Karnataka Urban Water Supply and Drainage Board, Bangalore

Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

2 Earth work excavation for pipeline trenches (except building


works) including depositing on bank including danger
shoring, struffing, barricading lighting and using sight rails
and boning rods at every 100 metres wherever necessary
as directed in the following strata. with all lead and lift etc
complete.,as directed by Engineer in-charge

Calculation of Earthwork for Complete Depth


i For Manhole Earth work 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size
and exclusive of disintegrated rock with all lead and lift etc
complete.
Area : 3.14 x 2.50 x 2.50 / 4 = 4.91 m2
Area : 3.14 x 2.80 x 2.80 / 4 = 6.15 m2
Area : 3.14 x 3 x 3 / 4 = 7.06 m2
AIT campus near Govt.Primary school
796 1 4.91 1.75 Cum 8.59
798 1 4.91 1.65 Cum 8.10
799 1 4.91 1.65 Cum 8.10
800 1 4.91 1.55 Cum 7.61
Near Hollycross Hospital
263 1 4.91 1.65 Cum 8.10
264 1 4.91 1.65 Cum 8.10
265 1 4.91 1.75 Cum 8.59
266 1 4.91 1.85 Cum 9.08
267 1 4.91 1.75 Cum 8.59

Sheet No:1 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

267A 1 4.91 1.85 Cum 9.08


470A 1 4.91 2.05 Cum 10.07
Total Qty 11 94.01

For Pipe Line Trench Earth Work 0-2 Mtrs - All soils
AIT campus near Govt.Primary school (1.5+1.4)/2
796-798 1 25.20 0.75 1.45 Cum 27.41
(1.40+1.40)/2
798-799 1 27.20 0.75 1.40 Cum 28.56
(1.40+1.30)/2
799-800 1 29.70 0.75 1.35 Cum 30.07
(1.30+1.50)/2
800-801 1 25.70 0.75 1.4 Cum 26.99

Near Hollycross Hospital (2+1.4)/2


262-263 1 27.20 0.75 1.7 Cum 34.68
(1.4+1.4)/2
263-264 1 27.20 0.75 1.4 Cum 28.56
(1.4+1.5)/2
264-265 1 27.20 0.75 1.45 Cum 29.58
(1.5+1.60)/2
265-266 1 27.20 0.75 1.55 Cum 31.62
(1.60+1.5)/2
266-267 1 27.20 0.75 1.550 Cum 31.62
(1.50+1.6)/2

Sheet No:2 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

267-267A 1 27.20 0.75 1.55 Cum 31.62


(1.60+1.80)/2
267A-470A 1 25.20 0.75 1.70 Cum 32.13
Out Fall 600mm Dia R.C.C Pipe (2+2)/2
2012A-2012B 1 47.00 1.20 2 Cum 112.80
(2+2)/2
2012D-2012E 1 37.00 1.20 2.00 Cum 88.80

Total Qty Cum 534.44


Gr Total Cum 628.45
Deduct DIR Qty Cum 267.43
Net Qty in All Soils Cum 361.02

Earth works excavation for MH in DIR


0 to 2 Mtr depth
b -do- In disintegrated rock, soft rock, soft shale, medium
hard rock comprising of lime stone sand stone, hard shale,
schist, fissured rock wihtout resorting to blasting.

For Manhole Earth Work 0 to 2 Mtr depth


AIT campus near Govt.Primary school
796 1 4.91 0.70 Cum 3.44
798 1 4.91 0.70 Cum 3.44
799 1 4.91 0.70 Cum 3.44
800 1 4.91 0.70 Cum 3.44
Near Hollycross Hospital
263 1 4.91 0.60 Cum 2.95

Sheet No:3 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

264 1 4.91 0.60 Cum 2.95


265 1 4.91 0.60 Cum 2.95
266 1 4.91 0.60 Cum 2.95
267 1 4.91 0.60 Cum 2.95
267A 1 4.91 0.60 Cum 2.95
470A 1 4.91 0.60 Cum 2.95
Total Qty 15 34.37
For Pipe Line Trench Earth Work 0-2 Mtrs in DIR
AIT campus near Govt.Primary school
796-798
1 25.50 0.75 0.7 Cum 13.39
798-799
1 27.50 0.75 0.70 Cum 14.44
799-800
1 30.00 0.75 0.7 Cum 15.75
800-801
1 26.00 0.75 0.8 Cum 15.60
Near Hollycross Hospital
262-263
1 27.50 0.75 0.6 Cum 12.38
263-264
1 27.50 0.75 0.6 Cum 12.38
264-265
1 27.50 0.75 0.60 Cum 12.38
265-266
1 27.50 0.75 0.6 Cum 12.38

Sheet No:4 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

266-267
1 27.50 0.75 0.600 Cum 12.38
267-267A
1 27.50 0.75 0.60 Cum 12.38
267A-470A
1 25.50 0.75 0.60 Cum 11.48

Sheet No:5 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Out Fall 600mm Dia R.C.C Pipe


2012A-2012B 1 48.20 1.70 0.6 Cum 49.16

2012D-2012E 1 38.20 1.70 0.6 Cum 38.96


Total Qty 15 Cum 233.06

Gr Total Cum 267.43


Earth works excavation for MH in DIR
ii 2 to 4 Mtr depth
b -do- In disintegrated rock, soft rock, soft shale, medium
hard rock comprising of lime stone sand stone, hard shale,
schist, fissured rock wihtout resorting to blasting.

For Manhole Earth Work 2 to 4 Mtr depth


For Pipe Line Earth Work 2 to 4 Mtr depth - DIR
Out Fall 600mm Dia R.C.C Pipe
2012A-2012B (2+2)/2
1 48.20 1.50 2.0 Cum 144.60
2012D-2012E (2.0+2.0)/2
1 38.20 1.50 2.0 Cum 114.60
Total Qty 2 Cum 259.20

iii Earth works excavation for MH in DIR


b For MH Earth Work 4 to 6 Mtr depth
Out Fall 600mm Dia R.C.C Pipe 1.40+1.60
2012A-2012B 1 48.80 1.20 1.50 Cum 87.84
1.20+1.40

Sheet No:6 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

2012D-2012E 1 38.80 1.20 1.30 Cum 60.53


Total Qty 2 Cum 148.37

Sheet No:7 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

17 Providing Murrum/gravel Bedding for the pipeline trenches


including watering and consolidation by punners etc.,
complete with all lead and lift etc complete.,. (In Black
Cotton and rock reaches), as directed by Engineer in-charge

For Manhole Murrum/gravel Bedding


Near Hollycross Hospital 1 4.91 0.15 Cum 0.74
263 1 4.91 0.15 Cum 0.74
264 1 4.91 0.15 Cum 0.74
265 1 4.91 0.15 Cum 0.74
266 1 4.91 0.15 Cum 0.74
267 1 4.91 0.15 Cum 0.74
267A 1 4.91 0.15 Cum 0.74
470A 1 4.91 0.15 Cum 0.74
Total Qty Cum 5.92
Abstract
Murrum /Bedding for MH
Total Qty Cum 5.92
For Pipe Line Murrum/gravel Bedding
Near Hollycross Hospital
262-263 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2
263-264 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2
264-265 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2

Sheet No:8 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

265-266 1 30.00 0.75 0.15 Cum 3.38

Sheet No:9 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

(0.15+0.15)/2
266-267 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2
267-267A 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2
267A-470A 1 28.00 0.75 0.15 Cum 3.15
(0.15+0.15)/3
Out Fall 600mm Dia R.C.C Pipe
(0.15+0.15)/2
2012A-2012B 1 48.80 1.00 0.15 Cum 7.32
(0.15+0.15)/2
2012D-2012E 1 38.80 1.00 0.15 Cum 5.82
Total Qty 9 Cum 36.57

Abstract
Murrum /Bedding for P-line
Total Qty Cum 42.49

Sheet No:10 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

14 Supplying, lowering, laying, jointing, testing and


commissioning of glazed stoneware pipes conforming to IS
651:1992 with latest amendements, of fallowings sizes
including conveying of pipe to worksite and caulking with
hemp dipped in tar and jointing with C.M. 1:1½ perfect
linking and curing for 10 days, and testing with water with all
lead including cost of jointing materials as directed as
directed by Engineer in-charge etc., complete. (contractor
will make his own arrangements for procuring water for
testing).

a 150 mm dia - Supply of pipe Rmt 0.0


200 mm dia - Supply of pipe Rmt 0
250 mm dia - Supply of pipe Rmt 0
150 mm Dia
150 mm Dia
AIT campus near Govt.Primary school
796-798 1 28.00 1.20 Rmt 26.80
798-799 1 30.00 1.20 Rmt 28.80
799-800 1 32.50 1.20 Rmt 31.30
800-801 1 28.50 1.20 Rmt 27.30
Near Hollycross Hospital
262-263 1 30.00 1.20 Rmt 28.80
263-264 1 30.00 1.20 Rmt 28.80
264-265 1 30.00 1.20 Rmt 28.80
265-266 1 30.00 1.20 Rmt 28.80
266-267 1 30.00 1.20 Rmt 28.80

Sheet No:11 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

267-267A 1 30.00 1.20 Rmt 28.80


267A-470A 1 28.00 1.20 Rmt 26.80
Total 11 313.80
Abstract Qty of
150 mm Stoneware pipe
150 Rmt 313.80
13 Supplying S&S RCC spun pipes NP-3 class conforming to IS
458:1988 with latest amendments and conveying to worksite,
rolling and lowering into trenches, laying true to line and level
including loading and unloading at both destinations and
jointing of pipes and specials ( excluding cost of specials)
including perfect linking of joints with jack to correct position
including cost of jointing materials ie., rubber rings confirming to
relevant IS for S&S RCC pipes with all lead and lift as directed
and giving necessary hydraulic test to the required pressure as
per ISS and testing & commissioning (Contractor will make his
own arrangements for procuring water for testing).as directed
by Engineer in-charge.

600 mm Dia R.C.C pipe


OUT FALL 600MM DAI R.C.C PIPR
2012A-2012B 1 50.00 1.50 Rmt 48.50
2012D-2012E 1 40.00 1.50 Rmt 38.50
Total 2 Rmt 87.00
Abstract Qty of
600 mm R.C.C pipe
600mm Rmt 87.00

Sheet No:12 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

10 Providing and constructing of Manhole chambers conical in


shape at top with CC 1:3:6 foundation using 40mm and down
size graded metal of approved quality and with an offset of 0.15
Mtr. alround the chamber and brick masonry in C.M. 1:4 plaster
with bricks of approved quality and CM plaster 1:3 proportion
12mm thick inside and outside except for the conical surface
outside where the thickness of plaster shall be 20 mm thick,
with 1 to 6 slope in the concrete towards the central drain,
finished smooth and fixing of pipes in CC 1:2:4 with graded
metal of 20 mm and down size including supplying and fixing
SFRC manhole frame and cover confirming to IS 12592 (Part-I):
1988 and IS 12592 (

Sheet No:13 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Part-II) 1991 with latest amendments in CC 1:2:4, supplying


and fixing of plastic foot steps staggered at 30 cms apart as
directed, watering, curing, barricading, danger lighting, pouring
tar over M.H. frame and cover, cost of tar, shoring, strutting,
dewatering, engraving Manhole No. on the inner conical
surface etc. as per the drawing with all lead and lifts and for
various diameters and depths noted below etc complete,. as
directed by Engineer in-charge

a -do- with table moulded bricks of approved quality and


medium duty SFRC manhole frame and cover for 1.20 Mtr.
dia.
For 1.30 mtr depth
800 1 1.30 No 1
For 1.40 mtr depth
798 1 1.40 No 1
799 1 1.40 No 1
263 1 1.40 No 1
264 1 1.40 No 1

Total MH 4
For 1.50 mtr depth
796 1 1.50 No 1
265 1 1.50 No 1
267 1 1.50 No 1
Total MH 3

For 1.60 mtr depth

Sheet No:14 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

266 1 ` 1.60 No 1
267A 1 ` 1.60 No 1
For 1.80 mtr depth
470A 1 1.80 No 1
Total MH 11

D SHIFTING OF EXISTING WATER SUPPLY PIPE LINE


4 Labour charges only for conveying supplied PVC pipes to
worksite, rolling and lowering into trenches, laying true to
line and level and perfect linking at joints, testing and
commissioning, including loading and unloading at both
destinations and cuts of pipes wherever necessary including
jointing of PVC pipes and specials (The PVC pipes, specials
and jointing materials will be supplied by the board at free of
cost) with jointing of approved type, with all labour, with all
lead & lift including encasing the pipe alround to a depth of
not less than 15cms with soft gravel or selected earth
available from the excavation etc complete and giving
necessary hydraulic test to the required pressure as per ISS
(contractor will make his own arrangements for procuring
water for testing). with all lead and lift etc complete.,as
directed by Engineer in-charge

arrangements for procuring water for testing). with all lead


and lift etc complete.,as directed by Engineer in-charge

a 90 mm dia PVC pipe - 6Kg/Cm2


796-797 1 14.50 Rmt 14.50

Sheet No:15 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

797-798 1 8.80 Rmt 8.80


800-801 1 9.60 Rmt 9.60
262-263 1 4.00 Rmt 4.00
798-799 1 7.00 Rmt 7.00
2012A-2012B 1 12.60 Rmt 12.60
1978 1 15.70 Rmt 15.70
2012B 1 5.20 Rmt 5.20
Total Rmt 77.40
b 110 mm dia PVC pipe - 6Kg/Cm2
2012A 1 11.80 Rmt 11.80
2012B 1 14.30 Rmt 14.30
2012C 1 15.00 Rmt 15.00
Total 41.10

4 Providing, laying, spreading and compacting stone


aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with 3 wheeled steel/ vibratory roller 8-10
tonnes in stages to proper grade and camber, applying and
brooming requisite type of screening/ binding Materials to fill
up the interstices of coarse aggregate, watering and
compacting to the required density. BY Manual means using
Screening Type-A (13.2mm agg.) Grading-II with all lead
and lift etc complete.,

Pipe Line in WBM

Sheet No:16 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

AIT campus near Govt.Primary school


796 1 28.00 1.00 0.15 Cum 4.20
798 1 30.00 1.00 0.15 Cum 4.50
799 1 32.50 1.00 0.15 Cum 4.88
800 1 28.50 1.00 0.15 Cum 4.28
Total Qty 17.86

Sheet No:17 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

3 Refilling pipeline trenches and foundation with selected


available earth from trench excavation and foundation
including watering, consolidation in layers of 15 cms.,
thickness including disposing off the surplus earth with all
lead and lift etc complete., as directed by Engineer in-
charge

0 to 2 1 628.45
2 to 4 1 259.20
4 to 6 1 148.37
Total Qty 1036.02
Deduct MH= (11*0.785*1.95*1.95*1.5) 49.25
Deduct Pipe= (306*0.785*0.175*0.175) 7.36
Deduct Pipe= (85*0.785*0.70*0.70) 32.70
Total deduct Qty 89.30
Gr Total 946.72

Sheet No:18 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

2 Earth work excavation for pipeline trenches (except building


works) including depositing on bank including danger
shoring, struffing, barricading lighting and using sight rails
and boning rods at every 100 metres wherever necessary
as directed in the following strata. with all lead and lift etc
complete.,as directed by Engineer in-charge

a -do in all soils mixed with boulders of upto 30 cms., size


and exclusive of disintegrated rock with all lead and lift etc
complete.
Area : 0.785 x 3.10 x 3.10 = 7.55 m2
Area : 0.785 x 3.60 x 3.60 = 10.18 m2
Area : 0.785 x 4.0 x 4.0 = 12.57 m2
For Manhole Earth work 0 to 2 Mtr depth
Out Fall 600mm Dia R.C.C Pipe
2203A24 1 10.18 2.00 Cum 20.36
2203A23 1 10.18 2.00 Cum 20.36
2203A22 1 10.18 2.00 Cum 20.36
2203A21 1 12.57 2.00 Cum 25.14
Total Qty 86.22

For Pipe Line Trench Earth Work 0-2 Mtrs - All soils

Out Fall 600mm Dia R.C.C Pipe


2203A25-2203A24 1 35.40 1.70 2.00 Cum 120.36
2203A24-2203A23 1 50.40 1.70 2.00 Cum 171.36
2203A23-2203A22 1 40.40 1.70 2.00 Cum 137.36

Sheet No:19 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

2203A22-2203A21 1 40.20 1.70 2.00 Cum 136.68


Total Qty Cum 565.76

Sheet No:20 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Gr Total Cum 651.98


Deduct DIR Qty Cum 164.16
Net Qty in All Soils Cum 487.82
Earth works excavation for MH in DIR
0 to 2 Mtr depth
b -do- In disintegrated rock, soft rock, soft shale, medium
hard rock comprising of lime stone sand stone, hard shale,
schist, fissured rock wihtout resorting to blasting.

For Manhole Earth Work 0 to 2 Mtr depth


Out Fall 600mm Dia R.C.C Pipe
Area : 0.785 x 3.10 x 3.10 = 7.55 m2
Area : 0.785 x 3.60 x 3.60 = 10.18 m2
Area : 0.785 x 4.0 x 4.0 = 12.57 m2
For Manhole Earth work 0 to 2 Mtr depth
Out Fall 600mm Dia R.C.C Pipe
(0.4+0.5)/2
2203A24 1 10.18 0.45 Cum 4.58
(0.5+0.6)/2
2203A23 1 10.18 0.55 Cum 5.60
(0.6+0.5)/2
2203A22 1 10.18 0.55 Cum 5.60
(0.5+0.4)/2
2203A21 1 12.57 0.45 Cum 5.66

Sheet No:21 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Total Qty 21.44

Sheet No:22 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

For Pipe Line Trench Earth Work 0-2 Mtrs in DIR


Out Fall 600mm Dia R.C.C Pipe
(0.4+0.5)/2
2203A25-2203A24 1 35.40 1.70 0.45 Cum 27.08
(0.5+0.6)/2
2203A24-2203A23 1 50.40 1.70 0.55 Cum 47.12
(0.6+0.5)/2
2203A23-2203A22 1 40.40 1.70 0.55 Cum 37.77
(0.5+0.4)/2
2203A22-2203A21 1 40.20 1.70 0.45 Cum 30.75
Total Qty Cum 142.72
Gr Total Cum 164.16
Earth works excavation for MH in DIR
2 to 4 Mtr depth
b -do- In disintegrated rock, soft rock, soft shale, medium
hard rock comprising of lime stone sand stone, hard shale,
schist, fissured rock wihtout resorting to blasting.

Area : 0.785 x 3.10 x 3.10 = 7.55 m2


Area : 0.785 x 3.60 x 3.60 = 10.18 m2
Area : 0.785 x 4.0 x 4.0 = 12.57 m2
For Manhole Earth Work 2 to 4 Mtr depth
Out Fallm 600mm Dia R.C.C Pipe
2203A24 1 7.55 1.65 Cum 12.46
2203A23 1 7.55 1.85 Cum 13.97
2203A22 1 7.55 2.00 Cum 15.10

Sheet No:23 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

2203A21 1 10.18 2.00 Cum 20.36


Total Qty 61.89

Sheet No:24 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

For Pipe Line Earth Work 2 to 4 Mtr depth - DIR


Out Fall 600mm Dia R.C.C Pipe
2203A25-2203A24 1 35.90 1.20 2.00 Cum 86.16
2203A24-2203A23 1 50.90 1.20 2.00 Cum 122.16
2203A23-2203A22 1 40.90 1.20 2.00 Cum 98.16
2203A22-2203A21 1 40.65 1.20 2.00 Cum 97.56
Total Qty Cum 404.04
Gr Total 465.93

Earth works excavation for MH in DIR


For MH Earth Work 4 to 6 Mtr depth
Out Fall 600mm Dia R.C.C Pipe
Out Fallm 600mm Dia R.C.C Pipe
Area : 0.785 x 3.10 x 3.10 = 7.55 m2
Area : 0.785 x 3.60 x 3.60 = 10.18 m2
Area : 0.785 x 4.0 x 4.0 = 12.57 m2
2203A22 1 7.55 0.45 Cum 3.40
2203A21 1 7.55 0.45 Cum 3.40

Total Qty 2 Cum 6.80

Sheet No:25 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

17 Providing Murrum/gravel Bedding for the pipeline trenches


including watering and consolidation by punners etc.,
complete with all lead and lift etc complete.,. (In Black
Cotton and rock reaches), as directed by Engineer in-charge

Sheet No:26 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

For Manhole Murrum/gravel Bedding


Out Fall 600mm Dia R.C.C Pipe
2203A25 1 7.55 0.15 Cum 1.13
2203A24 1 7.55 0.15 Cum 1.13
2203A23 1 7.55 0.15 Cum 1.13
2203A22 1 7.55 0.15 Cum 1.13
Total Qty 4 Cum 4.52
For Pipe Line Murrum/gravel Bedding
Out Fall 600mm Dia R.C.C Pipe
2203A25-2203A24 1 35.90 1.20 0.15 Cum 6.46
2203A24-2203A23 1 50.90 1.20 0.15 Cum 9.16
2203A23-2203A22 1 40.90 1.20 0.15 Cum 7.36
2203A22-2203A21 1 40.65 1.20 0.15 Cum 7.32
Total Qty 4 Cum 30.30
Gr Total Cum 34.82

Sheet No:27 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

13 Supplying S&S RCC spun pipes NP-3 class conforming to


IS 458:1988 with latest amendments and conveying to
worksite, rolling and lowering into trenches, laying true to
line and level including loading and unloading at both
destinations and jointing of pipes and specials ( excluding
cost of specials) including perfect linking of joints with jack to
correct position including cost of jointing materials ie., rubber
rings confirming to relevant IS for S&S RCC pipes with all
lead and lift as directed and giving necessary hydraulic test
to the required pressure as per ISS and testing &
commissioning (Contractor will make his own arrangements
for procuring water for testing).as directed by Engineer in-
charge.

f 600 mm Dia R.C.C pipe


2203A25-2203A24 1 37.50 Rmt 37.50
2203A24-2203A23 1 52.50 Rmt 52.50
2203A23-2203A22 1 42.50 Rmt 42.50
2203A22-2203A21 1 42.50 Rmt 42.50
Total 4 Rmt 175.00
600mm Rmt 175.00

Sheet No:28 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

10 Providing and constructing of Manhole chambers conical in


shape at top with CC 1:3:6 foundation using 40mm and
down size graded metal of approved quality and with an
offset of 0.15 Mtr. alround the chamber and brick masonry in
C.M. 1:4 plaster with bricks of approved quality and CM
plaster 1:3 proportion 12mm thick inside and outside except
for the conical surface outside where the thickness of plaster
shall be 20 mm thick, with 1 to 6 slope in the concrete
towards the central drain, finished smooth and fixing of
pipes in CC 1:2:4 with graded metal of 20 mm and down
size including supplying and fixing SFRC manhole frame
and cover confirming to IS 12592 (Part-I): 1988 and IS
12592 (Part-II) 1991 with latest amendments in CC 1:2:4,
supplying and fixing of plastic foot steps staggered at 30
cms apart as directed, watering, curing, barricading, danger
lighting, pouring tar over M.H. frame and cover, cost of tar,
shoring, strutting, dewatering, engraving Manhole No. on the
inner conical surface etc. as per the drawing with all lead
and lifts and for various diameters and depths noted below
etc complete,. as directed by Engineer in-charge

b -do- with table moulded bricks of approved quality and


medium duty SFRC manhole frame and cover for 1.20 Mtr.
dia.
For 3.8 mtr depth
2203A24 1 3.80 No 1

Sheet No:29 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

For 3.90 mtr depth


2203A23 1 3.90 No 1
For 4.1 mtr depth
2203A22,2203A21 2 4.10 No 2
Total MH 4

4 Refilling pipeline trenches and foundation with selected


available earth from trench excavation and foundation
including watering, consolidation in layers of 15 cms.,
thickness including disposing off the surplus earth with all
lead and lift etc complete., as directed by Engineer in-
charge

0 to 2 1 651.98
2 to 4 1 465.93
4 to 6 1 6.80
Total Qty 1124.71
Deduct MH= (4*0.785*1.95*1.95*3.5) 41.79
Deduct Pipe= (175*0.785*0.70*0.70) 67.31
Total deduct Qty 109.10
Gr Total 1015.61

Sheet No:30 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Abstract
Earthwork Exacavation
0 to 2 m
All Soils (361.02+487.82) Cum 848.84 31798.41 32647.25
DIR (267.43+164.16) Cum 431.59 66131.35 66562.94

2 to 4 m
DIR (259.20+465.93) Cum 725.13 11635.38 12360.51

4 to 6 m
DIR (148.37+6.80) Cum 155.17 865.83 1021.00

Murrum Filling (42.49+34.82) Cum 77.31 895.13 972.44

150 mm dia Stoneware pipe Rmt 313.80 51301.57 51615.37

600 mm dia RCC pipe (87+175) Rmt 262.00 181.6 443.60

MH construction
1.3 mtr depth Nos 1.00 121 122.00

Sheet No:31 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

1.4 mtr depth Nos 4.00 230 234.00


1.5 mtr depth Nos 3.00 260 263.00

Sheet No:32 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

1.6 mtr depth Nos 2.00 208 210.00


1.8 mtr depth Nos 1.00 124 125.00
3.8 mtr depth Nos 1.00 7 8.00
3.9 mtr depth Nos 1.00 1 2.00
4.10 mtr depth Nos 2.00 3 5.00

Water line Shifting


90 mm dia PVC pipe Rmt 77.40 5697.4 5774.80
110 mm dia PVC pipe Rmt 41.10 4293 4334.10

Water bund macdam Cum 17.86 6917.89 6935.75

Refilling (946.72+1015.60) Cum 1962.32 112792.08 114754.40

G CONSTRUCTION OF WET WELL IN Zone-II


1 Earth Work Excavation for foundation including depositing
and bank with all lead including shoring, strutting,
barricading, danger lighting. with all lead and lift etc.,
completed as directed by Engineer in-charge

I 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and
exclusive of disintegrated rock

Sheet No:33 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Average Dia =( 20 + 17.90 ) / 2 =18.95 3.142 / 4 18.95 x 18.95


( 3.142 x 18.95 x 18.95 ) / 4 x 2 1 0.7855 359.10 2.00 Cum 564.15 0.0 564.15
For Ramp Excavation = ( 21.0+14.40)/2 x 7.15 (avg) 1 17.7 7.15 2.00 Cum 253.11 0.0 253.11

b -do- in disintegrated rock and soft rock, soft shale, medium


hard rock comprising of lime stone, sand stone, hard shale,
schist, fissured rock without resorting to blasting -

c In Hard rock by control blasting.

II 2 to 4 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and
exclusive of disintegrated rock
Average Dia =(17.90 + 16.85 ) / 2 = 16.85 3.142 / 4 17.37 x 17.37
( 3.142 x 17.37 x 17.37 ) / 4 x 2 1 0.7855 301.72 1.00 Cum 237.00 0.0 237.00
For Ramp Excavation = ( 14.40+11.10)/2 x 5.80 (avg) 1 12.75 5.80 1.00 Cum 73.95 0.0 73.95

b -do- in disintegrated rock and soft rock, soft shale, medium


hard rock comprising of lime stone, sand stone, hard shale,
schist, fissured rock without resorting to blasting -

Average Dia =(16.85 + 15.80 ) / 2 = 16.85 3.142 / 4 16.32 x 16.32


( 3.142 x 16.32 x 16.32 ) / 4 x 2 1 0.7855 266.34 1.00 Cum 209.21 0.0 209.21
For Ramp Excavation = ( 11.10+7.90)/2 x 5.45 (avg) 1 9.5 5.45 1.00 Cum 51.78 0.0 51.78
c In Hard rock by control blasting.

Sheet No:34 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

III 4 to 6 Mtr depth


a -do in all soils mixed with boulders of upto 30 cms., size and
exclusive of disintegrated rock
b -do- in disintegrated rock and soft rock, soft shale, medium
hard rock comprising of lime stone, sand stone, hard shale,
schist, fissured rock without resorting to blasting -
Average Dia =(15.80 + 13.70 ) / 2 = 14.75 3.142 / 4 14.75 x 14.75
( 3.142 x 14.75 x 14.75 ) / 4 x 2 1 0.7855 217.56 2.00 Cum 341.79 0.0 341.79
For Ramp Excavation = ( 7.90+4.50)/2 x 5.15 (avg) 1 6.2 5.15 2.00 Cum 63.86 0.0 63.86
c In Hard rock by control blasting.
IV 6 to 8 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and
exclusive of disintegrated rock
b -do- in disintegrated rock and soft rock, soft shale, medium
hard rock comprising of lime stone, sand stone, hard shale,
schist, fissured rock without resorting to blasting -

Average Dia =(13.70 + 12.00 ) / 2 = 12.85 3.142 / 4 12.85 x 12.85


( 3.142 x 12.85 x 12.85 ) / 4 x1.65 1 0.7855 165.12 1.65 Cum 214.01 0.0 214.01
For Ramp Excavation = ( 4.50+0)/2 x 3.90 (avg) 1 2.25 3.90 1.65 Cum 14.48 0.0 14.48
c In Hard rock by control blasting.

2 Providing and laying C.C. 1:1.5:3 proportion for foundation (screed


layer) with 20 mm and down size of approved gradation hard
broken granite, trap, basalt or with any other approved hard
aggregate including cost and conveyance of all materials with all
lead and lift etc complete.,including plywood / steel form work
machine mixing laying tamping curing etc., complete, completed as
directed by Engineer in-charge

Sheet No:35 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Wet well 1 0.7855 114.49 0.15 Cum 13.49 0.0 13.49


(3.142x10.70x10.70/4 x 0.15 )

16 Supply and fabrication of TMT steel bars of any size


including conveying of steel to work site with all lead
including cleanin, straightening or bending placing in
position tieing as per design including cost of binding wire,
hoisting if any etc.,with all lead and lifts

Raft
Raft Bottom
Bottom Reinforcemnt below Wall ( Radials ) 16mm dia
@200mm c/c
79 no.s X 4.95 2x79 4.95 782.10
78 no.s X 3.35 2x78 3.35 522.60

Circumferals 16mm dia @ 150mm c/c


3.142x9.90 1 31.1
3.142x9.60 1 30.2
3.142x9.30 1 29.2
3.142x9.00 1 28.3
3.142x8.70 1 27.3
3.142x8.40 1 26.4
3.142x8.10 1 25.5
3.142x7.80 1 24.5
3.142x7.50 1 23.6
3.142x7.20 1 22.6

Sheet No:36 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

3.142x6.90 1 21.7
3.142x6.60 1 20.7
3.142x6.30 1 19.8
3.142x6.00 1 18.9
3.142x5.70 1 17.9
3.142x5.40 1 17.0
3.142x5.10 1 16.0
3.142x4.80 1 15.1
3.142x4.50 1 14.1
3.142x4.20 1 13.2
3.142x3.90 1 12.3
3.142x3.60 1 11.3
3.142x3.30 1 10.4
3.142x3.00 1 9.4
3.142x2.70 1 8.5
3.142x2.40 1 7.5
3.142x2.10 1 6.6
Lappings = (30*0.80 ) 30 0.8 24.0
Raft Top 1837.70 1.55 2848.44
20mm dia Bothways
4 10.7 42.80
4 10.7 42.80
4 10.7 42.80
4 10.65 42.60
4 10.65 42.60
4 10.6 42.40

Sheet No:37 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

4 10.6 42.40
4 10.5 42.00
4 10.4 41.60
4 10.4 41.60
4 10.3 41.20
4 10.2 40.80
4 10.2 40.80
4 10.1 40.40
4 10 40.00
4 9.9 39.60
4 9.8 39.20
4 9.6 38.40
4 9.5 38.00
4 9.3 37.20
4 9.2 36.80
4 9 36.00
4 8.8 35.20
4 8.7 34.80
4 8.6 34.40
4 8.5 34.00
4 8.4 33.60
4 8.1 32.40
4 8 32.00
4 7.9 31.60
4 7.7 30.80
4 7.5 30.00

Sheet No:38 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

4 7.4 29.60
4 7.3 29.20
4 7 28.00
4 6.8 27.20
4 6.6 26.40
4 6.4 25.60
4 6 24.00
4 5.8 23.20
4 5.5 22.00
4 5.2 20.80
4 4.9 19.60
4 4.5 18.00
4 4.1 16.40
4 3.3 13.20
4 2.5 10.00
1554.00 2.45 3807.30
For Chairs 16mm dia
46no.s x 0.90+1.75+0.95 46 3.6 165.6 1.55 256.68
For Lapp
16mm for Bottom ( 0.8 x 68 x 1.58 ) 68 0.80 54.4 1.55 84.32
20mm for Bottom (1.0 x 48 x 2.46 ) 48 1.00 48 2.45 117.60
Total Rmt 7114.34 0.0 7114.34

Sheet No:39 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

3 Providing and laying vibrated M30 design mix for R.C.C.


Works with 20 mm and down size of approved gradation
hard broken granite, trap, basalt or any other approved hard
aggregate, including, cost and conveyance of all materials
with all lead & lift, including plywood/steel form work,
centering, scaffolding, cement mortar, plastering in CM 1:3
proportion, 20mm. thick for inside with admixture of water
proof compound of requisite proportion of approved quality
including weigh batch plant mixing, curing, making
construction joints wherever necessary and giving
satisfactory water proof testing etc., complete (excluding
cost of reinforcement) for floor slab, resting on ground.

(contractor will make his own arrangements for procuring


water for testing) (Cement @ 400 Kgs) as directed by
Engineer-in-charge.

Raft 1 88.259 0.55 48.55 0.0 48.55


(3.142x10.60x10.60/4 x 0.55 )

16 Supply and fabrication of TMT steel bars of any size


including conveying of steel to work site with all lead
including cleanin, straightening or bending placing in
position tieing as per design including cost of binding wire,
hoisting if any etc.,with all lead and lifts

Sheet No:40 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Sidewall: Verticals 0 to 3mtrs 12mm dia @


200mm c/c bothface
inside 3.0+0.50+0.5 138 4 552 0.87 480.24
outside 138 4 552 0.87 480.24
Sidewall: Verticals 0 to 3mtrs 16mm dia @
200mm c/c bothface
inside 138 3 414 1.55 641.70
outside 138 3 414 1.55 641.70
Hoop Rods 16mm dia @ 150mm c/c upto 2.1mtrs
inside 15 26.95 404.25 1.55 626.59
Outside 15 28.85 432.75 1.55 670.76
Hoop Rods 16mm dia @ 200mm c/c upto 2.1m to 3.0mtrs

inside 4 26.95 107.8 1.55 167.09


Outside 4 28.85 115.4 1.55 178.87
12mm dia Spacers 3 x 26 x 0.9 78 0.9 70.2 0.87 61.07
Sidewall: Verticals 3 to 7.10mtrs 12mm dia @ 200mm c/c
bothface
inside 138 4.1 565.8 0.87 492.25
outside 138 4.1 565.8 0.87 492.25
Hoop Rods 16mm dia @ 200mm c/c upto 3m to 4.3mtrs
inside 7 26.95 188.65 1.55 292.41
Outside 7 28.85 201.95 1.55 313.02
Hoop Rods 12mm dia @ 200mm c/c upto 4.3m to 7.10mtrs

inside 14 26.95 377.3 0.87 328.25

Sheet No:41 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

Outside 14 28.85 403.9 0.87 351.39


12mm dia Spacers 4 x 26 x 0.9 104 0.9 93.6 0.87 81.43

12mm Lapping for Verticals


2 x 138 276 0.60 165.6 0.87 144.07
6443.33 0.0 6443.33

Sheet No:42 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Measurement Sheet

Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2)


Name of the agecny : H.K.Kantharaj , Contractor, Hassan

14th & Part


Authority/ Agreement No & Dt. 14/2012-13/Dtd:03.08.2012
Item Measurement Unit Present Qty Previously Qty.up to date
No Description of item No paid qty
L B D

4 Providing and laying Vibrated M30 design mix using 20mm


and down size of approved gradation hard granite, trap or
basalt broken metal including weigh batch plant mixing,
shoring, strutting, plywood/steel form work, curing etc.,
complete with all lead for all materials, for well curb or RCC
cutting edge (Cement @ 400 Kgs) as directed by Engineer-
in-charge.

a Below GL 3.142*8.4
1 26.393 0.4 7.10 74.96 0.0 74.96

(1) Certified that the work is executed as per specification and found satisfactory.

(2) Certified that the check measurement haven been done as per codal rules.

(3) Certified that the bill of quantities with rate have been verified and found correct.codal rules.

(4) Certified that the 3rd party agency M/s.IR Class system and solutions Pvt Ltd, Bangalore has visited the site on 20.02.2018, 06.05.2018, 27.07.2018 and 13.08.2018 and submitted the report
Recovery - Royalt amount

Royalt - Stament Enclosed

Sheet No:43 531538337.xlsx MB Sheet


upply and Drainage Board, Bangalore
Measurement Sheet

Name of the agecny : H.K.Kantharaj , Contractor, Hassan

Remarks

Sheet No:44 531538337.xlsx MB Sheet


upply and Drainage Board, Bangalore
Measurement Sheet

Name of the agecny : H.K.Kantharaj , Contractor, Hassan

Remarks

codal rules.

angalore has visited the site on 20.02.2018, 06.05.2018, 27.07.2018 and 13.08.2018 and submitted the report

Sheet No:45 531538337.xlsx MB Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

1 Cutting Road Surface for Pipe line trenches and disposing off the
excavated stuff as directed including barricading, danger lighting
etc., in the following classification with all lead and lift etc
complete.,

a Cutting macadam road Cum 4500.00 156.0 7669.81 1192273.91 0.00 156.00 0.00 7669.81 1192273.91
b Cutting Asphalt road Cum 6000.00 189.0 938.90 177452.10 0.00 189.00 0.00 938.90 177452.10
b Cutting concret road Cum 20.00 489.0 33.14 14801.05 0.00 489.00 0.00 33.14 14801.05
2 Earth work excavation for pipeline trenches (except building
works) including depositing on bank including shoring, struffing,
barricading, danger lighting and using sight rails and boning rods
at every 100 metres wherever necessary as directed in the
following strata. with all lead and lift etc complete.,as directed by
Engineer in-charge

I 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 43077.00 189.0 31798.41 6009899.49 848.84 189.00 160430.76 32647.25 6170330.25
exclusive of disintegrated rock
b -do- In disintegrated rock, soft rock, soft shale, medium hard rock Cum 25128.00 246.0 66131.35 16178555.56 431.59 196.80 84936.91 66562.94 16263492.47
comprising of lime stone sand stone, hard shale, schist, fissured
rock wihtout resorting to blasting.

c -do- In Hard rock by chistelling Cum 3590.00 9.0 0.00 0.00 9.00 0.00 0.00 0.00
II 2 to 4 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 4828.00 189.0 87.62 16560.18 189.00 0.00 87.62 16560.18
exclusive of disintegrated rock
b -do- In disintegrated rock, soft rock, soft shale, medium hard rock Cum 3862.00 279.0 11635.38 3163540.82 725.13 223.20 161849.02 12360.51 3325389.84
comprising of lime stone sand stone, hard shale, schist, fissured
rock wihtout resorting to blasting.

Sheet No-46 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

c -do- In Hard rock by chistelling Cum 966.00 579.0 895.42 518448.98 579.00 0.00 895.42 518448.98
III 4 to 6 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 444.00 9.0 0.00 0.00 9.00 0.00 0.00 0.00
exclusive of disintegrated rock

b -do- In disintegrated rock, soft rock, soft shale, medium hard rock Cum 887.00 300.0 865.83 259749.00 155.17 240.00 37240.80 1021.00 296989.80
comprising of lime stone sand stone, hard shale, schist, fissured
rock wihtout resorting to blasting.

c -do- In Hard rock by chistelling Cum 148.00 800.0 1277.51 1004086.40 800.00 0.00 1277.51 1004086.40
3 Refilling pipeline trenches and foundation with selected available Cum 82930.00 29.0 112792.08 3246132.98 1962.32 23.20 45525.82 114754.40 3291658.80
earth from trench excavation and foundation including watering,
consolidation in layers of 15 cms., thickness including disposing
off the surplus earth with all lead and lift etc complete., as
directed by Engineer in-charge

Sheet No-47 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

10 Providing and constructing of Manhole chambers conical in


shape at top with CC 1:3:6 foundation using 40mm and down size
graded metal of approved quality and with an offset of 0.15 Mtr.
alround the chamber and brick masonry in C.M. 1:4 plaster with
bricks of approved quality and CM plaster 1:3 proportion 12mm
thick inside and outside except for the conical surface outside
where the thickness of plaster shall be 20 mm thick, with 1 to 6
slope in the concrete towards the central drain, finished smooth
and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and
down size including supplying and fixing SFRC manhole frame
and cover confirming to IS 12592 (Part-I): 1988 and IS 12592
(Part-II) 1991 with latest amendments in CC 1:2:4, supplying and
fixing of plastic foot steps staggered at 30 cms apart as directed,
watering, curing, barricading, danger lighting, pouring tar over
M.H. frame and cover, cost of tar,

shoring, strutting, dewatering, engraving Manhole No. on the


inner conical surface etc. as per the drawing with all lead and lifts
and for various diameters and depths noted below etc complete,.
as directed by Engineer in-charge

a -do- with table moulded bricks of approved quality and medium


duty SFRC manhole frame and cover for 1.20 Mtr. dia.

PR 1 - 90%
For 0.90 mtr depth Nos 279 8899 2.00 16018.20 8009.10 0.00 2.00 16018.20
For 1.00 mtr depth Nos 891 9500 11.00 94050.00 8550.00 0.00 11.00 94050.00
For 1.10 mtr depth Nos 68 12000 23 248400.00 10800.00 0.00 23.00 248400.00
For 1.20 mtr depth Nos 62 12000 94 1015200.00 10800.00 0.00 94.00 1015200.00

Sheet No-48 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

For 1.30 mtr depth Nos 46 12200 121 1328580.00 1.00 8784.00 8784.00 122.00 1337364.00
For 1.40 mtr depth Nos 42 12500 230 2587500.00 4.00 9000.00 36000.00 234.00 2623500.00
For 1.50 mtr depth Nos 48 13000 260 3042000.00 3.00 9360.00 28080.00 263.00 3070080.00
For 1.60 mtr depth Nos 30 13500 208 2527200.00 2.00 9720.00 19440.00 210.00 2546640.00
For 1.70 mtr depth Nos 30 14000 169 2129400.00 12600.00 0.00 169.00 2129400.00
For 1.80 mtr depth Nos 30 14800 124 1651680.00 1.00 10650.00 10650.00 125.00 1662330.00
For 1.90 mtr depth Nos 34 15200 83 1135440.00 13680.00 0.00 83.00 1135440.00
For 2.00 mtr depth Nos 33 16200 66 962280.00 14580.00 0.00 66.00 962280.00
For 2.10 mtr depth Nos 21 16200 52 758160.00 14580.00 0.00 52.00 758160.00
For 2.20 mtr depth Nos 17 16500 31 460350.00 14850.00 0.00 31.00 460350.00
For 2.30 mtr depth Nos 17 17000 36 550800.00 15300.00 0.00 36.00 550800.00
b -do- with table moulded bricks of approved quality and medium
duty SFRC manhole frame and cover for 1.50 Mtr. dia.

For 2.40 mtr depth Nos 16 21000 18 340200.00 18900.00 0.00 18.00 340200.00
For 2.50 mtr depth Nos 9 21500 23 445050.00 19350.00 0.00 23.00 445050.00
For 2.60 mtr depth Nos 5 22000 17 336600.00 19800.00 0.00 17.00 336600.00
For 2.70 mtr depth Nos 4 22500 21 425250.00 20250.00 0.00 21.00 425250.00
For 2.80 mtr depth Nos 10 23000 11 227700.00 20700.00 0.00 11.00 227700.00
For 2.90 mtr depth Nos 2 24000 15 324000.00 21600.00 0.00 15.00 324000.00
For 3.00 mtr depth Nos 15 24500 15 330750.00 22050.00 0.00 15.00 330750.00
For 3.10 mtr depth Nos 8 25000 13 292500.00 22500.00 0.00 13.00 292500.00
For 3.20 mtr depth Nos 10 25500 8 183600.00 22950.00 0.00 8.00 183600.00
For 3.30 mtr depth Nos 9 26000 5 117000.00 23400.00 0.00 5.00 117000.00
For 3.40 mtr depth Nos 7 26500 5 119250.00 23850.00 0.00 5.00 119250.00
For 3.50 mtr depth Nos 3 27000 7 170100.00 24300.00 0.00 7.00 170100.00
For 3.60 mtr depth Nos 7 27500 2 49500.00 24750.00 0.00 2.00 49500.00
For 3.70 mtr depth Nos 3 28000 4 100800.00 25200.00 0.00 4.00 100800.00

Sheet No-49 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

For 3.80 mtr depth (0.5 Above GL) Nos 4 29000 7 182700.00 1.00 20880.00 20880.00 8.00 203580.00
For 3.90 mtr depth (0.6 Above GL) Nos 3 31000 1 27900.00 1.00 22320.00 22320.00 2.00 50220.00
For 4.00 mtr depth Nos 4 35000 4 126000.00 31500.00 0.00 4.00 126000.00
For 4.10 mtr depth Nos 3 36000 3 97200.00 2.00 25920.00 51840.00 5.00 149040.00
For 4.20 mtr depth Nos 1 37000 5 166500.00 33300.00 0.00 5.00 166500.00
For 4.30 mtr depth Nos 4 38000 1 34200.00 34200.00 0.00 1.00 34200.00
For 4.40 mtr depth Nos 2 39000 6 210600.00 35100.00 0.00 6.00 210600.00
For 4.50 mtr depth Nos 6 40000 5 180000.00 36000.00 0.00 5.00 180000.00
For 4.60 mtr depth Nos 3 41000 3 110700.00 36900.00 0.00 3.00 110700.00
For 4.70 mtr depth Nos 4 42000 2 75600.00 37800.00 0.00 2.00 75600.00
For 4.80 mtr depth Nos 2 43000 11 425700.00 38700.00 0.00 11.00 425700.00
For 5.00 mtr depth Nos 4 44000 4 158400.00 39600.00 0.00 4.00 158400.00
For 5.20 mtr depth Nos 1 46000 4 165600.00 41400.00 0.00 4.00 165600.00
For 5.30 mtr depth Nos 1 47000 3 126900.00 42300.00 0.00 3.00 126900.00
For 5.40 mtr depth Nos 3 48000 3 129600.00 43200.00 0.00 3.00 129600.00
For 5.60 mtr depth Nos 1 50000 4 180000.00 45000.00 0.00 4.00 180000.00
For 6.0 mtr depth Nos 1 53000 2 95400.00 47700.00 0.00 2.00 95400.00
c -do- with table moulded bricks of approved quality and Heavy
duty SFRC manhole frame and cover for 1.20 Mtr. dia.

For 1.20 mtr depth Nos 10 12000 2 21600.00 10800.00 0.00 2.00 21600.00
For 1.30 mtr depth Nos 6 12500 4 45000.00 11250.00 0.00 4.00 45000.00
For 1.40 mtr depth Nos 4 13000 14 163800.00 11700.00 0.00 14.00 163800.00
For 1.50 mtr depth Nos 2 13500 9 109350.00 12150.00 0.00 9.00 109350.00
For 1.60 mtr depth Nos 2 14000 26 327600.00 12600.00 0.00 26.00 327600.00
For 1.70 mtr depth Nos 4 14500 6 78300.00 13050.00 0.00 6.00 78300.00
For 1.80 mtr depth Nos 2 15000 13 175500.00 13500.00 0.00 13.00 175500.00
For 1.90 mtr depth Nos 1 15500 6 83700.00 13950.00 0.00 6.00 83700.00

Sheet No-50 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

For 2.00 mtr depth Nos 4 16000 8 115200.00 14400.00 0.00 8.00 115200.00
For 2.10 mtr depth Nos 2 16500 6 89100.00 14850.00 0.00 6.00 89100.00
For 2.20 mtr depth Nos 2 17000 6 91800.00 15300.00 0.00 6.00 91800.00
For 2.30 mtr depth Nos 2 17500 1 15750.00 15750.00 0.00 1.00 15750.00
d -do- with table moulded bricks of approved quality and Heavy
duty SFRC manhole frame and cover for 1.50 Mtr. dia.

For 2.40 mtr depth Nos 2 22500 7 141750.00 20250.00 0.00 7.00 141750.00
For 2.50 mtr depth Nos 2 23000 3 62100.00 20700.00 0.00 3.00 62100.00
For 2.60 mtr depth Nos 2 23500 1 21150.00 21150.00 0.00 1.00 21150.00
For 2.70 mtr depth Nos 2 24000 2 43200.00 21600.00 0.00 2.00 43200.00
For 2.80 mtr depth Nos 1 24500 4 88200.00 22050.00 0.00 4.00 88200.00
For 2.90 mtr depth Nos 1 25000 1 22500.00 22500.00 0.00 1.00 22500.00
For 3.00 mtr depth Nos 25500 1 22950.00 22950.00 0.00 1.00 22950.00
For 3.20 mtr depth Nos 1 26500 2 47700.00 23850.00 0.00 2.00 47700.00
For 3.30 mtr depth Nos 1 27000 2 48600.00 24300.00 0.00 2.00 48600.00
For 3.40 mtr depth Nos 1 27500 1 24750.00 24750.00 0.00 1.00 24750.00
For 3.50 mtr depth Nos 1 28000 1 25200.00 25200.00 0.00 1.00 25200.00
For 3.70 mtr depth Nos 1 29000 1 26100.00 26100.00 0.00 1.00 26100.00
For 4.00 mtr depth Nos 1 36000 2 45900.00 32400.00 0.00 2.00 45900.00
For 4.70 mtr depth Nos 1 38000 1 26460.00 34200.00 0.00 1.00 26460.00
1861 1871 1887

Sheet No-51 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

14 Supplying, lowering, laying, jointing, testing and commissioning of


glazed stoneware pipes conforming to IS 651:1992 with latest
amendements, of fallowings sizes including conveying of pipe to
worksite and caulking with hemp dipped in tar and jointing with
C.M. 1:1½ perfect linking and curing for 10 days, and testing with
water with all lead including cost of jointing materials as directed
as directed by Engineer in-charge etc., complete. (contractor will
make his own arrangements for procuring water for testing).

a 150mm Dia Rmt 48635.00 290.0


Supply ( PR1 - 70% ) 52000.00 10556000.00 203.00 0.00 52000.00 10556000.00
Laying & jointing ( PR2 - 25% ) 51301.57 3719363.85 313.80 46.40 14560.32 51615.37 3733924.17
b 200mm Dia Rmt 2930.00 350.0
Supply ( PR1 - 70% ) 1200.00 294000.00 245.00 0.00 1200.00 294000.00
Laying & jointing ( PR2 - 25% ) 936.20 81917.50 70.00 0.00 936.20 81917.50
c 250mm Dia Rmt 510.00 500.0
Supply ( PR1 - 70% ) 710.00 248500.00 350.00 0.00 710.00 248500.00
Laying & jointing ( PR2 - 25% ) 611.50 76437.50 125.00 0.00 611.50 76437.50
16 Providing Course Sand Bedding for the pipeline trenches Cum 1000.00 600.0 118.53 71118.00 600.00 0.00 118.53 71118.00
including watering and consolidation by punners etc., complete
with all lead and lift etc complete.,. (In Black Cotton and rock
reaches), as directed by Engineer in-charge

17 Providing Murrum/gravel Bedding for the pipeline trenches Cum 2200.00 110.0 757.36 83309.60 84.51 110.00 9296.10 841.87 92605.70
including watering and consolidation by punners etc., complete
with all lead and lift etc complete.,. (In Black Cotton and rock
reaches), as directed by Engineer in-charge

D Shifting of existing water supply pipe line

Sheet No-52 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

4 Supplying PVC ringtite pipes conforming to IS 4985:2000 with


latest amendments and conveying to worksite, rolling and
lowering into trenches, laying true to line and level and perfect
linking at joints, testing and commissioning, including loading and
unloading at both destinations and cuts of pipes wherever
necessary including jointing of PVC pipes and specials (including
cost of specials) with jointing of approved type, with all labour,
with all lead & lift including encasing the pipe alround to a depth
of not less than 15cms with soft gravel or selected earth available
from the excavation etc. complete and giving necessary hydraulic
test to the requiredpressure as per ISS (contractor will make his
own arrangements for procuring water for testing).

a 75 / 90 / mm dia PVC pipe - 6Kg/Cm2 Mtr 1000.00 150.0 5697.40 854610.00 77.40 120.00 9288.00 5774.80 863898.00
b 110 mm dia PVC pipe - 6Kg/Cm2 Mtr 1000.00 210.0 4293.00 901530.00 41.10 168.00 6904.80 4334.10 908434.80
4 Providing, laying, spreading and compacting stone aggregates of Cmt 9000.00 1325.0 6917.89 9166482.00 17.86 1325.00 23664.50 6935.75 9190146.50
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3
wheeled steel/ vibratory roller 8-10 tonnes in stages to proper
grade and camber, applying and brooming requisite type of
screening/ binding Materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density. BY
Manual means using Screening Type-A (13.2mm agg.) Grading-
II with all lead and lift etc complete.,

Sheet No-53 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

13 Supplying S&S RCC spun pipes NP-3 class conforming to IS


458:1988 with latest amendments and conveying to worksite,
rolling and lowering into trenches, laying true to line and level
including loading and unloading at both destinations and jointing
of pipes and specials (excluding cost of specials) including
perfect linking of joints with jack to correct position including cost
of jointing materials ie., Rubber rings comfirming to relevant IS
for S &S RCC pipes with all lead and lift as directed and giving
necessary hydraulic test to the required pressure as per ISS and
testing & commissioning (contractor will make his own
arrangements for procuring water for testing). as directed by
Engineer in-charge For UGD works the pipe shall be
manufactured using Sulphate Resistant Cement (SRC) Only

a 300 mm Dia - PR 75% Mtr 90.00 1650.0 450.00 1358156.25 1237.50 0.00 450.00 1358156.25
Laying & jointing ( PR2 - 20% ) 822.20 285400.50 330.00 0.00 822.20 285400.50
b 350 mm Dia - PR 75% Mtr 600.00 1850.0 0.00 534187.50 1387.50 0.00 0.00 534187.50
Laying & jointing ( PR2 - 20% ) 137.50 50875.00 370.00 0.00 137.50 50875.00
c 400 mm Dia - PR 75% Mtr 840.00 1800.0 865.00 1167750.00 1350.00 0.00 865.00 1167750.00
Laying & jointing ( PR2 - 20% ) 681.40 276354.00 360.00 0.00 681.40 276354.00
d 450 mm Dia - PR 75% Mtr 360.00 2000.0 745.00 1117500.00 1500.00 0.00 745.00 1117500.00
Laying & jointing ( PR2 - 20% ) 735.90 362200.00 500.00 0.00 735.90 362200.00
e 500 mm Dia - PR 75% Mtr 1530.00 2300.0 872.50 1505062.50 1725.00 0.00 872.50 1505062.50
Laying & jointing ( PR2 - 25% ) 727.20 418140.00 575.00 0.00 727.20 418140.00
f 600 mm Dia - PR 75% Mtr 1350.00 3000.0 1477.50 3324375.00 2250.00 0.00 1477.50 3324375.00
Laying & jointing ( PR2 - 20% ) 181.60 108960.00 262.00 600.00 157200.00 443.60 266160.00
F Construction of receving chamber

Sheet No-54 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

1 Earth work excavation for pipeline trenches (except building


works) including depositing on bank including shoring, strutting,
barricading, danger lighting and using sight rails and boning rods
at every 100 meters wherever necessary as directed in the
following strata with all lead and lift etc., complete. as directed by
Engineer in-charge.

0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 3823.20 95.0 2342.28 222516.60 95.00 0.00 2342.28 222516.60
exclusive of disintegrated rock
2 Providing and laying C.C 1:3:6 proportion for foundation Cum 550.80 300.0 213.03 63909.00 300.00 0.00 213.03 63909.00
(screened layer) with 40mm and down size of approved gradation
hard broken granite, trap basalt or with any other approved hard
aggregate including cost and conveyance of all materials with all
lead & lift including plywood / steel form work, machine mixing,
laying tamping, curing etc., complete. as directed by Engineer in-
charge For P.C.C -

3 Providing and laying vibrated cement concrete of 1:1 1/2:3 using Cum 453.60 4100.0 190.08 779323.90 4100.00 0.00 190.08 779323.90
20mm and down size metal of approved gradation hard broken
granite trap, basalt or with any other approved hard agregate
including machine mixing cost and conveyance of all materials
with all lead & lift for RCC works in 15Cms. thick layers well
consolidated, curing, smooth finishing exposed faces wherever
necessary plywood/steel form work, centring etc., complete
(excluding cost of reinforcement) - For Raft

Sheet No-55 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

4 Providing and constructing burnt brick masonry with approved Cum 1490.40 5000.0 935.47 4677350.00 5000.00 0.00 935.47 4677350.00
quality of non modular bricks of standard size of class
designation 50 (table moulded) with cement mortar 1:6 for
basement and superstructure including cost of materials, labour
charges, scaffolding, curing complete as per specifications as
directed by Engineer in-charge .

5 Providing and laying in position reinforced cement concrete of Cum 486.00 6100.0 221.26 1349686.00 6100.00 0.00 221.26 1349686.00
mix 1:1.5:3 with 20mm and down size graded granite metal,
machine mixed, concrete laid in layers not exceeding 15 cms
thick, vibrated for all works in foundation plinth and ground floor
level for roof slabs, staircase, lintels, retaining walls, return walls,
walls (any thickness) including attached plasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain
window cills, fillets etc., including cost of all materials, labour,
HOM of machinery, curing, complete as per specifications. as
directed by Engineer in-charge for coping & covering slab

6 Providing 12mm thick cement plaster in single coat with cement Sqm 12895.20 120.0 8251.48 990177.60 120.00 0.00 8251.48 990177.60
mortar 1:3, to brick masonry including rounding off corners
wherever required smooth rendering, : Providing and removing
scaffolding, including cost of materials, labour, curing complete
as per specifications. as directed by Engineer in-charge

Sheet No-56 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

9 Refilling pipeline trenches and foundation with selected available Cum 5475.60 25.0 2342.28 58557.00 25.00 0.00 2342.28 58557.00
earth from trench excavation and foundation including watering,
consolidation in layers of 15 cms., thickness including disposing
off the surplus earth with a lead of 200 metres with all lead and lift
etc., complete. as directed by Engineer in-charge

8 Providing TMT steel reinforcement for RCC work including MT 35.64 50000 14.805 740250.00 50000.00 0.00 14.805 740250.00
straightening, cutting, bending, hooking, placing in position,
lapping and / or welding wherever required, tying with binding
wire and anchoring to the adjoining members wherver necessary
complete as per design (laps, hooks and wasteage shall not be
measured and paid) cost of amterials, labour, HOM of machinery
complete as per specifications.

Total Amount 103651118.00 908891.03 104560009.00

CONSTRUCTION OF WET WELL IN Zone-II


1 Earth Work Excavation for foundation including depositing and bank
with all lead including shoring, strutting, barricading, danger lighting.
with all lead and lift etc., completed as directed by Engineer in-charge

I 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 207.80 90.00 0.00 207.80 90.00 18702.00 207.80 18702.00
exclusive of disintegrated rock
609.45 72.00 43880.40 609.45 43880.40

b -do- in disintegrated rock and soft rock, soft shale, medium hard rock Cum 105.50 210.00
comprising of lime stone, sand stone, hard shale, schist, fissured rock
without resorting to blasting -
c In Hard rock by control blasting. Cum 6.40 100.00

Sheet No-57 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

II 2 to 4 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 149.55 100.00 149.55 100.00 14955.00 149.55 14955.00
exclusive of disintegrated rock
161.40 80.00 12912.00 161.40 12912.00
b -do- in disintegrated rock and soft rock, soft shale, medium hard rock Cum 92.22 250.00 92.22 250.00 23055.00 92.22 23055.00
comprising of lime stone, sand stone, hard shale, schist, fissured rock
without resorting to blasting -

168.80 200.00 33760.00 168.80 33760.00


c In Hard rock by control blasting. Cum 7.48 600.00
III 4 to 6 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 88.20 100.00
exclusive of disintegrated rock
b -do- in disintegrated rock and soft rock, soft shale, medium hard rock Cum 79.38 250.00 79.38 250.00 19845.00 79.38 19845.00
comprising of lime stone, sand stone, hard shale, schist, fissured rock
without resorting to blasting -

326.30 200.00 65260.00 326.30 65260.00


c In Hard rock by control blasting. Cum 8.82 700.00
IV 6 to 8 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 39.18 100.00
exclusive of disintegrated rock
b -do- in disintegrated rock and soft rock, soft shale, medium hard rock Cum 35.27 300.00 35.27 300.00 10581.00 35.27 10581.00
comprising of lime stone, sand stone, hard shale, schist, fissured rock
without resorting to blasting -

193.20 240.00 46368.00 193.20 46368.00


c In Hard rock by control blasting. Cum 3.92 750.00

Sheet No-58 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

2 Providing and laying C.C. 1:1.5:3 proportion for foundation (screed Cum 6.80 4500.00 3.92 4500.00 17640.00 3.92 17640.00
layer) with 20 mm and down size of approved gradation hard
broken granite, trap, basalt or with any other approved hard
aggregate including cost and conveyance of all materials with all lead
and lift etc complete.,including plywood / steel form work machine
mixing laying tamping curing etc., complete, completed as directed by
Engineer in-charge

9.60 3600.00 34560.00 9.60 34560.00


3 Providing and laying vibrated M30 design mix for R.C.C. Works with Cum 7.70 6500.00 7.70 6500.00 50050.00 7.70 50050.00
20 mm and down size of approved gradation hard broken granite,
trap, basalt or any other approved hard aggregate, including, cost and
conveyance of all materials with all lead & lift, including plywood/steel
form work, centering, scaffolding, cement mortar, plastering in CM 1:3
proportion, 20mm. thick for inside with admixture of water proof
compound of requisite proportion of approved quality including weigh
batch plant mixing, curing, making construction joints wherever
necessary and giving satisfactory water proof testing etc., complete
(excluding cost of reinforcement) for floor slab, resting on ground.
(contractor will make his own arrangements for procuring water for
testing) (Cement @ 400 Kgs) as directed by Engineer-in-charge.

40.90 5200.00 212680.00 40.90 212680.00

Sheet No-59 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

4 Providing and laying Vibrated M30 design mix using 20mm and down
size of approved gradation hard granite, trap or basalt broken metal
including weigh batch plant mixing, shoring, strutting, plywood/steel
form work, curing etc., complete with all lead for all materials, for well
curb or RCC cutting edge (Cement @ 400 Kgs) as directed by
Engineer-in-charge.

a Below GL Cum 38.57 5500.00 38.57 5500.00 212135.00 38.57 212135.00


36.40 4400.00 160160.00 36.40 160160.00
b Above GL upto 3.5 mtr Cum 14.62 6500.00
c Above 3.5 mtr height Cum 11.68 6800.00

Sheet No-60 531538337.xlsx Bill Sheet


Karnataka Urban Water Supply and Drainage Board, Bangalore
Name of the work : Providing UGD scheme to Chikamagalur City - Pak(2) Name of the agH.K.Kantharaj , Contractor, Hassa

14 & Part 62 ' Authority/Agreement No. 14/2012-13/Dtd:03.08.201


13 & Part 10.10.2018

As per Tender Previous Present Update


Item
Unit
No
Qty Rate Qty Amt Qty Rate Amount Qty Amount

16 Supply and fabrication of TMT steel bars of any size including MT 12.00 48000 12.000 48000.00 576000.00 12.00 576000.00
conveying of steel to work site with all lead including cleanin,
straightening or bending placing in position tieing as per design
including cost of binding wire, hoisting if any etc.,

1.600 38400.00 61440.00 1.60 61440.00

0.00 1613983.40 1552543.40

103651118.00 2522874.43 106112552.40


price adjustment 3375455.00
107026573.00 2522874.43 109549447.43
(1) Certified that the work is executed as per specification and found satisfactory.
(2) Certified that the check measurement haven been done as per codal rules.
(3) Certified that the bill of quantities with rate have been verified and found correct.codal rules.
(4) Certified that the 3rd party agency M/s.IR Class system and solutions Pvt Ltd, Bangalore has visited the site on 20.02.2018, 06.05.2018, 27.07.2018 and 13.08.2018 and
submitted the report

Recovery - Royalt amount


Royalt - Stament Enclosed

Sheet No-61 531538337.xlsx Bill Sheet


upply and Drainage Board, Bangalore
Name of the agH.K.Kantharaj , Contractor, Hassan

Authority/Agreement No. 14/2012-13/Dtd:03.08.2012

Remarks

Sheet No-62 531538337.xlsx Bill Sheet


Royalty statement
Name of
Construction of manhole under UGD system to Chikkamagalur City (Zone-II, Pack-II)
the work :

Agencey : Sri.H.K.Kantharaju, Contractor, Hassan.

Bill No : 14th and part

MB No : 2285(Page No: 99 to 100), 2281 (Page No:82 to 100), 3382 (Page No:37 to 46)

Construction of manholes, receiving chambers & wetwell


Sl Bricks in
Item Qty Constant Metal Constant Sand Constant
No nos
1 MH of 1 mtr depth 5.0 1.160 5.80 1.030 5.15 595.00 2975.00
2 MH of 2 mtr depth 6.0 1.160 6.96 1.420 8.52 1275.00 7650.00
3 MH of 4 mtr depth 4.0 1.710 6.84 3.310 13.24 2980.00 11920.00
Wetwell
CC 1 : 1 1/2 : 3 for
1 13.490 0.900 12.14 0.450 6.07 0.000 0.00
bed
2 M 30 for Raft 48.550 0.900 43.70 0.450 21.85 0.000 0.00

CC 1 : 1 1/2 : 3 for
3 74.960 0.850 63.72 0.416 31.18 0.000 0.00
raft,coping,sidewall

139.15 86.01 22545.00

For metal 139.15 / Cum 139.152 Cmt 52.00 7235.90


For Sand 86.01 / Cum 86.011 Cmt 54.00 4644.61
For Bricks in No 22545.00 / 500 per = 45.090 Cmt 30.00 1352.70
Total 13233.00
26466.22

Assistant Executive Engineer,


KUWS & DB, Sub-Division,
CHIKKAMAGALURU
PWG 17 ORIGINAL/DUPLICATE/TRIPLICATE Reference Paras 158 of 178
P.W.Account Code

CONTRACT CERTIFICATE
No-14th & Part (For Other Works) Date:
Division: KUWS & Dboard, Division, Hassan Sub-Division: KUWS & DB, sub-dn, Chikamagalur
Bill Received No. Divisional
Cash Book V.R. No. Dated:
Sub-Divisional
Schedule Docket No: Head of Account:

Name of Work: Providing and laying sewer network, construction of manhole chambers, wetwell, DG room and providing and laying DI
pipe rising main from wetwell to ridge manhole (at Zone-I) - Package(2)

Name of Contractor and full address: Sri.H.K.Kantharaju, Contractor, Hassan.


Reference to agreement No: Agreement No. 14/2012-13/Dtd:03.08.2012
Certified that the measurements were taken by me on and recorded on
Sheets of Measurement Book No. & that the work is satisfactorily executed.

Contractor. Officer in-charge of the work.


Certified that the measurements were checked by me on and found correct. The work is
satisfactorily executed.
Certified that the quantities of Materials shown 3 of Account II have been actually brought to site of the work and the contractor has not previously
received any advance on his security. These materials are of an imperishable nature and are all required by the contractor for immediate use on the
work in connection with items for which rate for finished work have been agreed upon. A formal agreement signed and executed by the contractor is
recorded in Divisional Office.

Sub division officer


II MEMORANDUM OF PAYMENT
1. Total Value of work done or supplies made as per Accounts within
2. Deduct amount to be held in reserve percent Rs. …
3. … … Balance …
4. Deduct Payments:-
a) Amount of previous payment as in Divisional/Sub-Divisional
Cash Book Vr. No. Dated S.D. No.
Amount adjusted towards cash advance recovery of cost of stores
b) Payment or other materials supplied

made}
now
} Recovery of Amount creditable to this other work
Amount paid on this bill by cheque/cash.

Total

5. Balance being unpaid value of work done held in reserve. …


6. Deduct cash advance made on Divisional/Sub-Divisional Cash Book Vr. No
. Dated less adjustment
7. Net Amount due to or from contractor …
Unadjusted items
8. Advance to contractor for materials brought to site as detailed (within) …
9. Value of Government materials supplied …
Total amount Unadjusted …

Contractor's Signature.
(For use in the Executive Engineer's Office
Received Rs…………………………………(in words)………………..
……………………………………………………………………………..
…………………………………………..by cash and by adjustment
of payment as per memorandum:
(in final settlement of all demands)
Witness:
Receipt
1 Stamp
2
Dated Signature of Contractor.

Paid by me cheque No……………………Dated………………... Cash Rs…………………..

Dated, Initials of Officer making Payment Date Executive Engineer.


ence Paras 158 of 178
.W.Account Code

Dated:

oviding and laying DI

and recorded on

charge of the work.


correct. The work is

ontractor has not previously


or for immediate use on the
xecuted by the contractor is

b division officer

r's Signature.