SAUDI ARAMCO ID/PID - 30-June-14 - REV 8 (Standards Cutoff - June 2014) Rev 8 30-Jun-14

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
(Site Storage, Handling, Conditioning & Issuance)
SAIC-W-2032 31-Dec-14 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements
An approved procedure exists that has incorporated the following:
A) SAIC-W-2009 Checklist (Procedure for Welding
Consumables) B) SAIC-W-2010
Sch. Q,
Checklist (Receiving Inspection of Consumables) C)
Attachment VI
SAIC-W-2032 Checklist (Control of Welding Consumables)
A1 Tables
D) SATR-W-2009 - Rod Oven Calibration (Storage, Bake,
Portable)
(Procedure)
E) SATR-W-2010 - Welding Consumable Issuance Record
F) SATR-W-2020 - Recv Insp Detail Form & QC log
(Consumables)
Personnel involved in handling, storage, conditioning, issuance & controls of
welding consumables are trained as described below:
A) Material Controller (Receipt,
Sch. Q,
Control, Storage, Handling, Issue, etc.)
Attachment VI
B) Welding Foreman/Supervisor (Issue,
A2 Tables
Distribution, Control, Return)
C) QC Inspector (Monitors approved procedure and all activities)
(Procedure)
D) Welders
(Follows approved WPS for consumables received/used)

Procedure has provided details on how welding consumables are controlled


by the following but not limited to:
A) Receipt & Storage requirements - prior to issuance Sch. Q,
B) Material controller- Stock control (First in, First Attachment VI
A3 out) & issuance C) Tables
Requestor/User - Issue & Receiving of consumables (Daily Basis)
D) Return of un-used consumables, ID system (Procedure)
& reconditioning Procedure is being followed
by all responsible for the work.
B Storage of Welding Consumables.

Non-low hydrogen electrodes to A5.1 or A5.5 are stored in a dry SAES-W-011,


B1
environment. Attachment 1

SAES-W-011,
B2 All fluxes are stored in sealed containers in a dry environment.
Attachment 1

All electrodes & filler wires for SAW, GTAW, GMAW, & FCAW are stored in SAES-W-011,
B3
sealed containers in dry environment. Attachment 2

All electrodes and filler wires for SAW, GTAW, GMAW, and FCAW that SAES-W-011,
B4
have visible rusting or contamination are discarded. Attachment 2

GTAW filler metals have either AWS/ASME identification or the


SAES-W-011
B5 manufacture's identification marked on each individual rod, by the
Para. 6.3
manufacture, with flags, stencils or stamps.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
SAIC-W-2032 31-Dec-14 WELD-
(Site Storage, Handling, Conditioning & Issuance)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

C Handling & Conditioning of Electrodes

Storage ovens have continuous power supply during working and non- SAES-W-011,
C1
working hours or days (nights and weekends). Attachment 1

Storage and Re-bake ovens have calibrated Temperature Gauge. SAES-W-011,


C2
(Note 1 of SAES-W-011, Table 1) Attachment 1

Portable electrode storage ovens are kept at a minimum temperature of SAES-W-011,


C3
65C. Attachment 1

Atmospheric exposure of low hydrogen electrodes shall not exceed:


a) A5.1 electrodes : 4 hours (Open to atm) / 8 hours (if continuously kept in
portable oven at 65C).
b) A5.5 (E70XX & E80XX): 2 hours (Open to atm) / 4 hours
SAES-W-011,
C4 (electrodes continuously kept in portable oven at 65C).
Attachment 1
c) Low hydrogen electrodes with strengths > E80XX: 30 mins (Opento
atm) / 1 hour (if continuously kept in portable oven at 65C)
d) S. Steel and non-ferrous electrodes: 4 hours (Open to atm)
and 8 hours if continuously kept in portable oven at 65C.

The electrodes which has exceeded the permitted atmospheric exposure as


SAES-W-011,
C5 stated in Item B7 above and electrodes with damaged hermetically sealed
Attachment 1
containers shall undergo drying prior to its ssue for welding.

Drying of electrodes was performed as follows:


A) 2 hours minimum at 260-430C for A5.1 Low-hy electrodes. SAES-W-011,
C6
B) 2 hours minimum at 370-430C for A5.5 Low-hy electrodes. Attachment 1
C) 2 hours minimum at 120-250C for SS & non-ferrous electrodes.

Electrodes are re-dried only once and marked or segregated prior to re- SAES-W-011,
C7
issue. Attachment 1

Electrodes exposed to the atmosphere for less than the permitted duration
SAES-W-011,
C8 are re-conditioned or returned to the holding oven for 4 hours at 120°C
Attachment-1
before re-issue.

Any electrodes (low hydrogen or non-low-hydrogen) and fluxes that have SAES-W-011,
C9
been wet or moist are discarded. Attachment 1&2

Opened SAW flux containers are stored continuously in ovens at 65C SAES-W-011,
C10
minimum, or at mfg's recommendation, whichever is greater. Attachment 1

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
SAIC-W-2032 31-Dec-14 WELD-
(Site Storage, Handling, Conditioning & Issuance)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Shielding gases shall conform to the requirements of AWS A5.32


Specification for Welding Shielding Gases
A) Carbon dioxide (CO2): Compressed Gas Association CGA G-6.2, Grade
H (99.8% purity) SAES-W-011
C11
B) Argon (Ar): Compressed Gas Association CGA G-11.1 Grade C (99. Para. 6.7
997% Purity) Note : AWS A5.32 Specification for Welding Shielding Gases
gases and requirement for other gas mixtures shall be submitted to CSD for
approval

D Control of Electrode Issuance and Return

A project specific procedure or method statement for electrode issuance,


Procedure
D1 receiving and return was approved by SAPMT and Inspection (PID) per
Requirement
SAIC-W-2009.

REMARKS:

ATTACHMENTS:
Attachment 1 - SAES-W-011 - Conditioning, Storage & Exposure of Consumables (Att. 1 & Att. 2)
REFERENCE DOCUMENTS:
1. SAES-W-011, Welding Requirements for On-Plot Piping, (16 December 2013)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 30-June-14 - REV 8 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Control of Welding Consumables - Plant Piping
SAIC-W-2032 31-Dec-14 WELD-
(Site Storage, Handling, Conditioning & Issuance)
Attach. 1- SAES-W-011 - Conditioning, Storage & Exposure of Consumables (SMAW Att. 1 & SAW Att. 2)

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use