1 Dismantling Tiles
Stairs 1 12.5 4.25 53.125 Sft
2 10.5 4.25 89.25 Sft
1 20 4.25 85
Entrance 1 11.25 5.25 59.0625
1 6.08 5.25 31.92
Entrance Pillars 1 4.67 5.25 24.5175
Toilet Block 2 15 26.25 787.5
4 15 5.5 330
4 26.25 5 525
Ablution 2 3 2.5 15
2 10 2 40
Sup Wash Room 1 6 8 48
1 14 5 70
Total 80 Cft
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and
13
washing of stone aggregate): Ratio 1:2:4
Toilet Block 1 15 26.25 0.125 49.22 Cft
For Pipe 1 45 1 0.5 22.50 Cft
For WC 4 2 1 0.5 4.00 Cft
New Washrooms 0 6 8 0.125 0.00
0.00 Cft
Total 75.72 Cft
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened
graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,
16 after removing centring, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel
reinforcement, its fabrication and placing in position, etc.):- Type C (nominal mix 1: 2: 4)
Fabrication of mild steel reinforcement for cement concrete including cutting, bending, laying in position, making joints
17 and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes removal of rust from bars):- Deformed bars (Grade-60)
Total 91.81 Kg
18 1/2" Thick Plaster 1:4 upto 20ft Height
Qty as per item no 11 4775.50
Small Rooms GF 8 14.5 4 464.00
16 5 2.75 220.00
16 4 4 256.00
8 12 4 384.00
8 2.5 4 80.00
New Washroom 2 8.5 11.5 195.50
2 6.5 11.5 149.50
Toilet Block Partition walls toilet 8 5.5 8 352.00
P.walls bath 4 4.25 8 136.00
Ablution/bath 2 4.75 8 76.00 FF
Faces bath 1 12.24 8 97.92
Face toilet 1 5.92 8 47.36
Mess/Office Partition 2 9.84 6.58 129.49
Counter 6 2 2.5 30.00
2 5.5 2.5 27.50
Sup Washrooom 2 6 10 120.00
2 8 10 160.00
Toilet Block GF 8 4.75 8 304.00
P.walls bath 6 4.5 8 216.00
GF
Face Partitions 2 3 8 48.00
Faces bath 2 5 8 80.00