Construction Methodology For Stone Pitching - Boulder Apron
Construction Methodology For Stone Pitching - Boulder Apron
MACHINERIES:
Excavator - 1 No
Dumper - 2 Nos
MANPOWER:
Project Engineer - 1 No
Site Engineer - 1 No
Safety Engineer - 1 No
SAFETY ARRANGEMENTS:
All stone carrying labors shall be provided hard hand gloves, boots and helmets.
Acute surveillance shall be done by the safety engineer for smooth execution.
During heavy rain, laying of stones shall be stopped to avoid any casualties
caused due to slippery.