Doc. No.

EMSM11/ R 01
Master List Of Objective, Targets & Rev. No. 00
EMP Date: 10.11.2006

Sr. No. Title of the objective Target date for Department to which it is
completion of the applicable
activity
1 To improve the signage February, 2007 MR
in the plant with respect
to conservation of energy
2 To conduct the noise February, 2007 Maintenance
monitoring to identify the
level of noise in the plant
3 To identify the areas January, 2007 Maintenance
where the lux level in
high by conducting
Illumination monitoring
in the plant.
4 To conserve natural January, 2007 HR / Administration
resource by printing
guidelines for Photostat
and printing on both
sides of paper
5 To prevent contamination December, 2006 Maintenance
of oil through the
construction of marble
flooring in transformer
storage area.
6 To prevent land December, 2006 Maintenance
contamination by
installation of oil
collection tray in DG set
oil storage tank
7 To replace the cartons August, 2007 QA / Purchase
with bins for reducing the
consumption of cartons
8 To provide 100% general February, 2007 HR / QA
awareness training to all
concerned in the
organization on ISO
14001
9 To prevent loss of February, 2007 Maintenance
material due to fire in the
stores through proper
cabling
10 To comply with the February, 2007 Maintenance / HR
provision of the Air
consent by conducting
stack monitoring of DG
set
11 To improve the January, 2007 QA
conservation of water
through display of proper
signage’s and it’s
training.