1 Introduction 1
2 Objective of investigation 1
5 Laboratory Investigation 3
APPENDIX
1
Project: 1598 Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level Crossing
(33 Nos) under Umbrella Work for Chennai Division - Arakkonam - Puttur Section.
_____________________________________________________________________________________________________
1.0 INTRODUCTION
1.1 The work of “Geotechnical Investigation for the Provision of Limited Height Subway in
lieu of level crossing (33 Nos) under Umbrella Work for Chennai Division - Arakkonam -
Puttur Section” was entrusted to M/s. Geo Foundations and Structures Private Limited,
1.2 The soil Investigation works were carried out during April & May 2021. This report
summarizes the results of the soil investigation for the proposed underpass.
2.1 The objective of soil investigation is to determine the nature and characteristics of
3.1 Mobilization of boring rig with all necessary equipment and personnel.
3.2 Boring of TWO bore holes of 150 mm diameter with Calyx drilling equipment
through sand, silt, clay up to 10 m or hard strata (SPT N>100) whichever occurs
earlier.
3.3 Conducting Standard Penetration Tests in the bore holes and collecting the
laboratory.
3.5 Preparation and submission of detailed report of field and laboratory results for the
proposed underpass.
4.1 Boring rig with all requisite equipment’s and accessories were mobilized at the worksite.
4.2 TWO boreholes of 150 mm diameter were bored to a maximum depth up to 5.5 m
below the existing ground level. The bore holes were made as per relevant Indian
4.3 Representative soil sample was collected at every change of strata or about 1 m depth
so collected was sealed and numbered with full particulars for identification and sent to
the laboratory for conducting the required tests. The borehole termination depths and
4.4 Standard Penetration tests were conducted in the bore holes at 1 m depth interval up
Indian Standard, IS: 2131. In this test, a standard split spoon sampler is driven into the
ground at the required depth by means of standard hammer of 63.5 kgs weight, falling
from a height of 75 cm. Number of blows for the first 15 cm is not taken into
matters at the bottom of the bore- holes. The total number of blows for the next 30 cm
depth of penetration is considered as SPT ‘N’ value as shown in Figure nos. 1 & 2.
(Appendix I)
Table 3
The following laboratory tests were conducted on the selected soil samples collected from
All the above laboratory tests were carried out as per relevant Indian Standards.
All the samples were identified and classified as per relevant Indian Standard,
IS: 1498. The results are shown in Table Nos. 1 & 2. (Appendix II)
In borehole BH 1, Dense to very dense silty gravelly sand occurs from ground level up to
In borehole BH 2, Dense gravelly silty sand occurs from ground level up to 2 m, followed
by very dense gravelly sand up to 3 m, followed by soft rock up to 5 m at which depth the
7.0 The results given in this report are based on the laboratory tests of the site investigation
carried out. In actual execution, if any variation is found, the consultants may also be
referred to.
APPROVED BY,
BORELOGS
5
Project:1598 Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level crossing
(33 Nos) under Umbrella Work for Chennai Division - Arakkonam - Puttur Section.
Project : Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level crossing (33 Nos) under Umbrella Work for
Chennai Division - Arakkonam - Puttur Section.
Bore Hole No : BH 1 Drilling Hole Record-BH 1
Blows/300mm
GROUND LEVEL
PENETRATION
TEST DEPTH(m)
SPT 'N' PROFILE
SAMPLE TYPE
VALUES
SPT"N"
STRUCTURE
DEPTH (m)
SOIL DESCRIPTION REMARKS
R.Q.D(%)
COLOUR
LEGEND
TEST NO
C.R (%)
30cm
15cm
45cm
(m)
100
20
40
60
80
Dense, Granular
SPT-1 SS 1.00
1.00-1.45 13 17 19 36
Silty Gravelly SAND
Grey
(SP) G.W.L
2.00
SPT-2 SS 2.00
2.00-2.45 26 30 37 67
Very Dense,
Granular
3.00
SPT-3 SS 3.00
3.00-3.20 42 50 - >100 50/5 cm
Penetration
Weathered Rock
50/12 cm
4.00 SPT-4 SS 4.00-4.12 50 - - >100 Penetration
4.00
CR-1 CS 4.12-4.50 - - - - Nil Nil 5 Small Pieces
5.50
G.W.L : 1.8 m from G.L on
No. of SPT: 4 Nos. No. of UDS: Nil No. of CR: 2 Nos. REMARKS
24.04.2021
Project:1598 Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level crossing
(33 Nos) under Umbrella Work for Chennai Division - Arakkonam - Puttur Section.
Project : Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level crossing (33 Nos) under Umbrella Work for
Chennai Division - Arakkonam - Puttur Section.
Bore Hole No : BH 2 Drilling Hole Record-BH 2
Blows/300mm
GROUND LEVEL
PENETRATION
TEST DEPTH(m)
SPT 'N' PROFILE
SAMPLE TYPE
VALUES
SPT"N"
STRUCTURE
DEPTH (m)
SOIL DESCRIPTION REMARKS
R.Q.D(%)
COLOUR
LEGEND
TEST NO
C.R (%)
30cm
15cm
45cm
(m)
100
20
40
60
80
Dense, Granular
SPT-1 SS 1.00
(SM) 1.00-1.45 17 17 19 36
G.W.L
2.00
SPT-2 SS 2.00
2.00-2.45 32 34 36 70
Very Dense,
Granular
Gravelly SAND
Grey
(SP) 50/6 cm
3.00 SPT-3 SS 3.00-3.21 47 50 - >100 Penetration
3.00
CR-1 CS 3.21-4.00 - - - - 8 Nil 1 Piece (3cm)
+3 Small Pieces
Project No.: 1598 Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level crossing
(33 Nos) under Umbrella Work for Chennai Division - Arakkonam - Puttur Section.
GEO FOUNDATIONS & STRUCTURES PVT LTD Project : Geotechnical Investigation for the Provision of Boring End : 23.04.2021 5.50 1
Limited Height Subway in lieu of level crossing (33 Nos)
under Umbrella Work for Chennai Division - Arakkonam - Location G.W.T (m) Bore-Hole No.
Puttur Section.
TEST RESULTS Kainoor -
1.80 1
Gate 32 E Upline
SPECIFIC GRAVITY
PLASTICITY INDEX
PLASTIC LIMIT,%
LIQUID LIMIT.%
SILT & CLAY %
DEPTH ( m )
GRAVEL, %
N VALUE
SAND, %
SAMPLE
SOIL DESCRIPTION
36 1.00 SPT-1 SP 30 58 13 12
Silty Gravely SAND
67 2.00 SPT-2 SP 31 57 11 10
- 4.12-4.50 CR-1
Soft Rock
- 4.50-5.50 CR-2
Test Method:
NOTE: Type of Sample UCS- UnConfined Compressive Strength
SPT- Standard Penetration Test DS-Direct Shear
UDS- Un Disturbed Sample TA - Tri Axial test
8
Project No.: 1598 Geotechnical Investigation for the Provision of Limited Height Subway in lieu of level crossing
(33 Nos) under Umbrella Work for Chennai Division - Arakkonam - Puttur Section.
GEO FOUNDATIONS & STRUCTURES PVT LTD Project : Geotechnical Investigation for the Provision of Boring End : 24.04.2021 5.00 2
Limited Height Subway in lieu of level crossing (33 Nos)
under Umbrella Work for Chennai Division - Arakkonam - Location G.W.T (m) Bore-Hole No.
Puttur Section.
TEST RESULTS Kainoor -
1.60 2
Gate 32 W Downline
SPECIFIC GRAVITY
PLASTICITY INDEX
PLASTIC LIMIT,%
LIQUID LIMIT.%
SILT & CLAY %
DEPTH ( m )
GRAVEL, %
N VALUE
SAND, %
SAMPLE
SOIL DESCRIPTION
36 1.00 SPT-1 Gravelly Silty SAND SM 11 72 17 10
- 4.00-5.00 CR-2
Test Method:
NOTE: Type of Sample UCS- UnConfined Compressive Strength
SPT- Standard Penetration Test DS-Direct Shear
UDS- Un Disturbed Sample TA - Tri Axial test
APPENDIX-III
SITE PHOTOS
9
SITE PHOTOS