Professional Documents
Culture Documents
for
Excellence in Energy Management 2019
Sector Automobile
Unit CVBU - Lucknow, Tata Motors Limited
ISO 50001:2011
OHSAS 18001:2007
ISO 14001:2015
IATF 16949:2016
Represented By : Dr. Srinu Babu. Matta - Energy Lead Auditor
Head- Central Plant Engineering Department
1
Who areon
Brief introduction we…
Company/Unit
Bus
Focused
ERC setup
Service
Training
center
Plant Process
Western Complex
Material Bus Assembly Line
from TMML STU**
Vendor
base - Vehicle Assembly Line
Local, Eastern Complex
Private
Pune & Operator
Jamshedpur Chassis Cowl Paint BIW
Assembly Assembly Shop Shop
2
1. Energy Consumption Overview- Electrical
© Copyright, Confidential, Tata Motors Ltd ❖ Specific Energy consumption reduced by 34.3% in three years 5
Paint Shop
98%
Paint Shop
89%
THERMAL CONSUMPTION
3000 0.019 0.020
MTOE/ Plant Eq. Veh
0.012
1500 0.010
2455 0.008
1000
1841 2028 0.006
500 0.004
0.002
0 0.000
2016-17 2017-18 2018-19
❖ High propane consumption for double coat painting of Orange cabs in 2017 and Yellow cabs in 2018. Still Specific
Thermal
© Copyright, consumption
Confidential, was
Tata Motors Ltdreduced by 28.96% in three years 6
3
2. Specific Energy Consumption in last 3 years
National Benchmarking
Electrical Specific Energy
Thermal Specific Energy Consumption
Parameters Consumption
kWh/Eq. vehicle GJ/Eq. Vehicle
TML Lucknow CVBU 250 640
TML Pune CVBU 426 782
TML Jamshedpur CVBU 574 1204
TML Pantnagar CVBU 199 584
TML Dharwad CVBU 198 402
Mahindra & Mahindra, Kandivli (2017-18) 268 --
Mahindra & Mahindra, Nashik (2017-18) 181 --
Mahindra & Mahindra, Zaheerabad (2017-18) 460 --
International Benchmarking
Electrical Specific Energy
Thermal Specific Energy Consumption
Parameters Parameters Consumption
kWh/Vehicle GJ/Eq. Vehicle
Scania (Kwh/Veh.) 7200 --
Volvo (Kwh/Veh.) 6400 --
Daimler (Kwh/Veh.) 6870 --
National Benchmark for SEC 181 --
4
4. A. ENergy CONserving (ENCON) projects
B. Innovatiion Projects
Encon’s Summary
Annual Annual Thermal
Annual Electrical Saving Annual Thermal Total Annual Investment
Electrical Payback
Year Cost Saving Cost Saving Savings Made
Saving Quantity (Months)
(Rs million) (Rs million) (Rs million) (Rs million)
(Lac. kWh) (MT)
2016~17 17.06 13.99 331.10 9.93 38.12 9.51 3.0
2017~18 34.48 26.90 81.90 3.11 30.70 14.58 5.7
2018~19 59.05 47.24 73.00 7.07 54.31 15.30 3.4
123.13
2018-19
68.82
38.12 2017-18
5
4.A.1 ENCON Project in Paint shop – Wet on Wet (2C-1B)
and 1C – 1B Technology
Before
• New Model
Signa Cab was
Electro
Electro Deposition
introduced in Pre Treatment
Process Process
Process
Deposition Baking Oven
2017.
• It requires two
coat painting Sealant Line 1
application for Sealer Oven Underbody CED Inspection
the required
finish of the Sealant Line 2
paint process.
• So it was twice Baking
Moist Sanding Top Coat Line 2
Coated and Oven
double energy
in this process. Dispatch Wax Application Touch Inspection &
Up Polishing
Proposed Changes
6
4.A.1 ENCON Project in Paint shop – Wet on Wet (2C-1B)
and 1C – 1B Technology
After : First Phase:
Important ENCON Project in Paint shop Wet – on – wet technology
New paint developed in consultation of Paint technology OEM. It does not require to bake primer coat before applying top coat
paint. It allows wet on wet painting. So resulted energy saving by eliminating one baking process.
Second phase:
For Orange & Yellow Cab, it requires baking in-between
Primer & Top coat. So new paint has been developed after working along with Paint OEM so that single coat can give the desired
quality of the cab painting. Therefore in-between baking requirement has been completely eliminated by mono coat.
Sealant Line 1
Sealant Line 2
Baking
Moist Sanding Top Coat Line 2 ( 3C -1B Primer implemented) Oven
Bottom
45 KW 30 KW
Pump
Chilled
VFD Drive Heat water
Exchanger IN/Out
After:
After study and consultation with paint technology OEM, we have provided VFD’s in paint circulation
pumps of CED system. We reduced pump speed optimally during non production time like lunch break,
tea breaks, Sundays and public holidays etc while meeting the system circulation requirements, saved
energy substantially.
c Copyright, Confidential, Tata Motors Limited
Energy Saving : 1.3 Lakhs KWH/Year
7
4.A.3 ENCON Project in Assembly Line #01 – Thermal
Energy reduction in the Baking Oven
ENCON : Baking oven energy consumption is significant in the Line #01. An ENCON on Reducing
thermal energy in baking oven at Assembly Line 1 by 10 % was taken.
Input Energy : LPG, Consumption- 22.5 Kg/ Eq. Vehicle
Loading Vehicle:
Hump (Low floor bus), Loading qty per cycle- 2
Nos Can we increase number of
MCV Model: Loading qty per cycle- 3 Nos., LCV loading vehicle in each cycle
Model: Loading qty per cycle- 4 Nos.
Time for baking- 40-45 mints Questions – Can we decrease baking time
Three stations – Loading, Baking and
Unloading. (Length of each station of three15 Opportunities
Mtrs) of
improvements Can we reduce heat loss through Air curtain
Air curtain
Heat loss through air curtain Can we optimise conveyor speed
8
4.A.3 ENCON Project in Assembly Line #01 – Thermal
Energy reduction in the Baking Oven
A. Increased number of frame baked per cycle by increasing the
Can we increase number of
stack size
loading vehicle in each cycle
1. For LCV model stack size is increased from 4 to 6, Frames
2. For hump increased from 2 to 3 and stack to
3. For rest other model the stack size is of 4 be
loaded
4. For Multi model
i. 1 Hump & 4 LCV
ii. 1 Hump & 3 MCV (LPO55, LP52, LP42 & LP48)
iii. 1MCV& 4 LCV
Can we optimise conveyor speed Three stations – Loading, Baking and Unloading. (Length of each station of three15
Mtrs)
Increased conveyor speed (5.7 to 7.57 mts/min i.e. 7.89 mints to 5.25 mnts)
Time of Cycle reduced by 2.64 Minutes
There was heat loss during baking operation through air curtain
blower suction opening.
Solution: We have provided a pneumatic actuated shutter for
closing blower suction opening while baking process in progress.
Before After
LPG Consumption in FY 2017-18 LPG Comsumption in FY 2017-18
(Kg/Equivalent Vehicle) (Kg/Equivalent Vehicle)
24.4 24.8 30 24.423.524.2 28 % LPG Consumption
26 22.6 23.1 23.5 22.8 21.8
LPG (Kg/EQV)
21.922.121.121.6 reduction
25
LPG (Kg/EQV)
Nov-18
Jan-19
Feb-19
Mar-19
May-18
Apr-18
Jun-18
Jul-18
Aug-18
Dec-18
Months Months
Saving:-
The LPG consumption per Equi. veh. before improvement : Rs 1152 (22.43*51.36 )
The LPG consumption per Equi. veh. after improvements : Rs 831 (16.18*51.36)
Saving Per equivalent vehicle : Rs 321
Saving per annum (at rate of 9.5 Equ. frame per day) : Rs. 9,14,850 (321*9.5*25*12)
9
4.A. Energy saving projects implemented
in for last 3 years : 2016-17
Annual Annual Annual Thermal Saving Annual
Total Annual Investment
Electrical Electrical Thermal Cost Payback
No Title of Project Year Unit of Savings (Rs Made (Rs
Saving Cost Saving Saving (Rs (Months)
Quantity Measureme million) million)
(kWh) (Rs million) million)
nt
1 Reduction of Specific power consumption in CV-Cx & 2016-2017 18000 0.14 0 kgs 0 0.14 0.1 9
TCF line
2 Optimising use of Recon Interconnection 2016-2017 18000 0.14 0 kgs 0 0.14 0.45 39
3 Reduction of Specific power consumption through 2016-2017 18000 0.14 0 kgs 0 0.14 0.3 26
optimized running of compressors (mix)
4 Pressure optimisation in shops 2016-2017 27000 0.22 0 kgs 0 0.22 0.5 27
5 Optimised operation of FDV in F Block(Trim Line-1) 2016-2017 14000 0.11 0 kgs 0 0.11 0.3 33
6 Optimised running of service bay FDV blowers 2016-2017 30000 0.24 0 kgs 0 0.24 0 0
7 Optimised running hours of Eastern complex FDV 2016-2017 30358 0.24 0 kgs 0 0.24 0 0
blower.
8 Replacing of old celdac pads at Eastern Complex 2016-2017 8527 0.07 0 kgs 0 0.07 0.06 10
9 Reduction in slip % 2016-2017 10272 0.08 0 kgs 0 0.08 0.15 23
10 Optimising the capacity of AC system by giving 2016-2017 22491 0.18 0 kgs 0 0.18 0.15 10
alternate solution of cooling.
11 Running hours optimisation of AC plants 2016-2017 44660 0.36 0 kgs 0 0.36 0 0
12 Enhancing efficiency of AC System 2016-2017 9000 0.07 0 kgs 0 0.07 0.05 9
13 Stoppage of production on Saturdays 2016-2017 180000 1.44 0 kgs 0 1.44 0 0
14 Elimination of production activity in C shift 2016-2017 202500 1.62 0 kgs 0 1.62 0 0
15 Avoid Chain running of floor conveyors during idle 2016-2017 26460 0.21 0 kgs 0 0.21 0 0
time
16 Control of Building lights operation 2016-2017 200000 1.6 0 kgs 0 1.6 0.1 1
17 Control of process light in Work Areas 2016-2017 10000 0.08 0 kgs 0 0.08 0 0
18 Control of Overhead lights in the Coagulation area 2016-2017 13824 0.11 0 kgs 0 0.11 0 0
19 Optimization of 3 nos AC operation at PTED 2016-2017 43800 0.35 0 kgs 0 0.35 0 0
chemical Room
c Copyright, Confidential, Tata Motors Limited
30 Implementation of Magnetic Inductor System in the 2016-2017 0 0 33,000 kgs 1.0 2.45 0.07 0
Gas burner units
36 To reduce power consumption of lighting by optimizing 2016-2017 4528 0.04 0 kgs 0 0.04 0 0
the controls
37 Pinion loading with new motified grid 2016-2017 4770 0.04 0 kgs 0 0.04 0 0
10
4.A Energy saving projects implemented
in for last 3 years : 2017-18
Annual Annual Thermal Saving
Annual Thermal Total Annual Investment
Annual Electrical Electrical Cost Payback
No Title of Project Year Cost Saving (Rs Savings (Rs Made (Rs
Saving (kWh) Saving (Rs (Months)
Unit of million) million) million)
million) Quantity
Measurement
4 Reduction in trim assy. Line consumption by 5% 2017-2018 53.27 0.00 0 kgs 0 0.000 0 0
6 Low Temperature Phosphate Chemical introduction 2017-2018 0 0.00 1901.524 kgs 0.072 0.072 0 0
7 Installation of Heat Recovery System 2017-2018 0 0.00 44000 kgs 1.672 1.672 5 35.9
9 Empty skid storage system 2017-2018 386400 3.09 0 kgs 0 3.091 8 31.1
10 Optimization of pumps operation in PTED 2017-2018 235000 1.88 0 kgs 0 1.880 0 0
12 Control of Overhead lights in the Coagulation area 2017-2018 400000 3.20 0 kgs 0 3.200 0 0
13 Control of process light in Work Areas 2017-2018 10000 0.08 0 kgs 0 0.080 0 0
15 Avoid Chain running of floor conveyors during idle time 2017-2018 26460 0.21 0 kgs 0 0.212 0 0
21 Optimize usage of compressed air on shop floor 2017-2018 71535 0.57 0 kgs 0 0.572 0 0
24 Optimize usage of lighting and man-coolers 2017-2018 392814 3.14 0 kgs 0 3.143 0 0
27 Astronomical Timer ON/OFF operation control of street light. 2017-2018 12525 0.10 0 kgs 0 0.100 0 0
28 Temperature Optimisation in Air conditioning system 2017-2018 25000 0.20 0 kgs 0 0.200 0 0
32 Replacing of old celdac pads at Eastern Complex 2017-2018 35000 0.28 0 kgs 0 0.280 0.2 8.6
33 Optimised running hours of Eastern complex FDV blower. 2017-2018 25000 0.20 0 kgs 0 0.200 0 0
34 Optimised running of service bay FDV blowers 2017-2018 50000 0.40 0 kgs 0 0.400 0 0
35 Optimised operation of FDV in F Block(Trim Line-1) 2017-2018 15000 0.12 0 kgs 0 0.120 0 0
38 Reduction of Specific power consumption in CV-Cx & TCF line 2017-2018 63437 0.51 0 kgs 0 0.507 0 0
Totalc Copyright, Confidential, Tata Motors Limited 3448407 27.6 81901.5 3.11 30.70 14.58 5.70
11
4.A Energy saving projects implemented
in for last 3 years : 2018-19
Annual Annual Thermal Saving Annual
Annual Total Annual Investment
Electrical Thermal Cost Payback
No Title of Project Year Electrical Savings (Rs Made (Rs
Cost Saving Unit of Saving (Rs (Months)
Saving (kWh) million) million)
(Rs million) Quantity Measureme million)
nt
2018-
1 LED Migration project for Phase-01 2460000 19.7 0 kgs 0 19.7 12.60 7.7
2019
2018-
2 Optimization of compressed air energy 400000 3.2 0 kgs 0 3.2 0.2 0.8
2019
2018-
3 Elimination of C-Shift production 500000 4.0 0 kgs 4 8.0 0.5 0.8
2019
Low Temperature Phosphate Chemical 2018-
4 0 0.0 10000 kgs 0.42 0.4 0 0.0
introduction 2019
2018-
5 Empty Skid storage installation 0 0.0 25000 kgs 1.05 1.1 2 0.0
2019
2018-
6 Installation of Heat Recovery System 0 0.0 35000 kgs 1.47 1.5 0 0.0
2019
Implementation of Magnetic Inductor System in 2018-
7 0 0.0 3000 kgs 0.13 0.1 0 0.0
the Gas burner units 2019
2018-
8 Empty skid storage system 236400 1.9 0 kgs 0 1.9 0 0.0
2019
2018-
9 Optimization of pumps operation in PTED 200000 1.6 0 kgs 0 1.6 0 0.0
2019
2018-
10 PT/ED line Batch Production 200000 1.6 0 kgs 0 1.6 0 0.0
2019
Avoid Chain running of floor conveyors during idle 2018-
11 75000 0.6 0 kgs 0 0.6 0 0.0
time 2019
2018-
12 Stoppage of production on Saturdays. 100000 0.8 0 kgs 0 0.8 0 0.0
2019
To reduce the energy consumption of FDV in BIW 2018-
13 6832 0.1 0 kgs 0 0.1 0 0.0
by 5% 2019
To reduce the energy consumption of compressed 2018-
14 24075 0.2 0 kgs 0 0.2 0 0.0
air in BIW by 5% 2019
To reduce the energy consumption of CAB line in 2018-
15 148277 1.2 0 kgs 0 1.2 0 0.0
BIW by 5% 2019
To reduce the energy consumption of office 2018-
16 830489 6.6 0 kgs 0 6.6 0 0.0
power consumption by 5%
c Copyright, Confidential, Tata Motors Limited
2019
2018-
17 Reduction in trim assy. Line consumption by 5% 49462 0.4 0 kgs 0 0.4 0 0.0
2019
27 Running hours optimisation of AC plants 2018-2019 50000 0.4 0 kgs 0 0.4 0 0.0
Optimising the capacity of AC system by giving alternate
28 2018-2019 15000 0.1 0 kgs 0 0.1 0 0.0
solution of cooling.
29 Replacing of old celdac pads at Eastern Complex 2018-2019 50000 0.4 0 kgs 0 0.4 0 0.0
Optimised running hours of Eastern complex FDV
30 2018-2019 25000 0.2 0 kgs 0 0.2 0 0.0
blower.
31 Optimised running of service bay FDV blowers 2018-2019 50000 0.4 0 kgs 0 0.4 0 0.0
32 Optimised operation of FDV in F Block(Trim Line-1) 2018-2019 15000 0.1 0 kgs 0 0.1 0 0.0
Reduction of Specific power consumption through
33 2018-2019 80000 0.6 0 kgs 0 0.6 0 0.0
optimized running of compressors (mix)
Reduction of Specific power consumption in CV-Cx & TCF
34 2018-2019 50000 0.4 0 kgs 0 0.4 0 0.0
line
Total 5904924 47.2 7.066 54.31 15.30 3.38
12
4.B.1 Innovation Project : Remote Switching of Forced
Draft Ventilation System (FDV) via Mobile GSM System
2018-19
Forced draft Ventilation Units 2016-17 2017-18
Till Feb’19
Plant KWh/Eq Vehicle 21 17 18
Line 2 & 3 KWh/Eq Vehicle 16 12 12
BIW Shop KWh/Eq Vehicle 14 11 12
Assembly Line 1 Shop KWh/Eq Vehicle 40 38 46
13
4.B.1 Innovation Project : Remote Switching of Forced
Draft Ventilation System (FDV) via Mobile GSM System
Remote Switching FDVs
•This system is based on GSM (SMS based)
•It consists of 1 master block and 5 slave blocks (one at each electrical panel). SB 2 Switched off
•Slave blocks is installed at motor panel side while the master block is at control SB 2 Acknowledgement
room. (using authentication SIM only) Sent
SB 3 Switched off
SB 3
Acknowledgement
Sent
SB 4 Switched off
SB 4
Acknowledgement
Sent
F Block 1-5
Master Controller GSM modem F Block 1-5 Switched off
Slave controller
Acknowledgement
Sent
F Block 6-10
F Block 6-10 Switched off
Acknowledgement
Sent
1 Network Indicator:
Shows if mobile network
1 for operation is available
2 or not
2 FDV Status: Switched
on/off
3
3 Pushbutton for operation
Before After
Concerns: Benefits:
1. Energy Loss:-Energy loss of 1.5lakh KWH/annum due to 1.Energy saving :- Energy saving of 1.5lakh KWH/annum by
running of FDV's during non-production hours. providing remote switching off FDVs
2. Environment:- Increase in carbon footprint due to 2. Cost Saving :- Recurring cost saving of Rs. 10.7 Lakhs/annum
energy loss 3. Environment:- Reduction in carbon footprint
4. SMS escalation to user for information of FDV switch off
14
4.B.2 Innovation Project : LED Migration Project - Solution
based design and World Class Quality Standards compliance
LED, the best lighting option No expenses in Phase wise LEDification WCQ- Lighting Standard
today LED- migration project compliance
▪ Energy efficient, higher ▪ Entire plant in phases ▪ Designed lighting wrt WCQ
▪ OPEX model with M/s.
Lumens per Watts ▪ Better control schemes Lighting standard
Philips
▪ No Mercury-Environmental ▪ Reduction in consumption by ▪ Modifications - New wiring /
▪ Supply of LED Lights,
friendly 50% (Minimum) removal as per conditions
Installation, Testing &
▪ No IR & UV emissions ▪ Execution of the project without
Commissioning of LED lights
▪ Reduced heat generation disturbing the production
▪ 5 yrs extended warranty
▪ Compliance to Safety standards
Implementation Roadmap:
Innovative Projects: LED Migration Project Cowl shop
Before: 200-250 Lux After: 450-500 Lux
Phase-I Phase-II Phase-III 23 KW 8 KW
• Line-1 • TCF • Paint shop
• Street Lighting (EC • Other shops
& WC)
• BIW
15
4.B.2 Innovation Project : LED Migration Project - Solution
based design and World Class Quality Standards compliance
Conventional After Sensor installation
After LED Migration
Lighting system
Sensor
Controlled
lighting
Group
Manual
Controlled
Lighting group
Horizontal
Deployment of
this innovation
Occupancy Sensor project across Tata
Power Consumption : 14 KW : 6.5 KW (Red 46.4%) : 6.5 KW (Red 46.4%) Motors Plants is in
Lux level : 125~200 : 250~450 (Inc 250% ) : 250~450 (Inc 250% )
Energy Cons.-Monthly: 6,300 : 2,925 KWH / 23,400 INR : 1,312 KWH / 10,400 INR (Red 78.2% ) progress
KWH / 50,400 INR-Annually : (Red 46.4% )
: 15,744 KWH / 1,25,952 INR
75,600 KWH / 6,04,800 INR : 35,100 KWH / 2,80,800 INR
Inauguration of Phase-1 of Solar Power Plant Inauguration of 644 kWp Solar Power Plant in Tyre Yard-
2 MWp in Paint Shop on 8th Jan’ 2018 by Plant Head E.C. on 4th Mar 2019 by COO, Tata Motors
c Copyright, Confidential, Tata Motors Limited
16
5. Utilization of Renewable Energy Sources
Installed Generation
Type of Onsite / % of Overall
Year Technology Capacity (Million
Energy Offsite Electrical Energy
(MWp) kWh)
2016-17 Solar PV Electrical Onsite 0.025 0.023822 0.058
2017-18 Solar PV Electrical Onsite 2.025 0.313893 0.714
2018-19 Solar PV Electrical Onsite 4.025 2.496101 5.412
Roof-top Locations Planned for Solar Plant Installation in Eastern Complex
Solar plant Locations completed in Phase-I: BIW, Paint Shop and TCF Line-2&3
Solar plant Locations completed in Phase-II: Tyre Yard, Rear Axle shop, TCF-2&3 (south roof) and Trim Line-2&3
c Copyright, Confidential, Tata Motors Limited
70
57.03
69.91
40
25.04
24.03
19.60
30
15.26
14.04
Annual Carbon
10.37
20
8.51
abatement
4.82
3.14
17
6. Utilization of Waste Material as Fuel
18
7. Specific GHG Emission
Environmental Policy
19
8. Green Supply Chain
20
8. Green Supply Chain
Environment friendly initiatives taken by Supply Chain team along with vendors & Suppliers
Idea Value Realized value Status of Cost &
S. NO Projects on Energy conservation (in Rs. Cr) (in Rs. Cr) Energy Audit by
2018-19 Energy Cell
1 Small Urea Solution packaging replaced with bulk storage tanks near filling
station to reduce HW and eliminate Plastic. 1.79 1.39 Done
2 Thinner reuse by replacing black paint thinner with Paint Shop Recycled Thinner
in Frame Painting 0.12 0.04 Done
4 Packaged Drinking water is replaced by own purified water 0.04 0.04 Done
5 Plastic Cups replaced with steel cups and paper cups 0.08 0.08 Done
6 Sand Paper optimization 0.01 0 Done
7 Thermocol replaced by recyclable material in battery packaging 0.05 0.03 Done
8 Elimination of plastic wrapping waste from door Post 0.15 0.9 Done
9 Paint tins being disposed through scrap Sell after cleaning. 0.2 0.1 Done
Total annual value of implemented ideas 4 2.6
S N0.: 1
❖ Abated carbon emissions by 2,632 TCO2 e in last two years
Urea Bulk
Storage Tank
50 KL
8.2 Thermocol Elimination by replacing Thermocoal separator between battery stack layers
with recyclable separator Implemented condition
Earlier Condition – 1.Thermocol is replaced by
1. Thermocol was used as a separator recyclable separator
between layers of batteries in a battery 2. Thermocol usage in battery
stack. stack is eliminated.
2. Generation of waste Thermocol was not 3. Apart from being an ecofriendly
best environment practice . initiatives this project having
3. Lot of hip of Thermocol was accumulated potential saving of 5 lacs/annum Batteries package with
Batteries package with
c Copyright, Confidential, Tata Motors Limited Recyclable Separator
Thermocol Separator
21
9. Teamwork, Employee involvement & Monitoring
Monthly Energy Consumption Daily Consumption Report Daily Shopwise Report Hourly Consumption Report-Plant
Report
Daily Energy Audit Report Daily Solar Generation Report Hourly Consumption Report-Shop
2019-20
2018-19
H1: Reporting of shop-wise energy
2017-18 consumption started on hourly basis.
H1: Reporting of entire plant’s energy H1: Reporting of working day’s and
Reporting of energy consumption on daily basis non-working day’s consumption
consumption of the plant and Daily Energy Audit Report (DEAR) separately for identification of
Awareness level
individual shops on fortnightly circulated across the plant to minimize areas/processes of energy wastage.
and monthly basis energy wastage. H2: Automatic recording and reporting
H2: Reporting of entire plant’s and shop- of energy consumption through SCADA
wise energy consumption on daily basis. for eliminating manual errors and
minimizing the time required for report
preparation. → WIP
➢ Quarterly Performance Report:- Review by : Energy Auditor , GM , Plant Head, Sr. VP &MD
This report gives the consumption, Monthly and cumulative, performance trends, and efforts taken. This report is sent to
Plant Head (CVBU - Pune) & respective Divisional Heads.
Review by : Energy Auditor GM , Plant Head, Sr.
➢ Half yearly Performance Feed back to Plant Head & Divisions: - VP &MD
The performance of the Divisions with reference to the target both monthly and cumulative along with the performance
expected to achieve w r t the Target.
➢ Annual Performance Report: - Review by : Energy Auditor , GM , Plant Head, Sr. VP &MD
This report giving consumption performance of various areas along with the efforts taken by various Divisions. This
report is released to - Finance Division – as Input for disclosures for Director's Report.
Energy Management Cell – Prepares the Energy report –Daily, Monthly( M), Quarterly (Q), Half-yearly (H) & Annual reports.
Plant Head & MD reviews M, QY, HY, Annual reports
22
9. Teamwork, Employee involvement & Monitoring
Projects implemented through Kaizen
• Kaizens
• Suggestion
schemes
• Workshops
• Vendor meets
• Expo’s
• Challenging
projects
c Copyright, Confidential, Tata Motors Limited
We have Energy Management Cell in our Plant, Which initiates & Manages all sorts of Energy Conservation measures
across the Plant.
Energy Policy ISO 50001 Certificate
DH – Mr. S. B. Matta DH – Mr. V. Agrawal DH – Mr. S. N. Verma DH – Mr. U. Tauheed DH – Mr. R. K. Singh
Plant services Paint shop TCF BIW IBF
# DH – Divisional Head
DH – Mr. R. K. Singh DH –Mr. G. V. Joshi DH – Mr. A Chharia DH – Mr. Ankush Gour DH – Mr. R. K. Singh
Axle Shop Planning Materials & ADD HR CV- CX
23
10. Implementation of ISO 50001/Green Co/IGBC
rating
Events Planned for Energy Conservation Month Celebrations
➢ Energy Conservation Flag Hoisting
➢ Energy Conservation Pledge
➢ Slogan & Essay writing
➢Poster designing
➢Technical Seminars & Product Display
➢Energy Conservation Workshops
TARG
➢Expert Hour sessions
➢Energy Conservation Projects
➢Kaizen Events
➢Best Energy efficient shop competition
➢Best Energy efficient office competition
➢Energy Nuggets
➢Energy Conservation Competitions at schools
➢Awareness programs
Motivational speech on Energy Conservation by Head- Signing Energy pledge by the employees
Technical Services
24
10. Implementation of ISO 50001/Green Co/IGBC rating
25
10. Implementation of ISO 50001/Green Co/IGBC rating
Foot fall of 915+ had in the workshop including, Employees, Vendors, Contractual work force, Service
providers, Deligates from NEDA etc. and learnt about energy conserving products and Renewable
energy related products.
c Copyright, Confidential, Tata Motors Limited
Capital
Saving Potential Year of
Investment
S.No Details of Technology Absorption implementatio Photographs
n
KWH Rs. In Lakh
Smart Lighting project for Rear axle store area. 15744 0.05 2018-19
5
VFD & PID based operation of Cooling Towers. 2160 2.5 2018-19
8
26
11. Other innovative Technologies implemented
Capital Year of
Saving Potential
S. No. Details of Technology absorption investment (Rs. Implementatio Photographs
(KWH)
In Lakhs) n
Use of Pneumatic shut off valve for controlling 79200 5.544 2017-18
1 leakage
Use of CSU for individual offices to comensate for 10800 0.756 2017-18
2
flexible work hours
Use of pump coro coat for improving pump 35200 2.464 2017-18
4 efficiency
Treated fresh air unit for SB-5 ofice 2720 0.1904 2017-18
5
Capital Year of
S.No Details of Technology Absorption Saving Potential investment (Rs. implementatio Photographs
In Lakhs) n
Precision units in network and server rooms. 35000 6.2 2016-17
1
27
12. Long term Vision on EE
Vision towards Energy Conservation by FY 2024-25 (5 years) Specific Power Consumption ( kWh/Eq. Veh.)
Focused areas for reducing SPC: 400 381 Target of SPC reduction Better
➢ Optimization of Production processes. by 50% in 5 years.
➢ Periodic Energy audits.
➢ Heat Pumps installation for Axle Shop. 300 294
SPC-Actual
➢ Optimization Operation for HVAC system, Street 250
kWh.Eq. veh
SPC-Target
Lighting & other utilities. 220
➢ Adopting new technologies such as Smart 200 194
Lighting,LED migration, VFD’s for Paint shop, ASU & 166
138
Chiller Units, Energy Efficient motors, Star rated 110
equipments etc. 100
➢ Implementation of IOT in Energy
Management system.
0
Renewable Energy Contribution ( % )
Target of achieving RE
100
100 contribution by 100% in 5 years.
Better
90 85
80
Focused areas for increasing
RE Share-Target 65 RE contribution:
70
60 RE Share-Actual 52
50 ➢ Open Access Solar Power Plant of 14 MWp.
%
28
Our Message through this presentation is
“Systematic, Sustainable, Continual improvements,
Knowledge sharing, Innovation, customer delight,
society centric and Team Work”
are the core pillars to make a plant as an
29