You are on page 1of 3

SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.

Rev. 2018.03.00 31-Mar-18


SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
SAIC-W-2032 14-May-18 WELD-
(Site Storage, Handling, Conditioning & Issuance)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Tanajib Gas Plant Project - ISF Package 13 10-09003-0006 RTCC


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements

An approved procedure exists that has incorporated the following:


A) SAIC-W-2009 Checklist (Procedure for Welding Consumables)
Sch. Q,
B) SAIC-W-2010 Checklist (Receiving Inspection of Consumables)
Attachment VI
A1 C) SAIC-W-2032 Checklist (Control of Welding Consumables)
Tables
D) SATR-W-2009 - Rod Oven Calibration (Storage, Bake, Portable)
(Procedure)
E) SATR-W-2010 - Welding Consumable Issuance Record
F) SATR-W-2020 - Recv Insp Detail Form & QC log (Consumables)

Personnel involved in handling, storage, conditioning, issuance & controls


of welding consumables are trained as described below: Sch. Q,
A) Material Controller (Receipt, Control, Storage, Handling, Issue, etc.) Attachment VI
A2
B) Welding Foreman/Supervisor (Issue, Distribution, Control, Return) Tables
C) QC Inspector (Monitors approved procedure and all activities) (Procedure)
D) Welders (Follows approved WPS for consumables received/used)

Procedure has provided details on how welding consumables are


controlled by the following but not limited to:
Sch. Q,
A) Receipt & Storage requirements - prior to issuance
Attachment VI
A3 B) Material controller- Stock control (First in, First out) & issuance
Tables
C) Requestor/User - Issue & Receiving of consumables (Daily Basis)
(Procedure)
D) Return of un-used consumables, ID system & reconditioning
Procedure is being followed by all responsible for the work.

B Storage of Welding Consumables.

Non-low hydrogen electrodes to A5.1 or A5.5 are stored in a dry SAES-W-011,


B1
environment. Attachment 1

SAES-W-011,
B2 All fluxes are stored in sealed containers in a dry environment.
Attachment 1

All electrodes & filler wires for SAW, GTAW, GMAW, & FCAW are stored SAES-W-011,
B3
in sealed containers in dry environment. Attachment 2

All electrodes and filler wires for SAW, GTAW, GMAW, and FCAW that SAES-W-011,
B4
have visible rusting or contamination are discarded. Attachment 2

GTAW filler metals have either AWS/ASME identification or the


SAES-W-011
B5 manufacture's identification marked on each individual rod, by the
Para. 6.3
manufacture, with flags, stencils or stamps.

C Handling & Conditioning of Electrodes

Storage ovens have continuous power supply during working and non- SAES-W-011,
C1
working hours or days (nights and weekends). Attachment 1

Storage and Re-bake ovens have calibrated Temperature Gauge. SAES-W-011,


C2
(Note 1 of SAES-W-011, Table 1) Attachment 1
Saudi Aramco: Company General Use
SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
SAIC-W-2032 14-May-18 WELD-
(Site Storage, Handling, Conditioning & Issuance)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Tanajib Gas Plant Project - ISF Package 13 10-09003-0006 RTCC


Portable electrode storage ovens are kept at a minimum temperature of SAES-W-011,
C3
65C. Attachment 1

Atmospheric exposure of low hydrogen electrodes shall not exceed:


a) A5.1 electrodes : 4 hours (Open to atm) / 8 hours (if continuously kept
in portable oven at 65C).
b) A5.5 (E70XX & E80XX): 2 hours (Open to atm) / 4 hours
SAES-W-011,
C4 (electrodes continuously kept in portable oven at 65C).
Attachment 1
c) Low hydrogen electrodes with strengths > E80XX: 30 mins (Opento
atm) / 1 hour (if continuously kept in portable oven at 65C)
d) S. Steel and non-ferrous electrodes: 4 hours (Open to atm)
and 8 hours if continuously kept in portable oven at 65C.

The electrodes which has exceeded the permitted atmospheric exposure


SAES-W-011,
C5 as stated in Item B7 above and electrodes with damaged hermetically
Attachment 1
sealed containers shall undergo drying prior to its ssue for welding.

Drying of electrodes was performed as follows:


A) 2 hours minimum at 260-430C for A5.1 Low-hy electrodes. SAES-W-011,
C6
B) 2 hours minimum at 370-430C for A5.5 Low-hy electrodes. Attachment 1
C) 2 hours minimum at 120-250C for SS & non-ferrous electrodes.

Electrodes are re-dried only once and marked or segregated prior to re- SAES-W-011,
C7
issue. Attachment 1

Electrodes exposed to the atmosphere for less than the permitted duration
SAES-W-011,
C8 are re-conditioned or returned to the holding oven for 4 hours at 120°C
Attachment-1
before re-issue.

Any electrodes (low hydrogen or non-low-hydrogen) and fluxes that have SAES-W-011,
C9
been wet or moist are discarded. Attachment 1&2

Opened SAW flux containers are stored continuously in ovens at 65C SAES-W-011,
C10
minimum, or at mfg's recommendation, whichever is greater. Attachment 1

Shielding gases shall conform to the requirements of AWS A5.32


Specification for Welding Shielding Gases
A) Carbon dioxide (CO2): Compressed Gas Association CGA G-6.2,
Grade H (99.8% purity) SAES-W-011
C11
B) Argon (Ar): Compressed Gas Association CGA G-11.1 Grade C (99. Para. 6.7
997% Purity) Note : AWS A5.32 Specification for Welding Shielding
Gases gases and requirement for other gas mixtures shall be submitted
to CSD for approval

D Control of Electrode Issuance and Return

A project specific procedure or method statement for electrode issuance,


Procedure
D1 receiving and return was approved by SAPMT and Inspection (PID) per
Requirement
SAIC-W-2009.

REMARKS:

ATTACHMENTS:
Attachment 1 - SAES-W-011 - Conditioning, Storage & Exposure of Consumables (Att. 1 & Att. 2)
REFERENCE DOCUMENTS:
1. SAES-W-011, Welding Requirements for On-Plot Piping, (1 January 2018)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
SAIC-W-2032 14-May-18 WELD-
(Site Storage, Handling, Conditioning & Issuance)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Tanajib Gas Plant Project - ISF Package 13 10-09003-0006 RTCC

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use