MEMO

TO : PRODUCTION, PURCHASING, QS, QA/QC, MARKETING, ADMIN


CC : CORPORATE PLANNING GROUP, PRODUCTION HEAD
FROM : PLANNING DEPARTMENT
DATE : OCTOBER 15,2020
SUBJECT : P-TRAP INSTALLATION|BOTTLE TRAP ISSUE

Due to the deviation on the APPROVED MATERIAL SPECIFICATION AND APPROVED BOM AND BOQ and the
improper installation of P-Trap for Kitchen Sink (KSK) (See Figure 1.1). In which the supposedly installed P-Trap- 2”
Orange PVC – P-TRAP (Figure 2.1).

We highly recommend that exact Material, Fixture, Appurtenances and the like should be in accordance to the
Approved Plan, Approved Specification and Approved BOM/BOQ and other pertinent documents.

Figure 1.1: Actual Bottle Trap Installation

Figure 2.1: Isometric Detail for P-Trap Connection (As per Plan)

NOTE: Not endorsed by PLANNING, tapping of


kitchen to the CB. -RMP COMMENTS. For
compliance on existing only.
1
LESSANDRA PLANNING DEPARTMENT 2020OCTOBERMEMO006.1: SPECIFCATIONS AND MATERIALS
Figure 2.21: BOM/BOQ Reference

E.G.
1. ARILLELE – 2pcs – 2” dia. PVC ORANGE P-TRAP
-1 pc for Floor Drain (FD)
-1 pc for Kitchen Sink (KSK)

E.G.
1. BELLA – 3pcs – 2” dia. PVC ORANGE P-TRAP
-2 pc for Floor Drains (FD)
-1 pc for Kitchen Sink (KSK)

GENERAL NOTES
1. ALL MATERIALS pertaining to Plan stipulation and implementation MUST BE in FULL ACCORDANCE TO THE APPROVED
MATERIAL SPECIFICATIONS and APPROVED BILL OF MATERIALS (BOM) and BILL OF QUANTITIES (BOQ). NO DEVIATION
is allowed, unless with a validated proposal for variance.
2. For Future and Pending for Construction – Utilize 2” dia. ORANGE PVC P-TRAP for Kitchen Sink (KSK) and
Floor Drain (FD). As per Plan, Specification and BOM/BOQ.
3. For Existing – On-Site Operations should assess if installed Bottle Traps are possible to rectify.
4. On Going Construction – Utilize 2” dia. ORANGE PVC P-TRAP for Kitchen Sink (KSK) and Floor Drain (FD).
a. In cases where Bottle Trap is already installed and is under the status of (On Going). Rectification
is highly recommended.
5. This is Memo is applicable for LESSANDRA and CAMELLA HOUSES respectively. Specific on KSK.

Prepared by:
10/15/2020

GIAN PAOLO T. SICAPERO


Lessandra Planning|Housing

Noted by:

JAY G. PITO
Camella Planning|Housing

2
LESSANDRA PLANNING DEPARTMENT 2020OCTOBERMEMO006.1: SPECIFCATIONS AND MATERIALS
Approved by:

10/15/2020 10.16.2020
JOHN ADAM O. DAQUIGAN ROSE LANI B. TEJADA
Lessandra Planning Head Camella Planning Head

10.31.2020
ROBERTO D. FABRIQUE JR. DEBORAH ERIA
Technical Head Material Management Head

10/19/2020
KAREN S. BABIA RUNAR M. QUINDOZA
BIM |Housing Custodian BIM/QS HEAD

RENEE ROSE C. VELASCO SANDRA CAAGBAY-OBEL


Corporate Planning Corporate Planning Head|QA/QC Head

3
LESSANDRA PLANNING DEPARTMENT 2020OCTOBERMEMO006.1: SPECIFCATIONS AND MATERIALS