Perhitungan Berat Besi Beton 1 M3

This document provides calculations for the weight of steel reinforcement in 1 cubic meter of concrete for various beam, column, and slab configurations. It also includes sample calculations showing how to determine the weight of steel and formwork area for different cross-section dimensions. Finally, it lists unit prices for aluminum window frames and glass.

Uploaded by

cahyo prayit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views80 pages

Perhitungan Berat Besi Beton 1 M3

This document provides calculations for the weight of steel reinforcement in 1 cubic meter of concrete for various beam, column, and slab configurations. It also includes sample calculations showing how to determine the weight of steel and formwork area for different cross-section dimensions. Finally, it lists unit prices for aluminum window frames and glass.

Uploaded by

cahyo prayit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

Diameter Berat besi Diameter Berat besi Diameter Berat besi


No. No. No.
mm Kg / m' mm Kg / m' mm Kg / m'

1 4.0 0.099 11 12.0 0.888 1 10.0 0.617


2 5.0 0.154 12 13.0 1.042 2 13.0 1.042
3 5.5 0.186 13 14.0 1.208 3 16.0 1.578
4 5.7 0.200 14 16.0 1.578 4 19.0 2.226
5 6.0 0.222 15 19.0 2.226 5 22.0 2.984
6 6.5 0.260 16 22.0 2.984 6 25.0 3.853
7 8.0 0.395 17 23.0 3.261 7 29.0 5.185
8 9.0 0.499 18 25.0 3.853 8 32.0 6.313
9 10.0 0.617 19 28.0 4.833 9 36.0 7.990
10 11.0 0.746 20 31.0 5.925
21 32.0 6.313

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1 Sloof 15 x 20 cm' pakai tulangan 6 batang Ø 12 beugel Ø 15 jarak 15 cm


Panjang 1 m3 ukuran 15 x 20 cm = 1.00 : 0.15 : 0.20 M = 33.33 m'
Besi 6 batang Ø 10 = 6.00 x 33.33 x 0.62 Kg = 123.30 Kg ( A )
Besi beugel Ø 8 - 15 cm = 222.22 x 0.70 x 0.39 Kg = 61.38 Kg ( B )

Berat besi beton untuk ukuran 15 x 20 cm dalam 1 m3 = 184.68 Kg / m3 (A + B)


DIBULATKAN = 184.00 Kg

Begisting = 33.33 x 0.4 M = 13.33 m2

2 Kolom (K2) 30 x 35 cm' pakai tulangan 10 btg D16 beugel Ø 10 jarak 15 cm


Panjang 1 m3 ukuran 30 x 35 cm = 1.00 : 0.20 : 0.30 M = 16.67 m'
Besi 4 batang D 16 = 4.00 x 16.67 x 1.58 Kg = 105.22 Kg ( A )
Besi 2 batang Ø 12 = 2.00 x 16.67 x 0.89 Kg = 29.59 Kg ( A )
Besi beugel Ø 8 - (12) cm = 111.11 x 1.00 x 0.39 Kg = 43.84 Kg ( B )

Berat besi beton untuk ukuran 30 x 35 cm dalam 1 m3 = 178.65 Kg / m3 (A + B)


DIBULATKAN = 178.00 Kg

Begisting = 16.67 x 1.4 M = 23.33 m2


2 Kolom (K2) 20 x 30 cm' pakai tulangan 10 btg D16 beugel Ø 10 jarak 12 cm
Panjang 1 m3 ukuran 30 x 35 cm = 1.00 : 0.30 : 0.35 M = 9.52 m'
Besi 12 batang D 16 = 12.00 x 9.52 x 0.89 Kg = 101.46 Kg ( A )
Besi beugel Ø 8 - (12) cm = 79.37 x 1.30 x 0.39 Kg = 40.71 Kg ( B )

Berat besi beton untuk ukuran 30 x 35 cm dalam 1 m3 = 142.17 Kg / m3 (A + B)


DIBULATKAN = 142.00 Kg

Begisting = 9.52 x 1.4 M = 13.33 m2

3 Kolom praktis 15 x 15 cm' pakai tulangan 4 batang Ø 12 beugel Ø 8 jarak 15 cm


Panjang 1 m3 ukuran 15 x 15 cm = 1.00 : 0.15 : 0.15 M = 44.44 m'
Besi 4 batang Ø 12 = 4.00 x 44.44 x 0.89 Kg = 157.82 Kg ( A )
Besi beugel Ø 8 - 20 cm = 296.30 x 0.60 x 0.50 Kg = 88.78 Kg ( B )

Berat besi beton untuk ukuran 15 x 15 cm dalam 1 m3 = 246.60 Kg / m3 (A + B)


DIBULATKAN = 246.00 Kg

Begisting = 44.44 x 0.3 M = 13.33 m2


4 Balok (B4) 25 x 50 cm' pakai tulangan 4 btg Ø12 beugel Ø 8 jarak 13.5 cm
Panjang 1 m3 ukuran 25x 50 cm = 1.00 : 0.25 : 0.50 M = 8.00 m'
Besi 10 btg Ø 16 = 10.00 x 8.00 x 1.58 Kg = 126.26 Kg ( A )
Besi 2 Ø 12 2.00 x 8.00 x 0.89 Kg = 14.20 Kg ( B )
Besi beugel Ø 8 - 10 cm = 59.26 x 1.50 x 0.39 Kg = 35.07 Kg ( C )

Berat besi beton untuk ukuran 25 x 50 cm dalam 1 m3 = 175.54 Kg / m3 (A + B+C)


DIBULATKAN = 175.00 Kg

Begisting = 8.00 x 1.25 M = 10.00 m2

5 Balok (Bp) 15 x 30 cm' pakai tulangan 5 btg Ø12 beugel Ø 8 jarak 13.5 cm
Panjang 1 m3 ukuran `15x 30 cm = 1.00 : 0.15 : 0.30 M = 22.22 m'
Besi 5 btg d 16 = 5.00 x 22.22 x 1.58 Kg = 175.36 Kg ( A )
Besi beugel Ø 8 - 15 cm = 164.61 x 0.90 x 0.39 Kg = 58.45 Kg ( B )

Berat besi beton untuk ukuran 15 x 30 cm dalam 1 m3 = 233.81 Kg / m3 (A + B)


DIBULATKAN = 233.00 Kg

Begisting = 22.22 x 0.4 M = 8.89 m2

6 Balok (Bp) 15 x 20 cm' pakai tulangan 5 btg Ø12 beugel Ø 8 jarak 10 cm


Panjang 1 m3 ukuran `15x 30 cm = 1.00 : 0.15 : 0.20 M = 33.33 m'
Besi 5 btg d 12 = 5.00 x 33.33 x 0.89 Kg = 147.96 Kg ( A )
Besi beugel Ø 8 - 10 cm = 333.33 x 0.70 x 0.39 Kg = 92.06 Kg ( B )

Berat besi beton untuk ukuran 15 x 30 cm dalam 1 m3 = 240.02 Kg / m3 (A + B)


DIBULATKAN = 240.00 Kg

Begisting = 33.33 x 0.4 M = 13.33 m2

7 Balok (BL) 15 x 60 cm' pakai tulangan 4 btg Ø10 beugel Ø 6 jarak 20 cm


Panjang 1 m3 ukuran `15x 20 cm = 1.00 : 0.12 : 1.00 M = 8.33 m'
Besi 8 btg Ø 10 = 6.67 x 8.33 x 1.58 Kg = 87.68 Kg ( A )
Besi beugel Ø 10 - 10 cm = 55.56 x 1.00 x 1.58 Kg = 87.68 Kg ( B )

Berat besi beton untuk ukuran 15 x 60 cm dalam 1 m3 = 175.36 Kg / m3 (A + B)


DIBULATKAN = 175.00 Kg

Begisting = 8.33 x 1.5 M = 12.50 m2


HARGA SATUAN PEKERJAAN KOSEN ALUMUNIUM DAN KELENGKAPANNYA

P1
BAHAN
- Kosen Alumunium 4'' dark brown 8.760 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 1.102 m2 Rp. 136,172.00
- Panil Pintu Doubel taekwood 4.850 m2 Rp. 800,000.00
- Lapis HPL 4.850 m2 Rp. 228,800.00
- Pas. Kunci pintu 1.000 bh Rp. 233,306.00
- Engsel pintu 6.000 bh Rp. 38,307.00
- Grendel pintu 2.000 bh Rp. 41,125.00
- Pegangan pintu 4.000 bh Rp. 50,000.00

Jumlah
Jumlah Dibulatkan
P2
BAHAN
- Kosen Alumunium 4'' dark brown 7.200 m' Rp. 164,234.00
- Daun Pintu Alumunium 4'' dark Brown 7.160 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 0.960 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 0.960 m2 Rp. 70,000.00
- Pas. Kunci pintu 1.000 bh Rp. 233,306.00
- Grendel pintu 1.000 bh Rp. 41,125.00
- Engsel pintu 3.000 bh Rp. 38,307.00
- Pegangan pintu 2.000 bh Rp. 50,000.00

Jumlah
Jumlah Dibulatkan
P3
BAHAN
- Kosen Alumunium 4'' dark brown 7.000 m' Rp. 164,234.00
- Daun Pintu Alumunium 4'' Silver 6.760 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 0.960 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 0.960 m2 Rp. 70,000.00
- Pas. Kunci pintu 1.000 bh Rp. 233,306.00
- Grendel pintu 1.000 bh Rp. 41,125.00
- Engsel pintu 3.000 bh Rp. 38,307.00
- Pegangan pintu 2.000 bh Rp. 50,000.00

Jumlah
Jumlah Dibulatkan
PT1
BAHAN
- Kosen Alumunium 4'' dark brown 7.000 m' Rp. 164,234.00
- Daun pintu spandrell Alumunium 1.400 m2 Rp. 500,000.00
- Kaca bening tebal 5 mm 0.294 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 0.294 m2 Rp. 70,000.00
- Pas. Kunci pintu 1.000 bh Rp. 85,772.00
- Grendel pintu 1.000 bh Rp. 41,125.00
- Engsel pintu 3.000 bh Rp. 38,307.00
- Pegangan pintu 2.000 bh Rp. 50,000.00

Jumlah
Jumlah Dibulatkan
PT2
BAHAN
- Kosen Alumunium 4'' dark brown 5.020 m' Rp. 164,234.00
- Daun pintu spandrell Alumunium 1.302 m2 Rp. 500,000.00
- Pas. Kunci pintu 1.000 bh Rp. 85,772.00
- Grendel pintu 1.000 bh Rp. 41,125.00
- Engsel pintu 3.000 bh Rp. 38,307.00
- Pegangan pintu 2.000 bh Rp. 50,000.00

Jumlah
Jumlah Dibulatkan

J1
BAHAN
- Kosen Alumunium 4'' dark brown 4.840 m' Rp. 164,234.00
- Daun jendela Alumunium 4'' dark brown 2.240 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 0.475 m2 Rp. 136,172.00
- Engsel Jendela 4.000 bh Rp. 33,203.00
- Hak angin 1.000 bh Rp. 16,830.00
- Pas. Grendel Jendela 2.000 bh Rp. 41,125.00

Jumlah
Jumlah Dibulatkan
J2
BAHAN
- Kosen Alumunium 4'' dark brown 8.060 m' Rp. 164,234.00
- Daun jendela Alumunium 4'' dark brown 4.600 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 2.766 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 2.766 m2 Rp. 70,000.00
- Hak angin 2.000 bh Rp. 16,830.00
- Engsel Jendela 4.000 bh Rp. 33,203.00
- Pas. Grendel Jendela 2.000 bh Rp. 41,125.00

Jumlah
Jumlah Dibulatkan
J3
BAHAN
- Kosen Alumunium 4'' dark brown 19.600 m' Rp. 164,234.00
- Daun jendela Alumunium 4'' dark brown 7.300 m' Rp. 164,234.00
- Hak angin 3.000 bh Rp. 16,830.00
- Engsel Jendela 6.000 bh Rp. 33,203.00
- Pas. Grendel Jendela 3.000 bh Rp. 41,125.00
- Kaca Rayben tebal 5 mm 3.208 m2 Rp. 155,206.00

Jumlah
Jumlah Dibulatkan
J4
BAHAN
- Kosen Alumunium 4'' dark brown 3.080 m' Rp. 164,234.00
- Daun jendela Alumunium 4'' dark brown 2.520 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 0.280 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 0.280 m2 Rp. 70,000.00
- Hak angin 1.000 bh Rp. 16,830.00
- Engsel Jendela 2.000 bh Rp. 33,203.00
- Pas. Grendel Jendela 1.000 bh Rp. 41,125.00

Jumlah
Jumlah Dibulatkan
J5
BAHAN
- Kosen Alumunium 4'' dark brown 10.520 m' Rp. 164,234.00
- Daun jendela Alumunium 4'' dark brown 15.840 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 3.101 m2 Rp. 136,172.00
- Hak angin 5.000 bh Rp. 16,830.00
- Engsel Jendela 2.000 bh Rp. 33,203.00
- Pas. Grendel Jendela 1.000 bh Rp. 41,125.00

Jumlah
Jumlah Dibulatkan

BV
BAHAN
- Kosen Alumunium 4'' dark brown 2.520 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 0.418 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 0.190 m2 Rp. 70,000.00
- Kisi-kisi Alumunium 35.200 m' Rp. 60,000.00

Jumlah
Jumlah Dibulatkan

PA1
BAHAN
- Kosen Alumunium 3'' dark brown 31.050 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 8.652 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 8.652 m2 Rp. 70,000.00

Jumlah
Jumlah Dibulatkan
PA2
BAHAN
- Kosen Alumunium 3'' dark brown 8.320 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 10.658 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 10.658 m2 Rp. 70,000.00

Jumlah
Jumlah Dibulatkan
PA3
BAHAN
- Kosen Alumunium 3'' dark brown 16.880 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 4.459 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 4.459 m2 Rp. 70,000.00

Jumlah
Jumlah Dibulatkan
PA4
BAHAN
- Kosen Alumunium 3'' dark brown 20.240 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 5.570 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 5.570 m2 Rp. 70,000.00

Jumlah
Jumlah Dibulatkan
PA5
BAHAN
- Kosen Alumunium 3'' dark brown 20.240 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 5.570 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 5.570 m2 Rp. 70,000.00

Jumlah
Jumlah Dibulatkan
PA6
BAHAN
- Kosen Alumunium 3'' dark brown 9.370 m' Rp. 164,234.00
- Kaca bening tebal 5 mm 10.658 m2 Rp. 136,172.00
- Stiker Kaca Sandblast 10.658 m2 Rp. 70,000.00

Jumlah
Jumlah Dibulatkan
PA7
BAHAN
- Partisi GRC 2 muka 240 x 120 ex. 9.947 m2 Rp. 210,450.00
Jayaboard+rangka hollow galvanis 3 mm )

Jumlah
Jumlah Dibulatkan
PA8
BAHAN
- Partisi GRC 2 muka 240 x 120 ex. 8.443 m2 Rp. 210,450.00
Jayaboard+rangka hollow galvanis 3 mm )

Jumlah
Jumlah Dibulatkan
PA9
BAHAN
- Partisi GRC 2 muka 240 x 120 ex. 13.124 m2 Rp. 210,450.00
Jayaboard+rangka hollow galvanis 3 mm )

Jumlah
Jumlah Dibulatkan
LENGKAPANNYA

Rp. 1,438,689.84
Rp. 150,116.01
Rp. 3,880,320.00
Rp. 1,109,771.52
Rp. 233,306.00
Rp. 229,842.00
Rp. 82,250.00
Rp. 200,000.00

Rp. 7,324,295.37
Rp. 7,324,200.00

Rp. 1,182,484.80
Rp. 1,175,915.44
Rp. 130,725.12
Rp. 67,200.00
Rp. 233,306.00
Rp. 41,125.00
Rp. 114,921.00
Rp. 100,000.00

Rp. 3,045,677.36
Rp. 3,045,600.00

Rp. 1,149,638.00
Rp. 1,110,221.84
Rp. 130,725.12
Rp. 67,200.00
Rp. 233,306.00
Rp. 41,125.00
Rp. 114,921.00
Rp. 100,000.00

Rp. 2,947,136.96
Rp. 2,947,100.00

Rp. 1,149,638.00
Rp. 700,000.00
Rp. 40,034.57
Rp. 20,580.00
Rp. 85,772.00
Rp. 41,125.00
Rp. 114,921.00
Rp. 100,000.00

Rp. 2,252,070.57
Rp. 2,252,000.00

Rp. 824,454.68
Rp. 651,000.00
Rp. 85,772.00
Rp. 41,125.00
Rp. 114,921.00
Rp. 100,000.00

Rp. 1,817,272.68
Rp. 1,817,200.00

Rp. 794,892.56
Rp. 367,884.16
Rp. 64,708.93
Rp. 132,812.00
Rp. 16,830.00
Rp. 82,250.00

Rp. 1,459,377.65
Rp. 1,459,300.00

Rp. 1,323,726.04
Rp. 755,476.40
Rp. 376,651.75
Rp. 193,620.00
Rp. 33,660.00
Rp. 132,812.00
Rp. 82,250.00

Rp. 2,898,196.19
Rp. 2,898,100.00

Rp. 3,218,986.40
Rp. 1,198,908.20
Rp. 50,490.00
Rp. 199,218.00
Rp. 123,375.00
Rp. 497,838.77

Rp. 5,288,816.37
Rp. 5,288,800.00

Rp. 505,840.72
Rp. 413,869.68
Rp. 38,128.16
Rp. 19,600.00
Rp. 16,830.00
Rp. 66,406.00
Rp. 41,125.00

Rp. 1,101,799.56
Rp. 1,101,700.00

Rp. 1,727,741.68
Rp. 2,601,466.56
Rp. 422,242.14
Rp. 84,150.00
Rp. 66,406.00
Rp. 41,125.00

Rp. 4,943,131.38
Rp. 4,943,100.00

Rp. 413,869.68
Rp. 56,919.90
Rp. 13,300.00
Rp. 2,112,000.00

Rp. 484,089.58
Rp. 484,000.00

Rp. 5,099,465.70
Rp. 1,178,160.14 2.8 3.09
Rp. 605,640.00

Rp. 6,883,265.84
Rp. 6,883,200.00

Rp. 1,366,426.88 3.96 4.36


Rp. 1,451,348.41 3.31 3.22
Rp. 746,074.00

Rp. 3,563,849.29
Rp. 3,563,800.00

Rp. 2,772,269.92 8.88 8


Rp. 607,163.71 2.84 1.57
Rp. 312,116.00

Rp. 3,691,549.63
Rp. 3,691,500.00

Rp. 3,324,096.16 9.88 10.36


Rp. 758,532.51 2.84 1.81
Rp. 389,928.00

Rp. 4,472,556.67
Rp. 4,472,500.00

Rp. 3,324,096.16 9.88 10.36


Rp. 758,532.51 2.84 1.81
Rp. 389,928.00

Rp. 4,472,556.67
Rp. 4,472,500.00

Rp. 1,538,872.58 3.96 5.41


Rp. 1,451,348.41 3.31 3.22
Rp. 746,074.00

Rp. 3,736,294.99
Rp. 3,736,200.00

Rp. 2,093,304.06

Rp. 2,093,304.06
Rp. 2,093,300.00
Rp. 1,776,724.13

Rp. 1,776,724.13
Rp. 1,776,700.00
4.12

Rp. 2,761,861.62

Rp. 2,761,861.62
Rp. 2,761,800.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN ANGGARAN 2019

HARGA BAHAN
NO. URAIAN SATUAN FINAL
TAHUN 2018
( Rp. )
1 2 3 4
INFLASI = 3.02 %
A. UPAH TENAGA : ###
1 Pekerja hari 40,000
2 Tukang gali hari 30,000
3 Mandor Lapangan hari 45,000
4 Tukang cat / plitur / batu hari 40,000
5 Kepala tukang cat / plitur / batu hari 45,000
6 Tukang kayu hari 40,000
7 Kepala tukang kayu hari 45,000
8 Tukang Besi hari 40,000
9 Kepala Tukang besi hari 45,000
###
B. BAHAN: ###
Kelompok Material Alam : ###
1 Air liter 50
2 Tanah urug m³ 134,000
3 Tanah urug Pilihan m³ 153,000
4 Pasir urug (Pasir Ladon) m³ 119,000
5 Pasir batu (sirtu) m³ 175,000
6 Pasir pasang m³ 233,000
7 Batu blonos m³ 230,000
8 Batu belah 15/20 m³ 263,000
9 Batu belah / Mac Adam m³ 263,000
10 Batu muka 15x15x20 cm buah 2,100
11 Batu pecah tangan 5-7 cm m³ 300,000
12 Batu pecah mesin 2-3 cm m³ 444,000
13 Batu pecah mesin 3-4 cm m³ 444,000
14 Batu pecah mesin 1-2 cm m³ 444,000
15 Batu pecah mesin 0,5-1 cm m³ 444,000
16 Abu batu m³ 444,000
17 Batu Tempel Palimanan Hijau m² 166,000
18 Batu Tempel Palimanan Kuning m² 144,000
19 Batu Tempel (Tidak Beraturan) Kecil m² 160,000
20 Batu Tempel (Tidak Beraturan) Besar m² 152,000
21 Batu Candi Tempel 20 x 20, 5/20 m² 163,000
22 Batu tempel kuning tidak beraturan Ø 10 - 30 cm m² ###
23 Kerikil sungai (tidak disaring) royalti m³ 83,000
24 Batu kali besar royalti m³ 83,000
25 Pasir ( Quary ) m³ 83,000
26 Batu kali ( Quary ) m³ 83,000
27 Batu bata buah 850
###
Kelompok Kayu ###
28 a. Kayu Kalimantan ( Meranti Batu ) : Balok 8/15 m³ 4,657,000
b. Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (ikat) m³ 4,600,000
Kayu Kalimantan ( Meranti Batu ) 5/7 & 4/6 (lepas) m³ 4,657,000
c. Kayu Kalimantan ( Meranti Batu ) : 3/4 & 3/5 m³ 4,550,000
d. Kayu Kalimantan ( Meranti Batu ) : 2/3 m³ 4,550,000

Harga Saruan Bahan dan Upah 2018 13 dari 80


HARGA BAHAN
FINAL
NO. URAIAN SATUAN
TAHUN 2018
( Rp. )
1 2 3 4
e. Papan Meranti Batu ( 2 x 20 x 400 ) m³ 4,657,000
f. Papan Meranti Batu ( 2 x 25 x 400 ) m³ 4,657,000
29 a. Kayu Kempas : Balok 8/15 m³ 6,200,000
b. Kayu Kempas Ukuran 5/7 & 4/6 (ikat) m³ 5,650,000
Kayu Kempas Ukuran 5/7 & 4/6 (lepas) m³ 5,690,000
c. Kayu Kempas Ukuran 3/4 & 3/5 m³ 5,650,000
d. Kayu Kempas Ukuran 2/3 m³ 5,650,000
e. Papan Kempas m³ 6,200,000
3 Kayu Rawa (Pinus) m³ 1,950,000
4 Papan Cetak ( kayu pinus ) uk 2 x 20 x 200 m³ 2,477,000
5 Kayu lokal sekwalitas Laban / sengon merah m³ 2,683,000
6 Kayu tahun m³ 1,858,000
7 Kayu bakar m³ 351,000
8 Kayu stoot btg 13,000
9 Alat - alat bantu ( @ 3 alat ) set 48,000
10 Kayu untuk perancah ( kayu pinus / rawa ) m3 1,909,000
11 Kayu Struktural ( jati klas 2 ) m3 14,396,000
12 Tripleks tebal 3 mm uk. 120 x 240 cm lbr 56,000
13 Tripleks tebal 4 mm uk. 120 x 240 cm lbr 68,000
14 Tripleks tebal 6 mm uk. 120 x 240 cm lbr 80,000
15 Tripleks tebal 8 mm uk. 120 x 240 cm lbr 124,000
16 Tripleks tebal 3 mm uk. 90 x 210 cm (uk. Pintu) lbr 47,000
17 Tripleks tebal 4 mm uk. 90 x 210 cm (uk. Pintu) lbr 54,000
18 Tripleks melaminto tebal 3 mm uk. 120 x 240 cm putih lbr 108,000
19 Teakwood tebal 3 mm uk. 90 x 120 cm lbr 95,000
20 Teakwood tebal 4 mm uk. 90 x 210 cm lbr 118,000
21 Teakwood tebal 3 mm uk. 120 x240 cm lbr 102,000
22 Teakwood tebal 4 mm uk. 120 x240 cm lbr 113,000
71 Plywood 9 mm uk. 120 x 240 mm lbr 196,000
72 Pasang dinding ACP + rangka + aksesoris ( terpasang ) m² 650,000
73 Ijuk kg 20,000
74 Dolken Ø 8 - 10 m' 10,500
###
Kelompok Besi / Baja : ###
1 Paku kg 16,300
2 Paku skrup ( utk Gypsum) kg 32,800
3 Skrup atap ondulie bh 1,200
4 Skrup vixer bh 400
5 Dynabol dia 12 x 120 mm bh 1,500
6 Paku asbes gelombang kg 34,500
7 Paku sumbat kg 16,000
8 Paku Pancing kg 16,000
9 Besi beton/baja tulangan beton diameter 4 - 13 mm kg 11,700
10 Besi beton/baja tulangan beton diameter 14 - 32 mm kg 11,600
11 Besi Canal C, besi IWF dan Besi Siku kg 16,200
12 Baja plat kg 15,000
12 Kanopi Rangka besi hollow atap galvalume 0,35 mm terpasang m² 568,000
13 Folding Gate d : 4 m² 599,000
14 Folding Gate d : 5 m² 645,000
15 Folding Gate d : 8 m² 743,000
16 Besi Hollow kg 22,500
###
16 Profil allumunium m' 65,000
17 Alumunium plat m² 68,000

Harga Saruan Bahan dan Upah 2018 14 dari 80


HARGA BAHAN
FINAL
NO. URAIAN SATUAN
TAHUN 2018
( Rp. )
1 2 3 4
18 Besi Hollow kg 22,500
19 Kawat beton (bindrad) kg 20,700
20 Shower stainless kualitas baik buah 413,000
21 Shower standart buah 125,000
22 Kran air standar buah 31,000
23 Kran air kualitas baik kuningan buah 100,000
24 Pintu Frameless Uk. 210 x 80 cm tbl. 12 mm (Tempered) tunggal 5,692,000
25 Pintu Patchfitting Uk. 210 x 80 cm tbl. 12 mm tunggal 7,762,000
26 Bak cuci almunium standart unit 206,000
27 Kunci tanam 3 X Slog buah 180,000
28 Kunci tanam kwalitas baik kuningan buah 350,000
29 Kunci Slot buah 150,000
30 Kunci Silinder buah 75,000
31 Kunci Lemari buah 25,000
32 Kunci KM / WC bulat buah 52,000
33 Engsel pintu Nylon buah 17,000
34 Engsel pintu kuningan buah 26,000
35 Engsel jendela Nylon buah 21,000
36 Engsel jendela kuningan buah 24,000
37 Kait angin 6" psg 7,000
38 Kait angin 8" psg 9,000
39 Kait angin 10" psg 17,000
40 Hak angin / engsel angin psg 19,000
41 Hak angin / engsel angin kuningan psg 32,000
42 Spring knip buah 19,000
43 Door closer unit 222,000
44 Door holder unit 127,000
45 Door stop unit 63,000
46 Grendel jendela buah 14,000
47 Grendel pintu ( pendek ) buah 18,000
48 Grendel pintu ( panjang ) buah 20,000
49 Tarikan / Pegangan pintu buah 43,000
50 Tarikan / Pegangan pintu stainlessteel standart buah 175,000
51 Tarikan / Pegangan pintu stainlessteel 60 cm buah 414,000
52 Rel pintu dorong unit 222,000
62 Kosen Almunium 3" Coklat m' 95,000
63 Kosen Aluminium 3" Powder Coating (warna) m' 155,000
64 Kosen Aluminium 4" Powder Coating (warna) m' 180,000
65 Kosen Aluminium 3" Urat Kayu ex. YKK m' 235,000
66 Kosen Almunium 4" Coklat ex. YKK m' 280,000
67 Kosen Almunium 4" Silver ex. YKK m' 280,000
68 Kosen Aluminium 4" Powder Coating (warna) ex. YKK m' 320,000
69 Kosen Aluminium 4" Urat Kayu ex. YKK m' 320,000
70 Door closer ex. Dorna 310,000
71 Pintu Kaca Rayban Alumunium 4" Putih unit 1,290,000
72 Pintu Kaca Bening Alumunium 4" Putih unit 1,238,000
73 Kosen dan Pintu UPVC dan Asesoris ukuran 210 x 90 cm buah 2,683,000
74 Formite / penjaga jarak bekisting / spacer buah 2,000
75 Mur Baut Panjang buah 2,000
76 Mur Baut Pendek buah 1,700
76 Rangka atap baja ringan type C. 75/65 tebal 0,35 mm panjang 6.00 m (4.3 kg/m') m 14,000
77 Rangka atap baja ringan type C. 30/45 tebal 0,35 mm panjang 6.00 m panjang 6.00 m m 5,000
###
Kelompok Lantai : ###

Harga Saruan Bahan dan Upah 2018 15 dari 80


HARGA BAHAN
FINAL
NO. URAIAN SATUAN
TAHUN 2018
( Rp. )
1 2 3 4
1 Keramik polos kw.1 ukuran 30 x 30 cm m² 45,000
2 Keramik motif kw.1 ukuran 30 x 30 cm m² 54,000
3 Keramik granit kw.1 ukuran 30 x 30 cm m² 165,000
4 Keramik motif kw.1 ukuran 30 x 60 cm m² 149,000
5 Keramik motif kw.1 ukuran 30 x 60 cm Ex. Roman m² 175,000
6 Keramik polos kw.1 ukuran 40 x 40 cm m² 51,000
7 Keramik motif kw.1 ukuran 40 x 40 cm m² 64,000
8 Keramik motif granit kw.1 ukuran 40 x 40 cm m² 115,000
9 Keramik polos kw.1 ukuran 60 x 60 cm m² 100,000
10 Keramik motif kw.1 ukuran 60 x 60 cm m² 118,000
11 Keramik motif granit kw.1 ukuran 60 x 60 cm m² 130,000
12 Granite Tile Uk. 60 x 60 cm single loading m² 170,000
13 Granite Tile Uk. 60 x 60 cm double loading ex. Platinum m² 280,000
14 Keramik dinding kw.1 ukuran 30 x 60 cm m² 150,000
15 Keramik Artistik 10/20 buah 8,000
16 Keramik Artistik 10/30 buah 19,000
17 List keramik motif 5 x 20 cm buah 6,200
18 List keramik motif 5 x 25 cm buah 14,400
19 Plint keramik motif 10 x 20 cm buah 8,000
20 Plint keramik motif 10 x 30 cm buah 10,000
21 Plint keramik motif 10 x 40 cm buah 11,300
22 Plint keramik motif 10 x 60 cm buah 18,000
23 Plint granit 10 x 60 cm buah 36,000
24 Plint Lengkung fiber 60 x 10 x 4 cm buah 65,000
###
Kelompok Atap : ###
1 Genteng pres morando glasur buah 4,600
2 Kerpus genteng pres morando glasur buah 8,000
4 Seng gelombang 3'-6' (90 x 180 x 0.2 cm) lbr 51,000
5 Seng Plat BJLS 30 lebar 90 cm ; panjang 180 cm lbr 59,000
6 Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm lbr 51,000
7 Seng Plat BJLS 30 lebar 30 cm ; panjang 180 cm lbr 48,000
8 Kalsibot 4 mm 120 x 240 cm lbr 55,000
9 Plafond PVC m² 185,000
10 Gypsum board 120 x 240 x 9 mm lbr 69,000
11 List Gipsum Profil 15 cm Pj. 2.00 m' m' 8,500
12 List Gipsum profil 10 cm Pj. 2.00 m' m' 6,000
13 List Gipsum Artistik 20 cm Pj. 2.00 m' m' 30,000
14 Kompon board ( 1 zak = 20 kg ) kg 4,000
15 List plafond PVC Pj. 4.00 dan 6.00 m' m' 15,000
16 Lisplang GRC lebar 20 cm panjang 4.00 m m' 66,000
17 Lisplang GRC lebar 30 cm panjang 4.00 m m' 99,000
18 Partisi GRC 2 muka 240 x 120 ex. Jayaboard+rangka hollow galvanis 3 mm ) m² 183,000
19 Partisi kaca 8 mm framed natural ( framed alumunium 4/4 ) m² 356,000
20 Partisi kaca 8 mm framed coklat ( framed alumunium 4/4 ) m² 388,000
21 Partisi kaca 8 mm framed coated ( framed alum. 4/4 ) fin coating ducco warna m² 453,000
22 Partisi multiplek 9 mm 1 muka, artistik 1 ( rangka kayu 4/6 fin decosheet ) m² 345,000
23 Partisi multiplek 9 mm 1 muka, artistik 2 ( rangka kayu 4/6 fin HPLboard ) m² 405,000
24 Woodplank 0.20 x 4.00 m kg 62,000
25 Woodplank 0.30 x 4.00 m kg 72,000
###
Kelompok Cat / Minyak :
1 Cat genteng ( 1 Klg = 4 kg ) kg 49,000
2 Cat tembok / cat dasar kg 51,000

Harga Saruan Bahan dan Upah 2018 16 dari 80


HARGA BAHAN
FINAL
NO. URAIAN SATUAN
TAHUN 2018
( Rp. )
1 2 3 4
3 Cat Tembok Luar ( Wheather Shield ) kg 284,000
4 Cat Tembok pelapis anti bocor kg 67,000
5 Cat brown kg 72,000
6 Plamur Kayu kg 31,000
7 Plamur Tembok kg 21,500
8 Flincote kg 41,000
9 Minyak cat kg 22,000
10 Minyak Terpentin kg 8,500
11 Minyak Bekisting ( olie bekas ) ltr 3,100
12 Politur kg 72,000
13 Politur jadi kg 77,000
14 Teak oil kg 77,000
15 Dempul kg 40,000
16 Amplas lbr 5,600
17 Batu kambang (batu apung) kg 12,000
18 Sirlak kg 122,000
19 Spirtus ltr 12,000
20 Teer kg 37,000
21 Aspal bitumen (kemasan ) kg 11,900
22 Aspal curah kg 10,250
23 Join Sealent ( Aspal ) kg 11,900
24 Cat anti karat kg 65,000
25 Polytene 125 mikron kg 25,000
26 Curing Compound ltr 42,000
27 Expansion Cap ( pvc + solatip ) m' 3,500
###
28 Kuas cat 2" buah 8,000
29 Kuas cat 3" buah 10,000
30 Kuas cat 4" buah 19,000
31 Sikat Baja buah 10,000
32 Kapek buah 5,000
33 Roll Cat buah 36,000
34 Residu / Soligium ltr 26,000
8 Sealant tube 22,000
9 Lem Kuning kg 34,000
10 Wood Filler kg 34,000
11 Solar bersubsidi ltr 5,150
12 Minyak pelumas ltr 40,000
###
Kelompok Cement, Kaca dan Lain-lain : ###
1 Portland Cement ( PC ) 50 kg zak 58,000
2 Portland Cement ( PC ) kg 1,160
3 Cement warna kg 15,000
4 Cement putih kg 3,100
5 Beton K 100 (ready mix) m³ 1,023,000
6 Beton K 125 (ready mix) m³ 1,043,000
7 Beton K 150 (ready mix) m³ 1,064,000
8 Beton K 175 (ready mix) m³ 1,094,000
9 Beton K 200 (ready mix) m³ 1,116,000
10 Beton K 225 (ready mix) m³ 1,203,000
11 Kaca bening tebal 5 mm m² 100,000
12 Kaca Temperred tebal 5 mm m² 588,000
13 Kaca Temperred tebal 8 mm m² 799,000
14 Kaca Temperred tebal 10 mm m² 877,000

Harga Saruan Bahan dan Upah 2018 17 dari 80


HARGA BAHAN
FINAL
NO. URAIAN SATUAN
TAHUN 2018
( Rp. )
1 2 3 4
15 Kaca Temperred tebal 12 mm m² 1,011,000
16 Kaca Stopsol semua warna tebal 5 mm m² 382,000
17 Kaca Stopsol semua warna tebal 8 mm m² 711,000
18 Kaca One way tebal 6 mm m² 273,000
19 Kaca One way tebal 9 mm m² 382,000
20 Kaca One way tebal 12 mm m² 410,000
21 Sandblast kaca polos 100 x 80 cm m² 70,000
22 Kaca Patri tebal 5 mm m² 547,000
23 Kaca es tebal 5 mm m² 153,000
24 Jendelan naco buah 16,000
25 Profil kaca m' 37,000
26 Glassblock buah 25,000
27 Bak Mandi Fiberglass, volume 120 ltrr (sudut) buah 266,000
28 Closet Jongkok standart buah 288,000
29 Closet Jongkok kwalitas baik buah 450,000
30 Closet duduk standart - 1 ( monoblock manual ) unit 1,100,000
31 Closet duduk standart - 2 ( Monoblok single flush dimensi bowl) unit 1,200,000
32 Closet duduk costum ( Superior double jet flush dimensi bowl ) unit 7,224,000
33 Kloset duduk / Monoblok + pembilas otomatis " INA " Buah 1,548,000
34 Urinoir Otomatis buah 1,279,000
35 Floordrain (saringan buangan air KM/WC) buah 12,000
36 Floordrain Stainless Steel (saringan buangan air KM/WC) buah 31,000
37 Floordrain Stainless Steel (+ waste filter) buah 165,000
38 Wastafel Kw.1 pedes steel unit 1,083,000
39 Wastafel standart - 1 ( model gantung marble ) unit 639,000
40 Wastafel standart - 2 ( model gantung marble panas dingin ) unit 1,491,000
41 Bathtub standart - 1 unit 1,204,000
42 Bathtub standart - 2 unit 3,066,000
43 Bathtub costum unit 22,996,000
###
KELOMPOK AIR BERSIH ###
1 Pipa GI SNI ###
Ukuran ½" m' ###
Ukuran ¾" m' 23,500
Ukuran 1½" m' 48,000

2 Pipa PVC ###


Ukuran Ø ½" ( AW ) ex Wavin m' 5,000
Ukuran Ø ¾" ( AW ) ex Wavin m' 7,000
Ukuran Ø 1" ( AW ) ex Wavin m' 10,000
Ukuran Ø 1¼" ( AW ) ex Wavin m' 14,000
Ukuran Ø 1½" ( AW ) ex Wavin m' 16,000
Ukuran Ø 2" ( AW ) ex Wavin m' 21,000
Ukuran Ø 2½" ( AW ) ex Wavin m' 31,000
Ukuran Ø 3" ( AW ) ex Wavin m' 42,000
Ukuran Ø 4" ( AW ) ex Wavin m' 65,000
###
KELOMPOK LAMPU - LAMPU ###
1 Instalasi Titik Lampu unit 180,000
2 Lampu Pijar 25 Watt buah 20,000
3 Lampu 18 Watt ( CFL ) buah 65,000
4 Lampu 14 Watt (CFL) buah 36,000
5 Lampu 20 Watt (CFL) buah 70,000
6 Lampu TL 20 Watt ( Lengkap ) buah 75,000

Harga Saruan Bahan dan Upah 2018 18 dari 80


HARGA BAHAN
FINAL
NO. URAIAN SATUAN
TAHUN 2018
( Rp. )
1 2 3 4
7 Lampu TL 20 Watt Double ( Lengkap ) buah 150,000
8 Lampu TL 40 Watt ( Lengkap ) buah 140,000
9 Lampu TL 40 Watt Double ( Lengkap ) buah 280,000
10 Stop Kontak buah 18,000
11 Stop Kontak AC buah 80,000
12 Sakelar Tunggal buah 25,000
13 Sakelar Ganda buah 27,000
14 Armatur buah 450,000
15 Downlight 4" lampu LED buah 85,000
16 Downlight 4" (Housing CFL) buah 90,000
17 Box Panel unit 450,000
18 MCB MCB unit 80,000
19 MCB 6 10 A unit 60,000

Brebes, ............................................... 2019

###
###
###
###
###
###

Harga Saruan Bahan dan Upah 2018 19 dari 80


ANALISA SATUAN PEKERJAAN
TAHUN ANGGARAN 2019

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
A TENAGA
Pekerja L.01.01 OH 0.4000 40,000.00 16,000.00
Tukang Kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0200 45,000.00 900.00
JUMLAH TENAGA KERJA 25,800.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 42,000.00 52,500.00
Semen portland Kg 5.0000 1,160.00 5,800.00
Pasir beton m3 0.0050 233,000.00 1,165.00
Koral beton m3 0.0090 444,000.00 3,996.00
Kayu 5/7 ( Meranti batu ) m3 0.0720 4,600,000.00 331,200.00
Paku biasa Kg 0.0600 16,300.00 978.00
Residu Liter 0.4000 26,000.00 10,400.00
JUMLAH HARGA BAHAN 406,039.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 431,839.00
E Overhead & Profit 15% 15% 64,775.85
F Harga Satuan Pekerjaan (D+E) 496,614.00

A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang Kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 8,675.00
B BAHAN
Kayu balok 5/7 ( Meranti batu ) m3 0.1200 4,600,000.00 552,000.00
Paku 2”-3” Kg 0.0200 16,300.00 326.00
Kayu papan 3/20 ( Pinus ) m3 0.0070 1,950,000.00 13,650.00
JUMLAH HARGA BAHAN 565,976.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 574,651.00
E Overhead & Profit 15% 15% 86,197.65
F Harga Satuan Pekerjaan (D+E) 660,848.00

A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan


A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Mandor L.04.01 OH 0.0500 45,000.00 2,250.00
JUMLAH TENAGA KERJA 6,250.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,250.00
E Overhead & Profit 15% 15% 937.50
F Harga Satuan Pekerjaan (D+E) 7,187.00

A.2.2.1.13. Pembongkaran 1 m3 beton bertulang


A TENAGA
Pekerja L.01.01 OH 1.3334 40,000.00 53,336.00
Mandor L.04.01 OH 0.6660 45,000.00 29,970.00
JUMLAH TENAGA KERJA 83,306.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,306.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

E Overhead & Profit 15% 15% 12,495.90


F Harga Satuan Pekerjaan (D+E) 95,801.00
A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
A TENAGA
Pekerja L.01.01 OH 0.6667 40,000.00 26,668.00
Mandor L.04.01 OH 0.3330 45,000.00 14,985.00
JUMLAH TENAGA KERJA 41,653.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,653.00
E Overhead & Profit 15% 15% 6,247.95
F Harga Satuan Pekerjaan (D+E) 47,900.00

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
A TENAGA
Pekerja L.01.01 OH 0.7500 40,000.00 30,000.00
Mandor L.04.01 OH 0.0250 45,000.00 1,125.00
JUMLAH TENAGA KERJA 31,125.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,125.00
E Overhead & Profit 15% 15% 4,668.75
F Harga Satuan Pekerjaan (D+E) 35,793.00
A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m
A TENAGA
Pekerja L.01.01 OH 0.9000 40,000.00 36,000.00
Mandor L.04.01 OH 0.0450 45,000.00 2,025.00
JUMLAH TENAGA KERJA 38,025.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,025.00
E Overhead & Profit 15% 15% 5,703.75
F Harga Satuan Pekerjaan (D+E) 43,728.00
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m
A TENAGA
Pekerja L.01.01 OH 1.0000 40,000.00 40,000.00
Mandor L.04.01 OH 0.0320 45,000.00 1,440.00
JUMLAH TENAGA KERJA 41,440.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,440.00
E Overhead & Profit 15% 15% 6,216.00
F Harga Satuan Pekerjaan (D+E) 47,656.00
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m
A TENAGA
Pekerja L.01.01 OH 1.5000 40,000.00 60,000.00
Mandor L.04.01 OH 0.0600 45,000.00 2,700.00
JUMLAH TENAGA KERJA 62,700.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,700.00
E Overhead & Profit 15% 15% 9,405.00
F Harga Satuan Pekerjaan (D+E) 72,105.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
A TENAGA
Pekerja L.01.01 OH 0.2500 40,000.00 10,000.00
Mandor L.04.01 OH 0.0250 45,000.00 1,125.00
JUMLAH TENAGA KERJA 11,125.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,125.00
E Overhead & Profit 15% 15% 1,668.75
F Harga Satuan Pekerjaan (D+E) 12,793.00
A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)
A TENAGA
Pekerja L.01.01 OH 0.5000 40,000.00 20,000.00
Mandor L.04.01 OH 0.0500 45,000.00 2,250.00
JUMLAH TENAGA KERJA 22,250.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 22,250.00
E Overhead & Profit 15% 15% 3,337.50
F Harga Satuan Pekerjaan (D+E) 25,587.00
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Mandor L.04.01 OH 0.0100 45,000.00 450.00
JUMLAH TENAGA KERJA 12,450.00
B BAHAN -
Pasir urug M3 1.2000 119,000.00 142,800.00
JUMLAH HARGA BAHAN 142,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 155,250.00
E Overhead & Profit 15% 15% 23,287.50
F Harga Satuan Pekerjaan (D+E) 178,537.00
A.2.3.1.11.a Pengurugan 1 m3 dengan tanah urug biasa
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Mandor L.04.01 OH 0.0100 45,000.00 450.00
JUMLAH TENAGA KERJA 12,450.00
B BAHAN -
Tanah urug biasa M3 1.2000 134,000.00 160,800.00
JUMLAH HARGA BAHAN 160,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 173,250.00
E Overhead & Profit 15% 15% 25,987.50
F Harga Satuan Pekerjaan (D+E) 199,237.00
A.2.3.1.11.b Pengurugan 1 m3 dengan tanah urug pilihan
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Mandor L.04.01 OH 0.0100 45,000.00 450.00
JUMLAH TENAGA KERJA 12,450.00
B BAHAN -
Tanah urug pilihan M3 1.2000 153,000.00 183,600.00
JUMLAH HARGA BAHAN 183,600.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 196,050.00
E Overhead & Profit 15% 15% 29,407.50
F Harga Satuan Pekerjaan (D+E) 225,457.00

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 6,675.00
B BAHAN

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Ijuk m3 6.0000 20,000.00 120,000.00


JUMLAH HARGA BAHAN 120,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 126,675.00
E Overhead & Profit 15% 15% 19,001.25
F Harga Satuan Pekerjaan (D+E) 145,676.00
A.2.3.1.14. Pengurugan 1 m3 sirtu padat
A TENAGA
Pekerja L.01.01 OH 0.2500 40,000.00 10,000.00
Mandor L.04.01 OH 0.0250 45,000.00 1,125.00
JUMLAH TENAGA KERJA 11,125.00
B BAHAN
Sirtu m3 1.2000 175,000.00 210,000.00
JUMLAH HARGA BAHAN 210,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 221,125.00
E Overhead & Profit 15% 15% 33,168.75
F Harga Satuan Pekerjaan (D+E) 254,293.00
B.1 HARGA SATUAN PEKERJAAN TANAH SNI 03-2835-2002

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
A TENAGA
Pekerja L.01.01 OH 1.5000 40,000.00 60,000.00
Tukang Batu L.02.03 OH 0.7500 40,000.00 30,000.00
Kepala Tukang L.03.01 OH 0.0750 45,000.00 3,375.00
Mandor L.04.01 OH 0.0750 45,000.00 3,375.00
JUMLAH TENAGA KERJA 96,750.00
B BAHAN
Batu belah m3 1.2000 263,000.00 315,600.00
Semen portland Kg 202.0000 1,160.00 234,320.00
Pasir Pasang m3 0.4850 233,000.00 113,005.00
JUMLAH HARGA BAHAN 662,925.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 759,675.00
E Overhead & Profit 15% 15% 113,951.25
F Harga Satuan Pekerjaan (D+E) 873,626.00
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
A TENAGA
Pekerja L.01.01 OH 1.5000 40,000.00 60,000.00
Tukang Batu L.02.03 OH 0.7500 40,000.00 30,000.00
Kepala Tukang L.03.01 OH 0.0750 45,000.00 3,375.00
Mandor L.04.01 OH 0.0750 45,000.00 3,375.00
JUMLAH TENAGA KERJA 96,750.00
B BAHAN
Batu belah m3 1.2000 263,000.00 315,600.00
Semen portland Kg 163.0000 1,160.00 189,080.00
Pasir Pasang m3 0.5200 233,000.00 121,160.00
JUMLAH HARGA BAHAN 625,840.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 722,590.00
E Overhead & Profit 15% 15% 108,388.50
F Harga Satuan Pekerjaan (D+E) 830,978.00
A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP
A TENAGA
Pekerja L.01.01 OH 1.5000 40,000.00 60,000.00
Tukang Batu L.02.03 OH 0.7500 40,000.00 30,000.00
Kepala Tukang L.03.01 OH 0.0750 45,000.00 3,375.00
Mandor L.04.01 OH 0.0750 45,000.00 3,375.00
JUMLAH TENAGA KERJA 96,750.00
B BAHAN
Batu belah m3 1.2000 263,000.00 315,600.00
Semen portland Kg 136.0000 1,160.00 157,760.00
Pasir Pasang m3 0.5440 233,000.00 126,752.00
JUMLAH HARGA BAHAN 600,112.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 696,862.00
E Overhead & Profit 15% 15% 104,529.30
F Harga Satuan Pekerjaan (D+E) 801,391.00

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


A TENAGA
Pekerja L.01.01 OH 0.7800 40,000.00 31,200.00
Tukang Batu L.02.03 OH 0.3900 40,000.00 15,600.00
Kepala Tukang L.03.01 OH 0.0390 45,000.00 1,755.00
Mandor L.04.01 OH 0.0390 45,000.00 1,755.00
JUMLAH TENAGA KERJA 50,310.00
B BAHAN
Batu belah m3 1.2000 263,000.00 315,600.00
Pasir urug m3 0.4320 119,000.00 51,408.00
JUMLAH HARGA BAHAN 367,008.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 417,318.00
E Overhead & Profit 15% 15% 62,597.70
F Harga Satuan Pekerjaan (D+E) 479,915.00

A.4.1.1. HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 247.0000 1,160.00 286,520.00
Pasir Beton kg 869.0000 166.43 144,626.43
Kerikil (Maks 30 mm) kg 999.0000 328.89 328,560.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 770,456.43
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 852,451.43
E Overhead & Profit 15% 15% 127,867.71
F Harga Satuan Pekerjaan (D+E) 980,319.00
A.4.1.1.2. Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125)
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 276.0000 1,160.00 320,160.00
Pasir Beton kg 828.0000 166.43 137,802.86
Kerikil (Maks 30 mm) kg 1,012.0000 328.89 332,835.56
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 801,548.41
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 883,543.41
E Overhead & Profit 15% 15% 132,531.51
F Harga Satuan Pekerjaan (D+E) 1,016,074.00
A.4.1.1.3. Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150)
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

B BAHAN
Semen portland kg 299.0000 1,160.00 346,840.00
Pasir Beton kg 799.0000 166.43 132,976.43
Kerikil (Maks 30 mm) kg 1,017.0000 328.89 334,480.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 825,046.43
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 907,041.43
E Overhead & Profit 15% 15% 136,056.21
F Harga Satuan Pekerjaan (D+E) 1,043,097.00
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
A TENAGA
Pekerja L.01.01 OH 1.2000 40,000.00 48,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0600 45,000.00 2,700.00
JUMLAH TENAGA KERJA 59,600.00
B BAHAN
Semen portland kg 230.0000 1,160.00 266,800.00
Pasir Beton kg 893.0000 166.43 148,620.71
Kerikil (Maks 30 mm) kg 1,027.0000 328.89 337,768.89
Air Liter 200.0000 50.00 10,000.00
JUMLAH HARGA BAHAN 763,189.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 822,789.60
E Overhead & Profit 15% 15% 123,418.44
F Harga Satuan Pekerjaan (D+E) 946,208.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 326.0000 1,160.00 378,160.00
Pasir Beton kg 760.0000 166.43 126,485.71
Kerikil (Maks 30 mm) kg 1,029.0000 328.89 338,426.67
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 853,822.38
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 935,817.38
E Overhead & Profit 15% 15% 140,372.61
F Harga Satuan Pekerjaan (D+E) 1,076,189.00
A.4.1.1.6. Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 352.0000 1,160.00 408,320.00
Pasir Beton kg 731.0000 166.43 121,659.29
Kerikil (Maks 30 mm) kg 1,031.0000 328.89 339,084.44
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 879,813.73
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 961,808.73
E Overhead & Profit 15% 15% 144,271.31
F Harga Satuan Pekerjaan (D+E) 1,106,080.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

JUMLAH TENAGA KERJA 81,995.00


B BAHAN
Semen portland kg 371.0000 1,160.00 430,360.00
Pasir Beton kg 698.0000 166.43 116,167.14
Kerikil (Maks 30 mm) kg 1,047.0000 328.89 344,346.67
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 901,623.81
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 983,618.81
E Overhead & Profit 15% 15% 147,542.82
F Harga Satuan Pekerjaan (D+E) 1,131,161.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 384.0000 1,160.00 445,440.00
Pasir Beton kg 692.0000 166.43 115,168.57
Kerikil (Maks 30 mm) kg 1,039.0000 328.89 341,715.56
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 913,074.13
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 995,069.13
E Overhead & Profit 15% 15% 149,260.37
F Harga Satuan Pekerjaan (D+E) 1,144,329.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
A TENAGA
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.2750 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.0280 45,000.00 1,260.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 406.0000 1,160.00 470,960.00
Pasir Beton kg 684.0000 166.43 113,837.14
Kerikil (Maks 30 mm) kg 1,026.0000 328.89 337,440.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 932,987.14
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,014,982.14
E Overhead & Profit 15% 15% 152,247.32
F Harga Satuan Pekerjaan (D+E) 1,167,229.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
A TENAGA
Pekerja L.01.01 OH 1.650 40,000.00 66,000.00
Tukang Batu L.02.03 OH 0.275 40,000.00 11,000.00
Kepala Tukang L.03.01 OH 0.028 45,000.00 1,260.00
Mandor L.04.01 OH 0.083 45,000.00 3,735.00
JUMLAH TENAGA KERJA 81,995.00
B BAHAN
Semen portland kg 413.0000 1,160.00 479,080.00
Pasir Beton kg 681.0000 166.43 113,337.86
Kerikil (Maks 30 mm) kg 1021.0000 328.89 335,795.56
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 938,963.41
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,020,958.41
E Overhead & Profit 15% 15% 153,143.76
F Harga Satuan Pekerjaan (D+E) 1,174,102.00
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
A TENAGA
Pekerja L.01.01 OH 2.1000 40,000.00 84,000.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00


Kepala Tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.1050 45,000.00 4,725.00
JUMLAH TENAGA KERJA 104,300.00
B BAHAN
Semen portland kg 439.0000 1,160.00 509,240.00
Pasir Beton kg 670.0000 166.43 111,507.14
Kerikil (Maks 30 mm) kg 1,006.0000 328.89 330,862.22
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 962,359.37
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,066,659.37
E Overhead & Profit 15% 15% 159,998.90
F Harga Satuan Pekerjaan (D+E) 1,226,658.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
A TENAGA
Pekerja L.01.01 OH 2.1000 40,000.00 84,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala Tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.1050 45,000.00 4,725.00
JUMLAH TENAGA KERJA 104,300.00
B BAHAN
Semen portland kg 448.0000 1,160.00 519,680.00
Pasir Beton kg 667.0000 166.43 111,007.86
Kerikil (Maks 30 mm) kg 1,000.0000 328.89 328,888.89
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 970,326.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,074,626.75
E Overhead & Profit 15% 15% 161,194.01
F Harga Satuan Pekerjaan (D+E) 1,235,820.00

Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
A TENAGA
Pekerja L.01.01 OH 2.1000 40,000.00 84,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala Tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.1050 45,000.00 4,725.00
JUMLAH TENAGA KERJA 104,300.00
B BAHAN
Semen portland kg 448.0000 1,160.00 519,680.00
Pasir Beton kg 667.0000 166.43 111,007.86
Kerikil (Maks 30 mm) kg 1,000.0000 328.89 328,888.89
Bahan tambahan kimia Liter 4.5000 47,000.00 211,500.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 1,181,826.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,286,126.75
E Overhead & Profit 15% 15% 192,919.01
F Harga Satuan Pekerjaan (D+E) 1,479,045.00

CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A.4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
A TENAGA
Pekerja L.01.01 OH 0.0700 40,000.00 2,800.00
Tukang Besi L.02.05 OH 0.0700 40,000.00 2,800.00
Kepala Tukang L.03.01 OH 0.0070 45,000.00 315.00
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 6,095.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 11,700.00 122,850.00
Kawat beton kg 0.1500 20,700.00 3,105.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

JUMLAH HARGA BAHAN 125,955.00


C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 132,050.00
E Overhead & Profit 15% 15% 19,807.50
F Harga Satuan Pekerjaan (D+E) 151,857.00
A.4.1.1.17.a Pembesian 1 kg dengan besi polos atau besi ulir
A TENAGA
Pekerja L.01.01 OH 0.0070 40,000.00 280.00
Tukang Besi L.02.05 OH 0.0070 40,000.00 280.00
Kepala Tukang L.03.01 OH 0.0007 45,000.00 31.50
Mandor L.04.01 OH 0.0004 45,000.00 18.00
JUMLAH TENAGA KERJA 609.50
B BAHAN
Besi beton (polos/ulir) kg 1.0500 11,700.00 12,285.00
Kawat beton kg 0.0150 20,700.00 310.50
JUMLAH HARGA BAHAN 12,595.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,205.00
E Overhead & Profit 15% 15% 1,980.75
F Harga Satuan Pekerjaan (D+E) 15,185.00
A.4.1.1.18. Pemasangan 10 kg kabel presstressed polos/strands
A TENAGA
Pekerja L.01.01 OH 0.0500 40,000.00 2,000.00
Tukang Besi L.02.05 OH 0.0500 40,000.00 2,000.00
Kepala Tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 4,360.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 11,700.00 122,850.00
Kawat beton kg 0.1000 20,700.00 2,070.00
JUMLAH HARGA BAHAN 124,920.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,280.00
E Overhead & Profit 15% 15% 19,392.00
F Harga Satuan Pekerjaan (D+E) 148,672.00
A.4.1.1.20. (K3) Pemasangan 1 m2 bekisting untuk pondasi
A TENAGA
Pekerja L.01.01 OH 0.5200 40,000.00 20,800.00
Tukang Kayu L.02.04 OH 0.2600 40,000.00 10,400.00
Kepala Tukang L.03.01 OH 0.0260 45,000.00 1,170.00
Mandor L.04.01 OH 0.0260 45,000.00 1,170.00
JUMLAH TENAGA KERJA 33,540.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.0400 1,950,000.00 78,000.00
Paku 5 - 10 cm kg 0.3000 16,300.00 4,890.00
Minyak bekisting Liter 0.1000 3,100.00 310.00
JUMLAH HARGA BAHAN 83,200.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 116,740.00
E Overhead & Profit 15% 15% 17,511.00
F Harga Satuan Pekerjaan (D+E) 134,251.00
A.4.1.1.21. (K3) Pemasangan 1 m2 bekisting untuk sloof
A TENAGA
Pekerja L.01.01 OH 0.5200 40,000.00 20,800.00
Tukang Kayu L.02.04 OH 0.2600 40,000.00 10,400.00
Kepala Tukang L.03.01 OH 0.0260 45,000.00 1,170.00
Mandor L.04.01 OH 0.0260 45,000.00 1,170.00
JUMLAH TENAGA KERJA 33,540.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.0450 1,950,000.00 87,750.00
Paku 5 - 10 cm kg 0.3000 16,300.00 4,890.00
Minyak bekisting Liter 0.1000 3,100.00 310.00
JUMLAH HARGA BAHAN 92,950.00
C PERALATAN -
JUMLAH HARGA ALAT -

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

D Jumlah (A+B+C) 126,490.00


E Overhead & Profit 15% 15% 18,973.50
F Harga Satuan Pekerjaan (D+E) 145,463.00
A.4.1.1.22. (K3) Pemasangan 1 m2 bekisting untuk kolom
A TENAGA
Pekerja L.01.01 OH 0.6600 40,000.00 26,400.00
Tukang Kayu L.02.04 OH 0.3300 40,000.00 13,200.00
Kepala Tukang L.03.01 OH 0.0330 45,000.00 1,485.00
Mandor L.04.01 OH 0.0330 45,000.00 1,485.00
JUMLAH TENAGA KERJA 42,570.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.0400 1,950,000.00 78,000.00
Paku 5 - 12 cm kg 0.4000 16,300.00 6,520.00
Minyak bekisting Liter 0.2000 3,100.00 620.00
Balok kayu kelas II ( Meranti batu ) m3 0.0150 4,600,000.00 69,000.00
Plywood 9 mm Lbr 0.3500 196,000.00 68,600.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 42,000.00 84,000.00
JUMLAH HARGA BAHAN 306,740.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 349,310.00
E Overhead & Profit 15% 15% 52,396.50
F Harga Satuan Pekerjaan (D+E) 401,706.00
A.4.1.1.23. (K3) Pemasangan 1 m2 bekisting untuk balok
A TENAGA
Pekerja L.01.01 OH 0.6600 40,000.00 26,400.00
Tukang Kayu L.02.04 OH 0.3300 40,000.00 13,200.00
Kepala Tukang L.03.01 OH 0.0330 45,000.00 1,485.00
Mandor L.04.01 OH 0.0330 45,000.00 1,485.00
JUMLAH TENAGA KERJA 42,570.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.0400 1,950,000.00 78,000.00
Paku 5 - 12 cm kg 0.4000 16,300.00 6,520.00
Minyak bekisting Liter 0.2000 3,100.00 620.00
Balok kayu kelas II ( Meranti batu ) m3 0.0180 4,600,000.00 82,800.00
Plywood 9 mm Lbr 0.3500 196,000.00 68,600.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 42,000.00 84,000.00
JUMLAH HARGA BAHAN 320,540.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 363,110.00
E Overhead & Profit 15% 15% 54,466.50
F Harga Satuan Pekerjaan (D+E) 417,576.00
A.4.1.1.24. (K3) Pemasangan 1 m2 bekisting untuk lantai
A TENAGA
Pekerja L.01.01 OH 0.6600 40,000.00 26,400.00
Tukang Kayu L.02.04 OH 0.3300 40,000.00 13,200.00
Kepala Tukang L.03.01 OH 0.0330 45,000.00 1,485.00
Mandor L.04.01 OH 0.0330 45,000.00 1,485.00
JUMLAH TENAGA KERJA 42,570.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.0400 1,950,000.00 78,000.00
Paku 5 - 12 cm kg 0.4000 16,300.00 6,520.00
Minyak bekisting Liter 0.2000 3,100.00 620.00
Balok kayu kelas II ( Meranti batu ) m3 0.0150 4,600,000.00 69,000.00
Plywood 9 mm Lbr 0.3500 196,000.00 68,600.00
Dolken kayu Ø 8-10/400 cm Batang 6.0000 42,000.00 252,000.00
JUMLAH HARGA BAHAN 474,740.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 517,310.00
E Overhead & Profit 15% 15% 77,596.50
F Harga Satuan Pekerjaan (D+E) 594,906.00
A.4.1.1.25. (K3) Pemasangan 1 m2 bekisting untuk dinding
A TENAGA
Pekerja L.01.01 OH 0.6600 40,000.00 26,400.00
Tukang Kayu L.02.04 OH 0.3300 40,000.00 13,200.00
Kepala Tukang L.03.01 OH 0.0330 45,000.00 1,485.00
Mandor L.04.01 OH 0.0330 45,000.00 1,485.00
JUMLAH TENAGA KERJA 42,570.00
B BAHAN

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Kayu kelas III ( Pinus ) m3 0.0300 1,950,000.00 58,500.00


Paku 5 - 12 cm kg 0.4000 16,300.00 6,520.00
Minyak bekisting Liter 0.2000 3,100.00 620.00
Balok kayu kelas II ( Merati batu ) m3 0.0200 4,600,000.00 92,000.00
Plywood 9 mm Lbr 0.3500 196,000.00 68,600.00
Dolken kayu Ø 8-10/400 cm Batang 3.0000 42,000.00 126,000.00
Pormite / Penjaga jarak bekisting / spacer Buah 4.0000 2,000.00 8,000.00
JUMLAH HARGA BAHAN 360,240.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 402,810.00
E Overhead & Profit 15% 15% 60,421.50
F Harga Satuan Pekerjaan (D+E) 463,231.00
A.4.1.1.26. (K3) Pemasangan 1 m2 bekisting untuk tangga
A TENAGA
Pekerja L.01.01 OH 0.6600 40,000.00 26,400.00
Tukang Kayu L.02.04 OH 0.3300 40,000.00 13,200.00
Kepala Tukang L.03.01 OH 0.0330 45,000.00 1,485.00
Mandor L.04.01 OH 0.0330 45,000.00 1,485.00
JUMLAH TENAGA KERJA 42,570.00
B BAHAN
Kayu kelas III m3 0.0300 1,950,000.00 58,500.00
Paku 5 - 12 cm kg 0.4000 16,300.00 6,520.00
Minyak bekisting Liter 0.1500 3,100.00 465.00
Balok kayu kelas II m3 0.0150 4,600,000.00 69,000.00
Plywood 9 mm Lbr 0.3500 196,000.00 68,600.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 42,000.00 84,000.00
JUMLAH HARGA BAHAN 287,085.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 329,655.00
E Overhead & Profit 15% 15% 49,448.25
F Harga Satuan Pekerjaan (D+E) 379,103.00
A.4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton
A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang Kayu L.02.04 OH 0.0500 40,000.00 2,000.00
Kepala Tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 8,585.00
B BAHAN
Kayu kelas III ( papan pinus ) m3 0.0264 1,950,000.00 51,480.00
Paku 5 - 12 cm kg 0.6000 16,300.00 9,780.00
Dolken kayu Ø 8-10/400 cm Batang 0.5000 42,000.00 21,000.00
JUMLAH HARGA BAHAN 82,260.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,845.00
E Overhead & Profit 15% 15% 13,626.75
F Harga Satuan Pekerjaan (D+E) 104,471.00
A.4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 5.3000 40,000.00 212,000.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.3000 40,000.00 52,000.00
Tukang besi L.02.05 OH 1.0500 40,000.00 42,000.00
Kepala tukang L.03.01 OH 0.2620 45,000.00 11,790.00
Mandor L.04.01 OH 0.2650 45,000.00 11,925.00
JUMLAH TENAGA KERJA 340,715.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.2000 1,950,000.00 390,000.00
Paku Biasa kg 1.5000 16,300.00 24,450.00
Minyak bekisting Liter 0.4000 3,100.00 1,240.00
Besi beton (polos/ulir) kg 157.5000 11,700.00 1,842,750.00
Kawat beton kg 2.2500 20,700.00 46,575.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
JUMLAH HARGA BAHAN 3,180,235.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,520,950.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

E Overhead & Profit 15% 15% 528,142.50


F Harga Satuan Pekerjaan (D+E) 4,049,092.00
A.4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 5.6500 40,000.00 226,000.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.5600 40,000.00 62,400.00
Tukang besi L.02.05 OH 1.4000 40,000.00 56,000.00
Kepala tukang L.03.01 OH 0.3230 45,000.00 14,535.00
Mandor L.04.01 OH 0.2830 45,000.00 12,735.00
JUMLAH TENAGA KERJA 382,670.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.2700 1,950,000.00 526,500.00
Paku Biasa kg 2.0000 16,300.00 32,600.00
Minyak bekisting Liter 0.6000 3,100.00 1,860.00
Besi beton (polos/ulir) kg 210.0000 11,700.00 2,457,000.00
Kawat beton kg 3.0000 20,700.00 62,100.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
JUMLAH HARGA BAHAN 3,955,280.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,337,950.00
E Overhead & Profit 15% 15% 650,692.50
F Harga Satuan Pekerjaan (D+E) 4,988,642.00
A.4.1.1.30. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 7.0500 40,000.00 282,000.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.6500 40,000.00 66,000.00
Tukang besi L.02.05 OH 2.1000 40,000.00 84,000.00
Kepala tukang L.03.01 OH 0.4030 45,000.00 18,135.00
Mandor L.04.01 OH 0.3530 45,000.00 15,885.00
JUMLAH TENAGA KERJA 477,020.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.4000 1,950,000.00 780,000.00
Paku Biasa kg 4.0000 16,300.00 65,200.00
Minyak bekisting Liter 2.0000 3,100.00 6,200.00
Besi beton (polos/ulir) kg 315.0000 11,700.00 3,685,500.00
Kawat beton kg 4.5000 20,700.00 93,150.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
Kayu kelas II balok ( Meranti batu ) M3 0.1500 4,600,000.00 690,000.00
Plywood 9 mm Lbr 3.5000 196,000.00 686,000.00
Dolken kayu Ø 8-10/400 cm Batang 20.0000 42,000.00 840,000.00
JUMLAH HARGA BAHAN 7,721,270.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,198,290.00
E Overhead & Profit 15% 15% 1,229,743.50
F Harga Satuan Pekerjaan (D+E) 9,428,033.00
A.4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 6.3500 40,000.00 254,000.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.6500 40,000.00 66,000.00
Tukang besi L.02.05 OH 1.4000 40,000.00 56,000.00
Kepala tukang L.03.01 OH 0.3330 45,000.00 14,985.00
Mandor L.04.01 OH 0.3180 45,000.00 14,310.00
JUMLAH TENAGA KERJA 416,295.00
B BAHAN
Kayu kelas III Pinus ) m3 0.3200 1,950,000.00 624,000.00
Paku Biasa kg 3.2000 16,300.00 52,160.00
Minyak bekisting Liter 1.6000 3,100.00 4,960.00
Besi beton (polos/ulir) kg 210.0000 11,700.00 2,457,000.00
Kawat beton kg 3.0000 20,700.00 62,100.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
Kayu kelas II balok ( Meranti batu ) m3 0.1400 4,600,000.00 644,000.00
Plywood 9 mm Lembar 2.8000 196,000.00 548,800.00
Dolken kayu Ø 8-10/400 cm Batang 16.0000 42,000.00 672,000.00
JUMLAH HARGA BAHAN 5,940,240.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,356,535.00
E Overhead & Profit 15% 15% 953,480.25
F Harga Satuan Pekerjaan (D+E) 7,310,015.00
A.4.1.1.32. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 5.3000 40,000.00 212,000.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.3000 40,000.00 52,000.00
Tukang besi L.02.05 OH 1.0500 40,000.00 42,000.00
Kepala tukang L.03.01 OH 0.2650 45,000.00 11,925.00
Mandor L.04.01 OH 0.2650 45,000.00 11,925.00
JUMLAH TENAGA KERJA 340,850.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.3200 1,950,000.00 624,000.00
Paku Biasa kg 3.2000 16,300.00 52,160.00
Minyak bekisting Liter 1.6000 3,100.00 4,960.00
Besi beton (polos/ulir) kg 157.5000 11,700.00 1,842,750.00
Kawat beton kg 2.2500 20,700.00 46,575.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
Kayu kelas II balok ( Meranti batu ) m3 0.1200 4,600,000.00 552,000.00
Plywood 9 mm Lembar 2.8000 196,000.00 548,800.00
Dolken kayu Ø 8-10/400 cm Batang 32.0000 42,000.00 1,344,000.00
JUMLAH HARGA BAHAN 5,890,465.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,231,315.00
E Overhead & Profit 15% 15% 934,697.25
F Harga Satuan Pekerjaan (D+E) 7,166,012.00
A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 0.5300 40,000.00 21,200.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.3000 40,000.00 52,000.00
Tukang besi L.02.05 OH 1.0500 40,000.00 42,000.00
Kepala tukang L.03.01 OH 0.2620 45,000.00 11,790.00
Mandor L.04.01 OH 0.2650 45,000.00 11,925.00
JUMLAH TENAGA KERJA 149,915.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.2400 1,950,000.00 468,000.00
Paku Biasa kg 3.2000 16,300.00 52,160.00
Minyak bekisting Liter 1.6000 3,100.00 4,960.00
Besi beton (polos/ulir) kg 157.5000 11,700.00 1,842,750.00
Kawat beton kg 2.2500 20,700.00 46,575.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
Kayu kelas II balok ( Maranti batu ) m3 0.1600 4,600,000.00 736,000.00
Plywood 9 mm Lembar 2.8000 196,000.00 548,800.00
Dolken kayu Ø 8-10/400 cm Batang 24.0000 42,000.00 1,008,000.00
JUMLAH HARGA BAHAN 5,582,465.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,732,380.00
E Overhead & Profit 15% 15% 859,857.00
F Harga Satuan Pekerjaan (D+E) 6,592,237.00
A.4.1.1.34. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
A TENAGA
Pekerja L.01.01 OH 5.6500 40,000.00 226,000.00
Tukang batu L.02.03 OH 0.2750 40,000.00 11,000.00
Tukang kayu L.02.04 OH 1.5600 40,000.00 62,400.00
Tukang besi L.02.05 OH 1.4000 40,000.00 56,000.00
Kepala tukang L.03.01 OH 0.3230 45,000.00 14,535.00
Mandor L.04.01 OH 0.2830 45,000.00 12,735.00
JUMLAH TENAGA KERJA 382,670.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.2500 1,950,000.00 487,500.00
Paku Biasa kg 3.0000 16,300.00 48,900.00
Minyak bekisting Liter 1.2000 3,100.00 3,720.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Besi beton (polos/ulir) kg 210.0000 11,700.00 2,457,000.00


Kawat beton kg 3.0000 20,700.00 62,100.00
Semen portland kg 336.0000 1,160.00 389,760.00
Pasir Beton m3 0.5400 233,000.00 125,820.00
Kerikil m3 0.8100 444,000.00 359,640.00
Kayu kelas II balok ( Meranti batu ) m3 0.1050 4,600,000.00 483,000.00
Plywood 9 mm Lembar 2.5000 196,000.00 490,000.00
Dolken kayu Ø 8-10/400 cm Batang 14.0000 42,000.00 588,000.00
JUMLAH HARGA BAHAN 5,495,440.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,878,110.00
E Overhead & Profit 15% 15% 881,716.50
F Harga Satuan Pekerjaan (D+E) 6,759,826.00
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
A TENAGA
Pekerja L.01.01 OH 0.1800 40,000.00 7,200.00
Tukang batu L.02.03 OH 0.0200 40,000.00 800.00
Tukang kayu L.02.04 OH 0.0200 40,000.00 800.00
Tukang besi L.02.05 OH 0.0200 40,000.00 800.00
Kepala tukang L.03.01 OH 0.0060 45,000.00 270.00
Mandor L.04.01 OH 0.0090 45,000.00 405.00
JUMLAH TENAGA KERJA 10,275.00
B BAHAN
Kayu kelas III ( Pinus ) m3 0.0020 1,950,000.00 3,900.00
Paku Biasa kg 0.0100 16,300.00 163.00
Minyak bekisting Liter 1.2000 3,100.00 3,720.00
Besi beton (polos/ulir) kg 3.0000 11,700.00 35,100.00
Kawat beton kg 0.4500 20,700.00 9,315.00
Semen portland kg 4.0000 1,160.00 4,640.00
Pasir Beton m3 0.0060 233,000.00 1,398.00
Kerikil m3 0.0090 444,000.00 3,996.00
JUMLAH HARGA BAHAN 62,232.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 72,507.00
E Overhead & Profit 15% 15% 10,876.05
F Harga Satuan Pekerjaan (D+E) 83,383.00
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
A TENAGA
Pekerja L.01.01 OH 0.2970 40,000.00 11,880.00
Tukang batu L.02.03 OH 0.0330 40,000.00 1,320.00
Tukang kayu L.02.04 OH 0.0330 40,000.00 1,320.00
Tukang besi L.02.05 OH 0.0330 40,000.00 1,320.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 16,965.00
B BAHAN
Kayu kelas III m3 0.0030 1,950,000.00 5,850.00
Paku Biasa kg 0.0200 16,300.00 326.00
Minyak bekisting Liter 1.2000 3,100.00 3,720.00
Besi beton (polos/ulir) kg 3.6000 11,700.00 42,120.00
Kawat beton kg 0.0500 20,700.00 1,035.00
Semen portland kg 5.5000 1,160.00 6,380.00
Pasir Beton m3 0.0090 233,000.00 2,097.00
Kerikil m3 0.0150 444,000.00 6,660.00
JUMLAH HARGA BAHAN 68,188.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 85,153.00
E Overhead & Profit 15% 15% 12,772.95
F Harga Satuan Pekerjaan (D+E) 97,925.00
A.4.1.2. HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
A TENAGA
Pekerja L.01.01 OH 0.1320 40,000.00 5,280.00
Tukang batu L.02.03 OH 0.0220 40,000.00 880.00
Kepala tukang L.03.01 OH 0.0020 45,000.00 90.00
Mandor L.04.01 OH 0.0070 45,000.00 315.00
JUMLAH TENAGA KERJA 6,565.00
B BAHAN
Semen portland Kg 26.0800 1,160.00 30,252.80

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Pasir beton Kg 60.8000 166.43 10,118.86


Kerikil (Maks 30 mm) Kg 82.3200 328.89 27,074.13
Air L 17.2000 50.00 860.00
JUMLAH HARGA BAHAN 68,305.79
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,870.79
E Overhead & Profit 15% 15% 11,230.62
F Harga Satuan Pekerjaan (D+E) 86,101.00
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
A TENAGA
Pekerja L.01.01 OH 0.1650 40,000.00 6,600.00
Tukang batu L.02.03 OH 0.0280 40,000.00 1,120.00
Kepala tukang L.03.01 OH 0.0030 45,000.00 135.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 8,215.00
B BAHAN
Semen portland Kg 32.6000 1,160.00 37,816.00
Pasir beton Kg 76.0000 166.43 12,648.57
Kerikil (Maks 30 mm) Kg 102.9000 328.89 33,842.67
Air L 21.5000 50.00 1,075.00
JUMLAH HARGA BAHAN 85,382.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 93,597.24
E Overhead & Profit 15% 15% 14,039.59
F Harga Satuan Pekerjaan (D+E) 107,636.00
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
A TENAGA
Pekerja L.01.01 OH 0.1980 40,000.00 7,920.00
Tukang batu L.02.03 OH 0.0330 40,000.00 1,320.00
Kepala tukang L.03.01 OH 0.0030 45,000.00 135.00
Mandor L.04.01 OH 0.0100 45,000.00 450.00
JUMLAH TENAGA KERJA 9,825.00
B BAHAN
Semen portland Kg 32.1200 1,160.00 37,259.20
Pasir beton Kg 91.2000 166.43 15,178.29
Kerikil (Maks 30 mm) Kg 123.4800 328.89 40,611.20
Air L 25.8000 50.00 1,290.00
JUMLAH HARGA BAHAN 94,338.69
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,163.69
E Overhead & Profit 15% 15% 15,624.55
F Harga Satuan Pekerjaan (D+E) 119,788.00
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
A TENAGA
Pekerja L.01.01 OH 0.2480 40,000.00 9,920.00
Tukang batu L.02.03 OH 0.0410 40,000.00 1,640.00
Kepala tukang L.03.01 OH 0.0040 45,000.00 180.00
Mandor L.04.01 OH 0.0130 45,000.00 585.00
JUMLAH TENAGA KERJA 12,325.00
B BAHAN
Semen portland Kg 48.9000 1,160.00 56,724.00
Pasir beton Kg 114.0000 166.43 18,972.86
Kerikil (Maks 30 mm) Kg 154.3500 328.89 50,764.00
Air L 32.2500 50.00 1,612.50
JUMLAH HARGA BAHAN 128,073.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 140,398.36
E Overhead & Profit 15% 15% 21,059.75
F Harga Satuan Pekerjaan (D+E) 161,458.00
A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak
A TENAGA
Pekerja L.01.01 OH 0.1470 40,000.00 5,880.00
Tukang kayu L.02.04 OH 0.1470 40,000.00 5,880.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 12,660.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

B BAHAN
Kayu kaso 5/7 ( Meranti batu ) m3 0.0120 4,600,000.00 55,200.00
Kayu papan kelas III ( Pinus ) m3 0.0040 1,950,000.00 7,800.00
Paku Biasa Kg 0.2640 16,300.00 4,303.20
JUMLAH HARGA BAHAN 67,303.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 79,963.20
E Overhead & Profit 15% 15% 11,994.48
F Harga Satuan Pekerjaan (D+E) 91,957.00
A.4.1.2.24. Upah 1 titik Join dengan Sling
A TENAGA
Pekerja L.01.01 OH 0.2200 40,000.00 8,800.00
Tukang kayu L.02.04 OH 0.2200 40,000.00 8,800.00
Tukang besi L.02.05 OH 0.2200 40,000.00 8,800.00
Mandor L.04.01 OH 0.0110 45,000.00 495.00
JUMLAH TENAGA KERJA 26,895.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,895.00
E Overhead & Profit 15% 15% 4,034.25
F Harga Satuan Pekerjaan (D+E) 30,929.00
G.1. PEKERJAAN BETON SNI 7394 : 2002
G.042. Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR menggunakan batu split pecah mesin
A TENAGA
Tenaga
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang batu
Batu L.02.03 OH 0.2500 40,000.00 10,000.00
Kepala tukang
Tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.0800 45,000.00 3,600.00
JUMLAH TENAGA KERJA 80,725.00
B BAHAN
Bahan
Semen
Portlandportland
Cement (PC) Kg 218.000 1,160.00 252,880.00
Pasir beton
Beton (PB) m3 0.5200 233,000.00 121,160.00
Kerikil
Koral Beton
(Maks(maksimum
30 mm) 30 mm) pecah mesin m3 0.8700 444,000.00 386,280.00
JUMLAH HARGA BAHAN 760,320.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 841,045.00
E. Overhead & and
Profit
profit
15%
15 % 15% 126,156.75
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 967,201.00
G.043. Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR menggunakan batu split pecah mesin
A TENAGA
Tenaga
Pekerja L.01.01 OH 1.6500 40,000.00 66,000.00
Tukang batu
Batu L.02.03 OH 0.2500 40,000.00 10,000.00
Kepala tukang
Tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.0800 45,000.00 3,600.00
JUMLAH TENAGA KERJA 80,725.00
B BAHAN
Bahan
Semen
Portlandportland
Cement (PC) Kg 197.000 1,160.00 228,520.00
Pasir beton
Beton (PB) m3 0.4700 233,000.00 109,510.00
Kerikil
Koral Beton
(Maks(maksimum
30 mm) 30 mm) pecah mesin m3 0.9400 444,000.00 417,360.00
JUMLAH HARGA BAHAN 755,390.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 836,115.00
E. Overhead & and
Profit
profit
15%
15 % 15% 125,417.25
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 961,532.00
G.2. PEKERJAAN BETON SNI 7394 : 2008
G.046. Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu pecah mesin
A TENAGA
Tenaga
Pekerja L.01.01 OH 2.0000 40,000.00 80,000.00
Tukang batu
Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang
Tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0830 45,000.00 3,735.00
JUMLAH TENAGA KERJA 99,310.00
B BAHAN
Bahan
Semen
Portlandportland
Cement (PC) Kg 336.000 1,160.00 389,760.00
Pasir beton
Beton (PB) m3 0.540 233,000.00 125,820.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Kerikil
Koral Beton
(Maks(maksimum
30 mm) 30 mm) pecah mesin m3 0.810 444,000.00 359,640.00
JUMLAH HARGA BAHAN 875,220.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 974,530.00
E. Overhead &and
Profit
profit
15%
15 % 15% 146,179.50
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 1,120,709.00

G.56. Membuat 1 m³ plat lantai beton tebal 12 cm mutu K-225 (ready mix) dengan menggunakan plat bondex tb. 0.7 mm
A. Cor
Portland
betonCement
Ready Mix
(PC)Mutu K.225 m3 1.000 1,475,087.00 1,475,087.00
B. Pekerjaan
Portland Cement
pembesian
(PC) Kg 111.111 15,185.00 1,687,222.22
C. Pasang
Mandor plat bondex m2 8.333 #REF! #REF!
D. Pekerjaan
Mandor begisting m2 2.000 594,906.00 1,189,812.00
JUMLAH HARGA PEKERJAAN #REF!
DI BULATKAN #REF!
G.58. Memasang 1 m2 bekisting dengan papan
A TENAGA
Tenaga
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang kayu
Batu L.02.05 OH 0.1500 40,000.00 6,000.00
Kepala
Tukangtukang
Batu L.02.05 OH 0.1500 40,000.00 6,000.00
Mandor L.04.01 OH 0.0500 45,000.00 2,250.00
Pekerja bongkar cetakan L.01.01 OH 0.1500 40,000.00 6,000.00
JUMLAH TENAGA KERJA 32,250.00
B BAHAN
Bahan
Kayu
Portland
rawaCement
( Pinur(PC)
) Kg 0.024 1,950,000.00 46,800.00
Paku
Portland
5 - 12
Cement
cm (PC) Kg 0.300 16,300.00 4,890.00
Minyak
Mandorbegisting LS 0.1000 3,100.00 310.00
Balok
Mandor kayu Meranti batu 5/7 LS 0.0240 4,600,000.00 110,400.00
JUMLAH HARGA BAHAN 162,400.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 194,650.00
E. Overhead & andProfit
profit
15%
15 % 15% 29,197.50
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 223,847.00
G.59. Memasang 1 m2 bekisting menggunakan multipleks tebal 9 mm
A TENAGA
Tenaga
Pekerja L.01.01 OH 0.1200 40,000.00 4,800.00
Tukang kayu
Batu L.02.05 OH 0.1500 40,000.00 6,000.00
Kepala
Tukangtukang
Batu L.02.05 OH 0.1500 40,000.00 6,000.00
Mandor L.04.01 OH 0.0500 45,000.00 2,250.00
Pekerja bongkar cetakan L.01.01 OH 0.1200 40,000.00 4,800.00
JUMLAH TENAGA KERJA 23,850.00

B.13.a.1. Menghamparkan 1 m³ beton mutu K-125 (ready mix)


A TENAGA
Tenaga
Pekerja L.01.01 OH 1.0000 40,000.00 40,000.00
Tukang batu
Batu L.02.03 OH 0.2500 40,000.00 10,000.00
Kepala tukang
Tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.1000 45,000.00 4,500.00
JUMLAH TENAGA KERJA 55,625.00
B BAHAN
Bahan
Beton
Portland
Ready
Cement
Mix K.125
(PC) m3 1.020 1,043,000.00 1,063,860.00
JUMLAH HARGA BAHAN 1,063,860.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 1,119,485.00
E. Overhead &and
Profit
profit
15%
15 % 15% 167,922.75
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 1,287,407.00
B.13.a.2. Menghamparkan 1 m³ beton mutu K-175 (ready mix)
A TENAGA
Tenaga
Pekerja L.01.01 OH 1.0000 40,000.00 40,000.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Tukang batu
Batu L.02.03 OH 0.2500 40,000.00 10,000.00
Kepala tukang
Tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.1000 45,000.00 4,500.00
JUMLAH TENAGA KERJA 55,625.00
B BAHAN
Bahan
Beton
Portland
Ready
Cement
Mix K.175
(PC) m3 1.020 1,094,000.00 1,115,880.00
JUMLAH HARGA BAHAN 1,115,880.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 1,171,505.00
E. Overhead & and
Profit
profit
15%
15 % 15% 175,725.75
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 1,347,230.00
B.13.a.3. Menghamparkan 1 m³ beton mutu K-225 (ready mix)
A TENAGA
Tenaga
Pekerja L.01.01 OH 1.0000 40,000.00 40,000.00
Tukang batu
Batu L.02.03 OH 0.2500 40,000.00 10,000.00
Kepala tukang
Tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.1000 45,000.00 4,500.00
JUMLAH TENAGA KERJA 55,625.00
B BAHAN
Bahan
Beton
Portland
Ready
Cement
Mix K.225
(PC) m3 1.020 1,203,000.00 1,227,060.00
JUMLAH HARGA BAHAN 1,227,060.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 1,282,685.00
E. Overhead &and
Profit
profit
15%
15 % 15% 192,402.75
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 1,475,087.00

B.35 Membongkar 1 m2 begisting cara biasa dan membereskan puing - puing


A TENAGA
Tenaga
Pekerja L.01.01 OH 0.0400 40,000.00 1,600.00
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 1,780.00
B BAHAN
Bahan -
JUMLAH HARGA BAHAN -
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 1,780.00
E. Overhead & and
Profit
profit
15%
15 % 15% 267.00
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 2,047.00
B.37 Menggenangi air 100 m2 permukaan beton
A TENAGA
Tenaga
Pekerja L.01.01 OH 0.8000 40,000.00 32,000.00
Mandor L.04.01 OH 0.0400 45,000.00 1,800.00
JUMLAH TENAGA KERJA 33,800.00
B BAHAN
Bahan
Air
Portland Cement (PC) m3 5.000 50,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 283,800.00
E. Overhead & and
Profit
profit
15%
15 % 15% 42,570.00
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 326,370.00
B.37.a Menggenangi air 1 m2 permukaan beton
A TENAGA
Tenaga
Pekerja L.01.01 OH 0.0080 40,000.00 320.00
Mandor L.04.01 OH 0.0004 45,000.00 18.00
JUMLAH TENAGA KERJA 338.00
B BAHAN
Bahan
Air
Portland Cement (PC) m3 0.050 50,000.00 2,500.00
JUMLAH HARGA BAHAN 2,500.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 2,838.00
E. Overhead &and
Profit
profit
15%
15 % 15% 425.70
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 3,263.00

B.38.c Menyirami 100 m2 Beton dengan air selama 4 hari


A TENAGA
Tenaga
Pekerja L.01.01 OH 2.0000 40,000.00 80,000.00
Mandor L.04.01 OH 0.1000 45,000.00 4,500.00
JUMLAH TENAGA KERJA 84,500.00
B BAHAN
Bahan
Air
Portland Cement (PC) m2 20.000 50,000.00 1,000,000.00
JUMLAH HARGA BAHAN 1,000,000.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 1,084,500.00
E. Overhead &and
Profit
profit
15%
15 % 15% 162,675.00
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 1,247,175.00
B.38.d Menyirami 1 m2 Beton dengan air selama 4 hari
A TENAGA
Tenaga
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Mandor L.04.01 OH 0.0010 45,000.00 45.00
JUMLAH TENAGA KERJA 845.00
B BAHAN
Bahan
Air
Portland Cement (PC) m2 0.200 50,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
C. PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 10,845.00
E. Overhead &and
Profit
profit
15%
15 % 15% 1,626.75
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 12,471.00
A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg besi profil
A TENAGA
Pekerja L.01.01 OH 0.0600 40,000.00 2,400.00
Tukang Las Konstruksi L.02.10 OH 0.0600 #REF! #REF!
Kepala tukang L.03.01 OH 0.0060 #REF! #REF!
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA #REF!
B BAHAN
Besi Profil Kg 1.1500 16,200.00 18,630.00
JUMLAH HARGA BAHAN 18,630.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.2.1.1.a Pemasangan 1 kg besi plat


A TENAGA
Pekerja L.01.01 OH 0.0600 40,000.00 2,400.00
Tukang Las Konstruksi L.02.10 OH 0.0600 #REF! #REF!
Kepala tukang L.03.01 OH 0.0060 #REF! #REF!
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA #REF!
B BAHAN
Besi Plat Kg 1.1500 15,000.00 17,250.00
JUMLAH HARGA BAHAN 17,250.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.2.1.3.a Pengerjaan 1 kg pekerjaan perakitan


A TENAGA
Pekerja L.01.01 OH 0.0010 40,000.00 40.00
Tukang Besi Konstruksi L.02.06 OH 0.0010 #REF! #REF!
Kepala tukang L.03.01 OH 0.0000 #REF! #REF!
Mandor L.04.01 OH 0.0001 45,000.00 2.25
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar Liter 0.0100 5,150.00 51.50
Minyak pelumas Liter 0.0010 40,000.00 40.00
JUMLAH HARGA BAHAN 91.50
C PERALATAN
Sewa alat Perakitan Baja IWF Jam 0.0080 #REF! #REF!
JUMLAH HARGA ALAT #REF!
D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium


A TENAGA
Pekerja L.01.01 OH 0.0800 40,000.00 3,200.00
Tukang Las L.02.05 OH 0.8000 #REF! #REF!
Kepala tukang L.03.01 OH 0.0800 45,000.00 3,600.00
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA #REF!
B BAHAN
Sunscreen alluminium m2 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.2.1.11.a Pemasangan 1 m' kusen pintu alluminium putih


A TENAGA
Pekerja L.01.01 OH 0.0430 40,000.00 1,720.00
Tukang Alumunium L.02.02 OH 0.0430 #REF! #REF!
Kepala tukang L.03.01 OH 0.0043 45,000.00 193.50
Mandor L.04.01 OH 0.0021 45,000.00 94.50
JUMLAH TENAGA KERJA #REF!
B BAHAN
Profil alluminium putih m 1.1000 180,000.00 198,000.00
Skrup fixer buah 2.0000 1,200.00 2,400.00
Sealant Tube 0.0600 22,000.00 1,320.00
JUMLAH HARGA BAHAN 201,720.00
C PERALATAN -

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm
A TENAGA
Pekerja L.01.01 OH 0.0850 40,000.00 3,400.00
Tukang Alumunium L.02.02 OH 0.0850 #REF! #REF!
Kepala tukang L.03.01 OH 0.0085 45,000.00 382.50
Mandor L.04.01 OH 0.0042 45,000.00 189.00
JUMLAH TENAGA KERJA #REF!
B BAHAN
Profil alluminium m 4.4000 65,000.00 286,000.00
Aluminium strip m 14.6000 3,400.00 49,640.00
JUMLAH HARGA BAHAN 335,640.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium
A TENAGA
Pekerja L.01.01 OH 0.0850 40,000.00 3,400.00
Tukang Alumunium L.02.02 OH 0.0850 #REF! #REF!
Kepala tukang L.03.01 OH 0.0090 45,000.00 405.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pintu alluminium m 4.4000 65,000.00 286,000.00
Profil kaca m 4.5000 37,000.00 166,500.00
Sealant Tube 0.2700 22,000.00 5,940.00
JUMLAH HARGA BAHAN 458,440.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 15% 15% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


A TENAGA
Pekerja L.01.01 OH 0.2000 40,000.00 8,000.00
Tukang kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0010 45,000.00 45.00
JUMLAH TENAGA KERJA 16,945.00
B BAHAN
Seng plat m 1.0500 51,000.00 53,550.00
Paku Biasa kg 0.0150 16,300.00 244.50
Kayu Papan kelas II m3 0.0190 1,950,000.00 37,050.00
JUMLAH HARGA BAHAN 90,844.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,789.50
E Overhead & Profit 15% 15% 16,168.43

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

F Harga Satuan Pekerjaan (D+E) 123,957.00

A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
A TENAGA
Pekerja L.01.01 OH 0.2500 40,000.00 10,000.00
Tukang Besi L.02.05 OH 0.2500 40,000.00 10,000.00
Kepala Tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.0130 45,000.00 585.00
JUMLAH TENAGA KERJA 21,710.00
B BAHAN
Rangka metal hollow 40.40.2 mm m' 3.5000 56,520.00 197,820.00
Assesoris (perkuatan, las dll) Ls 1.0000 197,820.00 197,820.00
JUMLAH HARGA BAHAN 395,640.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 417,350.00
E Overhead & Profit 15% 15% 62,602.50
F Harga Satuan Pekerjaan (D+E) 479,952.00
A.4.2.1.21. Pemasangan 1 m2 rangka plafond menggunakan besi hollow 1x40.40.2mm, modul 60 x 60 cm.
A TENAGA
Pekerja L.01.01 OH 0.3500 40,000.00 14,000.00
Tukang Besi L.02.05 OH 0.3500 40,000.00 14,000.00
Kepala Tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0180 45,000.00 810.00
JUMLAH TENAGA KERJA 30,385.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 56,520.00 226,080.00
Assesoris (perkuatan, las dll) Ls 1.0000 226,080.00 226,080.00
JUMLAH HARGA BAHAN 452,160.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 482,545.00
E Overhead & Profit 15% 15% 72,381.75
F Harga Satuan Pekerjaan (D+E) 554,926.00

A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
A TENAGA
Pekerja L.01.01 OH 0.6000 40,000.00 24,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0300 45,000.00 1,350.00
JUMLAH TENAGA KERJA 34,250.00
B BAHAN
Bata merah m3 140.0000 850.00 119,000.00
Semen portland Kg 43.5000 1,160.00 50,460.00
Pasir Pasang m3 0.0800 233,000.00 18,640.00
JUMLAH HARGA BAHAN 188,100.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 222,350.00
E Overhead & Profit 15% 15% 33,352.50
F Harga Satuan Pekerjaan (D+E) 255,702.00
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
A TENAGA
Pekerja L.01.01 OH 0.6000 40,000.00 24,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0300 45,000.00 1,350.00
JUMLAH TENAGA KERJA 34,250.00
B BAHAN
Bata merah m3 140.0000 850.00 119,000.00
Semen portland Kg 32.9500 1,160.00 38,222.00
Pasir Pasang m3 0.0910 233,000.00 21,203.00
JUMLAH HARGA BAHAN 178,425.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 212,675.00
E Overhead & Profit 15% 15% 31,901.25
F Harga Satuan Pekerjaan (D+E) 244,576.00
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
A TENAGA
Pekerja L.01.01 OH 0.6000 40,000.00 24,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Mandor L.04.01 OH 0.0300 45,000.00 1,350.00


JUMLAH TENAGA KERJA 34,250.00
B BAHAN
Bata merah m3 140.0000 850.00 119,000.00
Semen portland Kg 26.5500 1,160.00 30,798.00
Pasir Pasang m3 0.0930 233,000.00 21,669.00
JUMLAH HARGA BAHAN 171,467.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 205,717.00
E Overhead & Profit 15% 15% 30,857.55
F Harga Satuan Pekerjaan (D+E) 236,574.00
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
A TENAGA
Pekerja L.01.01 OH 0.6000 40,000.00 24,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0300 45,000.00 1,350.00
JUMLAH TENAGA KERJA 34,250.00
B BAHAN
Bata merah m3 140.0000 850.00 119,000.00
Semen portland Kg 22.2000 1,160.00 25,752.00
Pasir Pasang m3 0.1020 233,000.00 23,766.00
JUMLAH HARGA BAHAN 168,518.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 202,768.00
E Overhead & Profit 15% 15% 30,415.20
F Harga Satuan Pekerjaan (D+E) 233,183.00
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
A TENAGA
Pekerja L.01.01 OH 0.6000 40,000.00 24,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0300 45,000.00 1,350.00
JUMLAH TENAGA KERJA 34,250.00
B BAHAN
Bata merah m3 140.0000 850.00 119,000.00
Semen portland Kg 18.5000 1,160.00 21,460.00
Pasir Pasang m3 0.1220 233,000.00 28,426.00
JUMLAH HARGA BAHAN 168,886.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 203,136.00
E Overhead & Profit 15% 15% 30,470.40
F Harga Satuan Pekerjaan (D+E) 233,606.00

A.4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 2 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata merah m3 70.0000 850.00 59,500.00
Semen portland Kg 18.9500 1,160.00 21,982.00
Pasir Pasang m3 0.0380 233,000.00 8,854.00
JUMLAH HARGA BAHAN 90,336.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,461.00
E Overhead & Profit 15% 15% 16,119.15
F Harga Satuan Pekerjaan (D+E) 123,580.00
A.4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata merah m3 70.0000 850.00 59,500.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Semen portland Kg 14.3700 1,160.00 16,669.20


Pasir Pasang m3 0.0400 233,000.00 9,320.00
JUMLAH HARGA BAHAN 85,489.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 102,614.20
E Overhead & Profit 15% 15% 15,392.13
F Harga Satuan Pekerjaan (D+E) 118,006.00
A.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 4 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata merah m3 70.0000 850.00 59,500.00
Semen portland Kg 11.5000 1,160.00 13,340.00
Pasir Pasang m3 0.0430 233,000.00 10,019.00
JUMLAH HARGA BAHAN 82,859.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 99,984.00
E Overhead & Profit 15% 15% 14,997.60
F Harga Satuan Pekerjaan (D+E) 114,981.00
A.4.4.1.10. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata merah m3 70.0000 850.00 59,500.00
Semen portland Kg 9.6800 1,160.00 11,228.80
Pasir Pasang m3 0.0450 233,000.00 10,485.00
JUMLAH HARGA BAHAN 81,213.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,338.80
E Overhead & Profit 15% 15% 14,750.82
F Harga Satuan Pekerjaan (D+E) 113,089.00
A.4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata merah m3 70.0000 850.00 59,500.00
Semen portland Kg 8.3200 1,160.00 9,651.20
Pasir Pasang m3 0.0490 233,000.00 11,417.00
JUMLAH HARGA BAHAN 80,568.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 97,693.20
E Overhead & Profit 15% 15% 14,653.98
F Harga Satuan Pekerjaan (D+E) 112,347.00
A.4.4.1.12. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

B BAHAN
Bata merah m3 70.0000 850.00 59,500.00
Semen portland Kg 6.5000 1,160.00 7,540.00
Pasir Pasang m3 0.0500 233,000.00 11,650.00
JUMLAH HARGA BAHAN 78,690.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95,815.00
E Overhead & Profit 15% 15% 14,372.25
F Harga Satuan Pekerjaan (D+E) 110,187.00

A.4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1 SP : 3 PP


A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata rooster bh 30.0000 - -
Semen portland Kg 11.0000 1,160.00 12,760.00
Pasir Pasang m3 0.0350 233,000.00 8,155.00
JUMLAH HARGA BAHAN 20,915.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,040.00
E Overhead & Profit 15% 15% 5,706.00
F Harga Satuan Pekerjaan (D+E) 43,746.00
A.4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1 SP : 4 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Bata berongga m3 30.0000 - -
Semen portland Kg 11.0000 1,160.00 12,760.00
Pasir Pasang m3 0.0350 233,000.00 8,155.00
JUMLAH HARGA BAHAN 20,915.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,040.00
E Overhead & Profit 15% 15% 5,706.00
F Harga Satuan Pekerjaan (D+E) 43,746.00
A.4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Bata rooster m3 70.0000 - -
Semen portland Kg 14.0000 1,160.00 16,240.00
Pasir Pasang m3 0.0320 233,000.00 7,456.00
JUMLAH HARGA BAHAN 23,696.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,046.00
E Overhead & Profit 15% 15% 6,456.90
F Harga Satuan Pekerjaan (D+E) 49,502.00

A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.1. Pemasangan 1 m2 plesteran 1 SP : 1 PP tebal 15 mm.
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 15.5040 1,160.00 17,984.64
Pasir Pasang m3 0.0160 233,000.00 3,728.00
JUMLAH HARGA BAHAN 21,712.64
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,062.64

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

E Overhead & Profit 15% 15% 6,159.40


F Harga Satuan Pekerjaan (D+E) 47,222.00
A.4.4.2.2. Pemasangan 1 m2 plesteran 1 SP : 2 PP tebal 15 mm.
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 10.2240 1,160.00 11,859.84
Pasir Pasang m3 0.0200 233,000.00 4,660.00
JUMLAH HARGA BAHAN 16,519.84
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,869.84
E Overhead & Profit 15% 15% 5,380.48
F Harga Satuan Pekerjaan (D+E) 41,250.00
A.4.4.2.3. Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 15mm.
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 7.7760 1,160.00 9,020.16
Pasir Pasang m3 0.0230 233,000.00 5,359.00
JUMLAH HARGA BAHAN 14,379.16
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,729.16
E Overhead & Profit 15% 15% 5,059.37
F Harga Satuan Pekerjaan (D+E) 38,788.00
A.4.4.2.4. Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 15 mm
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 6.2400 1,160.00 7,238.40
Pasir Pasang m3 0.0240 233,000.00 5,592.00
JUMLAH HARGA BAHAN 12,830.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,180.40
E Overhead & Profit 15% 15% 4,827.06
F Harga Satuan Pekerjaan (D+E) 37,007.00
A.4.4.2.5. Pemasangan 1 m2 plesteran 1 SP : 5 PP tebal 15 mm
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 5.1840 1,160.00 6,013.44
Pasir Pasang m3 0.0260 233,000.00 6,058.00
JUMLAH HARGA BAHAN 12,071.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,421.44

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

E Overhead & Profit 15% 15% 4,713.22


F Harga Satuan Pekerjaan (D+E) 36,134.00
A.4.4.2.6. Pemasangan 1 m2 plesteran 1 SP : 6 PP tebal 15 mm.
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 4.4160 1,160.00 5,122.56
Pasir Pasang m3 0.0270 233,000.00 6,291.00
JUMLAH HARGA BAHAN 11,413.56
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,763.56
E Overhead & Profit 15% 15% 4,614.53
F Harga Satuan Pekerjaan (D+E) 35,378.00
A.4.4.2.7. Pemasangan 1 m2 plesteran 1 SP : 7 PP tebal 15 mm
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 3.9360 1,160.00 4,565.76
Pasir Pasang m3 0.0280 233,000.00 6,524.00
JUMLAH HARGA BAHAN 11,089.76
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,439.76
E Overhead & Profit 15% 15% 4,565.96
F Harga Satuan Pekerjaan (D+E) 35,005.00
A.4.4.2.8. Pemasangan 1 m2 plesteran 1 SP : 8 PP tebal 15 mm
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00
Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 3.4560 1,160.00 4,008.96
Pasir Pasang m3 0.0290 233,000.00 6,757.00
JUMLAH HARGA BAHAN 10,765.96
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,115.96
E Overhead & Profit 15% 15% 4,517.39
F Harga Satuan Pekerjaan (D+E) 34,633.00

A.4.4.2.13. Pemasangan 1 m2 plesteran 1 SP : 1 PP tebal 20 mm


A TENAGA
Pekerja L.01.01 OH 0.4000 40,000.00 16,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0220 45,000.00 990.00
JUMLAH TENAGA KERJA 25,890.00
B BAHAN
Semen portland Kg 13.6320 1,160.00 15,813.12
Pasir Pasang m3 0.0270 233,000.00 6,291.00
JUMLAH HARGA BAHAN 22,104.12
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,994.12
E Overhead & Profit 15% 15% 7,199.12
F Harga Satuan Pekerjaan (D+E) 55,193.00
A.4.4.2.14. Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 20 mm
A TENAGA
Pekerja L.01.01 OH 0.2600 40,000.00 10,400.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Mandor L.04.01 OH 0.0130 45,000.00 585.00


JUMLAH TENAGA KERJA 19,885.00
B BAHAN
Semen portland Kg 10.3680 1,160.00 12,026.88
Pasir Pasang m3 0.0310 233,000.00 7,223.00
JUMLAH HARGA BAHAN 19,249.88
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,134.88
E Overhead & Profit 15% 15% 5,870.23
F Harga Satuan Pekerjaan (D+E) 45,005.00
A.4.4.2.15. Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm.
A TENAGA
Pekerja L.01.01 OH 0.4000 40,000.00 16,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0220 45,000.00 990.00
JUMLAH TENAGA KERJA 25,890.00
B BAHAN
Semen portland Kg 8.3200 1,160.00 9,651.20
Pasir Pasang m3 0.0320 233,000.00 7,456.00
JUMLAH HARGA BAHAN 17,107.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 42,997.20
E Overhead & Profit 15% 15% 6,449.58
F Harga Satuan Pekerjaan (D+E) 49,446.00
A.4.4.2.16. Pemasangan 1 m2 plesteran 1 SP : 5 PP tebal 20 mm
A TENAGA
Pekerja L.01.01 OH 0.4000 40,000.00 16,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0220 45,000.00 990.00
JUMLAH TENAGA KERJA 25,890.00
B BAHAN
Semen portland Kg 6.9120 1,160.00 8,017.92
Pasir Pasang m3 0.0350 233,000.00 8,155.00
JUMLAH HARGA BAHAN 16,172.92
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 42,062.92
E Overhead & Profit 15% 15% 6,309.44
F Harga Satuan Pekerjaan (D+E) 48,372.00
A.4.4.2.17. Pemasangan 1 m2 plesteran 1 SP : 6 PP tebal 20 mm
A TENAGA
Pekerja L.01.01 OH 0.4000 40,000.00 16,000.00
Tukang Batu L.02.03 OH 0.2000 40,000.00 8,000.00
Kepala Tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0220 45,000.00 990.00
JUMLAH TENAGA KERJA 25,890.00
B BAHAN
Semen portland Kg 5.8880 1,160.00 6,830.08
Pasir Pasang m3 0.0360 233,000.00 8,388.00
JUMLAH HARGA BAHAN 15,218.08
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,108.08
E Overhead & Profit 15% 15% 6,166.21
F Harga Satuan Pekerjaan (D+E) 47,274.00

A.4.4.2.19. Pemasangan 1 m2 berapen 1 SP : 5 PP tebal 15 mm


A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang Batu L.02.03 OH 0.0750 40,000.00 3,000.00
Kepala Tukang L.03.01 OH 0.0080 45,000.00 360.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 9,720.00
B BAHAN
Semen portland Kg 5.1840 1,160.00 6,013.44
Pasir Pasang m3 0.0260 233,000.00 6,058.00
JUMLAH HARGA BAHAN 12,071.44
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 21,791.44
E Overhead & Profit 15% 15% 3,268.72
F Harga Satuan Pekerjaan (D+E) 25,060.00
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1 SP : 3 PP lebar 10 cm

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A TENAGA
Pekerja L.01.01 OH 0.0800 40,000.00 3,200.00
Tukang Batu L.02.03 OH 0.4000 40,000.00 16,000.00
Kepala Tukang L.03.01 OH 0.0400 45,000.00 1,800.00
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 21,180.00
B BAHAN
Semen portland Kg 0.5000 1,160.00 580.00
Pasir Pasang m3 0.0130 233,000.00 3,029.00
JUMLAH HARGA BAHAN 3,609.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,789.00
E Overhead & Profit 15% 15% 3,718.35
F Harga Satuan Pekerjaan (D+E) 28,507.00
A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1 SP : 2 PP
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Semen portland Kg 4.3200 1,160.00 5,011.20
Pasir Pasang m3 0.0060 233,000.00 1,398.00
JUMLAH HARGA BAHAN 6,409.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 23,534.20
E Overhead & Profit 15% 15% 3,530.13
F Harga Satuan Pekerjaan (D+E) 27,064.00
A.4.4.2.24. Pemasangan 1 m2 finishing siar pasangan bata merah
A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang Batu L.02.03 OH 0.0750 40,000.00 3,000.00
Kepala Tukang L.03.01 OH 0.0080 45,000.00 360.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 9,720.00
B BAHAN
Semen portland Kg 3.1080 1,160.00 3,605.28
JUMLAH HARGA BAHAN 3,605.28
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,325.28
E Overhead & Profit 15% 15% 1,998.79
F Harga Satuan Pekerjaan (D+E) 15,324.00
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose
A TENAGA
Pekerja L.01.01 OH 0.0700 40,000.00 2,800.00
Tukang Batu L.02.03 OH 0.0350 40,000.00 1,400.00
Kepala Tukang L.03.01 OH 0.0040 45,000.00 180.00
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 4,560.00
B BAHAN
Semen portland Kg 1.6000 1,160.00 1,856.00
JUMLAH HARGA BAHAN 1,856.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,416.00
E Overhead & Profit 15% 15% 962.40
F Harga Satuan Pekerjaan (D+E) 7,378.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1 SP : 2 PP.
A TENAGA
Pekerja L.01.01 OH 0.3000 40,000.00 12,000.00
Tukang Batu L.02.03 OH 0.1500 40,000.00 6,000.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Kepala Tukang L.03.01 OH 0.0150 45,000.00 675.00


Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Semen portland Kg 6.3400 1,160.00 7,354.40
Pasir Pasang m3 0.0120 233,000.00 2,796.00
JUMLAH HARGA BAHAN 10,150.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,500.40
E Overhead & Profit 15% 15% 4,425.06
F Harga Satuan Pekerjaan (D+E) 33,925.00
A.4.4.2.27. Pemasangan 1 m2 acian.
A TENAGA
Pekerja L.01.01 OH 0.2000 40,000.00 8,000.00
Tukang Batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala Tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0100 45,000.00 450.00
JUMLAH TENAGA KERJA 12,900.00
B BAHAN
Semen portland Kg 3.2500 1,160.00 3,770.00
JUMLAH HARGA BAHAN 3,770.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,670.00
E Overhead & Profit 15% 15% 2,500.50
F Harga Satuan Pekerjaan (D+E) 19,170.00

A.4.4.3.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik artistik 10 cm x 20 cm Bh 53.0000 8,000.00 424,000.00
Semen portland Kg 8.1900 1,160.00 9,500.40
Pasir pasang M3 0.0450 233,000.00 10,485.00
Semen warna Kg 2.7500 15,000.00 41,250.00
JUMLAH HARGA BAHAN 485,235.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 530,385.40
E Overhead & Profit 15% 15% 79,557.81
F Harga Satuan Pekerjaan (D+E) 609,943.00
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm Bh 106.0000 6,200.00 657,200.00
Semen portland Kg 8.1900 1,160.00 9,500.40
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 3.2000 15,000.00 48,000.00
JUMLAH HARGA BAHAN 725,185.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 770,335.40
E Overhead & Profit 15% 15% 115,550.31
F Harga Satuan Pekerjaan (D+E) 885,885.00
A.4.4.3.34. Pemasangan 1m2 lantai keramik ukuran 33 cm x 33 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 33 cm x 33 cm Bh 10.0000 4,900.50 49,005.00
Semen portland Kg 8.1900 1,160.00 9,500.40
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.6200 15,000.00 24,300.00
JUMLAH HARGA BAHAN 93,290.40

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,440.40
E Overhead & Profit 15% 15% 20,766.06
F Harga Satuan Pekerjaan (D+E) 159,206.00
A.4.4.3.35. Pemasangan 1m2 lantai keramik polos ukuran 30 cm x 30 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 30 cm x 30 cm Bh 11.8700 4,050.00 48,073.50
Semen portland Kg 10.0000 1,160.00 11,600.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
JUMLAH HARGA BAHAN 92,658.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 137,808.50
E Overhead & Profit 15% 15% 20,671.28
F Harga Satuan Pekerjaan (D+E) 158,479.00
A.4.4.3.35.a. Pemasangan 1m2 lantai keramik motif ukuran 30 cm x 30 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 30 cm x 30 cm Bh 11.8700 4,860.00 57,688.20
Semen portland Kg 10.0000 1,160.00 11,600.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
JUMLAH HARGA BAHAN 102,273.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 147,423.20
E Overhead & Profit 15% 15% 22,113.48
F Harga Satuan Pekerjaan (D+E) 169,536.00
A.4.4.3.35.b. Pemasangan 1m2 lantai keramik motif granit ukuran 30 cm x 30 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 30 cm x 30 cm Bh 11.8700 14,850.00 176,269.50
Semen portland Kg 10.0000 1,160.00 11,600.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
JUMLAH HARGA BAHAN 220,854.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 266,004.50
E Overhead & Profit 15% 15% 39,900.68
F Harga Satuan Pekerjaan (D+E) 305,905.00
A.4.4.3.35.c. Pemasangan 1m2 lantai keramik polos ukuran 40 cm x 40 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

keramik ukuran 40 cm x 40 cm Bh 6.6300 8,160.00 54,100.80


Semen portland Kg 9.8000 1,160.00 11,368.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.3000 15,000.00 19,500.00
JUMLAH HARGA BAHAN 95,453.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 140,603.80
E Overhead & Profit 15% 15% 21,090.57
F Harga Satuan Pekerjaan (D+E) 161,694.00
A.4.4.3.35.d. Pemasangan 1m2 lantai keramik motif ukuran 40cm x 40cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 40cm x 40cm Bh 6.6300 10,240.00 67,891.20
Semen portland Kg 9.8000 1,160.00 11,368.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.3000 15,000.00 19,500.00
JUMLAH HARGA BAHAN 109,244.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 154,394.20
E Overhead & Profit 15% 15% 23,159.13
F Harga Satuan Pekerjaan (D+E) 177,553.00
A.4.4.3.35.e. Pemasangan 1m2 lantai keramik motif granit ukuran 40cm x 40cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 40cm x 40cm Bh 6.6300 18,400.00 121,992.00
Semen portland Kg 9.8000 1,160.00 11,368.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.3000 15,000.00 19,500.00
JUMLAH HARGA BAHAN 163,345.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 208,495.00
E Overhead & Profit 15% 15% 31,274.25
F Harga Satuan Pekerjaan (D+E) 239,769.00
A.4.4.3.35.f. Pemasangan 1m2 lantai keramik polos ukuran 60 cm x 60 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 60 cm x 60 cm Bh 3.1000 36,000.00 111,600.00
Semen portland Kg 9.6000 1,160.00 11,136.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
JUMLAH HARGA BAHAN 155,721.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 200,871.00
E Overhead & Profit 15% 15% 30,130.65
F Harga Satuan Pekerjaan (D+E) 231,001.00
A.4.4.3.35.g. Pemasangan 1m2 lantai keramik motif ukuran 60 cm x 60 cm

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 60 cm x 60 cm Bh 3.1000 42,480.00 131,688.00
Semen portland Kg 9.6000 1,160.00 11,136.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
JUMLAH HARGA BAHAN 175,809.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 220,959.00
E Overhead & Profit 15% 15% 33,143.85
F Harga Satuan Pekerjaan (D+E) 254,102.00
A.4.4.3.35.h. Pemasangan 1m2 lantai keramik motif granit ukuran 60 cm x 60 cm
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
keramik ukuran 60 cm x 60 cm Bh 3.1000 46,800.00 145,080.00
Semen portland Kg 9.6000 1,160.00 11,136.00
Pasir Pasang M3 0.0450 233,000.00 10,485.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
JUMLAH HARGA BAHAN 189,201.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 234,351.00
E Overhead & Profit 15% 15% 35,152.65
F Harga Satuan Pekerjaan (D+E) 269,503.00

A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm


A TENAGA
Pekerja L.01.01 OH 0.0900 40,000.00 3,600.00
Tukang Batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 9,000.00
B BAHAN
Plint keramik ukuran 10cm x 20cm Bh 5.3000 8,000.00 42,400.00
Semen portland Kg 1.1400 1,160.00 1,322.40
Pasir Pasang M3 0.0030 233,000.00 699.00
Semen Warna Kg 0.0250 15,000.00 375.00
JUMLAH HARGA BAHAN 44,796.40
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,796.40
E Overhead & Profit 15% 15% 8,069.46
F Harga Satuan Pekerjaan (D+E) 61,865.00
A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm
A TENAGA
Pekerja L.01.01 OH 0.0900 40,000.00 3,600.00
Tukang Batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 9,000.00
B BAHAN
Plint keramik ukuran 10 cm x 10 cm Bh 10.6000 8,000.00 84,800.00
Semen portland Kg 1.1400 1,160.00 1,322.40
Pasir Pasang M3 0.0030 233,000.00 699.00
Semen Warna Kg 0.0500 15,000.00 750.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

JUMLAH HARGA BAHAN 87,571.40


C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,571.40
E Overhead & Profit 15% 15% 14,485.71
F Harga Satuan Pekerjaan (D+E) 111,057.00
A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm
A TENAGA
Pekerja L.01.01 OH 0.0900 40,000.00 3,600.00
Tukang Batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 9,000.00
B BAHAN
Plint keramik ukuran 5 cm x 20 cm Bh 5.3000 6,200.00 32,860.00
Semen portland Kg 0.5700 1,160.00 661.20
Pasir Pasang M3 0.0015 233,000.00 349.50
Semen Warna Kg 0.0130 15,000.00 195.00
JUMLAH HARGA BAHAN 34,065.70
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,065.70
E Overhead & Profit 15% 15% 6,459.86
F Harga Satuan Pekerjaan (D+E) 49,525.00

A.4.4.3.49. Pemasangan 1 m2 dinding porslen 10 cm x 20 cm


A TENAGA
Pekerja L.01.01 OH 0.9000 40,000.00 36,000.00
Tukang Batu L.02.03 OH 0.4500 40,000.00 18,000.00
Kepala tukang L.03.01 OH 0.0450 45,000.00 2,025.00
Mandor L.04.01 OH 0.0450 45,000.00 2,025.00
JUMLAH TENAGA KERJA 58,050.00
B BAHAN
Porselen Dinding 10x20 Bh 53.0000 8,000.00 424,000.00
Semen portland Kg 9.3000 1,160.00 10,788.00
Pasir Pasang M3 0.0180 233,000.00 4,194.00
Semen Warna Kg 2.7500 15,000.00 41,250.00
JUMLAH HARGA BAHAN 480,232.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 538,282.00
E Overhead & Profit 15% 15% 80,742.30
F Harga Satuan Pekerjaan (D+E) 619,024.00

A.4.4.3.54.d. Pemasangan 1 m2 dinding keramik motif 30 cm x 60 cm


A TENAGA
Pekerja L.01.01 OH 0.9000 40,000.00 36,000.00
Tukang Batu L.02.03 OH 0.4500 40,000.00 18,000.00
Kepala tukang L.03.01 OH 0.0450 45,000.00 2,025.00
Mandor L.04.01 OH 0.0450 45,000.00 2,025.00
JUMLAH TENAGA KERJA 58,050.00
B BAHAN
keramik Dinding 30 cm x 60 cm Bh 6.1000 15,000.00 91,500.00
Semen portland Kg 9.3000 1,160.00 10,788.00
Pasir Pasang M3 0.0180 233,000.00 4,194.00
Semen Warna Kg 1.9400 15,000.00 29,100.00
JUMLAH HARGA BAHAN 135,582.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 193,632.00
E Overhead & Profit 15% 15% 29,044.80
F Harga Satuan Pekerjaan (D+E) 222,676.00
A.4.4.3.57. Pemasangan 1 m2 dinding batu paras warna hijau
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
Batu paras Dinding Bh 1.1000 166,000.00 182,600.00
Semen portland Kg 11.7500 1,160.00 13,630.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Pasir Pasang M3 0.0350 233,000.00 8,155.00


JUMLAH HARGA BAHAN 204,385.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 249,535.00
E Overhead & Profit 15% 15% 37,430.25
F Harga Satuan Pekerjaan (D+E) 286,965.00
A.4.4.3.57.a. Pemasangan 1 m2 dinding batu paras warna kuning
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
Batu paras Dinding Bh 1.1000 144,000.00 158,400.00
Semen portland Kg 11.7500 1,160.00 13,630.00
Pasir Pasang M3 0.0350 233,000.00 8,155.00
JUMLAH HARGA BAHAN 180,185.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 225,335.00
E Overhead & Profit 15% 15% 33,800.25
F Harga Satuan Pekerjaan (D+E) 259,135.00

A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam ukuran kecil ( tidak beraturan )
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
dinding batu tempel hitam Bh 1.1000 160,000.00 176,000.00
Semen portland Kg 11.7500 1,160.00 13,630.00
Pasir Pasang M3 0.0350 233,000.00 8,155.00
JUMLAH HARGA BAHAN 197,785.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 242,935.00
E Overhead & Profit 15% 15% 36,440.25
F Harga Satuan Pekerjaan (D+E) 279,375.00
A.4.4.3.58.a. Pemasangan 1 m2 dinding batu tempel hitam ukuran besar ( tidak beraturan )
A TENAGA
Pekerja L.01.01 OH 0.7000 40,000.00 28,000.00
Tukang Batu L.02.03 OH 0.3500 40,000.00 14,000.00
Kepala tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0350 45,000.00 1,575.00
JUMLAH TENAGA KERJA 45,150.00
B BAHAN
dinding batu tempel hitam Bh 1.1000 152,000.00 167,200.00
Semen portland Kg 11.7500 1,160.00 13,630.00
Pasir Pasang M3 0.0350 233,000.00 8,155.00
JUMLAH HARGA BAHAN 188,985.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 234,135.00
E Overhead & Profit 15% 15% 35,120.25
F Harga Satuan Pekerjaan (D+E) 269,255.00
A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A TENAGA
Pekerja L.01.01 OH 0.3500 40,000.00 14,000.00
Tukang Batu L.02.03 OH 0.1750 40,000.00 7,000.00
Kepala tukang L.03.01 OH 0.0170 45,000.00 765.00
Mandor L.04.01 OH 0.0020 45,000.00 90.00
JUMLAH TENAGA KERJA 21,855.00
B BAHAN
wallpaper lebar 50 cm m 2.2000 - -
Lem Putih Kg 0.2500 34,000.00 8,500.00
JUMLAH HARGA BAHAN 8,500.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,355.00
E Overhead & Profit 15% 15% 4,553.25
F Harga Satuan Pekerjaan (D+E) 34,908.00

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.0500 40,000.00 2,000.00
Kepala tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 6,450.00
B BAHAN
Gypsum board 9 mm (1200 x 2400 mm) Lembar 0.3640 69,000.00 25,116.00
Paku skrup kg 0.1100 32,800.00 3,608.00
JUMLAH HARGA BAHAN 28,724.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,174.00
E Overhead & Profit 15% 15% 5,276.10
F Harga Satuan Pekerjaan (D+E) 40,450.00

A.4.5.1.9.a. Pemasangan 1 m’ list langit-langit gypsum profil 10 cm


A TENAGA
Pekerja L.01.01 OH 0.0500 40,000.00 2,000.00
Tukang Kayu L.02.04 OH 0.0500 40,000.00 2,000.00
Kepala tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 4,360.00
B BAHAN
List gypsum profil 10 cm m 1.0500 6,000.00 6,300.00
Tepung gypsum kg 0.0100 4,000.00 40.00
JUMLAH HARGA BAHAN 6,340.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 10,700.00
E Overhead & Profit 15% 15% 1,605.00
F Harga Satuan Pekerjaan (D+E) 12,305.00
A.4.5.1.9.b. Pemasangan 1 m’ list langit-langit gypsum profil 15 cm
A TENAGA
Pekerja L.01.01 OH 0.0500 40,000.00 2,000.00
Tukang Kayu L.02.04 OH 0.0500 40,000.00 2,000.00
Kepala tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 4,360.00
B BAHAN
List gypsum profil 15 cm m 1.0500 8,500.00 8,925.00
Tepung gypsum kg 0.0100 4,000.00 40.00
JUMLAH HARGA BAHAN 8,965.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,325.00
E Overhead & Profit 15% 15% 1,998.75
F Harga Satuan Pekerjaan (D+E) 15,323.00

A.4.5.1.11. Pemasangan 1 m2 Lis Plafond PVC


A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang Kayu L.02.04 OH 0.0500 40,000.00 2,000.00
Kepala tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

JUMLAH TENAGA KERJA 6,450.00


B BAHAN
List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) M' 1.0500 15,000.00 15,750.00
Screw bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 22,950.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,400.00
E Overhead & Profit 15% 15% 4,410.00
F Harga Satuan Pekerjaan (D+E) 33,810.00
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.3.b. Pemasangan 1 m2 atap genteng Morando glazuur
A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang Kayu L.02.04 OH 0.0750 40,000.00 3,000.00
Kepala tukang L.03.01 OH 0.0080 45,000.00 360.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 9,720.00
B BAHAN
Genteng Morando glazuur Bh 18.0000 4,600.00 82,800.00
JUMLAH HARGA BAHAN 82,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 92,520.00
E Overhead & Profit 15% 15% 13,878.00
F Harga Satuan Pekerjaan (D+E) 106,398.00

A.4.5.2.6.b. Pemasangan 1 m’ bubung genteng Morando glazuur


A TENAGA
Pekerja L.01.01 OH 0.4000 40,000.00 16,000.00
Tukang Kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0020 45,000.00 90.00
JUMLAH TENAGA KERJA 24,990.00
B BAHAN
Genteng bubung Bh 3.5000 8,000.00 28,000.00
Semen portland Kg 8.0000 1,160.00 9,280.00
Pasir Pasang M3 0.0320 233,000.00 7,456.00
JUMLAH HARGA BAHAN 44,736.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,726.00
E Overhead & Profit 15% 15% 10,458.90
F Harga Satuan Pekerjaan (D+E) 80,184.00

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III ( kayu Kruing )
A TENAGA
Pekerja L.01.01 OH 0.3500 40,000.00 14,000.00
Tukang kayu L.02.04 OH 1.0500 40,000.00 42,000.00
Kepala tukang L.03.01 OH 0.1050 45,000.00 4,725.00
Mandor L.04.01 OH 0.0180 45,000.00 810.00
JUMLAH TENAGA KERJA 61,535.00
B BAHAN
Kayu Papan Kruing m3 0.0400 - -
Paku Biasa Kg 0.0500 16,300.00 815.00
JUMLAH HARGA BAHAN 815.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,350.00
E Overhead & Profit 15% 15% 9,352.50
F Harga Satuan Pekerjaan (D+E) 71,702.00

A.4.6.1.16.c. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu Kempas )
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 8,675.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

B BAHAN
Kayu Kempas 5/7 cm m3 0.0140 5,650,000.00 79,100.00
Reng kayu Kempas 2 x 3 cm m3 0.0036 5,650,000.00 20,340.00
Paku Biasa kg 0.2500 16,300.00 4,075.00
JUMLAH HARGA BAHAN 103,515.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,190.00
E Overhead & Profit 15% 15% 16,828.50
F Harga Satuan Pekerjaan (D+E) 129,018.00
A.4.6.1.16.d. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II ( Kayu Meranti batu )
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 8,675.00
B BAHAN
Kayu Meranti batu 5/7 cm m3 0.0140 4,600,000.00 64,400.00
Reng kayu Meranti batu 2 x 3 cm m3 0.0036 4,550,000.00 16,380.00
Paku Biasa kg 0.2500 16,300.00 4,075.00
JUMLAH HARGA BAHAN 84,855.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 93,530.00
E Overhead & Profit 15% 15% 14,029.50
F Harga Satuan Pekerjaan (D+E) 107,559.00

A.4.6.1.16.h. Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu Kempas )
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 8,675.00
B BAHAN
Kayu Kempas 5/7 cm m3 0.0140 5,650,000.00 79,100.00
Reng kayu Kempas 2 x 3 cm m3 0.0036 5,650,000.00 20,340.00
Paku Biasa kg 0.2500 16,300.00 4,075.00
JUMLAH HARGA BAHAN 103,515.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,190.00
E Overhead & Profit 15% 15% 16,828.50
F Harga Satuan Pekerjaan (D+E) 129,018.00
A.4.6.1.16.i. Pemasangan 1 m2 rangka atap genteng Palentong, kayu kelas II ( Kayu Meranti batu )
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 8,675.00
B BAHAN
Kayu Meranti batu 5/7 cm m3 0.0140 4,600,000.00 64,400.00
Reng kayu Meranti batu 2 x 3 cm m3 0.0036 4,550,000.00 16,380.00
Paku Biasa kg 0.2500 16,300.00 4,075.00
JUMLAH HARGA BAHAN 84,855.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 93,530.00
E Overhead & Profit 15% 15% 14,029.50
F Harga Satuan Pekerjaan (D+E) 107,559.00

A.4.6.1.19.a. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III ( Kayu Meranti batu )
A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang kayu L.02.04 OH 0.3000 40,000.00 12,000.00
Kepala tukang L.03.01 OH 0.0300 45,000.00 1,350.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Mandor L.04.01 OH 0.0750 45,000.00 3,375.00


JUMLAH TENAGA KERJA 22,725.00
B BAHAN
Kayu Meranti batu 5/7 m3 0.0154 4,600,000.00 70,840.00
Paku Biasa kg 0.2000 16,300.00 3,260.00
JUMLAH HARGA BAHAN 74,100.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,825.00
E Overhead & Profit 15% 15% 14,523.75
F Harga Satuan Pekerjaan (D+E) 111,348.00
A.4.6.1.19.b. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III ( Kayu Kempas )
A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang kayu L.02.04 OH 0.3000 40,000.00 12,000.00
Kepala tukang L.03.01 OH 0.0300 45,000.00 1,350.00
Mandor L.04.01 OH 0.0750 45,000.00 3,375.00
JUMLAH TENAGA KERJA 22,725.00
B BAHAN
Kayu Kempas 5/7 m3 0.0154 5,650,000.00 87,010.00
Paku Biasa kg 0.2000 16,300.00 3,260.00
JUMLAH HARGA BAHAN 90,270.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,995.00
E Overhead & Profit 15% 15% 16,949.25
F Harga Satuan Pekerjaan (D+E) 129,944.00

A.4.6.1.22.b. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II ( Kayu Meranti batu )
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 13,125.00
B BAHAN
Kayu Papan Meranti batu m3 0.0110 4,657,000.00 51,227.00
Paku Biasa kg 0.0500 16,300.00 815.00
JUMLAH HARGA BAHAN 52,042.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 65,167.00
E Overhead & Profit 15% 15% 9,775.05
F Harga Satuan Pekerjaan (D+E) 74,942.00

A.4.6.1.23.a. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III ( Kayu Meranti batu )
A TENAGA
Pekerja L.01.01 OH 0.1500 40,000.00 6,000.00
Tukang kayu L.02.04 OH 0.4500 40,000.00 18,000.00
Kepala tukang L.03.01 OH 0.0450 45,000.00 2,025.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 26,385.00
B BAHAN
Balok kayu Meranti batu m3 0.0280 4,657,000.00 130,396.00
Paku Biasa kg 0.1500 16,300.00 2,445.00
JUMLAH HARGA BAHAN 132,841.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 159,226.00
E Overhead & Profit 15% 15% 23,883.90
F Harga Satuan Pekerjaan (D+E) 183,109.00

F.125.b. Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti batu
A TENAGA
Tenaga
Pekerja OH 0.1500 40,000.00 6,000.00
Tukang kayu OH 0.2500 40,000.00 10,000.00
Kepala tukang OH 0.0250 45,000.00 1,125.00
Mandor OH 0.0750 45,000.00 3,375.00
JUMLAH TENAGA KERJA 20,500.00
B BAHAN
Kayu Meranti batu m³ 0.0120 4,600,000.00 55,200.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Paku 5 cm - 10 cm kg 0.1000 16,300.00 1,630.00


JUMLAH HARGA BAHAN 56,830.00
C PERALATAN -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 77,330.00
E. Overhead &and
Profit
profit
15%
15 % 15% 11,599.50
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 88,929.50
F.130 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Kruing
A TENAGA
Tenaga
Pekerja OH 0.0700 40,000.00 2,800.00
Tukang kayu OH 0.2000 40,000.00 8,000.00
Kepala tukang OH 0.0200 45,000.00 900.00
Mandor OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 11,880.00
B BAHAN
Papan Kayu Kruing (2 x 20 x 400) m³ 0.0044 - -
Paku 5 cm - 10 cm kg 0.0100 16,300.00 163.00
JUMLAH HARGA BAHAN 163.00
C PERALATAN -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 12,043.00
E. Overhead &and
Profit
profit
15%
15 % 15% 1,806.45
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 13,849.45
F.130.a Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti batu
A TENAGA
Tenaga
Pekerja OH 0.0700 40,000.00 2,800.00
Tukang kayu OH 0.2000 40,000.00 8,000.00
Kepala tukang OH 0.0200 45,000.00 900.00
Mandor OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 11,880.00
B BAHAN
Papan Kayu Meranti batu (2 x 20 x 400) m³ 0.0044 4,657,000.00 20,490.80
Paku 5 cm - 10 cm kg 0.0100 16,300.00 163.00
JUMLAH HARGA BAHAN 20,653.80
C PERALATAN -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C)
(A+B+C) 32,533.80
E. Overhead &and
Profit
profit
15%
15 % 15% 4,880.07
F. Harga Satuan
satuan pekerjaan
Pekerjaan ((D+E)
D+E) 37,413.87
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
A TENAGA
Pekerja L.01.01 OH 0.0600 40,000.00 2,400.00
Tukang kayu L.02.04 OH 0.6000 40,000.00 24,000.00
Kepala tukang L.03.01 OH 0.0600 45,000.00 2,700.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 29,235.00
B BAHAN
Kunci tanam antik Bh 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 379,235.00
E Overhead & Profit 15% 15% 56,885.25
F Harga Satuan Pekerjaan (D+E) 436,120.00
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
A TENAGA
Pekerja L.01.01 OH 0.0100 40,000.00 400.00
Tukang kayu L.02.04 OH 0.5000 40,000.00 20,000.00
Kepala tukang L.03.01 OH 0.0500 45,000.00 2,250.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 22,875.00
B BAHAN
Kunci tanam biasa Bh 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 202,875.00
E Overhead & Profit 15% 15% 30,431.25
F Harga Satuan Pekerjaan (D+E) 233,306.00
A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi
A TENAGA

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Pekerja L.01.01 OH 0.0050 40,000.00 200.00


Tukang kayu L.02.04 OH 0.5000 40,000.00 20,000.00
Kepala tukang L.03.01 OH 0.0500 45,000.00 2,250.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 22,585.00
B BAHAN
Kunci tanam KM Bh 1.0000 52,000.00 52,000.00
JUMLAH HARGA BAHAN 52,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,585.00
E Overhead & Profit 15% 15% 11,187.75
F Harga Satuan Pekerjaan (D+E) 85,772.00
A.4.6.2.4. Pemasangan 1 buah kunci silinder
A TENAGA
Pekerja L.01.01 OH 0.0050 40,000.00 200.00
Tukang kayu L.02.04 OH 0.5000 40,000.00 20,000.00
Kepala tukang L.03.01 OH 0.0500 45,000.00 2,250.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 22,585.00
B BAHAN
Kunci silinder Bh 1.0000 75,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 97,585.00
E Overhead & Profit 15% 15% 14,637.75
F Harga Satuan Pekerjaan (D+E) 112,222.00
A.4.6.2.5. Pemasangan 1 buah engsel pintu kuningan
A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0008 45,000.00 36.00
JUMLAH TENAGA KERJA 7,311.00
B BAHAN
Engsel pintu kuningan Bh 1.0000 26,000.00 26,000.00
JUMLAH HARGA BAHAN 26,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,311.00
E Overhead & Profit 15% 15% 4,996.65
F Harga Satuan Pekerjaan (D+E) 38,307.00
A.4.6.2.5.a Pemasangan 1 buah engsel pintu Nylon
A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0008 45,000.00 36.00
JUMLAH TENAGA KERJA 7,311.00
B BAHAN
Engsel pintu Nylon Bh 1.0000 17,000.00 17,000.00
JUMLAH HARGA BAHAN 17,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,311.00
E Overhead & Profit 15% 15% 3,646.65
F Harga Satuan Pekerjaan (D+E) 27,957.00
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu kuningan
A TENAGA
Pekerja L.01.01 OH 0.0100 40,000.00 400.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0005 45,000.00 22.50
JUMLAH TENAGA KERJA 4,872.50
B BAHAN
Engsel kupu-kupu kuningan Bh 1.0000 24,000.00 24,000.00
JUMLAH HARGA BAHAN 24,000.00
C PERALATAN -
JUMLAH HARGA ALAT -

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

D Jumlah (A+B+C) 28,872.50


E Overhead & Profit 15% 15% 4,330.88
F Harga Satuan Pekerjaan (D+E) 33,203.00
A.4.6.2.6.a Pemasangan 1 buah engsel jendela kupu-kupu Nylon
A TENAGA
Pekerja L.01.01 OH 0.0100 40,000.00 400.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0005 45,000.00 22.50
JUMLAH TENAGA KERJA 4,872.50
B BAHAN
Engsel kupu-kupu Nylon Bh 1.0000 21,000.00 21,000.00
JUMLAH HARGA BAHAN 21,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 25,872.50
E Overhead & Profit 15% 15% 3,880.88
F Harga Satuan Pekerjaan (D+E) 29,753.00
A.4.6.2.7.a Pemasangan 1 buah engsel angin biasa
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0005 45,000.00 22.50
JUMLAH TENAGA KERJA 12,922.50
B BAHAN
Engsel angin Bh 1.0000 19,000.00 19,000.00
JUMLAH HARGA BAHAN 19,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,922.50
E Overhead & Profit 15% 15% 4,788.38
F Harga Satuan Pekerjaan (D+E) 36,710.00
A.4.6.2.7.b Pemasangan 1 buah engsel angin antik
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Tukang kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0005 45,000.00 22.50
JUMLAH TENAGA KERJA 12,922.50
B BAHAN
Engsel angin antik Bh 1.0000 32,000.00 32,000.00
JUMLAH HARGA BAHAN 32,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,922.50
E Overhead & Profit 15% 15% 6,738.38
F Harga Satuan Pekerjaan (D+E) 51,660.00
A.4.6.2.8. Pemasangan 1 buah spring knip
A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 7,635.00
B BAHAN
Spring knip Bh 1.0000 19,000.00 19,000.00
JUMLAH HARGA BAHAN 19,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,635.00
E Overhead & Profit 15% 15% 3,995.25
F Harga Satuan Pekerjaan (D+E) 30,630.00
A.4.6.2.9.a Pemasangan 1 buah kait angin 6"
A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Mandor L.04.01 OH 0.0080 45,000.00 360.00


JUMLAH TENAGA KERJA 7,635.00
B BAHAN
Kait angin Bh 1.000 7,000.00 7,000.00
JUMLAH HARGA BAHAN 7,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,635.00
E Overhead & Profit 15% 15% 2,195.25
F Harga Satuan Pekerjaan (D+E) 16,830.00
A.4.6.2.9.b Pemasangan 1 buah kait angin 8"
A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 7,635.00
B BAHAN
Kait angin Bh 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,635.00
E Overhead & Profit 15% 15% 2,495.25
F Harga Satuan Pekerjaan (D+E) 19,130.00
A.4.6.2.9.c Pemasangan 1 buah kait angin 10"
A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0080 45,000.00 360.00
JUMLAH TENAGA KERJA 7,635.00
B BAHAN
Kait angin Bh 1.000 17,000.00 17,000.00
JUMLAH HARGA BAHAN 17,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,635.00
E Overhead & Profit 15% 15% 3,695.25
F Harga Satuan Pekerjaan (D+E) 28,330.00
A.4.6.2.10. Pemasangan 1 buah door closer
A TENAGA
Pekerja L.01.01 OH 0.0500 40,000.00 2,000.00
Tukang kayu L.02.04 OH 0.5000 40,000.00 20,000.00
Kepala tukang L.03.01 OH 0.0500 45,000.00 2,250.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 24,385.00
B BAHAN
Door closer set 1.0000 222,000.00 222,000.00
JUMLAH HARGA BAHAN 222,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 246,385.00
E Overhead & Profit 15% 15% 36,957.75
F Harga Satuan Pekerjaan (D+E) 283,342.00
A.4.6.2.11. Pemasangan 1 buah kunci selot
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang kayu L.02.04 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0010 45,000.00 45.00
JUMLAH TENAGA KERJA 9,745.00
B BAHAN
Kunci slot Bh 1.0000 150,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 159,745.00
E Overhead & Profit 15% 15% 23,961.75
F Harga Satuan Pekerjaan (D+E) 183,706.00
A.4.6.2.12. Pemasangan 1 buah Door holder
A TENAGA
Pekerja L.01.01 OH 0.0500 40,000.00 2,000.00
Tukang kayu L.02.04 OH 0.5000 40,000.00 20,000.00
Kepala tukang L.03.01 OH 0.0500 45,000.00 2,250.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 24,385.00
B BAHAN
Door holder Bh 1.000 127,000.00 127,000.00
JUMLAH HARGA BAHAN 127,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 151,385.00
E Overhead & Profit 15% 15% 22,707.75
F Harga Satuan Pekerjaan (D+E) 174,092.00
A.4.6.2.13. Pemasangan 1 buah door stop
A TENAGA
Pekerja L.01.01 OH 0.0100 40,000.00 400.00
Tukang kayu L.02.04 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 5,075.00
B BAHAN
Door stop Bh 1.0000 63,000.00 63,000.00
JUMLAH HARGA BAHAN 63,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,075.00
E Overhead & Profit 15% 15% 10,211.25
F Harga Satuan Pekerjaan (D+E) 78,286.00
A.4.6.2.14. Pemasangan 1 buah Rrel pintu sorong
A TENAGA
Pekerja L.01.01 OH 0.0600 40,000.00 2,400.00
Tukang kayu L.02.04 OH 0.6000 40,000.00 24,000.00
Kepala tukang L.03.01 OH 0.0600 45,000.00 2,700.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 29,235.00
B BAHAN
Rel pintu sorong Set 1.0000 222,000.00 222,000.00
JUMLAH HARGA BAHAN 222,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 251,235.00
E Overhead & Profit 15% 15% 37,685.25
F Harga Satuan Pekerjaan (D+E) 288,920.00
A.4.6.2.15. Pemasangan 1 buah kunci lemari
A TENAGA
Pekerja L.01.01 OH 0.0250 40,000.00 1,000.00
Tukang kayu L.02.04 OH 0.2500 40,000.00 10,000.00
Kepala tukang L.03.01 OH 0.0250 45,000.00 1,125.00
Mandor L.04.01 OH 0.0013 45,000.00 58.50
JUMLAH TENAGA KERJA 12,183.50
B BAHAN
Kunci lemari Set 1.0000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 37,183.50
E Overhead & Profit 15% 15% 5,577.53

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

F Harga Satuan Pekerjaan (D+E) 42,761.00

A.4.6.2.17. Pemasangan 1 m2 kaca bening tebal 5 mm


A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0008 45,000.00 36.00
JUMLAH TENAGA KERJA 7,311.00
B BAHAN
Kaca bening tebal 5 mm m2 1.1000 100,000.00 110,000.00
Sealant Kg 0.0500 22,000.00 1,100.00
JUMLAH HARGA BAHAN 111,100.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 118,411.00
E Overhead & Profit 15% 15% 17,761.65
F Harga Satuan Pekerjaan (D+E) 136,172.00

A.4.6.2.17.c. Pemasangan 1 m2 kaca Es tebal 5 mm


A TENAGA
Pekerja L.01.01 OH 0.0150 40,000.00 600.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0008 45,000.00 36.00
JUMLAH TENAGA KERJA 7,311.00
B BAHAN
Kaca Es tebal 5 mm m2 1.1000 153,000.00 168,300.00
Sealant Kg 0.0500 22,000.00 1,100.00
JUMLAH HARGA BAHAN 169,400.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 176,711.00
E Overhead & Profit 15% 15% 26,506.65
F Harga Satuan Pekerjaan (D+E) 203,217.00

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


A TENAGA
Pekerja L.01.01 OH 0.0750 40,000.00 3,000.00
Tukang kayu L.02.04 OH 0.1500 40,000.00 6,000.00
Kepala tukang L.03.01 OH 0.0150 45,000.00 675.00
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 9,855.00
B BAHAN
Kaca patri 5mm m2 1.1000 547,000.00 601,700.00
Sealant Kg 0.0500 22,000.00 1,100.00
JUMLAH HARGA BAHAN 602,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 612,655.00
E Overhead & Profit 15% 15% 91,898.25
F Harga Satuan Pekerjaan (D+E) 704,553.00
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

A TENAGA
Pekerja L.01.01 OH 0.0400 40,000.00 1,600.00
Tukang cat L.02.08 OH 0.0630 40,000.00 2,520.00
Kepala tukang L.03.01 OH 0.0630 45,000.00 2,835.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 7,090.00
B BAHAN
Teak oil L 0.3600 77,000.00 27,720.00
JUMLAH HARGA BAHAN 27,720.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 34,810.00
E Overhead & Profit 15% 15% 5,221.50
F Harga Satuan Pekerjaan (D+E) 40,031.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur


A TENAGA
Pekerja L.01.01 OH 0.0400 40,000.00 1,600.00
Tukang cat L.02.08 OH 0.0600 40,000.00 2,400.00
Kepala tukang L.03.01 OH 0.0160 45,000.00 720.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 4,855.00
B BAHAN
Politur L 0.1500 72,000.00 10,800.00
Politur jadi L 0.3720 77,000.00 28,644.00
Ampelas Lbr 2.0000 5,600.00 11,200.00
JUMLAH HARGA BAHAN 50,644.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 55,499.00
E Overhead & Profit 15% 15% 8,324.85
F Harga Satuan Pekerjaan (D+E) 63,823.00
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
A TENAGA
Pekerja L.01.01 OH 0.1000 40,000.00 4,000.00
Mandor L.04.01 OH 0.0060 45,000.00 270.00
JUMLAH TENAGA KERJA 4,270.00
B BAHAN
Residu atau ter L 0.3500 26,000.00 9,100.00
JUMLAH HARGA BAHAN 9,100.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,370.00
E Overhead & Profit 15% 15% 2,005.50
F Harga Satuan Pekerjaan (D+E) 15,375.00

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang cat L.02.08 OH 0.0630 40,000.00 2,520.00
Kepala tukang L.03.01 OH 0.0063 45,000.00 283.50
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 3,738.50
B BAHAN
Plamuur tembok Kg 0.1000 21,500.00 2,150.00
Cat dasar Tembok Kg 0.1000 51,000.00 5,100.00
Cat Penutup Tembok Kg 0.2600 51,000.00 13,260.00
JUMLAH HARGA BAHAN 20,510.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,248.50
E Overhead & Profit 15% 15% 3,637.28
F Harga Satuan Pekerjaan (D+E) 27,885.00
A.4.7.1.10.a. Pengecatan 1 m2 plafond baru menggunakan perancah ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang cat L.02.08 OH 0.0630 40,000.00 2,520.00
Kepala tukang L.03.01 OH 0.0063 45,000.00 283.50
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 3,738.50
B BAHAN
Plamuur tembok Kg 0.1000 21,500.00 2,150.00
Cat dasar Tembok Kg 0.1000 51,000.00 5,100.00
Cat Penutup Tembok Kg 0.2600 51,000.00 13,260.00
Perancah kayu m3 0.0020 1,909,000.00 3,818.00
JUMLAH HARGA BAHAN 24,328.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 28,066.50

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

E Overhead & Profit 15% 15% 4,209.98


F Harga Satuan Pekerjaan (D+E) 32,276.00
A.4.7.1.10.c Pengecatan 1 m2 tembok baru luar ( Wheather Shield ) ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang cat L.02.08 OH 0.0630 40,000.00 2,520.00
Kepala tukang L.03.01 OH 0.0063 45,000.00 283.50
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 3,738.50
B BAHAN
Plamuur tembok Kg 0.1000 21,500.00 2,150.00
Cat dasar Tembok Kg 0.1000 51,000.00 5,100.00
Cat Penutup Tembok Kg 0.2600 284,000.00 73,840.00
JUMLAH HARGA BAHAN 81,090.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 84,828.50
E Overhead & Profit 15% 15% 12,724.28
F Harga Satuan Pekerjaan (D+E) 97,552.00
A.4.7.1.10.d Pengecatan 1 m2 tembok pelapis anti bocor ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang cat L.02.08 OH 0.0630 40,000.00 2,520.00
Kepala tukang L.03.01 OH 0.0063 45,000.00 283.50
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 3,738.50
B BAHAN
Plamuur tembok Kg 0.1000 21,500.00 2,150.00
Cat dasar Tembok Kg 0.1000 51,000.00 5,100.00
Cat Penutup Tembok Kg 0.2600 67,000.00 17,420.00
JUMLAH HARGA BAHAN 24,670.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 28,408.50
E Overhead & Profit 15% 15% 4,261.28
F Harga Satuan Pekerjaan (D+E) 32,669.00
A.4.7.1.10.e. Pengecatan 1 m2 plafond lama menggunakan perancah (1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang cat L.02.08 OH 0.0630 40,000.00 2,520.00
Kepala tukang L.03.01 OH 0.0063 45,000.00 283.50
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 3,738.50
B BAHAN
Cat Penutup Tembok Kg 0.2600 51,000.00 13,260.00
Perancah kayu m3 0.0020 1,909,000.00 3,818.00
JUMLAH HARGA BAHAN 17,078.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,816.50
E Overhead & Profit 15% 15% 3,122.48
F Harga Satuan Pekerjaan (D+E) 23,938.00
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01.01 OH 0.0280 40,000.00 1,120.00
Tukang cat L.02.08 OH 0.0420 40,000.00 1,680.00
Kepala tukang L.03.01 OH 0.0042 45,000.00 189.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 3,124.00
B BAHAN
Cat dasar Tembok Kg 0.1200 51,000.00 6,120.00
Cat Penutup Tembok Kg 0.1800 51,000.00 9,180.00
JUMLAH HARGA BAHAN 15,300.00
C PERALATAN -
JUMLAH HARGA ALAT -

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

D Jumlah (A+B+C) 18,424.00


E Overhead & Profit 15% 15% 2,763.60
F Harga Satuan Pekerjaan (D+E) 21,187.00
A.4.7.1.15. Pemasangan 1 m2 wallpaper
A TENAGA
Pekerja L.01.01 OH 0.0200 40,000.00 800.00
Tukang cat L.02.08 OH 0.2000 40,000.00 8,000.00
Kepala tukang L.03.01 OH 0.0200 45,000.00 900.00
Mandor L.04.01 OH 0.0025 45,000.00 112.50
JUMLAH TENAGA KERJA 9,812.50
B BAHAN
Wallpaper m2 1.2000 - -
Lem Kayu/Karet Kg 0.2000 34,000.00 6,800.00
JUMLAH HARGA BAHAN 6,800.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,612.50
E Overhead & Profit 15% 15% 2,491.88
F Harga Satuan Pekerjaan (D+E) 19,104.00

A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk standart
A TENAGA
Pekerja L.01.01 OH 3.3000 40,000.00 132,000.00
Tukang batu L.02.03 OH 1.1000 40,000.00 44,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.1600 45,000.00 7,200.00
JUMLAH TENAGA KERJA 183,650.00
B BAHAN
Closet duduk Unit 1.0000 1,100,000.00 1,100,000.00
Perlengkapan % 0.0600 1,100,000.00 66,000.00
JUMLAH HARGA BAHAN 2,200,000.00 66,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 799,650.00
E Overhead & Profit 15% 15% 119,947.50
F Harga Satuan Pekerjaan (D+E) 919,597.00
A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen
A TENAGA
Pekerja L.01.01 OH 1.0000 40,000.00 40,000.00
Tukang batu L.02.03 OH 1.5000 40,000.00 60,000.00
Kepala tukang L.03.01 OH 0.1500 45,000.00 6,750.00
Mandor L.04.01 OH 0.1600 45,000.00 7,200.00
JUMLAH TENAGA KERJA 113,950.00
B BAHAN
Closet jongkok standart Unit 1.0000 288,000.00 288,000.00
Semen portland Kg 6.0000 1,160.00 6,960.00
Pasir pasang M3 0.0100 233,000.00 2,330.00
JUMLAH HARGA BAHAN 297,290.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 411,240.00
E Overhead & Profit 15% 15% 61,686.00
F Harga Satuan Pekerjaan (D+E) 472,926.00
A.5.1.1 4. (K3) Pemasangan 1 buah urinoir
A TENAGA
Pekerja L.01.01 OH 1.0000 40,000.00 40,000.00
Tukang batu L.02.03 OH 1.0000 40,000.00 40,000.00
Kepala tukang L.03.01 OH 0.1000 45,000.00 4,500.00
Mandor L.04.01 OH 0.0500 45,000.00 2,250.00
JUMLAH TENAGA KERJA 86,750.00
B BAHAN
Urinoir otomatis Unit 1.0000 1,279,000.00 1,279,000.00
Semen portland Kg 6.0000 1,160.00 6,960.00
Pasir pasang M3 0.0100 233,000.00 2,330.00
Perlengkapan % 30.0000 12,882.90 386,487.00
JUMLAH HARGA BAHAN 1,674,777.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,761,527.00
E Overhead & Profit 15% 15% 264,229.05
F Harga Satuan Pekerjaan (D+E) 2,025,756.00
A.5.1.1 5. (K3) Pemasangan 1 buah wastafel
A TENAGA
Pekerja L.01.01 OH 1.2000 40,000.00 48,000.00
Tukang batu L.02.03 OH 1.4500 40,000.00 58,000.00
Kepala tukang L.03.01 OH 0.1500 45,000.00 6,750.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Mandor L.04.01 OH 0.0600 45,000.00 2,700.00


JUMLAH TENAGA KERJA 115,450.00
B BAHAN
Wastafel Unit 1.2000 1,083,000.00 1,299,600.00
Semen portland Kg 6.0000 1,160.00 6,960.00
Pasir pasang M3 0.0100 233,000.00 2,330.00
Perlengkapan % 12.0000 13,088.90 157,066.80
JUMLAH HARGA BAHAN 1,465,956.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,581,406.80
E Overhead & Profit 15% 15% 237,211.02
F Harga Satuan Pekerjaan (D+E) 1,818,617.00

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel


A TENAGA
Pekerja L.01.01 OH 0.0300 40,000.00 1,200.00
Tukang batu L.02.03 OH 0.3000 40,000.00 12,000.00
Kepala tukang L.03.01 OH 0.0300 45,000.00 1,350.00
Mandor L.04.01 OH 0.0150 45,000.00 675.00
JUMLAH TENAGA KERJA 15,225.00
B BAHAN
Bak cuci piring Unit 1.0000 206,000.00 206,000.00
Waterdrain ( aksesoris lengkap 35 % ) Bh 1.0000 72,100.00 72,100.00
JUMLAH HARGA BAHAN 278,100.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 293,325.00
E Overhead & Profit 15% 15% 43,998.75
F Harga Satuan Pekerjaan (D+E) 337,323.00
A.5.1.1 14. Pemasangan 1 buah floor drain
A TENAGA
Pekerja L.01.01 OH 0.0100 40,000.00 400.00
Tukang batu L.02.03 OH 0.1000 40,000.00 4,000.00
Kepala tukang L.03.01 OH 0.0100 45,000.00 450.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 5,075.00
B BAHAN
Floor drain Unit 1.0000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 12,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,075.00
E Overhead & Profit 15% 15% 2,561.25
F Harga Satuan Pekerjaan (D+E) 19,636.00
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A TENAGA
Pekerja L.01.01 OH 2.1600 40,000.00 86,400.00
Tukang batu L.02.03 OH 0.7200 40,000.00 28,800.00
Kepala tukang L.03.01 OH 0.0720 45,000.00 3,240.00
Mandor L.04.01 OH 0.0110 45,000.00 495.00
JUMLAH TENAGA KERJA 118,935.00
B BAHAN
Bata merah bh 40.0000 850.00 34,000.00
Semen portland Kg 44.0000 1,160.00 51,040.00
Pasir pasang M3 0.0700 233,000.00 16,310.00
Pasir beton M3 0.0600 233,000.00 13,980.00
Kerikil M3 0.0700 444,000.00 31,080.00
Baja tulangan Kg 1.6000 11,700.00 18,720.00
JUMLAH HARGA BAHAN 165,130.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 284,065.00
E Overhead & Profit 15% 15% 42,609.75
F Harga Satuan Pekerjaan (D+E) 326,674.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm
A TENAGA

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Pekerja L.01.01 OH 3.2000 40,000.00 128,000.00


Tukang batu L.02.03 OH 1.1500 40,000.00 46,000.00
Kepala tukang L.03.01 OH 0.0110 45,000.00 495.00
Mandor L.04.01 OH 0.0160 45,000.00 720.00
JUMLAH TENAGA KERJA 175,215.00
B BAHAN
Bata merah bh 70.0000 850.00 59,500.00
Semen portland Kg 77.0000 1,160.00 89,320.00
Pasir pasang M3 0.1300 233,000.00 30,290.00
Pasir beton M3 0.0900 233,000.00 20,970.00
Kerikil M3 0.0200 444,000.00 8,880.00
Baja tulangan Kg 2.6000 11,700.00 30,420.00
JUMLAH HARGA BAHAN 239,380.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 414,595.00
E Overhead & Profit 15% 15% 62,189.25
F Harga Satuan Pekerjaan (D+E) 476,784.00
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm
A TENAGA
Pekerja L.01.01 OH 3.2000 40,000.00 128,000.00
Tukang batu L.02.03 OH 1.1500 40,000.00 46,000.00
Kepala tukang L.03.01 OH 0.0110 45,000.00 495.00
Mandor L.04.01 OH 0.0160 45,000.00 720.00
JUMLAH TENAGA KERJA 175,215.00
B BAHAN
Bata merah bh 123.0000 850.00 104,550.00
Semen portland Kg 114.0000 1,160.00 132,240.00
Pasir pasang M3 0.1840 233,000.00 42,872.00
Pasir beton M3 0.1200 233,000.00 27,960.00
Kerikil M3 0.0330 444,000.00 14,652.00
Baja tulangan Kg 4.8500 11,700.00 56,745.00
JUMLAH HARGA BAHAN 379,019.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 554,234.00
E Overhead & Profit 15% 15% 83,135.10
F Harga Satuan Pekerjaan (D+E) 637,369.00
A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”
A TENAGA
Pekerja L.01.01 OH 0.0540 40,000.00 2,160.00
Tukang batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0090 45,000.00 405.00
Mandor L.04.01 OH 0.0270 45,000.00 1,215.00
JUMLAH TENAGA KERJA 7,380.00
B BAHAN
Pipa galvanis ½” M 1.2000 - -
Perlengkapan % 35.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,380.00
E Overhead & Profit 15% 15% 1,107.00
F Harga Satuan Pekerjaan (D+E) 8,487.00
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4”
A TENAGA
Pekerja L.01.01 OH 0.0100 40,000.00 400.00
Tukang batu L.02.03 OH 0.4000 40,000.00 16,000.00
Kepala tukang L.03.01 OH 0.0400 45,000.00 1,800.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 18,425.00
B BAHAN
Kran air M 1.0000 31,000.00 31,000.00
Sealtape Buah 0.0250 - -
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,425.00
E Overhead & Profit 15% 15% 7,413.75
F Harga Satuan Pekerjaan (D+E) 56,838.00
A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4”
A TENAGA

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Pekerja L.01.01 OH 0.0540 40,000.00 2,160.00


Tukang batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0090 45,000.00 405.00
Mandor L.04.01 OH 0.0270 45,000.00 1,215.00
JUMLAH TENAGA KERJA 7,380.00
B BAHAN
Pipa galvanis 3/4” M 1.2000 23,500.00 28,200.00
Perlengkapan % 35.0000 282.00 9,870.00
JUMLAH HARGA BAHAN 38,070.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,450.00
E Overhead & Profit 15% 15% 6,817.50
F Harga Satuan Pekerjaan (D+E) 52,267.00
A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”
A TENAGA
Pekerja L.01.01 OH 0.0540 40,000.00 2,160.00
Tukang batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0090 45,000.00 405.00
Mandor L.04.01 OH 0.0270 45,000.00 1,215.00
JUMLAH TENAGA KERJA 7,380.00
B BAHAN
Pipa galvanis 1” M 1.2000 - -
Perlengkapan % 35.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,380.00
E Overhead & Profit 15% 15% 1,107.00
F Harga Satuan Pekerjaan (D+E) 8,487.00
A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”
A TENAGA
Pekerja L.01.01 OH 0.1080 40,000.00 4,320.00
Tukang batu L.02.03 OH 0.1800 40,000.00 7,200.00
Kepala tukang L.03.01 OH 0.0180 45,000.00 810.00
Mandor L.04.01 OH 0.0050 45,000.00 225.00
JUMLAH TENAGA KERJA 12,555.00
B BAHAN
Pipa galvanis 1 1/2” M 1.2000 48,000.00 57,600.00
Perlengkapan % 35.0000 576.00 20,160.00
JUMLAH HARGA BAHAN 77,760.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,315.00
E Overhead & Profit 15% 15% 13,547.25
F Harga Satuan Pekerjaan (D+E) 103,862.00

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


A TENAGA
Pekerja L.01.01 OH 0.0360 40,000.00 1,440.00
Tukang batu L.02.03 OH 0.0600 40,000.00 2,400.00
Kepala tukang L.03.01 OH 0.0060 45,000.00 270.00
Mandor L.04.01 OH 0.0020 45,000.00 90.00
JUMLAH TENAGA KERJA 4,200.00
B BAHAN
Pipa PVC 1/2” M 1.2000 5,000.00 6,000.00
Perlengkapan % 35.0000 60.00 2,100.00
JUMLAH HARGA BAHAN 8,100.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 12,300.00
E Overhead & Profit 15% 15% 1,845.00
F Harga Satuan Pekerjaan (D+E) 14,145.00
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”
A TENAGA
Pekerja L.01.01 OH 0.0360 40,000.00 1,440.00
Tukang batu L.02.03 OH 0.0600 40,000.00 2,400.00
Kepala tukang L.03.01 OH 0.0060 45,000.00 270.00
Mandor L.04.01 OH 0.0020 45,000.00 90.00
JUMLAH TENAGA KERJA 4,200.00
B BAHAN
Pipa PVC 3/4” M 1.2000 7,000.00 8,400.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

Perlengkapan % 35.0000 84.00 2,940.00


JUMLAH HARGA BAHAN 11,340.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,540.00
E Overhead & Profit 15% 15% 2,331.00
F Harga Satuan Pekerjaan (D+E) 17,871.00
A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”
A TENAGA
Pekerja L.01.01 OH 0.0360 40,000.00 1,440.00
Tukang batu L.02.03 OH 0.0600 40,000.00 2,400.00
Kepala tukang L.03.01 OH 0.0060 45,000.00 270.00
Mandor L.04.01 OH 0.0020 45,000.00 90.00
JUMLAH TENAGA KERJA 4,200.00
B BAHAN
Pipa PVC 1” M 1.2000 10,000.00 12,000.00
Perlengkapan % 35.0000 120.00 4,200.00
JUMLAH HARGA BAHAN 16,200.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,400.00
E Overhead & Profit 15% 15% 3,060.00
F Harga Satuan Pekerjaan (D+E) 23,460.00
A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 1/2”
A TENAGA
Pekerja L.01.01 OH 0.0540 40,000.00 2,160.00
Tukang batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0090 45,000.00 405.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 6,300.00
B BAHAN
Pipa PVC 1 1/2” M 1.2000 16,000.00 19,200.00
Perlengkapan % 35.0000 192.00 6,720.00
JUMLAH HARGA BAHAN 25,920.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,220.00
E Overhead & Profit 15% 15% 4,833.00
F Harga Satuan Pekerjaan (D+E) 37,053.00
A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”
A TENAGA
Pekerja L.01.01 OH 0.0540 40,000.00 2,160.00
Tukang batu L.02.03 OH 0.0900 40,000.00 3,600.00
Kepala tukang L.03.01 OH 0.0090 45,000.00 405.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 6,300.00
B BAHAN
Pipa PVC 2” M 1.2000 21,000.00 25,200.00
Perlengkapan % 35.0000 252.00 8,820.00
JUMLAH HARGA BAHAN 34,020.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,320.00
E Overhead & Profit 15% 15% 6,048.00
F Harga Satuan Pekerjaan (D+E) 46,368.00
A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”
A TENAGA
Pekerja L.01.01 OH 0.0810 40,000.00 3,240.00
Tukang batu L.02.03 OH 0.1350 40,000.00 5,400.00
Kepala tukang L.03.01 OH 0.0135 45,000.00 607.50
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 9,427.50
B BAHAN
Pipa PVC 21/2” M 1.2000 31,000.00 37,200.00
Perlengkapan % 35.0000 372.00 13,020.00
JUMLAH HARGA BAHAN 50,220.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,647.50
E Overhead & Profit 15% 15% 8,947.13
F Harga Satuan Pekerjaan (D+E) 68,594.00
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
1 2 3 4 5 6 7

A TENAGA
Pekerja L.01.01 OH 0.0810 40,000.00 3,240.00
Tukang batu L.02.03 OH 0.1350 40,000.00 5,400.00
Kepala tukang L.03.01 OH 0.0135 45,000.00 607.50
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 9,427.50
B BAHAN
Pipa PVC 3” M 1.2000 42,000.00 50,400.00
Perlengkapan % 35.0000 504.00 17,640.00
JUMLAH HARGA BAHAN 68,040.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 77,467.50
E Overhead & Profit 15% 15% 11,620.13
F Harga Satuan Pekerjaan (D+E) 89,087.00
A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
A TENAGA
Pekerja L.01.01 OH 0.0810 40,000.00 3,240.00
Tukang batu L.02.03 OH 0.1350 40,000.00 5,400.00
Kepala tukang L.03.01 OH 0.0135 45,000.00 607.50
Mandor L.04.01 OH 0.0040 45,000.00 180.00
JUMLAH TENAGA KERJA 9,427.50
B BAHAN
Pipa PVC 4” M 1.2000 65,000.00 78,000.00
Perlengkapan % 35.0000 780.00 27,300.00
JUMLAH HARGA BAHAN 105,300.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 114,727.50
E Overhead & Profit 15% 15% 17,209.13
F Harga Satuan Pekerjaan (D+E) 131,936.00

J.1. PEKERJAAN SANITASI


J.039. Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor tipe kecil)
Galian Tanah ( A.2.3.1.1) m³ 4.5000 35,793.00 161,068.50
Urugan Pasir urug (A.2.3.11) m³ 0.2142 178,537.00 38,242.63
Lantai kerja beton 1:3:5 (G.042) m² 2.2500 967,201.00 2,176,202.25
Pas. Batu bata 1 PC : 2 PS + Plesteran (A.4.4.1.1) m² 15.0000 296,952.00 4,454,280.00
Plat beton bertulang 1:2:3 penutup dan balok (A.4.1.1.28) m³ 0.3375 4,049,092.00 1,366,568.55
Pipa PVC 4" jenis AW + sambungan (A.5.1.1.24) m' 9.0000 131,936.00 1,187,424.00
Pipa GIP 1 1/2" (A.5.1.1.22) m' 1.2000 103,862.00 124,634.40
Galian tanah untuk rembesan (A.2.3.1.1) m³ 3.3750 35,793.00 120,801.38
Pasang Ijuk (A.2.3.1.13) kg 5.4000 145,676.00 786,650.40
Urugan kerikil 3-5 cm. (A.2.3.1.14) m³ 1.0500 254,293.00 267,007.65
Pipa PVC 4" berlobang jenis AW (A.5.1.1.24) m' 5.0000 131,936.00 659,680.00
Urugan kembali perataan tanah (A.2.3.1.9) m³ 1.1250 12,793.00 14,392.13
Tambahan upah ls 0.0920 500,000.00 46,000.00
Jumlah 11,402,951.88
Dibulatkan 11,402,951.00

A.4.2.1.21.a Pemasangan 1 m2 rangka plafond menggunakan besi hollow 1x40.40.1,2mm, modul 60 x 120 cm.
A TENAGA
Pekerja L.01.01 OH 0.3500 40,000.00 14,000.00
Tukang Besi L.02.05 OH 0.3500 40,000.00 14,000.00
Kepala Tukang L.03.01 OH 0.0350 45,000.00 1,575.00
Mandor L.04.01 OH 0.0180 45,000.00 810.00
JUMLAH TENAGA KERJA 30,385.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 33,030.00 132,120.00
Assesoris (perkuatan, las dll) Ls 100 %xrgk 33,030.00 33,030.00
JUMLAH HARGA BAHAN 165,150.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 195,535.00
E Overhead & Profit 15% 15% 29,330.25
F Harga Satuan Pekerjaan (D+E) 224,865.00
A.4.5.1.9.b. Pemasangan 1 m’ list langit-langit gypsum profil 15 cm
A TENAGA
Pekerja L.01.01 OH 0.0500 40,000.00 2,000.00
Tukang Kayu L.02.04 OH 0.0500 40,000.00 2,000.00
Kepala tukang L.03.01 OH 0.0050 45,000.00 225.00
Mandor L.04.01 OH 0.0030 45,000.00 135.00
JUMLAH TENAGA KERJA 4,360.00
B BAHAN
List gypsum profil 15 cm m 1.0500 8,500.00 8,925.00
Tepung gypsum kg 0.0100 4,000.00 40.00
JUMLAH HARGA BAHAN 8,965.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,325.00
E Overhead & Profit 15% 15% 1,998.75
F Harga Satuan Pekerjaan (D+E) 15,323.00

Analisa Harga Satuan Pekerjaan 2019 80 dari 80


HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2019

HARGA SATUAN
No. NOMOR ANALISA JENIS PEKERJAAN SATUAN
( Rp. )

1 2 3 4 5
(K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
1 A.2.2.1.2. m² 616,048.00
meter
A.2.3.1. HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m³ 35,793.00
2 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m m³ 43,728.00
3 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m m³ 47,656.00
4 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m m³ 72,105.00
5 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M m³ 12,793.00
6 A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) m³ 25,587.00
7 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m³ 178,537.00
8 A.2.3.1.11.a Pengurugan 1 m3 dengan tanah urug biasa m³ 199,237.00
9 A.2.3.1.11.b Pengurugan 1 m3 dengan tanah urug pilihan m³ 225,457.00
10 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan m² 145,676.00
11 A.2.3.1.14. Pengurugan 1 m3 sirtu padat m³ 254,293.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP m³ 873,626.00
2 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP m³ 801,391.00
3 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m³ 479,915.00

A.4.1.1. HARGA SATUAN PEKERJAAN BETON

1 A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) m³ 980,319.00


2 A.4.1.1.2. Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125) m³ 1,016,074.00
3 A.4.1.1.3. Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150) m³ 1,043,097.00
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6)
4 A.4.1.1.4. m³ 946,208.00
cm, w/c = 0,87
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c
5 A.4.1.1.5. m³ 1,076,189.00
= 0,66
Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm,
6 A.4.1.1.6. m³ 1,106,080.00
w/c = 0,61
Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm,
7 A.4.1.1.7. m³ 1,131,161.00
w/c = 0,58
Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm,
8 A.4.1.1.8. m³ 1,144,329.00
w/c = 0,56
Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm,
9 A.4.1.1.9. m³ 1,167,229.00
w/c = 0,53
Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm,
10 A.4.1.1.10. m³ 1,174,102.00
w/c = 0,52
Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm,
11 A.4.1.1.11. m³ 1,226,658.00
w/c = 0,49
Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm,
12 A.4.1.1.12. m³ 1,235,820.00
w/c = 0,48
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan
m³ 1,479,045.00
tambahan sesuai Tabel berikut:
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir =

20%
1 A.4.1.1.17.a Pembesian 1 kg dengan besi polos atau besi ulir kg 15,185.00
2 A.4.1.1.18. Pemasangan 10 kg kabel presstressed polos/strands kg 148,672.00
3 A.4.1.1.20. (K3) Pemasangan 1 m2 bekisting untuk pondasi m² 134,251.00
4 A.4.1.1.21. (K3) Pemasangan 1 m2 bekisting untuk sloof m² 145,463.00
5 A.4.1.1.22. (K3) Pemasangan 1 m2 bekisting untuk kolom m² 401,706.00

Harga Satuan Pekerjaan 2019 80 dari 80


HARGA SATUAN
No. NOMOR ANALISA JENIS PEKERJAAN SATUAN
( Rp. )

1 2 3 4 5
(K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
1 A.2.2.1.2. m² 616,048.00
meter
6 A.4.1.1.23. (K3) Pemasangan 1 m2 bekisting untuk balok m² 417,576.00
7 A.4.1.1.24. (K3) Pemasangan 1 m2 bekisting untuk lantai m² 594,906.00
8 A.4.1.1.25. (K3) Pemasangan 1 m2 bekisting untuk dinding m² 463,231.00
9 A.4.1.1.26. (K3) Pemasangan 1 m2 bekisting untuk tangga m² 379,103.00
10 A.4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton m² 104,471.00
11 A.4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) m³ 4,049,092.00
12 A.4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) m³ 4,988,642.00
13 A.4.1.1.30. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) m³ 9,428,033.00
14 A.4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) m³ 7,310,015.00
15 A.4.1.1.32. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) m³ 7,166,012.00
16 A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m³ 6,592,237.00
17 A.4.1.1.34. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) m³ 6,759,826.00
18 A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m' 83,383.00
19 A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m' 97,925.00

A.4.1.2. HARGA SATUAN PEKERJAAN BETON PRACETAK


(K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175)
20 A.4.1.2.1. m² 86,101.00
slump (120 ± 20) mm
(K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K
21 A.4.1.2.2. m² 107,636.00
175) slump (120 ± 20) mm
(K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K
22 A.4.1.2.3. m² 119,788.00
175) slump (120 ± 20) mm
(K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K
23 A.4.1.2.4. m² 161,458.00
175) slump (120 ± 20) mm
24 A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak titik 91,957.00
25 A.4.1.2.24. Upah 1 titik Join dengan Sling titik 30,929.00

G.1. PEKERJAAN BETON SNI 7394 : 2002


Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR menggunakan batu split
26 G.042. m³ 967,201.00
pecah mesin
Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR menggunakan batu split
27 G.043. m³ 961,532.00
pecah mesin

G.2. PEKERJAAN BETON SNI 7394 : 2008


Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu
28 G.046. m³ 1,120,709.00
pecah mesin

1 G.58. Memasang 1 m2 bekisting dengan papan m² 223,847.00

1 B.13.a.1. Menghamparkan 1 m³ beton mutu K-125 (ready mix) m³ 1,287,407.00


2 B.13.a.2. Menghamparkan 1 m³ beton mutu K-175 (ready mix) m³ 1,347,230.00
3 B.13.a.3. Menghamparkan 1 m³ beton mutu K-225 (ready mix) m³ 1,475,087.00
4 B.35 Membongkar 1 m2 begisting cara biasa dan membereskan puing - puing m² 2,047.00
5 B.37.a Menggenangi air 1 m2 permukaan beton m² 3,263.00
6 B.38.d Menyirami 1 m2 Beton dengan air selama 4 hari m² 12,471.00

1 A.4.2.1.1. Pemasangan 1 kg besi profil kg #REF!


2 A.4.2.1.1.a Pemasangan 1 kg besi plat kg #REF!
3 A.4.2.1.3.a Pengerjaan 1 kg pekerjaan perakitan kg #REF!
4 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium m² #REF!
5 A.4.2.1.11.a Pemasangan 1 m' kusen pintu alluminium putih m' #REF!
6 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m² #REF!
7 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m² #REF!
8 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m' 123,957.00
Pemasangan 1 m2 rangka plafond menggunakan besi hollow
9 A.4.2.1.21.a m² 224,865.00
1x40.40.1,2mm, modul 60 x 120 cm.

Harga Satuan Pekerjaan 2019 80 dari 80


HARGA SATUAN
No. NOMOR ANALISA JENIS PEKERJAAN SATUAN
( Rp. )

1 2 3 4 5
(K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
1 A.2.2.1.2. m² 616,048.00
meter

Harga Satuan Pekerjaan 2019 80 dari 80


HARGA SATUAN
No. NOMOR ANALISA JENIS PEKERJAAN SATUAN
( Rp. )

1 2 3 4 5
(K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
1 A.2.2.1.2. m² 616,048.00
meter
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu


1 A.4.4.1.8. m² 118,006.00
campuran 1 SP : 3 PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran
2 A.4.4.1.10. m² 113,089.00
1 SP : 5 PP
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.3. Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 15mm. m² 38,788.00
2 A.4.4.2.5. Pemasangan 1 m2 plesteran 1 SP : 5 PP tebal 15 mm m² 36,134.00
3 A.4.4.2.27. Pemasangan 1 m2 acian. m² 19,170.00
A.4.4.3.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 A.4.4.3.35.a. Pemasangan 1m2 lantai keramik motif ukuran 30 cm x 30 cm m² 169,536.00
2 A.4.4.3.35.b. Pemasangan 1m2 lantai keramik motif granit ukuran 30 cm x 30 cm m² 305,905.00

3 A.4.4.3.35.g. Pemasangan 1m2 lantai keramik motif ukuran 60 cm x 60 cm m² 254,102.00


4 A.4.4.3.35.h. Pemasangan 1m2 lantai keramik motif granit ukuran 60 cm x 60 cm m² 269,503.00
5 A.4.4.3.54.d. Pemasangan 1 m2 dinding keramik motif 30 cm x 60 cm m² 222,676.00
6 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam ukuran kecil ( tidak beraturan ) m² 279,375.00
7 A.4.4.3.58.a. Pemasangan 1 m2 dinding batu tempel hitam ukuran besar ( tidak beraturan ) m² 269,255.00
8 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm m² 34,908.00

A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm,
1 A.4.5.1.7. m² 40,450.00
tebal 9 mm
2 A.4.5.1.9.b. Pemasangan 1 m’ list langit-langit gypsum profil 15 cm m' 15,323.00
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
1
A.4.5.2.3.b. Pemasangan 1 m2 atap genteng Morando glazuur m² 106,398.00
3
A.4.5.2.6.b. Pemasangan 1 m’ bubung genteng Morando glazuur m' 80,184.00
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau
1 A.4.6.1.19.b. m² 129,944.00
III ( Kayu Kempas )

A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik bh 436,120.00
2 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa bh 233,306.00
3 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi bh 85,772.00
4 A.4.6.2.4. Pemasangan 1 buah kunci silinder bh 112,222.00
5 A.4.6.2.5. Pemasangan 1 buah engsel pintu kuningan bh 38,307.00
6 A.4.6.2.5.a Pemasangan 1 buah engsel pintu Nylon bh 27,957.00
7 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu kuningan bh 33,203.00
8 A.4.6.2.6.a Pemasangan 1 buah engsel jendela kupu-kupu Nylon bh 29,753.00
9 A.4.6.2.7.a Pemasangan 1 buah engsel angin biasa bh 36,710.00
10 A.4.6.2.7.b Pemasangan 1 buah engsel angin antik bh 51,660.00
11 A.4.6.2.8. Pemasangan 1 buah spring knip bh 30,630.00
12 A.4.6.2.9.a Pemasangan 1 buah kait angin 6" bh 16,830.00
13 A.4.6.2.9.b Pemasangan 1 buah kait angin 8" bh 19,130.00
14 A.4.6.2.9.c Pemasangan 1 buah kait angin 10" bh 28,330.00
15 A.4.6.2.10. Pemasangan 1 buah door closer bh 283,342.00
16 A.4.6.2.11. Pemasangan 1 buah kunci selot bh 183,706.00
17 A.4.6.2.12. Pemasangan 1 buah Door holder bh 174,092.00
18 A.4.6.2.13. Pemasangan 1 buah door stop bh 78,286.00
19 A.4.6.2.14. Pemasangan 1 buah Rrel pintu sorong bh 288,920.00

Harga Satuan Pekerjaan 2019 80 dari 80


HARGA SATUAN
No. NOMOR ANALISA JENIS PEKERJAAN SATUAN
( Rp. )

1 2 3 4 5
(K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
1 A.2.2.1.2. m² 616,048.00
meter
20 A.4.6.2.15. Pemasangan 1 buah kunci lemari bh 42,761.00
21 A.4.6.2.17. Pemasangan 1 m2 kaca bening tebal 5 mm m² 136,172.00

A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m² 63,823.00
2 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m² 15,375.00
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis
3 A.4.7.1.10. m² 27,885.00
cat penutup)
Pengecatan 1 m2 plafond baru menggunakan perancah ( 1lapis plamuur, 1
4 A.4.7.1.10.a. m² 32,276.00
lapis cat dasar, 2 lapis cat penutup)
Pengecatan 1 m2 tembok baru luar ( Wheather Shield ) ( 1lapis plamuur, 1
5 A.4.7.1.10.c m² 97,552.00
lapis cat dasar, 2 lapis cat penutup)

A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk standart bh 919,597.00
2 A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen bh 472,926.00
3 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel bh 1,818,617.00
5 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel bh 337,323.00
6 A.5.1.1 14. Pemasangan 1 buah floor drain bh 19,636.00

7 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm bh 476,784.00
8 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” m' 14,145.00
9 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m' 17,871.00
10 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m' 23,460.00
11 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 1/2” m' 37,053.00
12 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m' 46,368.00
13 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” m' 68,594.00

14 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m' 89,087.00


15 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m' 131,936.00
J.1. PEKERJAAN SANITASI
Membuat 1 unit septic tank ukuran 2 x 1,5 x 1,5 m + rembesan (kantor tipe
1 J.039. unit 11,402,951.00
kecil)

Harga Satuan Pekerjaan 2019 80 dari 80


BACK UP PERHTUNGAN VOLUME
sketch ga Perhitungan Volume

- Pekerjaan Tanah

PAVING
A 4.95 X 1.98 = 9.78 9.78 M2
B 9.15 X 3.00 = 27.45 27.45 M2
C 10.10 X 2.00 = 20.20 20.20 M2
Vol Total 57.43 M2
RENCANA ANGGARAN BIAYA (RAB)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT. ANALISA
Rp. Rp.

A PEKERJAAN PAVING
1 Pemasangan Paving Tb. 8 cm ( K-175 ) 57.43 M2 Taksir 118,750.00 6,819,367.19
6,819,367.19

Jumlah Total 6,819,367.19


Pembulatan 6,819,000.00

Err:511
PEMERINTAH KABUPATEN BREBES
DINAS PEKERJAAN UMUM
Jl. Jenderal Sudirman No. 129 telp. (0283) 671721 Brebes
BREBES

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB )

KEGIATAN #REF!
#REF!
PEKERJAAN #REF!
LOKASI #REF!
TAHUN ANGGARAN #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
Rp. Rp.

A PEKERJAAN PAVING 1 Unit #REF! #REF!

#REF! #REF! 1 Unit #REF! #REF!

#REF! #REF! 1 Unit #REF! #REF!

JUMLAH #REF!
PPN 10% #REF!
JUMLAH TOTAL #REF!
DIBULATKAN #REF!

Terbilang :
Err:511

Brebes, ............................................... 2019

Menyetujui : Direncanakan :
KEPALA BIDANG CIPTA KARYA KEPALA BIDANG PERENCANAA DAN PENGENDALIAN
DPU KABUPATEN BREBES DPU KABUPATEN BREBES

ABDUL MAJID, ST. MT RIDHO KHAERONI, ST


NIP. 19731101 200604 1 008 NIP. 19790604 200604 1 008

Mengetahui :
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BREBES

ACHMAD SATIBI, SH, ST, M.Si


NIP. 19610912 198503 1 008