APPLICATION FOR CONSTRUCTION PERMIT

STEP 1 : DATA TO BE FILLED UP BY HOMEONWER AND DEVELOPER ACCORDINGLY


To be filled up by Homeowner To be filled up by Developer
OWNER'S NAME : APPLICATION NO. :
SUBDIVISION : DATE FILED :
BLOCK / LOT : PERMIT DATE ISSUE :
HOUSE MODEL : EXPIRY DATE :
CONTACT NUMBER :
EMAIL ADDRESS :

STEP 2 : DEVELOPER TO IDENTIFY THE NATURE OF CONSTRUCTION AND HOMEOWNER TO COMPLETE THE REQUIRED DOCUMENTS
NATURE OF CONSTRUCTION TO BE IDENTIFIED BY DEVELOPER REQUIREMENTS TO BE COMPLETED BY HOMEOWNER
MAJOR CONSTRUCTION MINOR CONSTRUCTION MAJOR CONSTRUCTION MINOR CONSTRUCTION
HOUSE CONSTRUCTION HOUSE REPAIRS & ENHANCEMENT SIGNED CONSTRUCTION GUIDELINES SIGNED CONSTRUCTION GUIDELINES
HOUSE EXPANSION INTERIOR RENOVATION SITE DEVELOPMENT PLAN SITE DEVELOPMENT PLAN
AUXILLIARY STRUCTURES MINOR AUXILLIARY STRUCTURES FLOOR PLANS (with dimensions) FLOOR PLANS (with dimensions)
CARPORT/BALCONY/PORCH CANOPY/TRELLIS ELEVATIONS (with specifications) ELEVATIONS (with specifications)
FENCE LANDSCAPING SECTIONS / DETAILS (as required) MATERIAL SAMPLES/ BROCHURES
OTHERS (SPECIFY): ACU & GRILLES PERSPECTIVE BILL OF QUANTITIES & SPECIFICATIONS
OTHERS (SPECIFY): MATERIAL SAMPLES/ BROCHURES HOA CLEARANCE/ RPT PAYMENT
BILL OF QUANTITIES & SPECIFICATIONS
HOA CLEARANCE/ RPT PAYMENT
Once requirements/checklists are completed, Developer will assess documents submitted.

STEP 3 : DEVELOPER ASSESSMENT


REMARKS ASSESSMENT
1 PROCEED
FOR REVISION
APPROVED WITH COMMENTS
INCOMPLETE ATTACHMENTS
ENDORSED FOR BUILDING PERMIT APPLICATION (Subject to Owner's compliance
Signature over Printed Name - DEVELOPER with the Building Code)
2 PROCEED
FOR REVISION
APPROVED WITH COMMENTS
INCOMPLETE ATTACHMENTS
ENDORSED FOR BUILDING PERMIT APPLICATION (Subject to Owner's compliance
Signature over Printed Name - DEVELOPER with the Building Code)
Once documents are approved: (1) For major construction, secure building permit from LGU, process bond and fees then proceed to Step 4; (2) For minor construction
process bonds and fees then proceed to Step 5.

STEP 4 : TO BE FILLED UP BY THE DEVELOPER


BUILDING PERMIT APPROVAL (FOR MAJOR CONSTRUCTION)

BUILDING PERMIT NUMBER ISSUANCE DATE OF BUILDING PERMIT DEVELOPER Signature - Date

Once building permit is provided and Step 3 data are filled up, proceed to Step 4.

STEP 5 : TO BE CHECKED AND ASSESSED BY THE DEVELOPER


ADDITIONAL REQUIREMENTS PRIOR RELEASE OF PERMIT
MAJOR CONSTRUCTION MINOR CONSTRUCTION
SUBMIT APPROVED PRELIMINARY PLANS SUBMIT APPROVED PRELIMINARY PLANS
SUBMIT (2) SETS COPY OF APPROVED BUILDING PERMIT PLANS PROVIDE LIST OF MANPOWER/WORKERS WITH SAMPLE ID
PROVIDE LIST OF MANPOWER/WORKERS WITH SAMPLE ID PROVIDE LIST OF EQUIPMENT
PROVIDE LIST OF EQUIPMENT PAY CONSTRUCTION BOND OR NO.
PAY CONSTRUCTION BOND OR NO. PAY PROCESSING FEE OR NO.
PAY PROCESSING FEE OR NO. INDICATE CONSTRUCTION DURATION:
INDICATE CONSTRUCTION DURATION:

VERIFIED BY:
Signature over Printed Name - DEVELOPER DATE SIGNED

SERIES_SEPTEMBER_2016