D4.7 Cavity surface cleanliness (no debris) Manual Each cycle
2.11
2.12
PT D 34 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE D - Compression Molding
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15
D4.8 Mold closing speed Automatic Continuous
2.11
2.12
1.4
1.15
D4.9 Cavity temperature Automatic Continuous
2.11
2.12
1.4
1.15
D4.10 Post molding cooling (for SMC) - prevent deformation Manual Each cycle
2.11
2.12
1.4
1.15 Start-up, and restart after
D4.11 First piece approval Manual
2.11 down time event
2.12
1.4
1.15
D4.12 Shut down procedure Manual End of production or run
2.11
2.12
1.4
Per cavity, start-up and once
D5.2 2.11 Dimensions Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
D5.3 2.11 Appearance Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
D5.4 2.11 Physical properties (if applicable) Manual
every 8 hours
2.12
PT D 35 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Incoming components assessment procedure, covering onsite
E1.2 2.1 Manual Once per lot
testing or acceptance of supplier testing, with criteria (if applicable).
2.13
1.4
Purging all equipment and feeding system to avoid cross End of run or long downtime,
E2.1 2.1 Manual
contamination. material change
2.13
1.4
Stock rotation system in place for First in/First out (FIFO) and shelf- FIFO - per Lot
E3.1 2.11 Automatic/Manual
life. Shelf life - pull for use
2.12
1.4
Temperature control during shipment from material supplier to cold Continuous monitoring (i.e.,
E3.3 2.11 Automatic
storage area in plant (if applicable i.e.; one part epoxies). by chart recorder)
2.12
PT E 36 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4 Time exposed to room temperature when removed from cold storage Continuous monitoring by
E3.5 2.11 area for production. Allowable usage time after room temperature is Automatic/Manual controller or manual
2.12 reached. verification
1.4
1.6 Partial container handling to ensure no contamination (closed
E3.6 Automatic/Manual Continuous
2.11 container, clean environment)
2.12
1.4
1.6
E3.7 Partial container quantity Automatic/Manual Per Container
2.11
2.12
1.4
1.15 There shall be a standardized startup procedure/checklist that Start-up and restart after long
E4.1 Manual
2.11 defines things to do at start-up down time event
2.12
1.4
1.15
E4.2 Production plan (machine, mold, materials, part style) Manual At start-up
2.11
2.12
1.4
1.15 At start-up, and after long
E4.3 Startup check (verify process settings against setup sheet) Manual
2.11 down time event
2.12
1.4
1.15 Mold cavity temperatures; variation between each cavity and set Continuous, at start-up and
E4.4 Automatic
2.11 temperatures after down time event.
2.12
1.4
1.15
E4.5 Verification of preform size, or shape, or both manual Continuous
2.11
2.12
1.4
1.15 Plasticization - Temperature (resin chamber), Transfer Speed, and
E4.6 Automatic Continuous
2.11 Transfer Pressure
2.12
1.4
1.15
E4.7 Fill - Fill time and peak pressure Automatic Continuous
2.11
2.12
PT E 37 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.15
E4.8 Hold - Hold pressure and hold time Automatic Continuous
2.11
2.12
1.4
1.15
E4.9 Cure Time Automatic Continuous
2.11
2.12
1.4
1.15
E4.10 Mold Closing speed Automatic Continuous
2.11
2.12
1.4
1.15
E4.11 Cavity surface cleanliness (no debris) manual Continuous
2.11
2.12
1.4
1.15
E4.12 Pre-heat of components - If Insert molding required Automatic Continuous
2.11
2.12
1.4
1.15 Pre-heat of resin pellets or compound - If applicable (per
E4.13 Automatic Continuous
2.11 manufacturers recommendations)
2.12
1.4
1.15
E4.14 Hold - Cavity pressure (if applicable) Automatic Continuous
2.11
2.12
1.4
1.15
E4.15 Part weight (if applicable) Manual Once every 8 hours*
2.11
2.12
1.4
1.15 Start-up, and restart after
E4.16 First piece approval Manual
2.11 down time event
2.12
1.4
1.15
E4.17 Shut down procedures Manual End of production or run
2.11
2.12
PT E 38 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Per cavity, start-up and once
E5.2 2.11 Dimensions Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
E5.3 2.11 Appearance (vs. boundary sample or per instruction) Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
E5.4 2.11 Physical properties (if applicable) Manual
every 8 hours
2.12
PT E 39 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE F - Extrusion
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Stock rotation system in place for First in/First out (FIFO) and shelf- FIFO - per Lot
F2.1 2.11 Automatic/Manual
life Shelf life - pull for use
2.12
1.4 Continuous monitoring by
F2.2 2.11 Environment temperature and humidity controlled (if applicable) Automatic controller or manual
2.12 verification daily
1.4
1.6 Partial container handling to ensure no contamination (closed
F2.3 Automatic/Manual Continuous
2.11 container, clean environment)
2.12
1.4
1.6
F2.4 Partial container quantity Automatic/Manual Per Container
2.11
2.12
PT F 40 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE F - Extrusion
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Start-up and continuous by
F3.1 2.11 Dryer temperature per resin manufacturer guidelines (per material) Automatic
controller.
2.12
1.4
Start-up and once every 8
F3.2 2.11 Dryer time per resin manufacturer guidelines (per material) Manual
hours
2.12
1.4
F3.3 2.11 Drying equipment (dryer dedicated or clean procedure in place) Manual Material change
2.12
1.4
F3.4 2.11 Dew point Automatic Continuous by controller
2.12
1.4
Start up and once every 8
F3.5 2.11 Moisture content Manual
hours
2.12
1.4
1.11 Recycle ratio (per print, inspection standard or manufacturer Once every 8 hours and at
F4.1 Automatic
2.11 guidelines). Verified by feed pressure, weight or volume. every part change-over
2.13
1.4
1.11
F4.2 Regrind equipment (dedicated or cleaning procedure in place) Manual Material change
2.11
2.12
PT F 41 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE F - Extrusion
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
1.11
F4.3 Fines management (de-dusting) Automatic/Manual Material change
2.11
2.12
1.4
1.11 Prevention of contamination when transporting or feeding regrind to
F4.4 Automatic/Manual Start-up and continuous
2.11 the extrusion machine.
2.12
1.4
F5.1 2.11 Pigment blending - percent loading Automatic/Manual Start-up and continuous
2.12
1.4
F5.2 2.11 Color change procedure Manual At color change
2.12
1.4
1.15 There shall be a standardized startup procedure/checklist that Start-up and restart after long
F6.1 Manual
2.11 defines things to do at start-up down time event
2.12
1.4
1.15 Start-up and restart after long
F6.2 Production plan (machine, mold, materials, part quantity) Manual
2.11 down time event
2.12
1.4 Verify molding machine settings including but not limited to barrel
1.15 and head/die temperature settings, screw speed, screw cooling Start-up and restart after long
F6.3 Manual
2.11 temperature (if applicable), as well as settings for down stream down time event
2.12 processes
1.4
1.15 Start-up and restart after long
F6.4 Verify secondary equipment Manual
2.11 down time event
2.12
PT F 42 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE F - Extrusion
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Continuous if automatic, or at
1.15
F6.5 Mold surface temperature Automatic/Manual start-up and after down time
2.11
event.
2.12
1.4
1.15
F6.6 Extrusion Head Pressure Automatic Start-up and continuous
2.11
2.12
1.4
1.15
F6.7 Vacuum level (if applicable) Automatic Start-up and continuous
2.11
2.12
1.4
1.15
F6.8 Coolant inlet temperature (if applicable) Automatic Start-up and continuous
2.11
2.12
1.4
1.15 Start-up, and restart after
F6.9 First piece approval Manual
2.11 down time event
2.12
1.4
1.15 Material purge/evacuation of barrel - included in unplanned and
F6.10 Manual End of run or long downtime
2.11 downtime procedures
2.12
1.4
1.15
F6.11 Shut down procedures Manual End of production or run
2.11
2.12
PT F 43 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE F - Extrusion
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
*If minimum requirements are not met, provide supporting records to justify actual conditions.
Related
Molding
Observation/
Item # System Category/Process Steps Type of Control Monitoring Frequency
Comments
Assessment
Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail /
N/A)
1.4
Per cavity, start-up and once
F7.4 2.11 Dimensions Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
F7.5 2.11 Appearance (vs. boundary sample or per instruction) Manual
every 8 hours
2.12
1.4
Per cavity, start-up and once
F7.6 2.11 Physical properties (if applicable) Manual
every 8 hours
2.12
PT F 44 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Related
Calibration /
Molding System Injection Blow Vacuum Compression Transfer Included in Preventative
Item # Equipment Type Extrusion Verification Frequency Certification Comment
Assessment Molding Molding Forming Molding Molding Maintenance Plan
Frequency *
Question #
G1.4 2.14 Injection Mold Machine X Per Preventive Maintenance Every 5 years
G1.6 2.14 Blow mold machine X Per Preventive Maintenance Every 5 years
PT G 45 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Related
Calibration /
Molding System Injection Blow Vacuum Compression Transfer Included in Preventative
Item # Equipment Type Extrusion Verification Frequency Certification Comment
Assessment Molding Molding Forming Molding Molding Maintenance Plan
Frequency *
Question #
G3.2 2.14 Leak Testing, if applicable X X X At start up and per shift Every 6 months
PT G 46 of 47
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to specifications or other
requirements.
Note that not all tests are applicable to all molding processes.
Related
Molding
Item # System Category/Process Steps Monitoring Frequency Observation/Comments
Assessment
Question #
Dimension, Weight, Appearance, Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.0 General
Dimensions
Appearance
Performance
1.4 Procedures are in place to prevent damage to the finish or part during the
H1.1 100%
2.9 inspection and packaging processes
Appearance (flash, color and gloss, short shots, splay/burns, blister, sink
First off by quality and 100%
H1.2 1.4 marks, gate vestige, and other molding defects) of the molding shall be
by operator
verified per specification and applications manual
H1.3 1.4 Cracks, Weld line/Knit lines, and Whitening/ stress mark First off and last off
H1.6 1.4 Dimensional check (e.g., Go-no go, Plug and Ring gage) First off and once per shift
H1.8 1.4 General - Weight, Resin, Components, Porosity/Voids (if applicable) First off