For proposals with reconstruction of existing building, Qualified Person (QP) is to seek consultation
with SCDF and obtain a written confirmation where provision of HS/SS is not required. This written
confirmation shall be obtained before submitting plans to BCA for approval.
Q9 Who should I consult whether my development works
require HS/SS?
As the provision requirement of HS/SS in the residential developments is governed by Civil Defence
Shelter Act 1997 which is administered by the Singapore Civil Defence Force (SCDF), you may
consult SCDF at 1800 286 5555.
Q10 When can I expect a reply from BCA after I have made an
application?
You can expect to obtain reply from BCA within 10 working days.
Q11 What are the renovation works not allowed for HS/SS?
As HS/SS are made up of strengthened wall, floor, ceiling and HS/SS door, they must not be hacked
or drilled indiscriminately. Certain finishes and fixtures are not permitted as they may become
hazards to shelter occupants during a war emergency. Lighting, power socket outlets, telephone point
and radio/TV outlet points are also not allowed to be removed as they are essential for occupants to
remain inside and communicate with external parties.
The list of permitted and not permitted work can be downloaded here:
Permitted and Not Permitted Works for HS (68kb .pdf)
Permitted and Not Permitted Works in SS (14kb .pdf)
Q12 What are the details required to be shown in HS/SS building
plans?
The required details are given in the e-application form for the approval of HS/SS plans. You may
view the form by clicking this link: BCA-CD-PLAN02.
Q13 What are the details required to be shown in HS/SS
structural plans?
The HS/SS structural plans submitted must be completed with the required details:
gross floor area of dwelling unit that affects HS/SS area and volume;
However, to facilitate BCA in carrying out random site inspection, qualified persons (QP) are advised
to submit HS/SS work schedule, after obtaining approval of shelter structural plans, to Civil Defence
Shelter Engineering Department (CDSD) of BCA.
Q20 Is a first HS/SS in a residential development project
required for commissioning inspection?
Application for commissioning of the first HS/SS is not mandatory. However, qualified persons can
apply for commissioning inspection of first HS/SS to be commissioned first if they are unfamiliar with
HS/SS construction and commissioning. This first commissioned HS/SS shall serve as the reference
for other HS/SS in the same project development.
Q21 What are the necessary works required to conduct HS/SS
commissioning inspection?
The qualified person is to ensure readiness of HS/SS for commissioning inspection by completing
and submitting the checklist before applying for commissioning inspection to Civil Defence Shelter
Engineering Department (CDSD) of BCA.
Besides this, the approved HS/SS building and structural plans shall be provided at the time of
HS/SS commissioning inspection.
Q22 Are there any guidelines in selecting the number of HS/SS
for project commissioning inspection and over-pressure air-
tightness test?
Yes. The sample size for household shelter and storey shelter project commissioning inspection is
given in the “Guidelines for Plan Submission, Construction and Commissioning of Household or
Storey Shelters” as follows:
The Notice of Approval for Commissioning of Project HS/SS will be issued when all the HS/SS
samples for the entire project (or block-basis) passed the commissioning inspection.