6 First aid room & Refree insprection room 2 2.8 5.85 32.76 - -
Toilet-5 2 1.7 2 - - 6.8
STF & Defence room 2 2.8 3.2 17.92 - -
7
Toilet 2 1.6 2 - - 6.4
8 Changing room 2 6.70 11.8 158.12 - -
9 Shower area 2 5.7 11.8 - - 134.52
10 Toilet -4 2 4.8 9.55 - - 91.68
2 4.7 6.4 60.16 - - Back side of lift area
11 Office & Lobby area
2 3.25 3.25 21.13 - -
12 Lift Lobby area 2 2.4 2.5 12.00 - -
13 Changing room 2 5.8 11.58 134.33 - -
14 Shower area 2 4.8 11.58 - - 111.17
1 4.8 8.43 - - 40.46 Near Oman TV office
15 Toilet -3
1 4.5 8.28 - - 37.26 Near Oman TELE. Office
16 Oman TV office 1 4.8 8.58 41.18 - -
17 Oman TELE. office 1 4.15 4.8 19.92 - -
1 2.8 4.8 - 13.44 - Next to Oman TV office
18 Electrical room
1 3 4.8 - 14.4 - Next to Oman TELE. office
19 Oman Radio office 1 4.04 4.8 - - -
Passage area - 4m wide 1 4 21.3 85.20 - -
Passage area - 3m wide 2 3 21.4 128.40 - -
Passage area - 3.2m wide 2 3.2 16.7 106.88 - -
20 Player's entry 2 3.05 3.05 18.61 - -
6 0.1 3 1.80 - - 4m passage area
Bulk heads 2 0.1 19 3.80 - - 4m passage area
2 0.1 1.8 0.36 - - 3.2m passage area
21 Public entry/exit 2 46.11 92.22 - -
4m Ramp area
2 0.5 4 4.00 - -
Mezzainine Floor
1 Lift Lobby area 2 2.4 2.5 12.00 - -
2 Toilet -7 2 27.63 - 55.26
Area took from autocad
1 892 892.00 - -
2 1.4 5.7 2.80 - - Above @ Door
Mezzanine floor
4 2.2 2.2 8.80 - - Both side door
1 0.4 72.76 0.40 - - Bulk head
3
Deduct beams area -8 0.5 4 -4.00 - -
Deduct beams area -2 0.5 5 -1.00 - -
Deduct beams area -2 0.72 5 -1.44 - - Bulk head
Deduct columns -12 0.5 0.5 -3.00 - -
1st Floor
Passage area- From lift lobby to toilet 9 side 1 54.68 54.68 - -
Passage area- From lift lobby to ROP control 42.68
1 42.68 - -
1 room side
Passage area - in b/w VIP lounge & VIP Majlis 1 46.2 46.20 - -