Professional Documents
Culture Documents
Measurement Sheet
For Pipe Line Trench Earth Work 0-2 Mtrs - All soils
AIT campus near Govt.Primary school (1.5+1.4)/2
796-798 1 25.20 0.75 1.45 Cum 27.41
(1.40+1.40)/2
798-799 1 27.20 0.75 1.40 Cum 28.56
(1.40+1.30)/2
799-800 1 29.70 0.75 1.35 Cum 30.07
(1.30+1.50)/2
800-801 1 25.70 0.75 1.4 Cum 26.99
266-267
1 27.50 0.75 0.600 Cum 12.38
267-267A
1 27.50 0.75 0.60 Cum 12.38
267A-470A
1 25.50 0.75 0.60 Cum 11.48
(0.15+0.15)/2
266-267 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2
267-267A 1 30.00 0.75 0.15 Cum 3.38
(0.15+0.15)/2
267A-470A 1 28.00 0.75 0.15 Cum 3.15
(0.15+0.15)/3
Out Fall 600mm Dia R.C.C Pipe
(0.15+0.15)/2
2012A-2012B 1 48.80 1.00 0.15 Cum 7.32
(0.15+0.15)/2
2012D-2012E 1 38.80 1.00 0.15 Cum 5.82
Total Qty 9 Cum 36.57
Abstract
Murrum /Bedding for P-line
Total Qty Cum 42.49
Total MH 4
For 1.50 mtr depth
796 1 1.50 No 1
265 1 1.50 No 1
267 1 1.50 No 1
Total MH 3
266 1 ` 1.60 No 1
267A 1 ` 1.60 No 1
For 1.80 mtr depth
470A 1 1.80 No 1
Total MH 11
0 to 2 1 628.45
2 to 4 1 259.20
4 to 6 1 148.37
Total Qty 1036.02
Deduct MH= (11*0.785*1.95*1.95*1.5) 49.25
Deduct Pipe= (306*0.785*0.175*0.175) 7.36
Deduct Pipe= (85*0.785*0.70*0.70) 32.70
Total deduct Qty 89.30
Gr Total 946.72
For Pipe Line Trench Earth Work 0-2 Mtrs - All soils
0 to 2 1 651.98
2 to 4 1 465.93
4 to 6 1 6.80
Total Qty 1124.71
Deduct MH= (4*0.785*1.95*1.95*3.5) 41.79
Deduct Pipe= (175*0.785*0.70*0.70) 67.31
Total deduct Qty 109.10
Gr Total 1015.61
Abstract
Earthwork Exacavation
0 to 2 m
All Soils (361.02+487.82) Cum 848.84 31798.41 32647.25
DIR (267.43+164.16) Cum 431.59 66131.35 66562.94
2 to 4 m
DIR (259.20+465.93) Cum 725.13 11635.38 12360.51
4 to 6 m
DIR (148.37+6.80) Cum 155.17 865.83 1021.00
MH construction
1.3 mtr depth Nos 1.00 121 122.00
I 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and
exclusive of disintegrated rock
II 2 to 4 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and
exclusive of disintegrated rock
Average Dia =(17.90 + 16.85 ) / 2 = 16.85 3.142 / 4 17.37 x 17.37
( 3.142 x 17.37 x 17.37 ) / 4 x 2 1 0.7855 301.72 1.00 Cum 237.00 0.0 237.00
For Ramp Excavation = ( 14.40+11.10)/2 x 5.80 (avg) 1 12.75 5.80 1.00 Cum 73.95 0.0 73.95
Raft
Raft Bottom
Bottom Reinforcemnt below Wall ( Radials ) 16mm dia
@200mm c/c
79 no.s X 4.95 2x79 4.95 782.10
78 no.s X 3.35 2x78 3.35 522.60
3.142x6.90 1 21.7
3.142x6.60 1 20.7
3.142x6.30 1 19.8
3.142x6.00 1 18.9
3.142x5.70 1 17.9
3.142x5.40 1 17.0
3.142x5.10 1 16.0
3.142x4.80 1 15.1
3.142x4.50 1 14.1
3.142x4.20 1 13.2
3.142x3.90 1 12.3
3.142x3.60 1 11.3
3.142x3.30 1 10.4
3.142x3.00 1 9.4
3.142x2.70 1 8.5
3.142x2.40 1 7.5
3.142x2.10 1 6.6
Lappings = (30*0.80 ) 30 0.8 24.0
Raft Top 1837.70 1.55 2848.44
20mm dia Bothways
4 10.7 42.80
4 10.7 42.80
4 10.7 42.80
4 10.65 42.60
4 10.65 42.60
4 10.6 42.40
4 10.6 42.40
4 10.5 42.00
4 10.4 41.60
4 10.4 41.60
4 10.3 41.20
4 10.2 40.80
4 10.2 40.80
4 10.1 40.40
4 10 40.00
4 9.9 39.60
4 9.8 39.20
4 9.6 38.40
4 9.5 38.00
4 9.3 37.20
4 9.2 36.80
4 9 36.00
4 8.8 35.20
4 8.7 34.80
4 8.6 34.40
4 8.5 34.00
4 8.4 33.60
4 8.1 32.40
4 8 32.00
4 7.9 31.60
4 7.7 30.80
4 7.5 30.00
4 7.4 29.60
4 7.3 29.20
4 7 28.00
4 6.8 27.20
4 6.6 26.40
4 6.4 25.60
4 6 24.00
4 5.8 23.20
4 5.5 22.00
4 5.2 20.80
4 4.9 19.60
4 4.5 18.00
4 4.1 16.40
4 3.3 13.20
4 2.5 10.00
1554.00 2.45 3807.30
For Chairs 16mm dia
46no.s x 0.90+1.75+0.95 46 3.6 165.6 1.55 256.68
For Lapp
16mm for Bottom ( 0.8 x 68 x 1.58 ) 68 0.80 54.4 1.55 84.32
20mm for Bottom (1.0 x 48 x 2.46 ) 48 1.00 48 2.45 117.60
Total Rmt 7114.34 0.0 7114.34
a Below GL 3.142*8.4
1 26.393 0.4 7.10 74.96 0.0 74.96
(1) Certified that the work is executed as per specification and found satisfactory.
(2) Certified that the check measurement haven been done as per codal rules.
(3) Certified that the bill of quantities with rate have been verified and found correct.codal rules.
(4) Certified that the 3rd party agency M/s.IR Class system and solutions Pvt Ltd, Bangalore has visited the site on 20.02.2018, 06.05.2018, 27.07.2018 and 13.08.2018 and submitted the report
Recovery - Royalt amount
Remarks
Remarks
codal rules.
angalore has visited the site on 20.02.2018, 06.05.2018, 27.07.2018 and 13.08.2018 and submitted the report
1 Cutting Road Surface for Pipe line trenches and disposing off the
excavated stuff as directed including barricading, danger lighting
etc., in the following classification with all lead and lift etc
complete.,
a Cutting macadam road Cum 4500.00 156.0 7669.81 1192273.91 0.00 156.00 0.00 7669.81 1192273.91
b Cutting Asphalt road Cum 6000.00 189.0 938.90 177452.10 0.00 189.00 0.00 938.90 177452.10
b Cutting concret road Cum 20.00 489.0 33.14 14801.05 0.00 489.00 0.00 33.14 14801.05
2 Earth work excavation for pipeline trenches (except building
works) including depositing on bank including shoring, struffing,
barricading, danger lighting and using sight rails and boning rods
at every 100 metres wherever necessary as directed in the
following strata. with all lead and lift etc complete.,as directed by
Engineer in-charge
I 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 43077.00 189.0 31798.41 6009899.49 848.84 189.00 160430.76 32647.25 6170330.25
exclusive of disintegrated rock
b -do- In disintegrated rock, soft rock, soft shale, medium hard rock Cum 25128.00 246.0 66131.35 16178555.56 431.59 196.80 84936.91 66562.94 16263492.47
comprising of lime stone sand stone, hard shale, schist, fissured
rock wihtout resorting to blasting.
c -do- In Hard rock by chistelling Cum 3590.00 9.0 0.00 0.00 9.00 0.00 0.00 0.00
II 2 to 4 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 4828.00 189.0 87.62 16560.18 189.00 0.00 87.62 16560.18
exclusive of disintegrated rock
b -do- In disintegrated rock, soft rock, soft shale, medium hard rock Cum 3862.00 279.0 11635.38 3163540.82 725.13 223.20 161849.02 12360.51 3325389.84
comprising of lime stone sand stone, hard shale, schist, fissured
rock wihtout resorting to blasting.
c -do- In Hard rock by chistelling Cum 966.00 579.0 895.42 518448.98 579.00 0.00 895.42 518448.98
III 4 to 6 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 444.00 9.0 0.00 0.00 9.00 0.00 0.00 0.00
exclusive of disintegrated rock
b -do- In disintegrated rock, soft rock, soft shale, medium hard rock Cum 887.00 300.0 865.83 259749.00 155.17 240.00 37240.80 1021.00 296989.80
comprising of lime stone sand stone, hard shale, schist, fissured
rock wihtout resorting to blasting.
c -do- In Hard rock by chistelling Cum 148.00 800.0 1277.51 1004086.40 800.00 0.00 1277.51 1004086.40
3 Refilling pipeline trenches and foundation with selected available Cum 82930.00 29.0 112792.08 3246132.98 1962.32 23.20 45525.82 114754.40 3291658.80
earth from trench excavation and foundation including watering,
consolidation in layers of 15 cms., thickness including disposing
off the surplus earth with all lead and lift etc complete., as
directed by Engineer in-charge
PR 1 - 90%
For 0.90 mtr depth Nos 279 8899 2.00 16018.20 8009.10 0.00 2.00 16018.20
For 1.00 mtr depth Nos 891 9500 11.00 94050.00 8550.00 0.00 11.00 94050.00
For 1.10 mtr depth Nos 68 12000 23 248400.00 10800.00 0.00 23.00 248400.00
For 1.20 mtr depth Nos 62 12000 94 1015200.00 10800.00 0.00 94.00 1015200.00
For 1.30 mtr depth Nos 46 12200 121 1328580.00 1.00 8784.00 8784.00 122.00 1337364.00
For 1.40 mtr depth Nos 42 12500 230 2587500.00 4.00 9000.00 36000.00 234.00 2623500.00
For 1.50 mtr depth Nos 48 13000 260 3042000.00 3.00 9360.00 28080.00 263.00 3070080.00
For 1.60 mtr depth Nos 30 13500 208 2527200.00 2.00 9720.00 19440.00 210.00 2546640.00
For 1.70 mtr depth Nos 30 14000 169 2129400.00 12600.00 0.00 169.00 2129400.00
For 1.80 mtr depth Nos 30 14800 124 1651680.00 1.00 10650.00 10650.00 125.00 1662330.00
For 1.90 mtr depth Nos 34 15200 83 1135440.00 13680.00 0.00 83.00 1135440.00
For 2.00 mtr depth Nos 33 16200 66 962280.00 14580.00 0.00 66.00 962280.00
For 2.10 mtr depth Nos 21 16200 52 758160.00 14580.00 0.00 52.00 758160.00
For 2.20 mtr depth Nos 17 16500 31 460350.00 14850.00 0.00 31.00 460350.00
For 2.30 mtr depth Nos 17 17000 36 550800.00 15300.00 0.00 36.00 550800.00
b -do- with table moulded bricks of approved quality and medium
duty SFRC manhole frame and cover for 1.50 Mtr. dia.
For 2.40 mtr depth Nos 16 21000 18 340200.00 18900.00 0.00 18.00 340200.00
For 2.50 mtr depth Nos 9 21500 23 445050.00 19350.00 0.00 23.00 445050.00
For 2.60 mtr depth Nos 5 22000 17 336600.00 19800.00 0.00 17.00 336600.00
For 2.70 mtr depth Nos 4 22500 21 425250.00 20250.00 0.00 21.00 425250.00
For 2.80 mtr depth Nos 10 23000 11 227700.00 20700.00 0.00 11.00 227700.00
For 2.90 mtr depth Nos 2 24000 15 324000.00 21600.00 0.00 15.00 324000.00
For 3.00 mtr depth Nos 15 24500 15 330750.00 22050.00 0.00 15.00 330750.00
For 3.10 mtr depth Nos 8 25000 13 292500.00 22500.00 0.00 13.00 292500.00
For 3.20 mtr depth Nos 10 25500 8 183600.00 22950.00 0.00 8.00 183600.00
For 3.30 mtr depth Nos 9 26000 5 117000.00 23400.00 0.00 5.00 117000.00
For 3.40 mtr depth Nos 7 26500 5 119250.00 23850.00 0.00 5.00 119250.00
For 3.50 mtr depth Nos 3 27000 7 170100.00 24300.00 0.00 7.00 170100.00
For 3.60 mtr depth Nos 7 27500 2 49500.00 24750.00 0.00 2.00 49500.00
For 3.70 mtr depth Nos 3 28000 4 100800.00 25200.00 0.00 4.00 100800.00
For 3.80 mtr depth (0.5 Above GL) Nos 4 29000 7 182700.00 1.00 20880.00 20880.00 8.00 203580.00
For 3.90 mtr depth (0.6 Above GL) Nos 3 31000 1 27900.00 1.00 22320.00 22320.00 2.00 50220.00
For 4.00 mtr depth Nos 4 35000 4 126000.00 31500.00 0.00 4.00 126000.00
For 4.10 mtr depth Nos 3 36000 3 97200.00 2.00 25920.00 51840.00 5.00 149040.00
For 4.20 mtr depth Nos 1 37000 5 166500.00 33300.00 0.00 5.00 166500.00
For 4.30 mtr depth Nos 4 38000 1 34200.00 34200.00 0.00 1.00 34200.00
For 4.40 mtr depth Nos 2 39000 6 210600.00 35100.00 0.00 6.00 210600.00
For 4.50 mtr depth Nos 6 40000 5 180000.00 36000.00 0.00 5.00 180000.00
For 4.60 mtr depth Nos 3 41000 3 110700.00 36900.00 0.00 3.00 110700.00
For 4.70 mtr depth Nos 4 42000 2 75600.00 37800.00 0.00 2.00 75600.00
For 4.80 mtr depth Nos 2 43000 11 425700.00 38700.00 0.00 11.00 425700.00
For 5.00 mtr depth Nos 4 44000 4 158400.00 39600.00 0.00 4.00 158400.00
For 5.20 mtr depth Nos 1 46000 4 165600.00 41400.00 0.00 4.00 165600.00
For 5.30 mtr depth Nos 1 47000 3 126900.00 42300.00 0.00 3.00 126900.00
For 5.40 mtr depth Nos 3 48000 3 129600.00 43200.00 0.00 3.00 129600.00
For 5.60 mtr depth Nos 1 50000 4 180000.00 45000.00 0.00 4.00 180000.00
For 6.0 mtr depth Nos 1 53000 2 95400.00 47700.00 0.00 2.00 95400.00
c -do- with table moulded bricks of approved quality and Heavy
duty SFRC manhole frame and cover for 1.20 Mtr. dia.
For 1.20 mtr depth Nos 10 12000 2 21600.00 10800.00 0.00 2.00 21600.00
For 1.30 mtr depth Nos 6 12500 4 45000.00 11250.00 0.00 4.00 45000.00
For 1.40 mtr depth Nos 4 13000 14 163800.00 11700.00 0.00 14.00 163800.00
For 1.50 mtr depth Nos 2 13500 9 109350.00 12150.00 0.00 9.00 109350.00
For 1.60 mtr depth Nos 2 14000 26 327600.00 12600.00 0.00 26.00 327600.00
For 1.70 mtr depth Nos 4 14500 6 78300.00 13050.00 0.00 6.00 78300.00
For 1.80 mtr depth Nos 2 15000 13 175500.00 13500.00 0.00 13.00 175500.00
For 1.90 mtr depth Nos 1 15500 6 83700.00 13950.00 0.00 6.00 83700.00
For 2.00 mtr depth Nos 4 16000 8 115200.00 14400.00 0.00 8.00 115200.00
For 2.10 mtr depth Nos 2 16500 6 89100.00 14850.00 0.00 6.00 89100.00
For 2.20 mtr depth Nos 2 17000 6 91800.00 15300.00 0.00 6.00 91800.00
For 2.30 mtr depth Nos 2 17500 1 15750.00 15750.00 0.00 1.00 15750.00
d -do- with table moulded bricks of approved quality and Heavy
duty SFRC manhole frame and cover for 1.50 Mtr. dia.
For 2.40 mtr depth Nos 2 22500 7 141750.00 20250.00 0.00 7.00 141750.00
For 2.50 mtr depth Nos 2 23000 3 62100.00 20700.00 0.00 3.00 62100.00
For 2.60 mtr depth Nos 2 23500 1 21150.00 21150.00 0.00 1.00 21150.00
For 2.70 mtr depth Nos 2 24000 2 43200.00 21600.00 0.00 2.00 43200.00
For 2.80 mtr depth Nos 1 24500 4 88200.00 22050.00 0.00 4.00 88200.00
For 2.90 mtr depth Nos 1 25000 1 22500.00 22500.00 0.00 1.00 22500.00
For 3.00 mtr depth Nos 25500 1 22950.00 22950.00 0.00 1.00 22950.00
For 3.20 mtr depth Nos 1 26500 2 47700.00 23850.00 0.00 2.00 47700.00
For 3.30 mtr depth Nos 1 27000 2 48600.00 24300.00 0.00 2.00 48600.00
For 3.40 mtr depth Nos 1 27500 1 24750.00 24750.00 0.00 1.00 24750.00
For 3.50 mtr depth Nos 1 28000 1 25200.00 25200.00 0.00 1.00 25200.00
For 3.70 mtr depth Nos 1 29000 1 26100.00 26100.00 0.00 1.00 26100.00
For 4.00 mtr depth Nos 1 36000 2 45900.00 32400.00 0.00 2.00 45900.00
For 4.70 mtr depth Nos 1 38000 1 26460.00 34200.00 0.00 1.00 26460.00
1861 1871 1887
17 Providing Murrum/gravel Bedding for the pipeline trenches Cum 2200.00 110.0 757.36 83309.60 84.51 110.00 9296.10 841.87 92605.70
including watering and consolidation by punners etc., complete
with all lead and lift etc complete.,. (In Black Cotton and rock
reaches), as directed by Engineer in-charge
a 75 / 90 / mm dia PVC pipe - 6Kg/Cm2 Mtr 1000.00 150.0 5697.40 854610.00 77.40 120.00 9288.00 5774.80 863898.00
b 110 mm dia PVC pipe - 6Kg/Cm2 Mtr 1000.00 210.0 4293.00 901530.00 41.10 168.00 6904.80 4334.10 908434.80
4 Providing, laying, spreading and compacting stone aggregates of Cmt 9000.00 1325.0 6917.89 9166482.00 17.86 1325.00 23664.50 6935.75 9190146.50
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3
wheeled steel/ vibratory roller 8-10 tonnes in stages to proper
grade and camber, applying and brooming requisite type of
screening/ binding Materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density. BY
Manual means using Screening Type-A (13.2mm agg.) Grading-
II with all lead and lift etc complete.,
a 300 mm Dia - PR 75% Mtr 90.00 1650.0 450.00 1358156.25 1237.50 0.00 450.00 1358156.25
Laying & jointing ( PR2 - 20% ) 822.20 285400.50 330.00 0.00 822.20 285400.50
b 350 mm Dia - PR 75% Mtr 600.00 1850.0 0.00 534187.50 1387.50 0.00 0.00 534187.50
Laying & jointing ( PR2 - 20% ) 137.50 50875.00 370.00 0.00 137.50 50875.00
c 400 mm Dia - PR 75% Mtr 840.00 1800.0 865.00 1167750.00 1350.00 0.00 865.00 1167750.00
Laying & jointing ( PR2 - 20% ) 681.40 276354.00 360.00 0.00 681.40 276354.00
d 450 mm Dia - PR 75% Mtr 360.00 2000.0 745.00 1117500.00 1500.00 0.00 745.00 1117500.00
Laying & jointing ( PR2 - 20% ) 735.90 362200.00 500.00 0.00 735.90 362200.00
e 500 mm Dia - PR 75% Mtr 1530.00 2300.0 872.50 1505062.50 1725.00 0.00 872.50 1505062.50
Laying & jointing ( PR2 - 25% ) 727.20 418140.00 575.00 0.00 727.20 418140.00
f 600 mm Dia - PR 75% Mtr 1350.00 3000.0 1477.50 3324375.00 2250.00 0.00 1477.50 3324375.00
Laying & jointing ( PR2 - 20% ) 181.60 108960.00 262.00 600.00 157200.00 443.60 266160.00
F Construction of receving chamber
0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 3823.20 95.0 2342.28 222516.60 95.00 0.00 2342.28 222516.60
exclusive of disintegrated rock
2 Providing and laying C.C 1:3:6 proportion for foundation Cum 550.80 300.0 213.03 63909.00 300.00 0.00 213.03 63909.00
(screened layer) with 40mm and down size of approved gradation
hard broken granite, trap basalt or with any other approved hard
aggregate including cost and conveyance of all materials with all
lead & lift including plywood / steel form work, machine mixing,
laying tamping, curing etc., complete. as directed by Engineer in-
charge For P.C.C -
3 Providing and laying vibrated cement concrete of 1:1 1/2:3 using Cum 453.60 4100.0 190.08 779323.90 4100.00 0.00 190.08 779323.90
20mm and down size metal of approved gradation hard broken
granite trap, basalt or with any other approved hard agregate
including machine mixing cost and conveyance of all materials
with all lead & lift for RCC works in 15Cms. thick layers well
consolidated, curing, smooth finishing exposed faces wherever
necessary plywood/steel form work, centring etc., complete
(excluding cost of reinforcement) - For Raft
4 Providing and constructing burnt brick masonry with approved Cum 1490.40 5000.0 935.47 4677350.00 5000.00 0.00 935.47 4677350.00
quality of non modular bricks of standard size of class
designation 50 (table moulded) with cement mortar 1:6 for
basement and superstructure including cost of materials, labour
charges, scaffolding, curing complete as per specifications as
directed by Engineer in-charge .
5 Providing and laying in position reinforced cement concrete of Cum 486.00 6100.0 221.26 1349686.00 6100.00 0.00 221.26 1349686.00
mix 1:1.5:3 with 20mm and down size graded granite metal,
machine mixed, concrete laid in layers not exceeding 15 cms
thick, vibrated for all works in foundation plinth and ground floor
level for roof slabs, staircase, lintels, retaining walls, return walls,
walls (any thickness) including attached plasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing
courses, parapets, coping, bed blocks, anchor blocks, plain
window cills, fillets etc., including cost of all materials, labour,
HOM of machinery, curing, complete as per specifications. as
directed by Engineer in-charge for coping & covering slab
6 Providing 12mm thick cement plaster in single coat with cement Sqm 12895.20 120.0 8251.48 990177.60 120.00 0.00 8251.48 990177.60
mortar 1:3, to brick masonry including rounding off corners
wherever required smooth rendering, : Providing and removing
scaffolding, including cost of materials, labour, curing complete
as per specifications. as directed by Engineer in-charge
9 Refilling pipeline trenches and foundation with selected available Cum 5475.60 25.0 2342.28 58557.00 25.00 0.00 2342.28 58557.00
earth from trench excavation and foundation including watering,
consolidation in layers of 15 cms., thickness including disposing
off the surplus earth with a lead of 200 metres with all lead and lift
etc., complete. as directed by Engineer in-charge
8 Providing TMT steel reinforcement for RCC work including MT 35.64 50000 14.805 740250.00 50000.00 0.00 14.805 740250.00
straightening, cutting, bending, hooking, placing in position,
lapping and / or welding wherever required, tying with binding
wire and anchoring to the adjoining members wherver necessary
complete as per design (laps, hooks and wasteage shall not be
measured and paid) cost of amterials, labour, HOM of machinery
complete as per specifications.
I 0 to 2 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 207.80 90.00 0.00 207.80 90.00 18702.00 207.80 18702.00
exclusive of disintegrated rock
609.45 72.00 43880.40 609.45 43880.40
b -do- in disintegrated rock and soft rock, soft shale, medium hard rock Cum 105.50 210.00
comprising of lime stone, sand stone, hard shale, schist, fissured rock
without resorting to blasting -
c In Hard rock by control blasting. Cum 6.40 100.00
II 2 to 4 Mtr depth
a -do in all soils mixed with boulders of upto 30 cms., size and Cum 149.55 100.00 149.55 100.00 14955.00 149.55 14955.00
exclusive of disintegrated rock
161.40 80.00 12912.00 161.40 12912.00
b -do- in disintegrated rock and soft rock, soft shale, medium hard rock Cum 92.22 250.00 92.22 250.00 23055.00 92.22 23055.00
comprising of lime stone, sand stone, hard shale, schist, fissured rock
without resorting to blasting -
2 Providing and laying C.C. 1:1.5:3 proportion for foundation (screed Cum 6.80 4500.00 3.92 4500.00 17640.00 3.92 17640.00
layer) with 20 mm and down size of approved gradation hard
broken granite, trap, basalt or with any other approved hard
aggregate including cost and conveyance of all materials with all lead
and lift etc complete.,including plywood / steel form work machine
mixing laying tamping curing etc., complete, completed as directed by
Engineer in-charge
4 Providing and laying Vibrated M30 design mix using 20mm and down
size of approved gradation hard granite, trap or basalt broken metal
including weigh batch plant mixing, shoring, strutting, plywood/steel
form work, curing etc., complete with all lead for all materials, for well
curb or RCC cutting edge (Cement @ 400 Kgs) as directed by
Engineer-in-charge.
16 Supply and fabrication of TMT steel bars of any size including MT 12.00 48000 12.000 48000.00 576000.00 12.00 576000.00
conveying of steel to work site with all lead including cleanin,
straightening or bending placing in position tieing as per design
including cost of binding wire, hoisting if any etc.,
Remarks
MB No : 2285(Page No: 99 to 100), 2281 (Page No:82 to 100), 3382 (Page No:37 to 46)
CC 1 : 1 1/2 : 3 for
3 74.960 0.850 63.72 0.416 31.18 0.000 0.00
raft,coping,sidewall
CONTRACT CERTIFICATE
No-14th & Part (For Other Works) Date:
Division: KUWS & Dboard, Division, Hassan Sub-Division: KUWS & DB, sub-dn, Chikamagalur
Bill Received No. Divisional
Cash Book V.R. No. Dated:
Sub-Divisional
Schedule Docket No: Head of Account:
Name of Work: Providing and laying sewer network, construction of manhole chambers, wetwell, DG room and providing and laying DI
pipe rising main from wetwell to ridge manhole (at Zone-I) - Package(2)
made}
now
} Recovery of Amount creditable to this other work
Amount paid on this bill by cheque/cash.
Total
…
Contractor's Signature.
(For use in the Executive Engineer's Office
Received Rs…………………………………(in words)………………..
……………………………………………………………………………..
…………………………………………..by cash and by adjustment
of payment as per memorandum:
(in final settlement of all demands)
Witness:
Receipt
1 Stamp
2
Dated Signature of Contractor.
Dated:
and recorded on
b division officer