You are on page 1of 2

SARBJEET SINGH (Rigger Foreman)

Chicago Maintenance & Construction Company LLC


Post Box No. 27499, Jabel Ali, Dubai, UAE

Contact No.: UAE +971 52 3036161, +971 58 6152002


Email: sarb2016@gmail.com

PRECIS:
I am a full-time Lifting supervisor for past 10 years in the construction industry with good track record
and would like to excel further in the construction field through the experience that I have gained till
now.
OBJECTIVE:
Looking for a challenging and rewarding job opportunity, which exploits my inner talent, which will be
beneficial for a company and provide a good working environment.

Certificate of Achievement: -
• Certificate of Excellence from OSH Technologies PTE LTD for Lifting Supervisor Safety.
• Attained Certificate of Excellence Contribution for Achieving One Million Safe Manhours

SYNOPSIS:
Company Position Location Year
Chicago Maintenance &
Rigger Foreman Dubai (UAE) Aug 2015 to till
Construction Company LLC
Hindustan Company Rigger Foreman Govindwal, Punjab, India Feb 2012 to June 2014
Heavy Rigger / Lift
BJS Engineering Singapore Feb 2005 to June 2011
ing Supervisor

EDUCATIONAL QUALIFICATION:
Course School/College Year of Passing
Lifting Supervisor TUV, Dubai UAE 2019
Lifting Supervisor Eurolink Safety, Dubai UAE 2019
Lifting Supervisor Safety Course OSH Technologies PTE LTD (Singapore) 2009
Ship yard safety course OSH Technologies PTE LTD (Singapore) 2009
Risk management level OSH Technologies PTE LTD (Singapore) 2009
Rigging and signalman Course Absolute kinetics consultancy Pvt. (Singapore) 2007
Diploma in Fire & Safety Engineering Indian institute of integrated and technology 2018
Tower crane operator IAS 2018
Rigging and signalman Course Norsafe fours AS in Dubai 2015
12th Govt senior secondary school Bundala (PSEB) 2003
10th Govt senior secondary school Bundala (PSEB) 2001

CPR and First Aid Training Euro link Dubai 2015

Extra Skills: -MS Office, Excel, Power Point Presentation. Internet & Intranet Skills.

Key Responsibilities:
✓ Co-coordinating and supervising all lifting activities in accordance with the Lifting Plan;
✓ Briefing all lifting team members (i.e., crane operators, riggers and signalmen) on the Lifting Plan,
risk control measure and safe lifting procedure before the commencement of any lifting
operation;
✓ Ensuring that only registered crane operators, appointed riggers and appointed signalmen
participate in any lifting operation involving the use of mobile and tower cranes;
✓ Ensuring that the ground conditions are safe for any lifting operation to be performed by mobile
cranes;
✓ Be present during all lifting operations.
✓ If unsafe conditions are reported to him, to take suitable measures to rectify the conditions so
that the lifting operation can be conducted safely
✓ Hazard Identification & removal.
✓ Take appropriate action to mitigate or eliminate unsafe condition or hazard.
✓ To report and investigate all the incidents, accidents, near misses and find out the root causes.
✓ Regulating documentation and filing.
✓ To check the control measures of Risk/Impact Assessment.
Statutory Inspection of Lifting Equipment
• Under the General Provisions Regulations, lifting equipment such as cranes, lifting appliances
and lifting gears shall be inspected by an authorized examiner:
• At least once every 12 months;
• At least once every six months for lifting equipment carrying persons. An authorized examiner
must also be engaged to inspect the lifting equipment
• After modification or repairs of its load bearing components;
• When there is a change in equipment configuration, such as alteration of the boom length or
tower crane height; after an incident or accident involving the lifting equipment.
Pre-use Inspection of Lifting Equipment
• Lifting supervisor must ensure that the crane operator conduct pre-use inspection before each
lifting operation to ensure that the equipment is suitable, safe and correctly installed for the
lifting operation. The pre-use checks must include:
• Visual inspection of the lifting equipment;
• Functional test of the lifting equipment;
• Functional test of the safety system and devices;
• Functional test of the emergency stop device.
Lifting Plan:
• Lifting plan is to facilitate common understanding amongst the lifting team for a safe lifting
operation. A typical basic Lifting Plan incorporated with PTW for use at the workplaces. It
addresses some key factors affecting safe lifting operations such as:
• Details of the load;
• Details of the lifting equipment/ lifting gears used;
• Means of communications;
• Personnel involved in the lifting operation;
• Physical and environmental considerations;
• Sequence/ special precautions;
• Sketch of the zone of operation.

PERSONAL DETAILS
Date of Birth: 08 Nov 1985
Father Name: S. Hardeep Singh
Passport Number: L 4485344
Language Proficiency: English, Hindi, Punjabi
Reference: Available on Request

**********

You might also like