P r o te c t i o n a n d M o n i t o r i n g PHOENIX
The Phoenix surface choke, is used to isolate the Integrated Surface Panel (ISP) from the high
voltage AC on the ESP cable, but allows the DC signals to and from the ISP to pass freely. This
enables communication with the Multisensor Downhole Tool (MDT) without having very high
voltages present on the ISP.
This section of the manual details the different types of choke assemblies available and where
each are used. It gives detailed information on installation of the choke, and advise on which
choke is suitable for various set-ups. Also included is a brief fault finding guide.
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
SAFETY
WARNING
WARNING
WARNING
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
COMPLIANCE NOTICE
EN 61000-4-4 (1995) at 1kV (signal lines) and 2kV (AC power lines)
for Fast Transients Immunity
(1990)
THE PHOENIX MULTISENSOR SYSTEM IS PROVEN ACROSS THE RANGE OF
MOTORS AND PUMPS FROM THE FOLLOWING MANUFACTURERS;
Reda Pump Company, Inc
Centrilift, Inc
Oil Dynamics, Inc
ESP, Inc
ALNAS
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
This manual is the copyright of Phoenix Petroleum Services Ltd and must not be copied in part or full
without the prior written permission of Phoenix Petroleum Services.
SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
COMPLIANCE NOTICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
1. OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2. SPECIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
2.1 Star Point Choke . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
2.2 3 Phase Choke . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
1. Overview
The MultiSensor from Phoenix which communicate using the ESP electrical system require a choke
console to be installed in the wellhead electrical equipment. Two options are available ;
• Star Point Choke (recognisable by having a single fuse), and
• 3 Phase Choke (with four fuses). (3 phases and ground).
Star Point Chokes are used when the star point of the system is accessible (for instance, in a transformer
terminal box) and the 3 Phase Choke when no star point is available.
Both units are supplied un-enclosed for mounting within an existing DOL Starter or Transformer, or an
enclosure option is available to IP66.
The choke system has been designed to meet the highest European Regulations of FEA-M (1990),
Norwegian Water Resources and Energy Administration. It is exempt under CE Regulations although has
been tested with the ISP and MultiSensor as a system during CE Testing.
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
2. Specification
2.1 S t a r Po i n t C h o k e
Dimensions Height 20 8 m m
Wi d t h 19 4 m m
Depth 135 m m
We i g h t 3 kg
Mounting 4 o f f h o l e s f o r M 10 f i x i n g s p r o v i d e d
M a te r i a l Epoxy Resin
Connections 1 off t o S t a r Po i n t - u s e H V Wi r e
1 off to Ground
1 off Signal Cable to ISP
Fu n c t i o n s D e - C o u p l e M u l t i S e n s o r S i g n a l f r o m H i g h Vo l t a g e L i n e
Fu s e p r o t e c t i n e v e n t o f f a u l t
L i m i t s i g n a l c o n n e c t i o n v o l t a g e t o I S P t o 20 0 V a c / d c
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
Mounting 4 o f f h o l e s f o r M 10 f i x i n g s p r o v i d e d
Connections 3 off t o P h a s e A , B , C - u s e H V Wi r e
1 off to Ground
1 off Signal Cable to ISP
Fu n c t i o n s D e - C o u p l e M u l t i S e n s o r S i g n a l f r o m H i g h Vo l t a g e L i n e
Fu s e p r o t e c t i n e v e n t o f f a u l t
L i m i t s i g n a l c o n n e c t i o n v o l t a g e t o I S P t o 20 0 V a c / d c
MOTOR TERMINALS A
STAR
POINT
ALARM TRIP
C
5/17/99
Pi 1 2 0 0 PS I
Pd 2 2 0 0 PS I
3:32 PM
F l ow 1 0 0 0 0 b f p d
DO WN U P ACK MOR E
P r o te c t i o n a n d M o n i t o r i n g
Page 8
STAR
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
SW3
SW6
POINT A B C D E F G H OFF OFF OFF OFF
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
SW2
SW5
CHOKE OFF OFF OFF OFF OFF OFF OFF OFF
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
SW1
SW7
A B C D E F G H A B C D E F G H
1+ 2+ 3+ 4+ 5+ 6+ 7+ 8+ +12V GND 1+ 2+ 3+ 4+ 5+ 6+ 7+ 8+
1- 2- 3- 4- 5- 6- 7- 8- +12V GND GND GND GND GND GND GND GND GND
ANALOGUE OUTPUTS ANALOGUE OUTPUTS
FUSE
EARTH RESET
TRIP ALARM TOOL MAINS
MODBUS 232
X Y
00
TX
RX
RTS
N.C.
N.C.
N.O.
N.O.
LINE
COM
COM
A B Y Z A B Y Z
CYBER KEY
ALARM TRIP
Pi 1 2 0 0 PS I
5/17/99
Pd 2 2 0 0 PS I
F l ow 1 0 0 0 0 b f p d
DO WN U P ACK MOR E
3:32 PM
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
SW3
SW6
A B C D E F G H OFF OFF OFF OFF
P r o te c t i o n a n d M o n i t o r i n g
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
SW2
SW5
OFF OFF OFF OFF OFF OFF OFF OFF
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
SW1
SW7
A B C D E F G H A B C D E F G H
Page 9
1+ 2+ 3+ 4+ 5+ 6+ 7+ 8+ +12V GND 1+ 2+ 3+ 4+ 5+ 6+ 7+ 8+
1- 2- 3- 4- 5- 6- 7- 8- +12V GND GND GND GND GND GND GND GND GND
ANALOGUE OUTPUTS ANALOGUE OUTPUTS
FUSE
RESET
MODBUS 232 TRIP ALARM TOOL MAINS
X Y
00
TX
RX
RTS
N.C.
N.C.
N.O.
N.O.
LINE
COM
COM
A B Y Z A B Y Z
SIGNAL CABLE
PHOENIX
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
This is not always possible and to review, four electrical systems which may be used (below) and referred
to in the selection.
TO WELLHEAD
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
Star Point Choke is only used when the star point will remain
electrically connected to the downhole ESP when the variable
speed drive or starter package is stopped. It is not suitable ;
• where there is no star point (delta connected
secondary), or
• where there is a disconnect contactor after the
transformer secondary.
DELTA
STARTER VARIABLE SPEED CONNECTED
BEFORE DRIVE WITH SYSTEM
THE STAR CONNECTED
TRANSFORMER TRANSFORMER
TO WELLHEAD
TO WELLHEAD
3.3 M u l t i p l e ES P f r o m a S i n g l e Tr a n s f o r m e r ( B u s S y s te m s )
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
4. I n s t a l l a t i o n a n d Wi r i n g
Th e I n te g r a te d S u r f a c e Pa n e l c o n t a i n s a n d c o n n e c t s t o p o te n t i a l l y
lethal voltages.
E n s u r e t h e I S P p o w e r i s i s o l a te d b e f o r e r e m o v i n g t h e g l a n d p l a te o r
te r m i n a l a c c e s s p l a te .
Th e c o n n e c t i o n t o t h e C h o k e C o n s o l e m a y b e l i v e e v e n w h e n t h e I S P
i s n o t p o w e r e d d u e t o v o l t a g e s c o m i n g b a c k f r o m t h e ES P s y s te m .
A l l H i g h Vo l t a g e c a b l e s ( t o S t a r Po i n t o r P h a s e s A , B o r C ) m u s t m e e t
the local regulatory requirements and be specified to a minimum of ;
S t a r Po i n t ; 30 0 0 Va c n o m i n a l
P h a s e s ; 8 6 6 0 Va c n o m i n a l
R e f e r t h e Te s t i n g S e c t i o n p r i o r t o a n y H V Te s t i n g ( I n s u l a t i o n o r
Fu n c t i o n ) o f t h e e l e c t r i c a l s y s te m ( S t a r te r, Tr a n s f o r m e r ) t o w h i c h t h e
choke connects.
4.1 S t a r Po i n t C h o k e
Install a ground conductor between the ground terminal (lower centre of the choke) and the transformer
ground.
Run the high voltage cable from the Star Point connection (M5 stud) and the star point of the transformer.
Connect the two wire signal cable to TB1-1/2 (this signal cable runs to the ISP Tool-line and Chassis).
Ensure that ;
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
CABLE TO
WELLHEAD ISP TB1-LINE/CHASSIS
Install a ground conductor between the ground terminal (lower centre of the choke) and the transformer
ground.
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
Connect the two wire signal cable to TB1-1/2 (this signal cable runs to the ISP Tool-line and Chassis).
Ensure that ;
3 PHASE
CHOKE
A B C
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
5 Te s t i n g t h e C h o k e A s s e m b l y
D i s c o n n e c t t h e C h o k e C o n s o l e f r o m t h e Tr a n s f o r m e r a n d H i g h
Vo l t a g e S y s te m p r i o r t o a n y I n s u l a t i o n ( M e g g e r ™ ) Te s t .
A l w a y s Te s t w i t h ;
Fa i l u r e t o t a k e t h e s e p r e c a u t i o n s w i l l r e s u l t i n e q u i p m e n t d a m a g e .
5.1 C h e c k i n g Fu s e s
Fuses are Bussman HVJ1/8 and when measured with an ohmmeter should be in the range 30 to 40 ohms.
If outside this range replace the fuse.
5.2 I n s u l a t i o n Te s t i n g
High voltage system must be isolated from the lightning barrier and link to the ISP prior to testing.
Always disconnect and isolate with HV sleeving the cable entering the lightning barrier. If you do not the
lightning barrier will cause the insulation test to fail.
As a precautionary measure disconnect the cable from the choke TB1 (which goes to the ISP) during
testing.
DISCONNECT AND
ISOLATE HV CABLE
TO LIGHTNING BARRIER
L I N E BA R R I E R
DISCONNECT
AS A PRECAUTION
ISP TB TOOL LINE/CHASSIS
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
5.3 I S P Te s t i n g
When powered on, the ISP will test the basic function of the choke and confirm ;
• low voltage insulation level (100 Vdc test) is good, and
• communications are being received from the MultiSensor.
The ISP will identify if the fuse has failed in the Star Point Choke. It is not possible to determine if any
one fuse has failed in the 3 Phase Choke until the ESP is running. If such a fault is suspected when the
unit is running then an alarm message will display requesting the choke fuses to be tested.
Refer the ISP User Manual Fault Finding section on Page 51.
P r o te c t i o n a n d M o n i t o r i n g PHOENIX
6.0 FA U LT R E P O R T I N G
I n t h e e v e n t o f p r o b l e m s w i t h t h e M u l t i s e n s o r s y s te m t h e f o l l o w i n g f o r m
should be filled in and sent to Phoenix to assist in resolving of the problem
Th e r e l e v a n t e n g i n e e r r e p o r t i n g t h e f a u l t m u s t f i l l o u t t h e f o l l o w i n g
p a r a m e te r s
Nature of problem -
Effects on system -
SYSTEM
Date Engineer
Client Well site
Pump on/ off Bottom hole temp
Well free flowing/ back spinning Megga value of cable
Single/ 3- phase surface choke Surface fuses checked (state)
Check frame test on tool (state) Tool installed/ pulled
MULTISENSOR
Serial No Zero Cal (Cz) mA
Calibration Module No Full Cal (Cf) mA
Tool Speed Hz Current Leakage (Cl) mA
PANEL
Serial No Fuses checked 4 off (state)
ISP/ MSP/ Multi or TSP Check output voltage + - V
Version of Firmware Digital board serial No
WELL PARAMETERS (please state units)
PI Pd Ti Tm Flow Vib
ISP Only – (Report Diagnostics for)
Open Current mA Voltage mA Stability mA
Power up Panel check fault log (state) Analogue board fitted
MSP Only
Modbus board fitted Logger board fitted
Relay board fitted Analogue Qty