Pekerjaan Persiapan 1 Pekerjaan Pembersihan
Pekerjaan Persiapan 1 Pekerjaan Pembersihan
P= 15.00
L= 12.00
L= P x L
15.00 15.00 x 12.00
L= 180.00 M²
h= 63.50
v= 68.00
131.50 M¹
h+v 63.50
68.00 +
131.50
URAIAN PEKERJAAN
II. PEKERJAAN TANAH & PASIR PERHITUNGAN VOL SAT
1. Panjang Galian Horizontal
h1 = 760 Ph
h7 = 460
h8 = 560
h9 = 760
URAIAN PEKERJAAN
II. PEKERJAAN TANAH & PASIR PERHITUNGAN VOL SAT
2. Panjang Galian Vertikal
v2 = 260
Pv
v3 = 1560
v6 = 1560
v5= 2.00 + 0.60 = 2.60
v1 = 1060
v5 = 260
v6= 15.00 + 0.60 = 15.60 +
v4 = 1260
Err:522
Tp= Ph + Pv 59,60 M¹
50.90 + Err:522
Tp= Err:522 M¹
L= 0.80 83.98 M³
T= 0.95
Tp= Err:522
V= L x T x Tp
0,80 x 0,95 x 110,50
V= 83.98 M³
L= 0.80
T= 0.05
Tp= 110.50
V= L x T x Tp
0,80 x 0,05 x 110,50
V= 4.42 M³ 4.42 M³
L= 0.80 17.68 M³
T= 0.20
Tp= 110.50
V= L x T x Tp
0,80 x 0,20 x 79,90
V= 17.68 M³
URAIAN PEKERJAAN
II. PEKERJAAN PANJANG PONDASI BATU KALI PERHITUNGAN VOL SAT
3. Panjang Galian Horizontal
h1 = 700 Ph
h8 = 500
h9 = 700
Pv
h6 = 1500
Err:522
h5 = 200
Tp= Ph + Pv
Err:522 + Err:522
Tp= 102.40 M¹
La= 0.30
Lb= 0.60 32.26 M³
T= 0.70
Tp= 102.40
V= La + Lb x T x Tp
2
V= 0,30+0,60 x 0,70 x 102,40
2
V= 32.26 M³
URAIAN PEKERJAAN
6 Pek Urugan Tanah Pondasi PERHITUNGAN VOL SAT
1.) Teras
2,00 x 5,00 x 0,12
= 1.20 M²
165 335 300 100 300
2.) Ruang Tamu
B
5,00 x 5,00 x 0,12
DAPUR = 3.00 M²
300
300
TAMAN BELAKANG
200
KM/WC
500
RUANG TAMU
RUANG SANTAI
KAMAR TIDUR TAMU
3,00 x 3,00 x 0,12
200
TERAS
= 1.08 M² 21.76 M²
B 8.) Kamar tidur tamu
500 300 100 300 4,00 x 4,00 x 0,12
= 1.92 M²
9.) KM/WC Umum
3,00 x 2,00 x 0,12
= 0.72 M²
10.) Kamar tidur anak
4,00 x 4,00 x 0,12
= 1.92 M²
11.) Ruang makan
4,00 x 5,00 x 0,12
= 2.4 M²
T= 0.05
L Total= 21.76
V= T x L Total
= 0.05 x 21.76
= 1.09 M³ 1.09 M³
URAIAN PEKERJAAN
NO GAMBAR & JENIS PEKERJAAN
PERHITUNGAN VOL SAT
III. PEKERJAAN BETON
1. Panjang Sloof Horizontal
h1 = 700
PH
PH x Sloof
h7 = 400 = 45.50 x 0.04
= 1.71 M³
h8 = 500
h9 = 700
2. Panjang Sloof Vertikal
PV
PV x Sloof
h6 = 1500
h3 = 1500
= 56.00 x 0.04
h1 = 1000
= 2.10 M³ 2,10 M³
h4 = 1200
Tp= PH + PV
h5 = 200
1.71 + 2.10
Tp= 3.81 M³ 3,81 M³
URAIAN PEKERJAAN
NO GAMBAR & JENIS PEKERJAAN
PERHITUNGAN VOL SAT
III PEKERJAAN BETON
1 Pek Cor Sloof 25 x 15
L= 0.15
T= 0.25
P Total= 3.81
V= L x T x PT
= 0.15 x 0.25 x 3.81
= 0.14 M³ 0.14 M³
A. HARGA BAHAN
1 Pekerja OH 107,000.00
2 Tukang OH 141,500.00
3 kepala Tukang OH 155,500.00
4 Mandor OH 176,000.00
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Rumah Mewah
PEKERJAAN : PEMBANGUNAN RUMAH TIPE 180
LOKASI : Jayapura, Papua, Indonesia
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
JUMLAH I Rp 14,477,100.00
II. PEKERJAAN TANAH
1. Penggalian Tanah Pondasi 83.98 M³ 84,650.00 7,108,907.00
2. Tanah Urugan Hasil Galian Pondasi 12.48 M³ 28,870.00 360,297.60
3. Pasir Urug Bawah Pondasi 4.42 M³ 585,860.00 2,589,501.20
4. Pasir Urug Bawah Lantai 1.09 M³ 585,860.00 637,298.51
5. Penimbunan Pilihan Peninggian Lantai 75.76 M³ 375,860.00 28,474,213.95
6. Pas. Anstamping/Bt. Kosong 17.68 M³ 962,290.00 17,013,287.20
7. Pas. Pondasi Batu Kali 1 : 4 64.32 M³ 1,462,080.00 94,040,985.60
150,224,491.06
JUMLAH II Rp 150,224,491.06
III. PEKERJAAN BETON
1. Pek. Cor Sloof 25 x 15 0.14 M³ 7,352,790.00 1,050,529.87
2. Pek. Cor Kolom 20 x 15 2.43 M³ 10,720,720.00 26,051,349.60
3. Pek. Cor Kolom Praktis 15 x 15 1.82 M³ 7,875,760.00 14,353,572.60
4. Pek. Cor Ring Balok 15 x 20 3.05 M³ 16,819,870.00 51,300,603.50
5. Pek. Cor Lantai Bawah Keramik 1.09 M³ 1,352,860.00 1,471,641.11
6. Pek. Cor Lantai Dack Beton 3.07 M³ 9,797,810.00 30,098,872.32
7. Pek. Cor Meja Beton Wastafel Zing Aluminium 0.30 M³ 7,769,720.00 2,326,720.35
126,653,289.35
JUMLAH IV Rp 128,235,587.54
V. PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI
1. Pek. Kusen Pintu, Jendela & Ventilasi Ky. Besi 5/10 0.91 M³ 9,836,020.00 8,950,778.20
2. Pek. Daun Pintu Pani Kayu 11.07 M² 832,450.00 9,215,221.50
3. Pek. Jendela Panil Kaca 15.65 M² 1,078,860.00 16,878,764.70
4. Pek. Ventilasi Kaca Mati 28.80 M² 488,570.00 14,070,816.00
5. Pek. Engsel Pintu 24 Psg 70,290.00 1,686,960.00
6. Pek. Engsel Jendela 30 Psg 34,450.00 1,033,500.00
7. Pek. Kunci Pintu Double 2 Bh 239,250.00 478,500.00
8. Pek. Kunci Tanam 2 Slaag 6 Bh 239,250.00 1,435,500.00
9. Pek. Grendel Jendela 15 Bh 102,810.00 1,542,150.00
10. Pek. Hak Kait Angin 15 Bh 107,310.00 1,609,650.00
56,901,840.40
JUMLAH V Rp 56,901,840.40
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
JUMLAH VI Rp 196,199,078.78
VII. PEKERJAAN PENGECETAN
1. Pek. Cat Dinding Tembok 265.48 M² 60,560.00 16,077,408.24
2. Pek. Cat Minyak Lisplang Kayu 24.40 M² 60,600.00 1,478,640.00
3. Pek. Cat Minyak Kayu Kusen 29.07 M² 60,600.00 1,761,490.50
4. Pek. Cat Teak Oil/Politur Daun Pintu Kayu + Jendela 42.00 M² 66,640.00 2,798,746.72
5. Pek. Cat Plafond 175.30 M² 22,530.00 3,949,509.00
6. Pek. Cat List Gybsumboard 17.87 M² 22,530.00 402,593.08
7. Pek. Cat Minyak List Kayu 61.00 M² 60,600.00 3,696,600.00
30,164,987.54
Pekerjaan Sanitair
1. Pek. Closed Jongkok 3.00 Bh 2,000,000.00 6,000,000.00
2. Klosed Duduk KIA Standar / Sejenis 2.00 Bh 57,150.00 114,300.00
3. Pek. Kran Air dia. 1/2" 5.00 Bh 93,340.00 466,700.00
4. Pek. Washtafel Zing Aluminium 1.00 Bh 260,000.00 260,000.00
5. Pek. Septictank & Peresapan 2.00 Unit 4,548,321.90 9,096,643.79
19,616,269.99
JUMLAH IX Rp 19,616,269.99
X. PEKERJAAN AKHIR
1. Pek. Pembersihan Akhir 1.00 Ls 1,000,000.00
1,000,000.00
JUMLAH X Rp 1,000,000.00
PEMBULATAN Rp 750,531,000.00
ANALISA HARGA SATUAN
KEGIATAN :Pembangunan Rumah Mewah
PEKERJAAN :Rumah Mewah Type 180
LOKASI : Jayapura, Papua, Indonesia
# PEKERJAAN PERSIAPAN
1. 1 M² Pembersihan Lokasi
SNI No. 6.1 ~ Pekerja 0.1000 H/o 107,000.00 10,700.00
2835-2002 ~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 19,500.00
DIBULATKAN 19,500.00
2. 1 M¹ Pagar Sementara dari Seng Gel. T. 2 m
SNI No. 6.2 ~ Dolken Kayu Buah 1.2500 Btg 68,571.43 85,714.29
2835-2002 ~ Semen PC 2.5000 Kg 1,800.00 4,500.00
~ Seng Gelombang BJLS. 20 1.2000 Lbr 68,500.00 82,200.00
~ Pasir Beton 0.0050 M³ 530,000.00 2,650.00
~ Koral Beton 0.0090 M³ 285,000.00 2,565.00
~ Kayu Kls. II 0.0720 M³ 2,950,000.00 212,400.00
~ Paku Campur 0.0600 Kg 27,500.00 1,650.00
~ Meni Besi 0.4500 Kg 30,200.00 13,590.00
~ Pekerja 0.2000 H/o 107,000.00 21,400.00
~ Tukang 0.4000 H/o 141,500.00 56,600.00
~ Kepala Tukang 0.0200 H/o 155,500.00 3,110.00
~ Mandor 0.0200 H/o 176,000.00 3,520.00
JUMLAH 489,899.29
DIBULATKAN 489,890.00
3. 1 M¹ Pengukuran dan Pemasangan Bouwplank
SNI No. 6.4 ~ Kayu Papan 3/20 0.0070 M³ 2,950,000.00 20,650.00
2835-2002 ~ Kayu Skoor 5/7 0.0120 M³ 2,950,000.00 35,400.00
~ Paku Campur 0.0200 Kg 27,500.00 550.00
~ Tukang Kayu 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang Kayu 0.0100 H/o 107,000.00 1,070.00
~ Pekerja 0.1000 H/o 107,000.00 10,700.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 83,400.00
DIBULATKAN 83,400.00
# PEKERJAAN PENGECATAN
Terbilang : DELAPAN RATUS EMPAT PULUH SEMBILAN JUTA TUJUH RATUS SEMBILAN RIBU RUPIAH.
Jayapura, …………………2018
ANRIANSYAH DWITAMA
Mahasiswa Teknik Sipil - USTJ
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )
PEKERJAAN : PEMBANGGUNAN RUMAH MEWAH
PERKERJAAN : RUMAH TYPE 180
LOKASI : JAYAPURA
BULAN KE 1 BULAN KE 2 BULAN KE 3
JUMLAH HARGA BOBOT MINGGU KE MINGGU KE MINGGU KE
NO URAIAN PERKERJAAN %
(Rp) (%)
1 2 3 4 1 2 3 4 1 2 3 4
I. PEKERJAAN PERSIAPAN 14,477,100.00 1.93 0.96 0.96 100%
II. PEKERJAAN TANAH 150,224,491.06 20.02 10.01 10.01
III. PEKERJAAN BETON 126,653,289.35 16.88 4.22 4.22 4.22 4.22
IV. PEKERJAAN DINDING DAN LANTAI 128,235,587.54 17.09 2.44 2.44 2.44 2.44 2.44 2.44 2.44
V. PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI 56,901,840.40 7.58 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
50%
VI. PEKERJAAN ATAP & PLAFOND 196,199,078.78 26.14 5.23 5.23 5.23 5.23 5.23
VII. PEKERJAAN PENGECETAN 30,164,987.54 4.02 1.34 1.34 1.34
VIII. PEKERJAAN ELEKTRIKAL 27,059,100.00 3.61 1.20 1.20 1.20
IX. PEKERJAAN MEKANIKAL & SANITAIR 19,616,269.99 2.61 0.87 0.87 0.87
X. PEKERJAAN AKHIR 1,000,000.00 0.13 0.07 0.07
0%
TOTAL 750,531,744.65 100.00 0.96 10.97 14.23 5.17 7.61 12.84 8.62 8.62 10.69 12.03 6.87 1.41
BOBOT RENCANA KOMULATIF ( % ) 0 0.95 11.92 26.15 31.32 38.92 51.76 60.38 68.99 79.68 91.71 98.58 100
BOBOT REALISASI KOMULATIF ( % )
SELISIH ( % )