Grease the vibration isolators if necessary; Grease the exposed valve spindles to avoid rust development.
Clean all the nylon type or aluminum type air filters; Wipe clean the surface of the return air louver and intake fresh air louver.
General clean the interior surface of the equipment to remove debris and spill-over of condensate.
Check and clean drain pan, condensate drain pipe and floor drains to ensure no choking and flooding.
Test the operation of volume control dampers and examine flexible connections.
Inspect heaters if any to ensure proper functioning.
Inspect for any condensate from the equipment and the refrigerant pipes nearby.
Inspect equipment casing, supporting framework, starter panel and control panel for corrosion and if found necessary, wire
brush to clean metal and paint with an approved anti-corrosion paint system.
Inform the person responsible for the operation of the equipment of any changes or adjustments.
Measure and record major operational parameters, including compressor current, refrigerant pressure, etc…Ensure that the
operating parameters correlate with the operating conditions.
Use fresh water to jet clean the condenser coils to prevent the accumulation of acid and dust.
Submit report including recommendations for any improvement works.
OBSERVATIONS
Compressor Starting Current
Compressor Running Current R: Y: B:
Refrigerant Pressure
COMMENTS & ACTION TAKEN IF ANY: