PERHITUNGAN PEMBESIAN BETON BERTULANG

Beton strous peil dia 30" = Err:509 x Err:509 = Err:509


Err:509

Beton food plate uk 80 x 80 = 0.03727955 : 13.3164 = 357.20385


0.15 x 0.2

Beton sloof, kolom, ring balk & gewel 15/15


Bekisting = 1 / 0.0225 = 44.4444444
Pembesian = 2.466 + 0.88776 = 149.056
0.0225
Beton sloof 15/20
Bekisting = 1 / 0.03 = 33.3333333
Pembesian = 5.32656 x 1.03572 = 212.076
0.03
Beton kolom 15/30
Bekisting = 1 / 0.0225 = 44.4444444
Pembesian = 2.466 x 0.88776 = 149.056
0.0225
Beton kolom 25/25
Bekisting = 1 / 0.03 = 33.3333333
Pembesian = 3.55104 x 1.03572 = 152.892
0.03
Beton balok gantung 20/25
Bekisting = 1 / Err:509 = Err:509
Pembesian = Err:509 x Err:509 = Err:509
Err:509
Beton balok gantung 15/30
Bekisting = 1 / 0.018 = 55.5555556
Pembesian = 3.0825 x 0.798984 = 215.638
0.018
Beton plat lantai tbl. 12 cm
Bekisting = 1 / 0.1 = 10
Pembesian = 133.333333 x 0.6165 = 91.242
14.6666667 x 0.6165 =
Beton plat lantai tbl. 8 cm
Bekisting = 1 / 0.1 = 10
Pembesian = 66.6666667 x 0.6165 = 45.621
7.33333333 x 0.6165 =
Beton plat lantai tbl. 12 cm
Bekisting = 1 / Err:509 = Err:509
Pembesian = Err:509 x Err:509 = Err:509
Err:509 x Err:509 =
44.4528
7.4088
0.7

3.51

6.165
HITUNGAN BESI DAN BEKISTING
L T P Tulangan Pokok

Pas. Sloof 15/20 0.15 0.20 33.33 12
Pas. Kolom 15/15 0.15 0.15 44.44 10
Pas. Kolom Pilar 20/20~30 0.15 0.20 33.33 12
Pas. Ringbalk 15/30 0.30 0.30 11.11 12
Pas. Balok Gantung 15/15 0.15 0.15 44.44 10
Pas. Balok Latei 15/10 0.12 0.15 55.56 10

L2
Pas. Plat beton t = 12 cm 3.16 10
Pas. Plat beton t = 7 cm 3.16 10
Pas. Plat Sirip beton t = 5 cm 4.47 10
Tulangan Pokok Tulangan Bantu Tulangan Sengkang
Jumlah Berat Jumlah Berat Jarak Berat
6 177.55 0 0 - 6 0.15 34.52
4 109.60 0 0 - 6 0.15 39.46
4 118.37 0 0 - 6 0.15 34.52
8 78.91 12 4 39.46 8 0.15 35.07
4 109.60 0 0 - 6 0.15 39.46
5 171.25 0 0 - 6 0.15 44.39

Jumlah Jumlah
21.08 41.10 10 21.08 41.10
21.08 41.10 10 21.08 41.10
29.81 82.20 0 - -

9.5
0.665 10.5
Total Berat Total Luas
Besi Bekisting
212.08 13.33
149.06 13.33
152.89 23.33
153.44 10.00
149.06 20.00
215.64 23.33

82.20 10.00
82.20 3.16
82.20 20.00
SLOOF 15/15
SLOOF 15/15 0.15 x 0.15 x 44.444444 = 1.00

Panjang Besi d.10 4 Bh x 44.444444 = 177.77778

Berat Besi d.10 0.620 Kg/m x 177.77778 = 110.22222

Panjang Besi d.6 44.444444 : 0.15 x 0.6 = 177.77778

Berat Besi d.6 0.220 Kg/m x 177.77778 = 39.111111

Total Berat Besi / M3 = 149.33333


Total Luas Beqisting = 13.3333
SLOOF 15/20
SLOOF 15/20 0.15 x 0.2 x 33.333333 = 1.00

Panjang Besi d.10 6 Bh x 33.333333 = 200

12 0.892 Kg/m x 200 = 178.33333

Panjang Besi d.6 33.333333 : 0.15 x 0.7 = 155.55556

Berat Besi d.6 0.220 Kg/m x 155.55556 = 34.222222

Total Berat Besi / M3 = 212.55556


Total Luas Beqisting = 11.6667

KOLOM 15/15
KOLOM 15/15 0.15 x 0.15 x 44.444444 = 1.00

Panjang Besi d.10 4 Bh x 44.444444 = 177.77778

10 0.617 Kg/m x 177.77778 = 109.62963

Panjang Besi d.6 44.444444 : 0.15 x 0.6 = 177.77778

Berat Besi d.6 0.220 Kg/m x 177.77778 = 39.111111

Total Berat Besi / M3 = 148.7407


Total Luas Beqisting = 13.3333
KOLOM 15/20
KOLOM 15/20 0.15 x 0.2 x 33.333333 = 1.00

Panjang Besi d.10 4 Bh x 33.333333 = 133.33333

12 0.892 Kg/m x 133.33333 = 118.88889

Panjang Besi d.6 33.333333 : 0.15 x 0.7 = 155.55556

Berat Besi d.6 0.220 Kg/m x 155.55556 = 34.222222

Total Berat Besi / M3 = 153.1111


Total Luas Beqisting = 11.6667
KOLOM 30/30
KOLOM 30/30 0.3 x 0.3 x 11.111111 = 1.00

Panjang Besi d.10 12 Bh x 11.111111 = 133.33333


12 0.892 Kg/m x 133.33333 = 118.88889

Panjang Besi d.6 11.111111 : 0.15 x 1.2 = 88.888889

Berat Besi d.8 0.395 Kg/m x 88.888889 = 35.111111

Total Berat Besi / M3 = 154.0000


Total Luas Beqisting = 13.3333
KOLOM 30/60
KOLOM 30/60 0.3 x 0.6 x 5.5555556 = 1.00

Panjang Besi d.10 18 Bh x 5.5555556 = 100

12 0.892 Kg/m x 100 = 89.166667

Panjang Besi d.6 5.5555556 : 0.15 x 1.8 = 66.666667

Berat Besi d.6 0.395 Kg/m x 66.666667 = 26.333333

Total Berat Besi / M3 = 115.5000


Total Luas Beqisting = 10.0000

BALOK LATEI 12/15


BALOK LATEI 12/15 0.12 x 0.15 x 55.555556 = 1.00

Panjang Besi d.10 5 Bh x 55.555556 = 277.77778

Berat Besi d.10 0.620 Kg/m x 277.77778 = 172.22222

Panjang Besi d.6 55.555556 : 0.15 x 0.54 = 200

Berat Besi d.6 0.220 Kg/m x 200 = 44

Total Berat Besi / M3 = 216.2222


Total Luas Beqisting = 16.6667
BALOK 30/30
BALOK 30/30 0.3 x 0.3 x 11.111111 = 1.00

Panjang Besi d.12 8 Bh x 11.111111 = 88.888889

12 0.892 Kg/m x 88.888889 = 79.259259

Panjang Besi d.12 4 Bh x 11.111111 = 44.444444

12 0.892 Kg/m x 44.444444 = 39.62963

Panjang Besi d.6 11.111111 : 0.15 x 1.2 = 88.888889

Berat Besi d.6 0.395 Kg/m x 88.888889 = 35.111111

Total Berat Besi / M3 = 154


Total Luas Beqisting = 13.3333
BALOK 20/30
BALOK 20/30 0.2 x 0.3 x 16.666667 = 1.00

Panjang Besi d.12 7 Bh x 16.666667 = 116.66667

12 0.892 Kg/m x 116.66667 = 104.02778


Panjang Besi d.12 4 Bh x 16.666667 = 66.666667

12 0.892 Kg/m x 66.666667 = 59.444444

Panjang Besi d.6 16.666667 : 0.15 x 1 = 111.11111

Berat Besi d.6 0.220 Kg/m x 111.11111 = 24.444444

Total Berat Besi / M3 = 187.91667


Total Luas Beqisting = 13.3333
BALOK 15/20
BALOK 15/20 0.15 x 0.2 x 33.333333 = 1.00

Panjang Besi d.12 6 Bh x 33.333333 = 200

12 0.892 Kg/m x 200 = 178.33333

Panjang Besi d.12 2 Bh x 33.333333 = 66.666667

12 0.892 Kg/m x 66.666667 = 59.444444

Panjang Besi d.6 33.333333 : 0.15 x 0.7 = 155.55556

Berat Besi d.6 0.395 Kg/m x 155.55556 = 61.444444

Total Berat Besi / M3 = 299.22222


Total Luas Beqisting = 13.3333

PLAT Beton Saluran


PLAT Beton Saluran 0.1 x 1 x 10 = 1.00

Panjang Besi d.10 10 : 0.15 x 2.2 = 146.66667

0.617 Kg/m x 146.66667 = 90.444444

Panjang Besi d.10 1 : 0.15 x 20.2 = 134.66667

0.617 Kg/m x 134.66667 = 83.044444

Total Berat Besi / M3 = 173.48889


Total Luas Beqisting = 2.2000

PLAT Beton Lantai


PLAT Beton Lantai 0.1 x 1 x 10 = 1.00

Panjang Besi d.10 10 : 0.15 x 2.2 = 146.66667

0.617 Kg/m x 146.66667 = 90.444444

Panjang Besi d.10 1 : 0.15 x 20.2 = 134.66667

0.617 Kg/m x 134.66667 = 83.044444

Total Berat Besi / M3 = 173.48889


Total Luas Beqisting = 12.2000
M3

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2

M3

M
Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg

Kg
M2

M3

Kg
M

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2

M3

Kg

Kg

Kg
M2
ANALI SA HAR GA SAT
Wilayah Situbondo Kota KONSTRUKSI LAPIS PONDASI BAWAH (
( MENGGUNAKAN BURUH
Engginer Estimate (EE)

PROPINSI : KODE KABUPATEN :


JAWA TIMUR ( 35 ) SITUBONDO
URAIAN : ANGGAPAN / ASUMSI :

1. Material disiapkan dilokasi pekerjaan 1. Menggunakan tenaga manusia 400 m 2 per hari
2. Menghampar pasir setebal 5 cm 2. Material - material dikirim ke tempat pekerjaan ol
3. Batu pecah berukuran besar ( 10-15 cm) 3. Batu sudah dipecah
disusun berdiri 4. Tanah dasar sudah disiapkan
4. Batu pecah yang lebih kecil mengisi rongga 5. Dipadatkan sampai tebal + 12.50 cm
diatasnya sehingga rata kemudian dipadatkan /
digilas dengan mesin gilas .

PEKERJA JUMLAH HARI KODE


ORANG

P Mandor 3 1 L061

E Operator terampil 1 1 L081

K Pekerja 99 1 L101

MAT E R IAL JUMLAH VOLUME KODE


SATUAN

M Batu pecah 10 - 15 cm ( Manual ) 50.00 m3 M020


A Batu pecah 5 - 7 cm ( Manual ) 20.00 m3 M022
T Pasir urug / timbunan 30.00 m3 M011
E Alat bantu (set @ 3 alat) 4.00 set M170
R
I
A
L

P E R A LATA N JUMLAH HARI KODE


KERJA

P Mesin Gilas 3 roda 8 - 10 ton 1 1 E080


E
R
A
L
A
T
A
N

VOLUME : 400,00 SATUAN: m2


QUANTITY
ANALI SA HAR GA SAT UAN
UKSI LAPIS PONDASI BAWAH ( LPB ) - TELFORD KODE
( MENGGUNAKAN BURUH ) K.516
Engginer Estimate (EE)

KODE DISIAPKAN OLEH : TANGGAL :


( 12 )

an tenaga manusia 400 m 2 per hari


material dikirim ke tempat pekerjaan oleh pemasok

sudah disiapkan
sampai tebal + 12.50 cm

JUMLAH UPAH B IAYA SUB TOTAL


Hari-Orang (Rp/org/hari) (Rp.) (Rp.)

3 73,000 219,000

1 91,000 91,000

99 55,000 5,445,000

PEKERJA 5,755,000.00
HARGA SATUAN B IAYA SUB TOTAL
( Rp. ) ( Rp. ) ( Rp. )

170,000.00 8,500,000.00
170,000.00 3,400,000.00
84,000.00 2,520,000.00
0.00 0.00
MATERIAL 14,420,000.00
JAM HARGA B IAYA SUB TOTAL
KERJA (Rp./jam) (Rp.) (Rp.)

5 381,000.00 1,905,000.00

PERALATAN 1,905,000.00
TOTAL (Rp.) 22,080,000.00

HARGA SATUAN Rp. 55,200.00 per m2


ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
I BAHAN PASIR
1 Pasir Pasang M3 92,000 160,000
2 Pasir Urug/Sirtu M3 82,000 150,000
3 Pasir Cor m3 92,000 160,000
4 Koral M3 135,000 210,600
5 Tanah Urug M3 68,000 113,000

II BAHAN BATU PECAH MANUAL


1 Batu Pecah 1-1 (manual) m3 xxx xxx
2 Batu 1-2 (Grosok Ayak/Ampyangan) M3 327,000 436,000
3 Batu Pecah 2-3 M3 234,000 310,000
4 Batu Pecah 3-5 M3 218,000 286,000
5 Batu Pecah 5-7 M3 218,000 294,000
6 Batu Pecah 10-15 M3 218,000 300,000
7 Batu Gunung/Batu Kali M3 169,000 249,000
8 Grosok (ABC) M3 196,000 278,000
9 Batu Merah Bj 600 900

III BAHAN BATU PECAH MESIN


1 Batu Pecah 0,5-1 M3 331,000 331,000
2 Batu Pecah 1-1 M3 340,000 340,000
3 Batu Pecah 1-2 M3 340,000 340,000
4 Batu Pecah 2-3 M3 340,000 340,000
5 Batu Pecah 3-5 (mesin) m3 xxx xxx
6 Pasir Abu Batu M3 296,000 296,000
7 Pasir Ayak Untuk Hot Mix m3 xxx xxx

IV BAHAN ASPAL
1 Aspal Curah Kg 12,000 12,000
2 Aspal Kemas Kg 12,000 12,000

V BAHAN SEMEN
1 Semen 50 Kg zak xxx xxx
2 Semen 40 Kg Zak 64,000 69,000
3 Semen Putih 40 Kg Zak 92,000 96,000

Halaman 18
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN

VI BAHAN KAPUR
1 Kapur Pasang m3 291,000 336,000
2 Kapur Pasang (10 Kg) setara Puger Zak 7,200 7,700

VII BAHAN LANTAI DAN KERAMIK


1 Tegel Keramik 30 x 30 (polos) M2 45,000 47,000
2 Tegel Keramik 30 x 30 (warna gelap) M2 54,000 56,000
3 Tegel Keramik 40 x 40 (polos) M2 53,000 55,000
4 Tegel Keramik 40 x 40 (warna gelap) M2 60,000 62,000
5 Tegel Keramik 20 x 25 (polos) M2 52,000 54,000
6 Tegel Keramik 30 x 30 (Warna Gelap) Kasar m2 57,750 57,750
7 Tegel Abu-Abu 20 x 20 m2 37,000 43,000
8 Tegel Wavel Warna 20 x 20 m2 41,000 49,000
9 Tegel Galar Merah 30 x 30 m2 43,000 50,000
10 Wastafel (setara INA) komplit Bh 420,000 421,000
11 Tempat Sabun Bh 27,000 29,000
12 Kloset Jongkok (setara INA) warna muda Bh 147,000 149,000
13 Kloset Jongkok (setara INA) warna tua Bh 181,000 183,000
14 Kloset Duduk (setara INA) warna muda Bh 493,000 495,000
15 Kloset Duduk (setara INA) warna tua Bh 556,000 558,000
16 Urinoir (komplit) buah xxx xxx
17 Tempat Cuci Piring (komplit-setara Royal) Bh 201,000 203,000
18 Avour (KM/WC dan Bak Cuci) Bh 27,000 30,000

VIII BAHAN GENTENG


1 Genteng Karang Pilang ex Ambulu Bj 3,000 3,000
2 Genteng Bubungan Karang Pilang ex Ambulu Bj 7,000 8,000
3 Genteng Karang Pilang ex Kalibagor Bj 2,000 2,000
4 Genteng Bubungan Karang Pilang ex Kalibagor Bj 3,000 3,000
5 Genteng Blintong biji xxx xxx
6 Genteng Bubungan Blintong biji xxx xxx
7 Genteng Press Kalibagor Bj 1,000 1,000
8 Genteng Bubungan Press Kalibagor Bj 5,000 5,000
9 Genteng Mirando ex Kalibagor biji xxx xxx
10 Genteng Bubungan Mirando ex Kalibagor biji xxx xxx
11 Genteng Beton Bj 3,000 4,000
12 Genteng Bubungan Beton Bj 4,000 4,000
13 Genteng Bima Klass A biji xxx xxx

Halaman 19
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
14 Genteng Bubungan Bima Klass A biji xxx xxx
15 Genteng Layur setara biji xxx xxx
16 Genteng Bubungan Layur setara biji xxx xxx
17 Genteng Mirando Layur biji xxx xxx
18 Genteng Bubungan Mirando Layur biji xxx xxx
19 Genteng Blintong Layur biji xxx xxx
20 Genteng Bubungan Blintong Layur biji xxx xxx
21 Genteng Metal m2 xxx xxx
22 Genteng Bubungan Metal m' xxx xxx
23 Roster Karang Pilang Kecil biji xxx xxx
24 Roster Beton Uk. 30 biji xxx xxx

IX BAHAN BESI
1 Besi Beton Polos Kg 12,400 12,900
2 Besi Beton Ulir Kg 13,000 13,400
3 Kawat Beton Kg 17,000 17,400
4 Kawat Bronjong Kg 14,000 14,600
5 Kawat Duri Rol 77,200 77,700
6 Kawel / Baut ( bahan plat ) Kg 16,300 16,800
7 Kawel / Baut ( bahan besi ) Kg 16,300 16,800

X BAHAN KAP DAN JEMBATAN BAJA


1 WF 150 mm s/d 280 panjang 12 m Kg 13,400 13,400
2 WF 300 mm s/d 500 panjang 12 m Kg 13,400 13,400
3 WF 600 mm s/d 900 panjang 12 m Kg 13,400 13,400
4 Plat Simpul Kg xxx xxx
5 Baut Baja Dia. 1/2" panjang 4" biji 12,000 12,500
6 Baut Baja Dia.1" panjang 4" biji xxx xxx
7 Baut Baja Dia.1 1/4" panjang 6" biji xxx xxx
8 Besi Mur Baut Angker 1/2 panjang 30 cm biji 12,400 12,600
9 Besi Mur Baut Pagar Sandaran 3/8 panjang 4 cm biji xxx xxx
10 Besi Mur Baut Pagar Sandaran 3/8 panjang 15 cm biji xxx xxx
11 Besi Mur Baut Kuku Macan 3/8 panjang 15 cm set xxx xxx
12 Rangka Atap Baja Ringan M2 200,000 210,000
13 Profil Siku 30 x 30 x 3 lonjor xxx xxx
14 Profil Siku 40 x 40 x 4 lonjor xxx xxx
15 Profil Siku 50 x 50 x 5 lonjor xxx xxx
16 Profil Siku 60 x 60 x 6 lonjor xxx xxx
17 Profil Siku 70 x 70 x 7 lonjor xxx xxx

Halaman 20
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
18 Profil Siku 80 x 80 x 8 lonjor xxx xxx
19 Profil Siku 90 x 90 x 9 lonjor xxx xxx
20 Profil Siku 100 x 100 x 10 lonjor xxx xxx
21 Profil Siku 120 x 120 x 11 lonjor xxx xxx
22 Profil Siku 130 x 130 x 12 lonjor xxx xxx
23 Profil Kanal UNP 80 x 45 x 6 x 8 x 4 lonjor xxx xxx
24 Profil Kanal UNP 100 x 50 x 6 x 8,5 x 4,5 lonjor xxx xxx
25 Profil Kanal UNP 120 x 55 x 7 x 9 x 4,5 lonjor xxx xxx
26 Profil Kanal UNP 140 x 60 x 7 x 10 x 5 lonjor xxx xxx
27 Profil kanal CNP 125 x 50 x 20 x 3,1 (3,2) lonjor xxx xxx
28 Profil kanal CNP 125 x 50 x 20 x 2,2 (2,3) lonjor xxx xxx
29 Profil kanal CNP 100 x 50 x 20 x 3,1 (3,2) lonjor xxx xxx
30 Profil kanal CNP 100 x 50 x 20 x 2,5 (2,3) lonjor xxx xxx
31 Profil kanal CNP 100 x 50 x 20 x 2,2 (3,2) lonjor xxx xxx
32 Profil kanal CNP 100 x 50 x 20 x 1,8 (2,3) lonjor xxx xxx

XI BAHAN PLAT BESI


1 Plat 8 mm uk. 120 x 240 = 187 Kg kg 11,800 12,200
2 Plat 8 mm uk. 120 x 240 = 187 Kg kg 11,800 12,200
3 Plat 15 mm uk. 120 x 240 = 350 Kg kg xxx xxx
4 Plat 1,2 mm uk. 120 x 240 lembar xxx xxx
5 Plat 1,8 mm uk.120 x 240 lembar xxx xxx
6 Plat 2,8 mm uk. 120 x 240 lembar xxx xxx
7 Plat 3,8 mm uk.120 x 240 lembar xxx xxx
8 Plat strip lebar 2.5 cm tbl. 3 mm lonjor xxx xxx
9 Plat strip lebar 3 cm tbl. 3 mm lonjor xxx xxx
10 Plat strip lebar 5 cm tbl. 3 mm lonjor xxx xxx

XII SENG GELOMBANG


1 Seng Gelombang BJLS 30 uk. 80 x 300 Lbr 109,000 110,000
2 Seng Gelombang BJLS 30 uk. 80 x 180 Lbr 68,000 69,000

Halaman 21
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
XIII SENG TALANG
1 Seng Talang BJLS 30 uk. 45 M' 21,000 24,000
2 Seng Talang BJLS 30 uk. 55 M' 25,000 29,000
3 Seng Talang BJLS 30 uk. 60 M' 29,000 34,000
4 Seng Talang BJLS 30 uk. 90 M' 41,000 48,000

XIV ASBES GELOMBANG


1 Asbes Gelombang Kecil 300 x 105 x 4 mm Lbr 96,000 97,000
2 Asbes Gelombang Kecil 240 x 105 x 4 mm Lbr 72,000 74,000
3 Asbes Gelombang Kecil 210 x 105 x 4 mm Lbr 61,000 63,000
4 Asbes Gelombang Kecil 180 x 105 x 4 mm Lbr 54,000 55,000
5 Asbes Gelombang Besar 300 x 102 x 5 mm Lbr xxx xxx
6 Asbes Gelombang Besar 250 x 102 x 5 mm Lbr xxx xxx
7 Asbes Gelombang Besar 225 x 102 x 5 mm Lbr xxx xxx
8 Asbes Gelombang Besar 200 x 102 x 5 mm Lbr xxx xxx
9 Asbes Gelombang Besar 180 x 102 x 5 mm Lbr xxx xxx
10 Nock Stel Kecil 105 cm Lbr 32,000 33,000
11 Nock Stel Besar 102 cm Lbr xxx xxx
12 Seng Alumunium uk. 80 x 180 Lbr 130,000 140,000
13 xxx xxx xxx
14 xxx xxx xxx
15 xxx xxx xxx
16 xxx xxx xxx
17 xxx xxx xxx
18 xxx xxx xxx
19 xxx xxx xxx
20 xxx xxx xxx
21 xxx xxx xxx
22 xxx xxx xxx
23 xxx xxx xxx
24 xxx xxx xxx
25 xxx xxx xxx
26 xxx xxx xxx
27 xxx xxx xxx
28 Enternit Polos m2 11,000 12,000
29 Gypsum 9 mm Lbr 73,000 75,000
30 Gypsum list m' 15,000 17,500

XV BAHAN PAKU

Halaman 22
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
1 Paku Reng Kg 17,000 17,000
2 Paku Usuk Kg 14,000 14,000
3 Paku Triplek/Eternit Kg 24,000 24,000
4 Paku Seng Kg 25,000 25,000
5 Paku Sekrup 7,5 cm biji xxxx xxxx
6 Paku Sekrup 9 cm biji xxxx xxxx
7 Paku Sekrup 12 cm biji xxxx xxxx

XVI BAHAN PIPA GL


1 Pipa Gl Medium 1/2" lonjor xxx xxx
2 Pipa Gl Medium 3/4" lonjor xxx xxx
3 Pipa Gl Medium 1" lonjor xxx xxx
4 Pipa Gl Medium 1 1/4" lonjor xxx xxx
5 Pipa Gl Medium 1 1/2" lonjor xxx xxx
6 Pipa Gl Medium 2" lonjor xxx xxx
7 Pipa Gl Medium 2 1/2" lonjor xxx xxx
8 Pipa Gl Medium 3" lonjor xxx xxx
9 Pipa Gl Medium 4" lonjor xxx xxx
10 Pipa Gl Medium 5" lonjor xxx xxx
11 Pipa Gl Medium 6" lonjor xxx xxx
12 Pipa Gl Medium 8" lonjor xxx xxx
13 Pipa Gl BSA 1/2" lonjor xxx xxx
14 Pipa Gl BSA 3/4" lonjor 141,000 142,000
15 Pipa Gl BSA 1" lonjor 181,000 183,000
16 Pipa Gl BSA 1 1/4" lonjor xxx xxx
17 Pipa Gl BSA 1 1/2" lonjor xxx xxx
18 Pipa Gl BSA 2" M xxx xxx
19 Pipa Gl BSA 2 1/2" lonjor xxx xxx
20 Pipa Gl BSA 3" M 806,000 810,000
21 Pipa Gl BSA 3" M 806,000 810,000
22 Pipa Gl BSA 6" lonjor 1,492,000 1,500,000
23 Pipa Gl BSA 4" lonjor 1,026,000 1,031,000
24 Pipa Gl BSB 3/4" lonjor xxx xxx
25 Pipa Gl BSB 1" lonjor xxx xxx
26 Pipa Gl BSB 1 1/4" lonjor xxx xxx
27 Pipa Gl BSB 1 1/2" lonjor xxx xxx
28 Pipa Gl BSB 2" lonjor xxx xxx
29 Pipa Gl BSB 2 1/2" lonjor xxx xxx
30 Pipa Gl BSB 3" lonjor xxx xxx

Halaman 23
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
31 Pipa Gl BSB 4" lonjor xxx xxx

XVII BAHAN SAMBUNGAN PIPA BESI


1 DOP 1/2" buah xxx xxx
2 DOP 3/4" buah xxx xxx
3 DOP 1" buah xxx xxx
4 DOP 1 1/4" buah xxx xxx
5 DOP 1 1/2" buah xxx xxx
6 DOP 2" buah xxx xxx
7 DOP 2 1/2" buah xxx xxx
8 DOP 3" buah xxx xxx
9 DOP 4" buah xxx xxx
10 DOP 6" buah xxx xxx
11 PLUG 1/2" buah xxx xxx
12 PLUG 3/4" buah xxx xxx
13 PLUG 1" buah xxx xxx
14 PLUG 1 1/2" buah xxx xxx
15 PLUG 2" buah xxx xxx
16 PLUG 2 1/2" buah xxx xxx
17 PLUG 3" buah xxx xxx
18 SOCK 1/2" buah xxx xxx
19 SOCK 3/4" buah xxx xxx
20 SOCK 1" buah xxx xxx
21 SOCK 1 1/4" buah xxx xxx
22 SOCK 1 1/2" buah xxx xxx
23 SOCK 2" buah xxx xxx
24 SOCK 2 1/2" buah xxx xxx
25 SOCK 3" buah xxx xxx
26 SOCK 4" buah xxx xxx
27 SOCK 6" buah xxx xxx
28 KNIE 1/2" buah xxx xxx
29 KNIE 3/4" buah xxx xxx
30 KNIE 1" buah xxx xxx
31 KNIE 1 1/4" buah xxx xxx
32 KNIE 1 1/2" buah xxx xxx
33 KNIE 2" buah xxx xxx
34 KNIE 2 1/2" buah xxx xxx
35 KNIE 3" buah xxx xxx
36 KNIE 4" buah xxx xxx

Halaman 24
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
37 KNIE 6" buah xxx xxx
38 DOUBLE NEPEL 1/2" buah xxx xxx
39 DOUBLE NEPEL 3/4" buah xxx xxx
40 DOUBLE NEPEL 1" buah xxx xxx
41 DOUBLE NEPEL 1 1/4" buah xxx xxx
42 DOUBLE NEPEL 1 1/2" buah xxx xxx
43 DOUBLE NEPEL 2" buah xxx xxx
44 DOUBLE NEPEL 2 1/2" buah xxx xxx
45 DOUBLE NEPEL 3" buah xxx xxx
46 DOUBLE NEPEL 4" buah xxx xxx
47 TEE 1/2" GI buah xxx xxx
48 TEE 3/4" GI buah xxx xxx
49 TEE 1" GI buah xxx xxx
50 TEE 1 1/4" GI buah xxx xxx
51 TEE 1 1/2" GI buah xxx xxx
52 TEE 2" GI buah xxx xxx
53 TEE 2 1/2" GI buah xxx xxx
54 TEE 3" x 2" GI buah xxx xxx
55 TEE 4" x 2" GI buah xxx xxx
56 TEE 6" x 4" GI buah xxx xxx
57 TEE 6" x 4" GI buah xxx xxx

XVIII BAHAN KRAN


1 Kran Biasa 1/2" (besi) Bh 17,000 18,000
2 Kran Biasa 3/4" (besi) Bh 24,000 25,000
3 Stop Kran 1/2" (besi) Bh 50,000 51,000
4 Stop Kran 3/4" (besi) Bh 73,000 74,000
5 Ball Valve 3/4" (PVC) Bh 84,000 85,000
6 Ball Valve 1" (PVC) Bh 130,000 130,000
7 Ball Valve 1 1/4" (PVC) Bh 218,000 219,000
8 Ball Valve 1 1/2" (PVC) Bh 295,000 296,000
9 Ball Valve 2" (PVC) Bh 470,000 471,000
10 Ball Valve 3" (PVC) Bh 1,601,000 1,602,000

XIX PIPA PVC CLASS AW


A PIPA UKURAN 4 METER
1 PIPA PVC 1/2" Ljr xxx xxx
2 PIPA PVC 3/4" Ljr xxx xxx
3 PIPA PVC 1" Ljr xxx xxx

Halaman 25
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
4 PIPA PVC 1 1/4" Ljr xxx xxx
5 PIPA PVC 1 1/2" Ljr xxx xxx
6 PIPA PVC 2" Ljr xxx xxx
7 PIPA PVC 2 1/2" Ljr xxx xxx
8 PIPA PVC 4" Ljr 351,000 360,000
B PIPA + MOF UKURAN 4 METER
1 PIPA PVC 1/2" Ljr xxx xxx
2 PIPA PVC 3/4" Ljr xxx xxx
3 PIPA PVC 1" Ljr xxx xxx
4 PIPA PVC 1 1/4" Ljr xxx xxx
5 PIPA PVC 1 1/2" Ljr xxx xxx
6 PIPA PVC 2" Ljr xxx xxx
7 PIPA PVC 2 1/2" Ljr xxx xxx
8 PIPA PVC 3" Ljr xxx xxx
C PIPA + RR UKURAN 4 METER
1 PIPA PVC 2" Ljr xxx xxx
2 PIPA PVC 2 1/2" Ljr xxx xxx
3 PIPA PVC 3" Ljr xxx xxx
4 PIPA PVC 4" Ljr xxx xxx
5 PIPA PVC 5" Ljr xxx xxx
6 PIPA PVC 6" Ljr xxx xxx
7 PIPA PVC 8" Ljr xxx xxx
8 PIPA PVC 10" Ljr xxx xxx
9 PIPA PVC 12" Ljr xxx xxx
D PIPA + MOF ( SOCKET ) PANJANG 6 M - S 12,5
1 PIPA PVC 1/2" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
2 PIPA PVC 3/4" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
3 PIPA PVC 1" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
4 PIPA PVC 1 1/4" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
5 PIPA PVC 1 1/2" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
6 PIPA PVC 2" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
7 PIPA PVC 2 1/2" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
8 PIPA PVC 3" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
9 PIPA PVC 4" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
10 PIPA PVC 6" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
11 PIPA PVC 8" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
12 PIPA PVC 10" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
13 PIPA PVC 12" ( MOF P = 6 M - 12,5 S ) lonjor xxx xxx
E PIPA + RR ( RUBBER RING ) PANJANG 6 M - S 10

Halaman 26
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
1 PIPA PVC 2" ( RR P = 6 M - 10 S ) lonjor xxx xxx
2 PIPA PVC 2 1/2" ( RR P = 6 M - 10 S ) lonjor xxx xxx
3 PIPA PVC 3" ( RR P = 6 M - 10 S ) lonjor xxx xxx
4 PIPA PVC 4" ( RR P = 6 M - 10 S ) lonjor xxx xxx
5 PIPA PVC 6" ( RR P = 6 M - 10 S ) lonjor xxx xxx
6 PIPA PVC 8" ( RR P = 6 M - 10 S ) lonjor xxx xxx
F PIPA + RR ( RUBBER RING ) PANJANG 6 M - S 12,5
1 PIPA PVC 2" ( RR P = 6 M - 12,5 S ) lonjor xxx xxx
2 PIPA PVC 2 1/2" ( RR P = 6 M - 12,5 S ) lonjor xxx xxx
3 PIPA PVC 3" ( RR P = 6 M - 12,5 S ) lonjor xxx xxx
4 PIPA PVC 4" ( RR P = 6 M - 12,5 S ) lonjor xxx xxx
5 PIPA PVC 6" ( RR P = 6 M - 12,5 S ) lonjor xxx xxx
6 PIPA PVC 8" ( RR P = 6 M - 12,5 S ) lonjor xxx xxx

Halaman 27
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
XX ASESORIS PIPA
1 Air Valve 1" buah xxx xxx
2 Air Valve 2" buah xxx xxx
3 Air Valve 3" buah xxx xxx
4 Baut Mur 5/8" x 2" buah xxx xxx
5 Baut Mur 5/8" x 2,5" buah xxx xxx
6 Baut Mur 5/8" x 3" buah xxx xxx
7 Baut Mur 5/8" x 4" buah xxx xxx
8 Baut Mur 3/4" x 2,5" buah xxx xxx
9 Baut Mur 3/4" x 3" buah xxx xxx
10 Clamp Sadle 2" x 3/4" buah xxx xxx
11 Clamp Sadle 3 x 3/4" buah xxx xxx
12 Clamp Sadle 4" x 3/4" buah xxx xxx
13 Clamp Sadle 6" buah xxx xxx
14 Flange Las 2" buah xxx xxx
15 Flange Las 2 1/2" buah xxx xxx
16 Flange Las 3" buah xxx xxx
17 Flange Las 4" buah xxx xxx
18 Giboult Joint 2" buah xxx xxx
19 Giboult Joint 3" buah xxx xxx
20 Giboult Joint 4" buah xxx xxx
21 Giboult Joint 6" buah xxx xxx
22 HU (Hidrant Umum) Type Conical 1m3 buah xxx xxx
23 HU (Hidrant Umum) Type Conical 2m3 buah xxx xxx
24 HU (Hidrant Umum) Type Conical 3m3 buah xxx xxx
25 HU (Hidrant Umum) Type Conical 4m3 buah xxx xxx
26 Reducer GI 3/4" x 1/2 " buah xxx xxx
27 Reducer GI 1" x 1/2 " buah xxx xxx
28 Reducer GI 2" x 1 " buah xxx xxx
29 Reducer GI 3" x 2 " buah xxx xxx
30 Reducer GI 4" x 2" buah xxx xxx
31 Reducer GI 4" x 3" buah xxx xxx
32 Reducer GI 6" x 2" buah xxx xxx
33 Reducer GI 6" x 3" buah xxx xxx
34 Reducer GI 6" x 4" buah xxx xxx
35 Reducer PVC Moof 1 1/2" x 1" buah xxx xxx
36 Reducer PVC Moof 2" x 1 1/2" buah xxx xxx
37 Reducer PVC Moof 2" x 1" buah xxx xxx
38 Reducer PVC Moof 3" x 2" buah xxx xxx

Halaman 28
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
39 Reducer PVC Moof 4" x 2" buah xxx xxx
40 Reducer PVC Moof 4" x 3" buah xxx xxx
41 Reducer PVC Moof 6" x 2" buah xxx xxx
42 Reducer PVC Moof 6" x 3" buah xxx xxx
43 Reducer PVC Moof 6" x 4" buah xxx xxx
44 Sock Drat PVC 1/2" buah xxx xxx
45 Sock Drat PVC 3/4" buah xxx xxx
46 Sock Drat PVC 1" buah xxx xxx
47 Sock Drat PVC 1 1/4" buah xxx xxx
48 Sock Drat PVC 1 1/2" buah xxx xxx
49 Sock Drat PVC 2" buah xxx xxx
50 Sock Drat PVC 2 1/2" buah xxx xxx
51 Sock Drat PVC 3" buah xxx xxx
52 Sock Drat PVC 4" buah xxx xxx
53 Stop Kran 1" buah xxx xxx
54 Stop Kran 1 1/4" buah xxx xxx
55 Stop Kran 1 1/2" buah xxx xxx
56 Stop Kran 2" (Gate Valve) buah xxx xxx
57 Stop Kran 3" (Gate Valve) buah xxx xxx
58 Stop Kran 4" (Gate Valve) buah xxx xxx
59 Stop Kran 6" (Gate Valve) buah xxx xxx
60 Straatpot 4" buah xxx xxx
61 Straatpot 6" buah xxx xxx
62 Tee All Flange 3" x 3" buah xxx xxx
63 Tee All Flange 4" x 2" buah xxx xxx
64 Tee All Flange 4" x 3" buah xxx xxx
65 Tee All Flange 4" x 4" buah xxx xxx
66 Tee GI 1/2" buah xxx xxx
67 Tee GI 3/4" buah xxx xxx
68 Tee GI 1" buah xxx xxx
69 Tee GI 1 1/4" buah xxx xxx
70 Tee GI 1 1/2" buah xxx xxx
71 Tee GI 2" buah xxx xxx
72 Tee GI 2 1/2" buah xxx xxx
73 Tee GI 3" buah xxx xxx
74 Tee GI 4" buah xxx xxx
75 Manhole 60 x 60 (Plat Baja) + Pengunci buah xxx xxx
76 Formika (90 x 120 cm) lembar xxx xxx
77 Pipa Screen buah xxx xxx

Halaman 29
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
78 Kabel Sling (Wire Rop) Baja 20 mm m' xxx xxx
79 Kabel Sling (Wire Rop) Baja 10 mm m' xxx xxx
80 Bak Mandi Fibre 60 x 60 buah xxx xxx
81 Ass (Rol) buah xxx xxx
82 Klem Pengapit buah xxx xxx
83 Track Skhor buah xxx xxx
84 Klem GI 1/2" buah xxx xxx
85 Klem GI 3/4" buah xxx xxx
86 Klem GI 1" buah xxx xxx
87 Klem GI 1 1/4" buah xxx xxx
88 Klem GI 1 1/2" buah xxx xxx
89 Klem GI 2" buah xxx xxx
90 Klem GI 2 1/2" buah xxx xxx
91 Klem GI 3" buah xxx xxx
92 Klem GI 4" buah xxx xxx
93 Kaki Rangka HU set xxx xxx
94 Kunci Pipa Besar set xxx xxx
95 Kunci Pipa Kecil set xxx xxx
96 Pohon Jambu Air 5 cm pohon xxx xxx
97 Ijuk Aren kg xxx xxx
98 Katup Apung buah xxx xxx
99 Wall Pipe buah xxx xxx

XXI BAHAN KAYU


1 Kayu Jati 8/12 ; 6/12 (Klass B) M3 13,636,000 13,681,000
2 Kayu Jati Usuk 5/7 ; 4/6 (Klass B) M3 10,727,000 10,772,000
3 Kayu Jati Papan 2/20 ; 3/30 ; 4/20 (Klass B) M3 14,204,000 14,250,000
4 Kayu Jati Reng 2/3 ; 3/5 (Klass C) M3 8,727,000 8,772,000
5 Kayu Kamper 8/12 ; 6/12 M3 10,510,000 10,556,000
6 Kayu Kamper Usuk 5/7 ; 4/6 M3 9,090,000 9,136,000
7 Kayu Kamper Papan 2/20 ; 3/30 ; 4/20 M3 11,079,000 11,124,000
8 Kayu Kamper Reng 2/3 ; 3/5 M3 8,181,000 8,227,000
9 Kayu Bengkirai 8/12 ; 6/12 m3 xxx xxx
10 Kayu Bengkirai Usuk 5/7 ; 4/6 ; 3/5 m3 xxx xxx
11 Kayu Bengkirai Papan 2/20 ; 3/30 ; 4/20 m3 xxx xxx
12 Kayu Meranti 8/12 ; 6/12 M3 5,454,000 5,500,000
13 Kayu Meranti Usuk 5/7 ; 4/6 M3 3,977,000 4,022,000
14 Kayu Meranti Papan 2/20 ; 3/30 ; 4/20 M3 6,000,000 6,045,000
15 Kayu Meranti Reng 2/3 ; 3/5 M3 3,977,000 4,022,000

Halaman 30
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
16 Kayu Papan Sapen m3 xxx xxx
17 Kayu Kruing 5/7 ; 6/12 ; 8/12 ; 8/15 M3 xxx xxx
18 Kayu Ulin 8/12 ; 6/12 m3 xxx xxx
19 Kayu ( Bekisting ) M3 1,989,000 2,034,000
20 Bambu Lj 28,000 28,000
21 Kayu List 1/5 Meranti Lj 4,000 4,000
22 Sesek Bambu Lbr 38,000 38,000

XXII BAHAN TRIPLEK


1 Triplek 122 x 244 x 2 mm Lbr 40,000 41,000
2 Triplek 122 x 244 x 3 mm Lbr 54,000 56,000
3 Triplek 122 x 210 x 4 mm Lbr 70,000 72,000
4 Triplek 92 x 210 x 9 mm lembar xxx xxx
5 Multiplek 122 x 244 x 9 mm Lbr 125,000 127,000
6 Multiplek 92 x 210 x 9 mm lembar xxx xxx
7 TeakWood 122 x 244 x 3 mm Lbr 139,000 140,000
8 TeakWood 92 x 210 x 3 mm Lbr 92,000 94,000
9 Triplek 92 x 210 x 3 mm lapis aluminium Lbr 109,000 110,000
10 Triplek 92 x 210 x 3 mm lapis aluminium garis Lbr 103,000 105,000
11 Teak bloks (lapis jati) Lbr 238,000 240,000
12 Parquite Jati m2 xxx xxx

XXIII BAHAN CAT KAYU DAN TEMBOK


1 Plamir Tembok Kg 16,000 17,000
2 Plamir Kayu Kg 25,000 26,000
3 Cat Genteng Kg 39,000 40,000
4 Cat Tembok (Setara Cathilac) Kg 27,000 28,000
5 Minyak Cat Ltr 27,000 28,000
6 Meni Kayu Kg 25,000 26,000
7 Cat Kayu (Setara Emco) Kg 73,000 74,000
8 Cat Brown Kg 48,000 49,000
9 Ter 1 Blek = 10L Blek 170,000 170,000

XXIV BAHAN KACA POLOS DAN RYBAN


1 Kaca polos 3 mm M2 61,000 70,000
2 Kaca polos 5 mm M2 90,000 100,000
3 Kaca Ryban 3 mm M2 72,000 81,000
4 Kaca Ryban 5 mm M2 106,000 115,000
5 Kerangka Kaca Nako Ukr. 10 x 100 Daun XXX XX

Halaman 31
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
6 Glass Block Bj 29,000 31,000

XXV ALAT PENGGANTUNG DAN PENGUNCI


1 Kunci 2 x putar Bh 109,000 110,000
2 Engsel jendela nylon arch asli Bh 27,000 28,000
3 Engsel pintu nylon arch asli Bh 40,000 41,000
4 Engsel singapur Bh 51,000 52,000
5 Grendel Jendela Bh 5,000 6,000
6 Grendel Tanam Bh 61,000 62,000
7 Hak angin biasa Bh 7,000 8,000
8 Kunci Bulat Bh 45,000 46,000

XXVI BUIS BETON


1 Buis Beton bulat diameter 1,00 x 0,5 Bj 197,000 252,000
2 Buis Beton bulat diameter 0,90 x 0,50 biji xxx xxx
3 Buis Beton bulat diameter 0,80 x 0,50 Bj 149,000 193,000
4 Buis Beton bulat diameter 0,70 x 0,50 Bj 134,000 179,000
5 Buis Beton bulat diameter 0,60 x 0,50 Bj 111,000 145,000
6 Buis Beton bulat diameter 0,50 x 0,50 Bj 100,000 130,000
7 Buis Beton bulat diameter 0,50 x 1 biji xxx xxx
8 Buis Beton bulat diameter 0,40 x 1 Bj 107,000 131,000
9 Buis Beton bulat diameter 0,30 x 1 Bj 84,000 109,000
10 Buis Beton bulat diameter 0,25 x 1 biji xxx xxx
11 Buis Beton bulat diameter 0,20 x 1 Bj 70,000 90,000
12 Buis Beton Sigaran diameter 0,20 x 1 Bj 35,000 45,000
13 Buis Beton Sigaran diameter 0,30 x 1 Bj 41,000 54,000

XXVII BAHAN PAVING STONE


1 Paving Stone Kotak tebal 8 cm (warna) kasar M2 84,000 97,000
2 Paving Stone Kotak tebal 8 cm (warna) halus M2 82,000 92,000
3 Paving Stone Kotak tebal 7 cm (warna) kasar M2 74,000 84,000
4 Paving Stone Kotak tebal 7 cm (warna) halus M2 73,000 83,000
5 Paving Stone Kotak tebal 6 cm (warna) kasar M2 70,000 80,000
6 Paving Stone Kotak tebal 6 cm (warna) halus M2 68,000 77,000
7 Paving Stone Kotak tebal 8 cm (abu-abu) kasar M2 78,000 90,000
8 Paving Stone Kotak tebal 8 cm (abu-abu) halus M2 75,000 85,000
9 Paving Stone Kotak tebal 7 cm (abu-abu) kasar M2 66,000 76,000
10 Paving Stone Kotak tebal 7 cm (abu-abu) halus M2 69,000 80,000
11 Paving Stone Kotak tebal 6 cm (abu-abu) kasar M2 59,000 69,000

Halaman 32
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
12 Paving Stone Kotak tebal 6 cm (abu-abu) halus M2 60,000 70,000
13 Pav. Stone Segi 8 t = 7 cm (warna) halus M2 82,000 93,000
14 Pav. Stone Segi 8 t = 6 cm (warna) halus M2 76,000 86,000
15 Pav. Stone Segi 8 t = 7 cm (abu-abu) halus M2 76,000 86,000
16 Pav. Stone Segi 8 t = 6 cm (abu-abu) halus M2 69,000 80,000
17 xxx xxx xxx xxx
18 xxx xxx xxx xxx
19 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (warna) halus M2 78,000 89,000
20 Pav. Stone 3 Berlian/Segi 6 t = 6 cm (warna) halus M2 71,000 81,000
21 Pav. Stone 3 Berlian/Segi 6 t = 5 cm (warna) halus M2 64,000 75,000
22 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (abu-abu) halus M2 71,000 81,000
23 Pav. Stone Segi 6 t = 6 cm (abu-abu) halus M2 64,000 75,000
24 xxx xxx xxx xxx
25 Kanstein uk. 10 x 30 x 50 Bj 23,000 30,000
26 Kanstein uk. 15 x 30 x 50 Bj 27,000 34,000
27 Kanstein Trotoar uk. 10 x 40 x 50 biji xxx xxx
28 Batako Uk.10 x 20 x 40 Bj 4,000 5,000

XXVIII BAHAN LISTRIK


1 NYA 1,5 mm M' 3,000 3,000
2 NYA 2,5 mm M' 6,000 6,000
3 NYA 4 mm M' 5,000 5,000
4 NYA 6 mm M' 9,000 9,000
5 Twistel kabel 2 x 10 mm m' xxx xxx
6 Twistel kabel 2 x 16 mm m' xxx xxx
7 Kabel Turin NYA 3 x 4 mm ( NYM 3 x 4 ) m' xxx xxx
8 Kabel NYY. LMK uk. 2 x 1 1/2" m' xxx xxx
9 Kabel NYY. LMK uk.4 x 16 mm m' xxx xxx
10 Kabel NYY. LMK uk.2 x 2,5" mm m' xxx xxx
11 Kabel NYAF uk. 6 mm m' xxx xxx
12 Kabel Tanah uk.3 x 6 mm m' xxx xxx
13 Kabel NYY.LMK 2 x 4 mm m' xxx xxx
14 Kabel NYY.LMK 2 x 6 mm m' xxx xxx
15 Kabel NYMHY.LMK 2 x 4 mm m' xxx xxx
16 Kabel NYA.LMK uk. 10 mm m' xxx xxx
17 Kabel NYAF.LMK. Uk. 10 mm m' xxx xxx
18 Kabel NYAF.LMK. Uk. 6 mm m' xxx xxx
19 Kabel NYM 2 x 1,5 mm M' 7,000 7,000
20 Kabel NYM 2 x 2,5 mm M' 10,000 10,000

Halaman 33
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
21 Kabel NYM 3 x 2,5 mm M' 13,000 13,000
22 Kabel T.C 3 x 3,5 + 1 x 35 m' xxx xxx
23 Kabel T.C 4 x 25 m' xxx xxx
24 Lampu TL 20 Watt (merk setara Philip) komplit buah xxx xxx
25 Lampu TL 2 x 20 Watt (merk setara Philip) komplit buah xxx xxx
26 Lampu Dop Pijar (merk setara Philip) 5 Watt buah xxx xxx
27 Lampu Dop Pijar (merk setara Philip) 10 Watt buah xxx xxx
28 Lampu Dop Pijar (merk setara Philip) 15 Watt buah xxx xxx
29 Lampu Dop Pijar (merk setara Philip) 25 Watt buah xxx xxx
30 Lampu Dop Pijar (merk setara Philip) 40 Watt buah xxx xxx
31 Lampu Dop Pijar (merk setara Philip) 60 Watt buah xxx xxx
32 Lampu Dop Pijar (merk setara Philip) 75 Watt buah xxx xxx
33 Lampu Dop Pijar (merk setara Philip) 100 Watt buah xxx xxx
34 Lampu PLC (merk setara Philip) 65 Watt buah xxx xxx
35 Lampu PLC (merk setara Philip) 8 Watt buah xxx xxx
36 Lampu PLC (merk setara Philip) 14 Watt buah xxx xxx
37 Lampu PLC (merk setara Philip) 18 Watt buah xxx xxx
38 Lampu PLC (merk setara Philip) 23 Watt Bh 54,000 54,000
39 Dop LED 3 Watt (merk setara Philip) buah 39,000 39,000
40 Dop LED 5 Watt (merk setara Philip) buah 54,000 54,000
41 Dop LED 7 Watt (merk setara Philip) buah 70,000 70,000
42 Dop LED 10 Watt (merk setara Philip) buah 92,000 92,000
43 Dop LED 15 Watt (merk setara Philip) buah 120,000 120,000
44 Dop Halogen 500 Watt ( HPIT ) buah xxx xxx
45 Trafo Mercury HF 250 Watt ( GS ) buah xxx xxx
46 Trafo Mercury HF 125 Watt ( GS ) buah xxx xxx
47 Trafo Mercury HC 400 Watt / 220 Volt ( GS ) buah xxx xxx
48 Neon WD Komplit 40 Watt / 220 Volt buah xxx xxx
49 Dop Natrium NH 220 E buah xxx xxx
50 Sakelar Tunggal (merk setara Brocco) Bh 10,000 10,000
51 Sakelar Ganda (merk setara Brocco) Bh 14,000 14,000
52 Stop Kontak (merk setara Brocco) Bh 12,000 12,000
53 Zekering buah xxx xxx
54 Kap T.O 2 buah xxx xxx
55 Kap Mercury Cobra Kecil buah xxx xxx
56 Kap Mercury Cobra Besar buah xxx xxx
57 Kap Terbuka E. 27 (hijau) buah xxx xxx
58 Kap Taman Type Cristolite TO. 10 buah xxx xxx
59 Time Switch buah xxx xxx

Halaman 34
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
60 Magnetic Contractor 220 V buah xxx xxx
61 MCB 40 Ampere Bh 60,000 60,000
62 MCB 40 A ( Dobel ) buah xxx xxx
63 Panel kontrol 30 x 40 x 15 cm buah 245,000 245,000
64 Time Switch buah 397,000 397,000
65 Terminal buah xxx xxx
66 Lidah Buaya set xxx xxx
67 Perching Connector 1 B buah xxx xxx
68 Kabel NYAF 16 mm m' xxx xxx
69 Elemen + Kop + Sekring 63 A buah xxx xxx
70 Elemen + Kop + Sekring 10 A buah xxx xxx
71 Skoen 25 buah xxx xxx
72 Isolasi Kertas Besar buah xxx xxx
73 Stank Ampera Yang Besar buah xxx xxx
74 Lampu Selang Warna buah xxx xxx
75 Silkon / Foto Sensor 6 A buah xxx xxx
76 Silkon / Foto Sensor 3 A buah xxx xxx
77 Ornamen Pipa BSA uk. 1m (2") + 1m (1,5") / 2m buah xxx xxx
78 Ornamen Pipa BSA uk. 2m (2") + 1m (1,5") / 3m buah xxx xxx
79 Ornamen Pipa BSA uk. 3m (2") + 1m (1,5") / 4m buah xxx xxx
80 Ornamen Pipa BSA uk. 4m (2") + 1m (1,5") / 5m buah xxx xxx
81 Ornamen Pipa BSA uk. 5m (2") + 1m (1,5") / 6m buah xxx xxx
82 Ornamen Pipa BSA uk. 5m (2") + 2m (1,5") / 7m buah xxx xxx
83 Ornamen Pipa BSA uk. 6m (2") + 2m (1,5") / 8m buah xxx xxx
84 Ornamen Pipa BSA uk. 6m (2") + 3m (1,5") / 9m buah xxx xxx
85 Ornamen Pipa BSA uk. 1m (1,5") + 1m (1,25") / 2m buah xxx xxx
86 Ornamen Pipa BSA uk. 2m (1,5") + 1m (1,25") / 3m buah xxx xxx
87 Ornamen Pipa BSA uk. 3m (1,5") + 1m (1,25") / 4m buah xxx xxx
88 Ornamen Pipa BSA uk. 4m (1,5") + 1m (1,25") / 5m buah xxx xxx
89 Ornamen Pipa BSA uk. 5m (1,5") + 1m (1,25") / 6m buah xxx xxx
90 Ornamen Pipa BSA uk. 5m (1,5") + 2m (1,25") / 7m buah xxx xxx
91 Ornamen Pipa BSA uk. 6m (1,5") + 2m (1,25") / 8m buah xxx xxx
92 Ornamen Pipa BSA uk. 6m (1,5") + 3m (1,25") / 9m buah xxx xxx
93 Klem Begel 45 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx
94 Klem Begel 30 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx
95 Klem Begel 24 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx
96 Klem Begel 12 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx

DOT MATRIK

Halaman 35
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
1 Led High Power 5 mm buah xxx xxx
2 IC Shift Register buah xxx xxx
3 IC Buffer buah xxx xxx
4 IC Current Source buah xxx xxx
5 IC Microcontroller set xxx xxx
6 Memory set xxx xxx
7 IC RTC ( Real Time Clock ) set xxx xxx
8 PCB 35 cm x 380 cm set xxx xxx
9 Power Supply buah xxx xxx
10 PC Interface ( USB to RS485 ) set xxx xxx
11 Software set xxx xxx
12 Acrylic 3 mm lembar xxx xxx
13 Alumunium Siku 1 x 1 cm lonjor xxx xxx
14 Plat Alumunium 2 mm 1,5 x 4 cm lembar xxx xxx
15 Alumunium Kotak 2 x 4 mm lonjor xxx xxx
16 Silicon Kaca buah xxx xxx
17 PC Interface ( USB to Wireles ) set xxx xxx
18 NoteBook ( Downloder ) buah xxx xxx
19 Timah, Kabel dan Komponen Pasif set xxx xxx
20 Rumah Led buah xxx xxx
21 Sensor Suhu buah xxx xxx
22 Wireles set xxx xxx

XXIX BAHAN LAIN - LAIN


1 Spirtus Ltr 14,000 16,000
2 Sirlak India Kg 190,000 192,000
3 Pewarna Plitur Bh xxx xxx
4 Amplas Lbr 3,000 4,000
5 Minyak Tanah Ltr 14,000 14,000
6 Solar Ltr 6,000 6,000
7 Bensin Ltr 6,000 6,000
8 Kayu Bakar M3 113,000 113,000
9 Pelumas Ltr 33,000 33,000
10 Gemuk/Stempet 1/2Kg 20,000 20,000
11 Kusen Aluminium warna putih 4 " M' 81,000 81,000
12 Kusen Aluminium warna coklat 4 " M' 92,000 92,000
13 Rangka Jendela Aluminium warna putih M1 81,000 81,000
14 Rangka Jendela Aluminium warna coklat M1 98,000 98,000
15 Rangka Pintu Aluminium warna putih M1 136,000 136,000

Halaman 36
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
16 Rangka Pintu Aluminium warna coklat M1 147,000 147,000
17 Rolling Door Aluminium warna Putih M2 409,000 409,000
18 Rolling Door Aluminium Warna Coklat M2 490,000 490,000
19 Pintu Harmonika M2 1,254,000 1,254,000
20 Oker Kg 28,000 28,000
21 Lem Kayu Kg 13,000 13,000
22 Dempul Kayu (untuk plitur) Bj 2,000 2,000
23 Tandon Fiber Glass 550 ltr Bh 948,000 993,000
24 Tandon Fiber Glass 1100 ltr Bh 1,771,000 1,844,000
25 Tandon Fiber Glass 3200 ltr Bh 4,363,000 4,409,000
26 Tandon Steinless Stel 500 ltr Bh 2,442,000 2,515,000
27 Tandon Steinless Stel 1000 ltr Bh 2,727,000 2,863,000
28 Batu Alam (Piring) uk. 10x20 cm Biji 3,000 9,000
29 Batu Palimanan Halus (10 x 20) M2 96,000 98,000
30 Batu Palimanan Kasar (10 x 20) M2 96,000 98,000
31 Batu Susun Sirih M2 65,000 68,000
32 Batu Hijau Sukabumi M2 116,000 117,000
33 Batu Andesit Bakar M2 159,000 160,000
34 Batu Bali Green (polos) M2 105,000 106,000
35 Roster Karang Pilang Besar Bj 10,000 11,000
36 Roster Beton uk.30 Bj 9,000 10,000
37 Roster Karang Pilang Kecil Bj 5,000 6,000
38 Aqua Proof Kg 53,000 55,000
39 Chladianplast 100 x 80 lembar 76,000 81,000
40 Chladianplast 210 x 80 lembar 89,000 94,000
41 Chladianplast 240 x 80 lembar 101,000 109,000
42 Chladianplast 300 x 80 lembar 127,000 129,000
43 Pipa Besi Kotak 1,4 mm uk. 4 x 4 Stainless Steel Lj 113,000 122,000
44 Pipa Besi Kotak 1,4 mm uk. 2 x 4 Lj 98,000 107,000
45 Pipa Besi Kotak 1,4 mm uk. 2 x 2 Lj 57,000 66,000
46 Pipa Besi Kotak 1,6 mm uk. 5 x 5 Stainless Steel Lj 201,000 210,000
47 Cangkul buah xxx xxx
48 Gancu buah xxx xxx
49 Sekrop buah xxx xxx
50 Kuas 3 " Bh 10,000 11,000
51 Kuas 4 " Bh 14,000 15,000
52 Pagar BRC m 450,000 472,500
53 Tiang Pagar BRC buah xxx xxx
54 Poly Carbonat (P= 11,80 m, L = 2,10, Tebal 6 mm) Lbr 2,101,000 2,101,000

Halaman 37
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
55 Kalsiplank uk. 8 mm x 20 cm x 4 m M1 65,000 68,000
56 Kalsiplank uk. 8 mm x 30 cm x 4 m m' 107,000 110,000
57 Kalsiplank uk. 12 mm x 20 cm x 4 m m' xxx xxx
58 Kalsiplank uk. 12 mm x 20 cm x 4 m m' xxx xxx
59 Kalsibot/Silikabot Lbr 76,000 79,000
60 Air liter 50.00 50.00
61 Sewa alat pengelasan jam 250,000 250,000
62 Wall paper m2 xxx xxx

XXX BRONJONG ( GABION ) PABRIKAN


1 Bronjong 2.0 x 1.0 x 0.5 ( 2.7 mm ) Unit xxx xxx
2 Bronjong 3.0 x 1.0 x 0.5 ( 2.7 mm ) Unit xxx xxx
3 Bronjong 3.0 x 1.5 x 0.5 ( 2.7 mm ) Unit xxx xxx
4 Bronjong 4.0 x 1.0 x 0.5 ( 2.7 mm ) Unit xxx xxx
5 Bronjong 1.5 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx
6 Bronjong 2.0 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx
7 Bronjong 3.0 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx
8 Bronjong 4.0 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx
9 Bronjong 2.0 x 1.0 x 0.5 ( 3.0 mm ) Unit xxx xxx
10 Bronjong 3.0 x 1.0 x 0.5 ( 3.0 mm ) Unit xxx xxx
11 Bronjong 3.0 x 1.5 x 0.5 ( 3.0 mm ) Unit xxx xxx
12 Bronjong 4.0 x 1.0 x 0.5 ( 3.0 mm ) Unit xxx xxx
13 Bronjong 1.5 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx
14 Bronjong 2.0 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx
15 Bronjong 3.0 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx
16 Bronjong 4.0 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx

Halaman 38
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
XXXI TAMBAHAN BAHAN
1 Plitur Jadi Ltr 40,000.00 40,000.00
2 Pernis kayu Ltr 60,000.00 60,000.00
3 Batu Precash M2 150,000.00 150,000.00
4 Batu Sisir M2 150,000.00 150,000.00
5 Tegel Galar Merah 30 x 30 M2 xxx xxx
6 Truck Bak Terbuka Jam 163,249.00 163,249.00
7 Rangka hollow ( galvalum ) Ljr 30,000.00 30,000.00
8 Paku gypsum Kg 21,000 21,000
9 Jointing Kg 12,900 12,900
10 Cotton tape Roll 18,900 18,900
11 Cat Besi Kg 43,000 44,000
12 Meni Besi Kg 26,500 26,500
13 Cat Eksterior ( Setara Dulux Eksterior ) Kg 88,000 88,000
14 Cat Besi Dof ( setara Dulux ) Kg 80,000 80,000
15 Prototipe Ikan Ls 2,950,000 2,950,000
16 Batu Andesit Bakar M2 159,000 160,000
17 Huruf Stainless Steel Cm 12,500 12,500
18 Coating Batu Alam Ltr 55,000 55,000
15 Acrylic Tbl 5mm m2 700,000 700,000
16 Lampu LED Acrylic Unit 450,000 450,000
17 Penyambungan Unit 150,000 150,000
18 Kap Lampu Sorot untuk HPI-T 400 Watt Bh 381,000 381,000
19 Dop Lampu HPI-T 400 Watt Bh 240,000 240,000
20 Kaca Shower tbl 12mm ( ryban ) M2 750,000 810,000
21 Kunci Pintu (underlock) Bh 300,000 300,000
22 Pas. Engsel Pintu Kaca Shower Bh 315,000 315,000
23 Handle Pintu Set 180,000 180,000
24 Door Closer Dekson Bh 240,000 240,000
25 Patch Fitting Bh 540,000 540,000

Halaman 39
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
26 Engsel Pintu tanam (Floor /Top hinges) Pegas Bh 780,000 780,000
27 - - - -

XXXII TENAGA
1 Mandor Org/Hr 73,000 78,000
2 Kepala Tukang Org/Hr 69,000 73,000
3 Tukang Kayu Org/Hr 69,000 73,000
4 Tukang Batu Org/Hr 64,000 69,000
5 Tukang Besi Org/Hr 64,000 69,000
6 Tukang Cat Org/Hr 64,000 69,000
7 Tukang Acrylic Ls 50,000 55,000
8 Pekerja Org/Hr 55,000 60,000
9 Tukang Listrik Org/Hr 64,000 69,000
10 Mekanik Org/Hr 69,000 73,000
11 Pembantu Mekanik Org/Hr 60,000 64,000
12 Operator Terampil Org/Hr 91,000 96,000
13 Pembantu Operator Org/Hr 69,000 73,000
14 Sopir Terampil Org/Hr 91,000 96,000
15 Pembantu Sopir Org/Hr 69,000 73,000

Halaman 40
ASEMBAGUS
NO JENIS BAHAN SATUAN
KOTA PEGUNUNGAN
16 Penjaga Org/Hr 50,000 55,000
17 Buruh Terampil Org/Hr 60,000 64,000
18 Penganyam Org/Hr 60,000 64,000
19 Pekerja Pengisi Org/Hr 50,000 55,000

Halaman 41
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN

101,000 170,000 107,000 175,000


83,000 151,000 84,000 152,000
101,000 170,000 107,000 175,000
135,000 210,600 135,000 210,600
68,000 113,000 79,000 124,000

xxx xxx xxx xxx


245,000 313,000 206,000 274,000
245,000 313,000 177,000 245,000
226,000 294,000 170,000 238,000
201,000 270,000 170,000 238,000
201,000 270,000 170,000 238,000
136,000 204,000 118,000 186,000
177,000 245,000 189,000 257,000
500 600 500 600

331,000 331,000 331,000 331,000


322,000 322,000 322,000 322,000
314,000 314,000 314,000 314,000
283,000 283,000 283,000 283,000
xxx xxx xxx xxx
296,000 296,000 296,000 296,000
xxx xxx xxx xxx

12,000 12,000 12,000 12,000


12,000 12,000 12,000 12,000

xxx xxx xxx xxx


64,000 69,000 64,000 69,000
92,000 96,000 92,000 96,000

Halaman 42
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN

270,000 292,000 291,000 336,000


9,000 9,500 9,000 9,500

45,000 47,000 50,000 52,000


50,000 52,000 55,000 57,000
51,000 53,000 52,000 54,000
61,000 63,000 68,000 70,000
53,000 55,000 55,000 57,000
57,750 ### 57,750 57,750
33,000 37,000 37,000 43,000
39,000 41,000 41,000 49,000
45,000 43,000 43,000 50,000
411,000 413,000 510,000 512,000
28,000 30,000 45,000 47,000
159,000 160,000 175,000 177,000
198,000 200,000 198,000 200,000
437,000 439,000 510,000 512,000
505,000 507,000 596,000 598,000
xxx xxx xxx xxx
295,000 297,000 327,000 329,000
27,000 30,000 27,000 30,000

2,000 2,000 3,000 3,000


7,000 8,000 7,000 8,000
2,000 2,000 1,000 1,000
3,000 3,000 3,000 3,000
xxx xxx xxx xxx
xxx xxx xxx xxx
1,000 1,000 1,000 1,000
4,000 4,000 4,000 4,000
xxx xxx xxx xxx
xxx xxx xxx xxx
3,000 4,000 3,000 4,000
4,000 4,000 4,000 4,000
xxx xxx xxx xxx

Halaman 43
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

12,400 12,900 12,400 12,900


13,000 13,400 13,000 13,400
17,000 17,400 17,000 17,400
14,000 14,600 14,000 14,600
77,200 80,400 77,200 77,700
16,300 16,800 19,000 19,500
16,300 16,800 19,000 19,500

13,400 13,400 13,400 13,400


13,400 13,400 13,400 13,400
13,400 13,400 13,400 13,400
xxx xxx xxx xxx
11,400 ### 12,000 11,400
xxx xxx xxx xxx
xxx xxx xxx xxx
11,900 ### 12,400 11,900
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
207,000 217,000 200,000 210,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 44
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

11,800 12,200 11,800 12,200


11,800 12,200 11,800 12,200
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

127,000 128,000 110,000 110,000


76,000 77,000 68,000 69,000

Halaman 45
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN

21,000 24,000 19,000 22,000


25,000 28,000 25,000 29,000
29,000 34,000 29,000 33,000
41,000 47,000 42,000 48,000

99,000 100,000 96,000 96,000


79,000 80,000 72,000 73,000
69,000 70,000 63,000 64,000
59,000 60,000 54,000 55,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
33,000 34,000 30,000 31,000
xxx xxx xxx xxx
130,000 140,000 130,000 140,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
11,000 12,000 13,000 14,000
78,000 79,000 73,000 74,000
15,000 17,500 15,000 17,500

Halaman 46
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


13,000 13,000 17,000 17,000
13,000 13,000 14,000 14,000
21,000 21,000 22,000 22,000
22,000 22,000 28,000 28,000
xxxx xxxx xxxx xxxx
xxxx xxxx xxxx xxxx
xxxx xxxx xxxx xxxx

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
141,000 142,000 141,000 142,000
181,000 183,000 181,000 183,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
806,000 810,000 806,000 810,000
806,000 810,000 806,000 810,000
1,492,000 1,500,000 1,492,000 1,500,000
1,026,000 1,031,000 1,026,000 1,031,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 47
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 48
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

17,000 18,000 17,000 18,000


24,000 25,000 24,000 25,000
50,000 51,000 50,000 51,000
73,000 74,000 73,000 74,000
84,000 85,000 84,000 85,000
130,000 ### 130,000 130,000
218,000 219,000 218,000 219,000
295,000 296,000 295,000 296,000
470,000 471,000 470,000 471,000
1,601,000 1,602,000 1,601,000 1,602,000

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 49
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
351,000 360,000 351,000 360,000

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 50
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 51
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 52
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 53
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

13,636,000 13,681,000 13,636,000 13,681,000


10,727,000 10,772,000 10,727,000 10,772,000
14,204,000 14,250,000 14,204,000 14,250,000
8,727,000 8,772,000 8,727,000 8,772,000
11,363,000 11,409,000 10,510,000 10,556,000
10,795,000 10,840,000 9,090,000 9,136,000
11,931,000 11,977,000 11,079,000 11,124,000
10,636,000 10,681,000 8,181,000 8,227,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
6,250,000 6,295,000 5,454,000 5,500,000
5,681,000 5,727,000 3,977,000 4,022,000
10,909,000 10,954,000 6,000,000 6,045,000
5,681,000 5,727,000 3,977,000 4,022,000

Halaman 54
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
1,989,000 2,034,000 1,989,000 2,034,000
32,000 32,000 38,000 38,000
4,000 4,000 4,000 4,000
39,000 ### 38,000 38,000

45,000 47,000 45,000 47,000


56,000 58,000 61,000 63,000
73,000 75,000 73,000 75,000
xxx xxx xxx xxx
152,000 154,000 147,000 149,000
xxx xxx xxx xxx
141,000 143,000 107,000 109,000
147,000 149,000 79,000 80,000
110,000 111,000 103,000 105,000
110,000 111,000 103,000 105,000
266,000 268,000 234,000 236,000
xxx xxx xxx xxx

30,000 30,000 18,000 19,000


30,000 30,000 30,000 31,000
39,000 40,000 43,000 44,000
25,000 26,000 28,000 29,000
28,000 29,000 22,000 23,000
30,000 31,000 30,000 31,000
66,000 67,000 65,000 66,000
50,000 51,000 81,000 82,000
190,000 191,000 147,000 148,000

61,000 64,000 51,000 54,000


79,000 81,000 70,000 73,000
73,000 76,000 57,000 60,000
90,000 93,000 84,000 87,000
XX XX XX XX

Halaman 55
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


29,000 31,000 29,000 31,000

96,000 97,000 96,000 97,000


38,000 39,000 20,000 21,000
49,000 50,000 39,000 40,000
65,000 66,000 51,000 52,000
6,000 7,000 7,000 8,000
84,000 85,000 68,000 69,000
8,000 9,000 9,000 10,000
90,000 91,000 68,000 69,000

168,000 197,000 197,000 252,000


xxx xxx xxx xxx
125,000 149,000 149,000 193,000
110,000 134,000 134,000 179,000
93,000 111,000 111,000 145,000
82,000 100,000 100,000 130,000
xxx xxx xxx xxx
93,000 107,000 107,000 131,000
70,000 84,000 84,000 109,000
xxx xxx xxx xxx
60,000 70,000 70,000 90,000
30,000 35,000 35,000 45,000
35,000 41,000 41,000 54,000

78,000 84,000 84,000 97,000


78,000 82,000 82,000 92,000
69,000 74,000 74,000 84,000
69,000 73,000 73,000 83,000
64,000 70,000 70,000 80,000
64,000 68,000 68,000 77,000
72,000 78,000 78,000 90,000
70,000 75,000 75,000 85,000
61,000 66,000 66,000 76,000
64,000 69,000 69,000 80,000
54,000 59,000 59,000 69,000

Halaman 56
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


57,000 60,000 60,000 70,000
78,000 82,000 82,000 93,000
70,000 76,000 76,000 86,000
70,000 76,000 76,000 86,000
64,000 69,000 69,000 80,000
xxx xxx xxx xxx
xxx xxx xxx xxx
73,000 78,000 78,000 89,000
66,000 71,000 71,000 81,000
60,000 64,000 64,000 75,000
66,000 71,000 71,000 81,000
60,000 64,000 64,000 75,000
xxx xxx xxx xxx
20,000 23,000 23,000 30,000
25,000 26,000 27,000 34,000
xxx xxx xxx xxx
3,000 4,000 4,000 5,000

3,000 3,000 3,000 3,000


6,000 6,000 6,000 6,000
5,000 5,000 5,000 5,000
9,000 9,000 9,000 9,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
7,000 7,000 7,000 7,000
10,000 10,000 10,000 10,000

Halaman 57
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


13,000 13,000 13,000 13,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
54,000 54,000 54,000 54,000
39,000 39,000 39,000 39,000
54,000 54,000 54,000 54,000
70,000 70,000 70,000 70,000
92,000 92,000 92,000 92,000
120,000 120,000 120,000 120,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
10,000 10,000 10,000 10,000
14,000 14,000 14,000 14,000
12,000 12,000 12,000 12,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 58
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
60,000 60,000 60,000 60,000
xxx xxx xxx xxx
245,000 245,000 245,000 245,000
397,000 397,000 397,000 397,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 59
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

18,000 20,000 16,000 18,000


227,000 229,000 340,000 342,000
xxx xxx xxx xxx
4,000 5,000 4,000 5,000
14,000 14,000 14,000 14,000
6,000 6,000 6,000 6,000
6,000 6,000 6,000 6,000
136,000 136,000 113,000 113,000
34,000 34,000 33,000 33,000
20,000 20,000 20,000 20,000
84,000 84,000 81,000 81,000
92,000 92,000 92,000 92,000
109,000 109,000 101,000 101,000
120,000 120,000 113,000 113,000
150,000 150,000 141,000 141,000

Halaman 60
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


161,000 161,000 152,000 152,000
425,000 425,000 409,000 409,000
510,000 510,000 490,000 490,000
1,533,000 1,533,000 1,420,000 1,420,000
43,000 44,000 68,000 68,000
15,000 16,000 13,000 14,000
5,000 5,000 5,000 5,000
1,250,000 1,295,000 965,000 1,010,000
1,818,000 1,863,000 1,418,000 1,463,000
4,363,000 4,409,000 4,363,000 4,409,000
2,556,000 2,601,000 1,909,000 1,954,000
3,692,000 3,738,000 2,840,000 2,886,000
1,000 3,000 3,000 9,000
95,000 97,000 96,000 98,000
95,000 97,000 96,000 98,000
64,000 66,000 65,000 68,000
111,000 113,000 116,000 117,000
157,000 159,000 159,000 160,000
95,000 97,000 105,000 106,000
10,000 12,000 10,000 11,000
9,000 10,000 9,000 10,000
5,000 7,000 5,000 6,000
51,000 53,000 60,000 61,000
84,000 87,000 84,000 87,000
99,000 101,000 89,000 91,000
113,000 117,000 101,000 105,000
141,000 148,000 127,000 133,000
113,000 122,000 141,000 150,000
98,000 107,000 107,000 116,000
65,000 74,000 65,000 74,000
201,000 210,000 201,000 210,000
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
10,000 11,000 10,000 11,000
19,000 19,000 19,000 19,000
486,000 508,500 450,000 472,500
xxx xxx xxx xxx
2,836,000 2,836,000 2,101,000 2,101,000

Halaman 61
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


68,000 70,000 68,000 70,000
107,000 110,000 73,000 76,000
xxx xxx xxx xxx
xxx xxx xxx xxx
51,000 54,000 56,000 59,000
50.00 ### 50.00 50.00
250,000 ### 250,000 250,000
xxx xxx xxx xxx

xxx xxx xxx xxx


xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx
xxx xxx xxx xxx

Halaman 62
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN

40,000.00 40,000.00 40,000.00 40,000.00


60,000.00 60,000.00 60,000.00 60,000.00
150,000.00 150,000.00 150,000.00 150,000.00
150,000.00 150,000.00 150,000.00 150,000.00
xxx xxx xxx xxx
163,249.00 163,249.00 163,249.00 163,249.00
30,000.00 30,000.00 30,000.00 30,000.00
21,000 21,000 21,000 21,000
12,900 12,900 12,900 12,900
18,900 18,900 18,900 18,900
50,400 44,000 43,000 44,000
26,500 26,500 26,500 26,500
88,000 88,000 88,000 88,000
80,000 80,000 80,000 80,000
2,625,000 2,625,000 2,625,000 2,625,000
157,000 159,000 159,000 160,000
12,500 ### 4,500 12,500
55,000 ### 55,000 55,000

381,000 381,000 381,000 381,000


240,000 240,000 240,000 240,000
750,000 810,000 750,000 810,000
300,000 ### 300,000 300,000
315,000 ### 315,000 315,000
180,000 ### 180,000 180,000
240,000 ### 240,000 240,000
540,000 ### 540,000 540,000

Halaman 63
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


780,000 ### 780,000 780,000
- ### - -

73,000 78,000 73,000 78,000


69,000 73,000 69,000 73,000
69,000 73,000 69,000 73,000
64,000 69,000 64,000 69,000
64,000 69,000 64,000 69,000
64,000 69,000 64,000 69,000
50,000 55,000 50,000 55,000
55,000 60,000 55,000 60,000
64,000 69,000 64,000 69,000
69,000 73,000 69,000 73,000
60,000 64,000 60,000 64,000
91,000 96,000 91,000 96,000
69,000 73,000 69,000 73,000
91,000 96,000 91,000 96,000
69,000 73,000 69,000 73,000

Halaman 64
SITUBONDO BESUKI

KOTA PEGUNUNGAN KOTA PEGUNUNGAN


50,000 55,000 50,000 55,000
60,000 64,000 60,000 64,000
60,000 64,000 60,000 64,000
50,000 55,000 50,000 55,000

Halaman 65
DAFTAR HARGA SATUAN DASAR
BAHAN BANGUNAN DAN UPAH
KABUPATEN SITUBONDO TAHUN 2009
4 5 6
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
1 Pasir Pasang M3 92,000 160,000 101,000
2 Pasir Urug/Sirtu M3 82,000 150,000 83,000
3 Pasir Cor m3 92,000 160,000 101,000
4 Koral M3 135,000 210,600 135,000
5 Tanah Urug M3 68,000 113,000 68,000
6 Batu Pecah 1-1 (manual) m3 xxx xxx xxx
7 Batu 1-2 (Grosok Ayak/Ampyangan) M3 327,000 436,000 245,000
8 Batu Pecah 2-3 M3 234,000 310,000 245,000
9 Batu Pecah 3-5 M3 218,000 286,000 226,000
10 Batu Pecah 5-7 M3 218,000 294,000 201,000
11 Batu Pecah 10-15 M3 218,000 300,000 201,000
12 Batu Gunung/Batu Kali M3 169,000 249,000 136,000
13 Grosok (ABC) M3 196,000 278,000 177,000
14 Batu Merah Bj 600 900 500
15 Batu Pecah 0,5-1 M3 331,000 331,000 331,000
16 Batu Pecah 1-1 M3 340,000 340,000 322,000
17 Batu Pecah 1-2 M3 340,000 340,000 314,000
18 Batu Pecah 2-3 M3 340,000 340,000 283,000
19 Batu Pecah 3-5 (mesin) m3 xxx xxx xxx
20 Pasir Abu Batu M3 296,000 296,000 296,000
21 Pasir Ayak Untuk Hot Mix m3 xxx xxx xxx
22 Aspal Curah Kg 12,000 12,000 12,000
23 Aspal Kemas Kg 12,000 12,000 12,000
24 Semen 50 Kg kg #VALUE! #VALUE! xxx
25 Semen 40 Kg kg 1,600 1,725 1,600
26 Semen Putih 40 Kg kg 2,300 2,400 2,300
27 Kapur Pasang m3 291,000 336,000 270,000
28 Kapur Pasang (10 Kg) setara Puger Zak 7,200 7,700 9,000
29 Tegel Keramik 30 x 30 (polos) M2 45,000 47,000 45,000
30 Tegel Keramik 30 x 30 (warna gelap) M2 54,000 56,000 50,000
31 Tegel Keramik 40 x 40 (polos) M2 53,000 55,000 51,000
32 Tegel Keramik 40 x 40 (warna gelap) M2 60,000 62,000 61,000
33 Tegel Keramik 20 x 25 (polos) M2 52,000 54,000 53,000
34 Tegel Keramik 30 x 30 (Warna Gelap) Kasar m2 57,750 57,750 57,750
35 Tegel Abu-Abu 20 x 20 m2 37,000 43,000 33,000
36 Tegel Wavel Warna 20 x 20 m2 41,000 49,000 39,000

Halaman 66
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
37 Tegel Galar Merah 30 x 30 m2 43,000 50,000 45,000
38 Wastafel (setara INA) komplit Bh 420,000 421,000 411,000
39 Tempat Sabun Bh 27,000 29,000 28,000
40 Kloset Jongkok (setara INA) warna muda Bh 147,000 149,000 159,000
41 Kloset Jongkok (setara INA) warna tua Bh 181,000 183,000 198,000
42 Kloset Duduk (setara INA) warna muda Bh 493,000 495,000 437,000
43 Kloset Duduk (setara INA) warna tua Bh 556,000 558,000 505,000
44 Urinoir (komplit) buah xxx xxx xxx
45 Tempat Cuci Piring (komplit-setara Royal) Bh 201,000 203,000 295,000
46 Avour (KM/WC dan Bak Cuci) Bh 27,000 30,000 27,000
47 Genteng Karang Pilang ex Ambulu Bj 3,000 3,000 2,000
48 Genteng Bubungan Karang Pilang ex Ambulu Bj 7,000 8,000 7,000
49 Genteng Karang Pilang ex Kalibagor Bj 2,000 2,000 2,000
50 Genteng Bubungan Karang Pilang ex Kalibagor Bj 3,000 3,000 3,000
51 Genteng Blintong biji xxx xxx xxx
52 Genteng Bubungan Blintong biji xxx xxx xxx
53 Genteng Press Kalibagor Bj 1,000 1,000 1,000
54 Genteng Bubungan Press Kalibagor Bj 5,000 5,000 4,000
55 Genteng Mirando ex Kalibagor biji xxx xxx xxx
56 Genteng Bubungan Mirando ex Kalibagor biji xxx xxx xxx
57 Genteng Beton Bj 3,000 4,000 3,000
58 Genteng Bubungan Beton Bj 4,000 4,000 4,000
59 Genteng Bima Klass A biji xxx xxx xxx
60 Genteng Bubungan Bima Klass A biji xxx xxx xxx
61 Genteng Layur setara biji xxx xxx xxx
62 Genteng Bubungan Layur setara biji xxx xxx xxx
63 Genteng Mirando Layur biji xxx xxx xxx
64 Genteng Bubungan Mirando Layur biji xxx xxx xxx
65 Genteng Blintong Layur biji xxx xxx xxx
66 Genteng Bubungan Blintong Layur biji xxx xxx xxx
67 Genteng Metal m2 xxx xxx xxx
68 Genteng Bubungan Metal m' xxx xxx xxx
69 Roster Karang Pilang Kecil biji xxx xxx xxx
70 Roster Beton Uk. 30 biji xxx xxx xxx
71 Besi Beton Polos Kg 12,400 12,900 12,400
72 Besi Beton Ulir Kg 13,000 13,400 13,000
73 Kawat Beton Kg 17,000 17,400 17,000
74 Kawat Bronjong Kg 14,000 14,600 14,000
75 Kawat Duri rool 77,200 77,700 77,200
76 Kawel / Baut ( bahan plat ) Kg 16,300 16,800 16,300

Halaman 67
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
77 Kawel / Baut ( bahan besi ) Kg 16,300 16,800 16,300
78 WF 150 mm s/d 280 panjang 12 m Kg 13,400 13,400 13,400
79 WF 300 mm s/d 500 panjang 12 m Kg 13,400 13,400 13,400
80 WF 600 mm s/d 900 panjang 12 m Kg 13,400 13,400 13,400
81 Plat Simpul Kg xxx xxx xxx
82 Baut Baja Dia. 1/2" panjang 4" biji 12,000 12,500 11,400
83 Baut Baja Dia.1" panjang 4" biji xxx xxx xxx
84 Baut Baja Dia.1 1/4" panjang 6" biji xxx xxx xxx
85 Besi Mur Baut Angker f 1/2 panjang 30 cm biji 12,400 12,600 11,900
86 Besi Mur Baut Pagar Sandaran f 3/8 panjang 4 cm biji xxx xxx xxx
87 Besi Mur Baut Pagar Sandaran f 3/8 panjang 15 cm biji xxx xxx xxx
88 Besi Mur Baut Kuku Macan f 3/8 panjang 15 cm set xxx xxx xxx
89 Rangka Atap Baja Ringan M2 200,000 210,000 207,000
90 Profil Siku 30 x 30 x 3 kg #VALUE! #VALUE! #VALUE!
91 Profil Siku 40 x 40 x 4 kg #VALUE! #VALUE! #VALUE!
92 Profil Siku 50 x 50 x 5 kg #VALUE! #VALUE! #VALUE!
93 Profil Siku 60 x 60 x 6 kg #VALUE! #VALUE! #VALUE!
94 Profil Siku 70 x 70 x 7 kg #VALUE! #VALUE! #VALUE!
95 Profil Siku 80 x 80 x 8 kg #VALUE! #VALUE! #VALUE!
96 Profil Siku 90 x 90 x 9 kg #VALUE! #VALUE! #VALUE!
97 Profil Siku 100 x 100 x 10 kg #VALUE! #VALUE! #VALUE!
98 Profil Siku 120 x 120 x 11 kg #VALUE! #VALUE! #VALUE!
99 Profil Siku 130 x 130 x 12 kg #VALUE! #VALUE! #VALUE!
100 Profil Kanal UNP 80 x 45 x 6 x 8 x 4 kg #VALUE! #VALUE! #VALUE!
101 Profil Kanal UNP 100 x 50 x 6 x 8,5 x 4,5 kg #VALUE! #VALUE! #VALUE!
102 Profil Kanal UNP 120 x 55 x 7 x 9 x 4,5 kg #VALUE! #VALUE! #VALUE!
103 Profil Kanal UNP 140 x 60 x 7 x 10 x 5 kg #VALUE! #VALUE! #VALUE!
104 Profil kanal CNP 125 x 50 x 20 x 3,1 (3,2) kg #VALUE! #VALUE! #VALUE!
105 Profil kanal CNP 125 x 50 x 20 x 2,2 (2,3) kg #VALUE! #VALUE! #VALUE!
106 Profil kanal CNP 100 x 50 x 20 x 3,1 (3,2) kg #VALUE! #VALUE! #VALUE!
107 Profil kanal CNP 100 x 50 x 20 x 2,5 (2,3) kg #VALUE! #VALUE! #VALUE!
108 Profil kanal CNP 100 x 50 x 20 x 2,2 (3,2) lonjor xxx xxx xxx
109 Profil kanal CNP 100 x 50 x 20 x 1,8 (2,3) lonjor xxx xxx xxx
110 Plat 8 mm uk. 120 x 240 = 187 Kg kg 11,800 12,200 11,800
111 Plat 8 mm uk. 120 x 240 = 187 Kg kg 11,800 12,200 11,800
112 Plat 15 mm uk. 120 x 240 = 350 Kg kg xxx xxx xxx
113 Plat 1,2 mm uk. 120 x 240 lembar xxx xxx xxx
114 Plat 1,8 mm uk.120 x 240 lembar xxx xxx xxx
115 Plat 2,8 mm uk. 120 x 240 lembar xxx xxx xxx
116 Plat 3,8 mm uk.120 x 240 lembar xxx xxx xxx

Halaman 68
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
117 Plat strip lebar 2.5 cm tbl. 3 mm kg #VALUE! #VALUE! #VALUE!
118 Plat strip lebar 3 cm tbl. 3 mm kg #VALUE! #VALUE! #VALUE!
119 Plat strip lebar 5 cm tbl. 3 mm kg #VALUE! #VALUE! #VALUE!
120 Seng Gelombang BJLS 30 uk. 80 x 300 Lbr 109,000 110,000 127,000
121 Seng Gelombang BJLS 30 uk. 80 x 180 Lbr 68,000 69,000 76,000
122 Seng Talang BJLS 30 uk. 45 M' 21,000 24,000 21,000
123 Seng Talang BJLS 30 uk. 55 M' 25,000 29,000 25,000
124 Seng Talang BJLS 30 uk. 60 M' 29,000 34,000 29,000
125 Seng Talang BJLS 30 uk. 90 M' 41,000 48,000 41,000
126 Asbes Gelombang Kecil 300 x 105 x 4 mm Lbr 96,000 97,000 99,000
127 Asbes Gelombang Kecil 240 x 105 x 4 mm Lbr 72,000 74,000 79,000
128 Asbes Gelombang Kecil 210 x 105 x 4 mm Lbr 61,000 63,000 69,000
129 Asbes Gelombang Kecil 180 x 105 x 4 mm Lbr 54,000 55,000 59,000
130 Asbes Gelombang Besar 300 x 102 x 5 mm Lbr xxx xxx xxx
131 Asbes Gelombang Besar 250 x 102 x 5 mm Lbr xxx xxx xxx
132 Asbes Gelombang Besar 225 x 102 x 5 mm Lbr xxx xxx xxx
133 Asbes Gelombang Besar 200 x 102 x 5 mm Lbr xxx xxx xxx
134 Asbes Gelombang Besar 180 x 102 x 5 mm Lbr xxx xxx xxx
135 Nock Stel Kecil 105 cm Lbr 32,000 33,000 33,000
136 Nock Stel Besar 102 cm Lbr xxx xxx xxx
137 Seng Alumunium uk. 80 x 180 Lbr 130,000 140,000 130,000
138 xxx 0 xxx xxx xxx
139 xxx 0 xxx xxx xxx
140 xxx 0 xxx xxx xxx
141 xxx 0 xxx xxx xxx
142 xxx 0 xxx xxx xxx
143 xxx 0 xxx xxx xxx
144 xxx 0 xxx xxx xxx
145 xxx 0 xxx xxx xxx
146 xxx 0 xxx xxx xxx
147 xxx 0 xxx xxx xxx
148 xxx 0 xxx xxx xxx
149 xxx 0 xxx xxx xxx
150 xxx 0 xxx xxx xxx
151 xxx 0 xxx xxx xxx
152 xxx 0 xxx xxx xxx
153 Enternit Polos m2 11,000 12,000 11,000
154 Gypsum 9 mm Lbr 73,000 75,000 78,000
155 Gypsum list m' 15,000 17,500 15,000
156 Paku Reng Kg 17,000 17,000 13,000

Halaman 69
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
157 Paku Usuk Kg 14,000 14,000 13,000
158 Paku Triplek/Eternit Kg 24,000 24,000 21,000
159 Paku Seng Kg 25,000 25,000 22,000
160 Paku Sekrup 7,5 cm biji xxxx xxxx xxxx
161 Paku Sekrup 9 cm biji xxxx xxxx xxxx
162 Paku Sekrup 12 cm biji xxxx xxxx xxxx
163 Pipa Gl Medium 1/2" lonjor xxx xxx xxx
164 Pipa Gl Medium 3/4" lonjor xxx xxx xxx
165 Pipa Gl Medium 1" lonjor xxx xxx xxx
166 Pipa Gl Medium 1 1/4" lonjor xxx xxx xxx
167 Pipa Gl Medium 1 1/2" lonjor xxx xxx xxx
168 Pipa Gl Medium 2" lonjor xxx xxx xxx
169 Pipa Gl Medium 2 1/2" lonjor xxx xxx xxx
170 Pipa Gl Medium 3" lonjor xxx xxx xxx
171 Pipa Gl Medium 4" lonjor xxx xxx xxx
172 Pipa Gl Medium 5" lonjor xxx xxx xxx
173 Pipa Gl Medium 6" lonjor xxx xxx xxx
174 Pipa Gl Medium 8" lonjor xxx xxx xxx
175 Pipa Gl BSA 1/2" lonjor xxx xxx xxx
176 Pipa Gl BSA 3/4" M 23,500 23,667 23,500
177 Pipa Gl BSA 1" M 30,167 30,500 30,167
178 Pipa Gl BSA 1 1/4" lonjor xxx xxx xxx
179 Pipa Gl BSA 1 1/2" lonjor xxx xxx xxx
180 Pipa Gl BSA 2" M xxx xxx xxx
181 Pipa Gl BSA 2 1/2" lonjor xxx xxx xxx
182 Pipa Gl BSA 3" M 134,333 135,000 134,333
183 Pipa Gl BSA 3" M 134,333 135,000 134,333
184 Pipa Gl BSA 6" M 248,667 250,000 248,667
185 Pipa Gl BSA 4" M 171,000 171,833 171,000
186 Pipa Gl BSB 3/4" lonjor xxx xxx xxx
187 Pipa Gl BSB 1" lonjor xxx xxx xxx
188 Pipa Gl BSB 1 1/4" lonjor xxx xxx xxx
189 Pipa Gl BSB 1 1/2" lonjor xxx xxx xxx
190 Pipa Gl BSB 2" lonjor xxx xxx xxx
191 Pipa Gl BSB 2 1/2" lonjor xxx xxx xxx
192 Pipa Gl BSB 3" lonjor xxx xxx xxx
193 Pipa Gl BSB 4" lonjor xxx xxx xxx
194 DOP 1/2" buah xxx xxx xxx
195 DOP 3/4" buah xxx xxx xxx
196 DOP 1" buah xxx xxx xxx

Halaman 70
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
197 DOP 1 1/4" buah xxx xxx xxx
198 DOP 1 1/2" buah xxx xxx xxx
199 DOP 2" buah xxx xxx xxx
200 DOP 2 1/2" buah xxx xxx xxx
201 DOP 3" buah xxx xxx xxx
202 DOP 4" buah xxx xxx xxx
203 DOP 6" buah xxx xxx xxx
204 PLUG 1/2" buah xxx xxx xxx
205 PLUG 3/4" buah xxx xxx xxx
206 PLUG 1" buah xxx xxx xxx
207 PLUG 1 1/2" buah xxx xxx xxx
208 PLUG 2" buah xxx xxx xxx
209 PLUG 2 1/2" buah xxx xxx xxx
210 PLUG 3" buah xxx xxx xxx
211 SOCK 1/2" buah xxx xxx xxx
212 SOCK 3/4" buah xxx xxx xxx
213 SOCK 1" buah xxx xxx xxx
214 SOCK 1 1/4" buah xxx xxx xxx
215 SOCK 1 1/2" buah xxx xxx xxx
216 SOCK 2" buah xxx xxx xxx
217 SOCK 2 1/2" buah xxx xxx xxx
218 SOCK 3" buah xxx xxx xxx
219 SOCK 4" buah xxx xxx xxx
220 SOCK 6" buah xxx xxx xxx
221 KNIE 1/2" buah xxx xxx xxx
222 KNIE 3/4" buah xxx xxx xxx
223 KNIE 1" buah xxx xxx xxx
224 KNIE 1 1/4" buah xxx xxx xxx
225 KNIE 1 1/2" buah xxx xxx xxx
226 KNIE 2" buah xxx xxx xxx
227 KNIE 2 1/2" buah xxx xxx xxx
228 KNIE 3" buah xxx xxx xxx
229 KNIE 4" buah xxx xxx xxx
230 KNIE 6" buah xxx xxx xxx
231 DOUBLE NEPEL 1/2" buah xxx xxx xxx
232 DOUBLE NEPEL 3/4" buah xxx xxx xxx
233 DOUBLE NEPEL 1" buah xxx xxx xxx
234 DOUBLE NEPEL 1 1/4" buah xxx xxx xxx
235 DOUBLE NEPEL 1 1/2" buah xxx xxx xxx
236 DOUBLE NEPEL 2" buah xxx xxx xxx

Halaman 71
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
237 DOUBLE NEPEL 2 1/2" buah xxx xxx xxx
238 DOUBLE NEPEL 3" buah xxx xxx xxx
239 DOUBLE NEPEL 4" buah xxx xxx xxx
240 TEE 1/2" GI buah xxx xxx xxx
241 TEE 3/4" GI buah xxx xxx xxx
242 TEE 1" GI buah xxx xxx xxx
243 TEE 1 1/4" GI buah xxx xxx xxx
244 TEE 1 1/2" GI buah xxx xxx xxx
245 TEE 2" GI buah xxx xxx xxx
246 TEE 2 1/2" GI buah xxx xxx xxx
247 TEE 3" x 2" GI buah xxx xxx xxx
248 TEE 4" x 2" GI buah xxx xxx xxx
249 TEE 6" x 4" GI buah xxx xxx xxx
250 TEE 6" x 4" GI buah xxx xxx xxx
251 Kran Biasa 1/2" (besi) Bh 17,000 18,000 17,000
252 Kran Biasa 3/4" (besi) Bh 24,000 25,000 24,000
253 Stop Kran 1/2" (besi) Bh 50,000 51,000 50,000
254 Stop Kran 3/4" (besi) Bh 73,000 74,000 73,000
255 Ball Valve 3/4" (PVC) Bh 84,000 85,000 84,000
256 Ball Valve 1" (PVC) Bh 130,000 130,000 130,000
257 Ball Valve 1 1/4" (PVC) Bh 218,000 219,000 218,000
258 Ball Valve 1 1/2" (PVC) Bh 295,000 296,000 295,000
259 Ball Valve 2" (PVC) Bh 470,000 471,000 470,000
260 Ball Valve 3" (PVC) Bh 1,601,000 1,602,000 1,601,000
261 PIPA PVC 1/2" m' #VALUE! #VALUE! #VALUE!
262 PIPA PVC 3/4" m'
263 PIPA PVC 1" m'
264 PIPA PVC 1 1/4" m'
265 PIPA PVC 1 1/2" m'
266 PIPA PVC 2" m'
267 PIPA PVC 2 1/2" m'
268 PIPA PVC 4" m' 87,750 90,000 87,750
269 PIPA PVC 1/2" m' #VALUE! #VALUE! #VALUE!
270 PIPA PVC 3/4" m'
271 PIPA PVC 1" m'
272 PIPA PVC 1 1/4" m'
273 PIPA PVC 1 1/2" m'
274 PIPA PVC 2" m'
275 PIPA PVC 2 1/2" m'
276 PIPA PVC 3" m'

Halaman 72
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
277 PIPA PVC 2" m' #VALUE! #VALUE! #VALUE!
278 PIPA PVC 2 1/2" m'
279 PIPA PVC 3" m'
280 PIPA PVC 4" m'
281 PIPA PVC 5" m'
282 PIPA PVC 6" m'
283 PIPA PVC 8" m'
284 PIPA PVC 10" m'
285 PIPA PVC 12" m'
286 PIPA PVC 1/2" ( MOF P = 6 M - 12,5 S ) m' #VALUE! #VALUE! xxx
287 PIPA PVC 3/4" ( MOF P = 6 M - 12,5 S ) m' #VALUE!
288 PIPA PVC 1" ( MOF P = 6 M - 12,5 S ) m' xxx
289 PIPA PVC 1 1/4" ( MOF P = 6 M - 12,5 S ) m' #VALUE!
290 PIPA PVC 1 1/2" ( MOF P = 6 M - 12,5 S ) m'
291 PIPA PVC 2" ( MOF P = 6 M - 12,5 S ) m'
292 PIPA PVC 2 1/2" ( MOF P = 6 M - 12,5 S ) m'
293 PIPA PVC 3" ( MOF P = 6 M - 12,5 S ) m'
294 PIPA PVC 4" ( MOF P = 6 M - 12,5 S ) m'
295 PIPA PVC 6" ( MOF P = 6 M - 12,5 S ) m'
296 PIPA PVC 8" ( MOF P = 6 M - 12,5 S ) m'
297 PIPA PVC 10" ( MOF P = 6 M - 12,5 S ) m'
298 PIPA PVC 12" ( MOF P = 6 M - 12,5 S ) m'
299 PIPA PVC 2" ( RR P = 6 M - 10 S ) m' #VALUE! #VALUE! #VALUE!
300 PIPA PVC 2 1/2" ( RR P = 6 M - 10 S ) m'
301 PIPA PVC 3" ( RR P = 6 M - 10 S ) m'
302 PIPA PVC 4" ( RR P = 6 M - 10 S ) m'
303 PIPA PVC 6" ( RR P = 6 M - 10 S ) m'
304 PIPA PVC 8" ( RR P = 6 M - 10 S ) m'
305 PIPA PVC 2" ( RR P = 6 M - 12,5 S ) m' #VALUE! #VALUE! #VALUE!
306 PIPA PVC 2 1/2" ( RR P = 6 M - 12,5 S ) m'
307 PIPA PVC 3" ( RR P = 6 M - 12,5 S ) m'
308 PIPA PVC 4" ( RR P = 6 M - 12,5 S ) m'
309 PIPA PVC 6" ( RR P = 6 M - 12,5 S ) m'
310 PIPA PVC 8" ( RR P = 6 M - 12,5 S ) m'
311 Air Valve 1" buah xxx xxx xxx
312 Air Valve 2" buah xxx xxx xxx
313 Air Valve 3" buah xxx xxx xxx
314 Baut Mur 5/8" x 2" buah xxx xxx xxx
315 Baut Mur 5/8" x 2,5" buah xxx xxx xxx
316 Baut Mur 5/8" x 3" buah xxx xxx xxx

Halaman 73
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
317 Baut Mur 5/8" x 4" buah xxx xxx xxx
318 Baut Mur 3/4" x 2,5" buah xxx xxx xxx
319 Baut Mur 3/4" x 3" buah xxx xxx xxx
320 Clamp Sadle 2" x 3/4" buah xxx xxx xxx
321 Clamp Sadle 3 x 3/4" buah xxx xxx xxx
322 Clamp Sadle 4" x 3/4" buah xxx xxx xxx
323 Clamp Sadle 6" buah xxx xxx xxx
324 Flange Las 2" buah xxx xxx xxx
325 Flange Las 2 1/2" buah xxx xxx xxx
326 Flange Las 3" buah xxx xxx xxx
327 Flange Las 4" buah xxx xxx xxx
328 Giboult Joint 2" buah xxx xxx xxx
329 Giboult Joint 3" buah xxx xxx xxx
330 Giboult Joint 4" buah xxx xxx xxx
331 Giboult Joint 6" buah xxx xxx xxx
332 HU (Hidrant Umum) Type Conical 1m3 buah xxx xxx xxx
333 HU (Hidrant Umum) Type Conical 2m3 buah xxx xxx xxx
334 HU (Hidrant Umum) Type Conical 3m3 buah xxx xxx xxx
335 HU (Hidrant Umum) Type Conical 4m3 buah xxx xxx xxx
336 Reducer GI 3/4" x 1/2 " buah xxx xxx xxx
337 Reducer GI 1" x 1/2 " buah xxx xxx xxx
338 Reducer GI 2" x 1 " buah xxx xxx xxx
339 Reducer GI 3" x 2 " buah xxx xxx xxx
340 Reducer GI 4" x 2" buah xxx xxx xxx
341 Reducer GI 4" x 3" buah xxx xxx xxx
342 Reducer GI 6" x 2" buah xxx xxx xxx
343 Reducer GI 6" x 3" buah xxx xxx xxx
344 Reducer GI 6" x 4" buah xxx xxx xxx
345 Reducer PVC Moof 1 1/2" x 1" buah xxx xxx xxx
346 Reducer PVC Moof 2" x 1 1/2" buah xxx xxx xxx
347 Reducer PVC Moof 2" x 1" buah xxx xxx xxx
348 Reducer PVC Moof 3" x 2" buah xxx xxx xxx
349 Reducer PVC Moof 4" x 2" buah xxx xxx xxx
350 Reducer PVC Moof 4" x 3" buah xxx xxx xxx
351 Reducer PVC Moof 6" x 2" buah xxx xxx xxx
352 Reducer PVC Moof 6" x 3" buah xxx xxx xxx
353 Reducer PVC Moof 6" x 4" buah xxx xxx xxx
354 Sock Drat PVC 1/2" buah xxx xxx xxx
355 Sock Drat PVC 3/4" buah xxx xxx xxx
356 Sock Drat PVC 1" buah xxx xxx xxx

Halaman 74
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
357 Sock Drat PVC 1 1/4" buah xxx xxx xxx
358 Sock Drat PVC 1 1/2" buah xxx xxx xxx
359 Sock Drat PVC 2" buah xxx xxx xxx
360 Sock Drat PVC 2 1/2" buah xxx xxx xxx
361 Sock Drat PVC 3" buah xxx xxx xxx
362 Sock Drat PVC 4" buah xxx xxx xxx
363 Stop Kran 1" buah xxx xxx xxx
364 Stop Kran 1 1/4" buah xxx xxx xxx
365 Stop Kran 1 1/2" buah xxx xxx xxx
366 Stop Kran 2" (Gate Valve) buah xxx xxx xxx
367 Stop Kran 3" (Gate Valve) buah xxx xxx xxx
368 Stop Kran 4" (Gate Valve) buah xxx xxx xxx
369 Stop Kran 6" (Gate Valve) buah xxx xxx xxx
370 Straatpot 4" buah xxx xxx xxx
371 Straatpot 6" buah xxx xxx xxx
372 Tee All Flange 3" x 3" buah xxx xxx xxx
373 Tee All Flange 4" x 2" buah xxx xxx xxx
374 Tee All Flange 4" x 3" buah xxx xxx xxx
375 Tee All Flange 4" x 4" buah xxx xxx xxx
376 Tee GI 1/2" buah xxx xxx xxx
377 Tee GI 3/4" buah xxx xxx xxx
378 Tee GI 1" buah xxx xxx xxx
379 Tee GI 1 1/4" buah xxx xxx xxx
380 Tee GI 1 1/2" buah xxx xxx xxx
381 Tee GI 2" buah xxx xxx xxx
382 Tee GI 2 1/2" buah xxx xxx xxx
383 Tee GI 3" buah xxx xxx xxx
384 Tee GI 4" buah xxx xxx xxx
385 Manhole 60 x 60 (Plat Baja) + Pengunci buah xxx xxx xxx
386 Formika (90 x 120 cm) lembar xxx xxx xxx
387 Pipa Screen buah xxx xxx xxx
388 Kabel Sling (Wire Rop) Baja F 20 mm m' xxx xxx xxx
389 Kabel Sling (Wire Rop) Baja F 10 mm m' xxx xxx xxx
390 Bak Mandi Fibre 60 x 60 buah xxx xxx xxx
391 Ass (Rol) buah xxx xxx xxx
392 Klem Pengapit buah xxx xxx xxx
393 Track Skhor buah xxx xxx xxx
394 Klem GI 1/2" buah xxx xxx xxx
395 Klem GI 3/4" buah xxx xxx xxx
396 Klem GI 1" buah xxx xxx xxx

Halaman 75
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
397 Klem GI 1 1/4" buah xxx xxx xxx
398 Klem GI 1 1/2" buah xxx xxx xxx
399 Klem GI 2" buah xxx xxx xxx
400 Klem GI 2 1/2" buah xxx xxx xxx
401 Klem GI 3" buah xxx xxx xxx
402 Klem GI 4" buah xxx xxx xxx
403 Kaki Rangka HU set xxx xxx xxx
404 Kunci Pipa Besar set xxx xxx xxx
405 Kunci Pipa Kecil set xxx xxx xxx
406 Pohon Jambu Air F 5 cm pohon xxx xxx xxx
407 Ijuk Aren kg xxx xxx xxx
408 Katup Apung buah xxx xxx xxx
409 Wall Pipe buah xxx xxx xxx
410 Kayu Jati 8/12 ; 6/12 (Klass B) M3 13,636,000 13,681,000 13,636,000
411 Kayu Jati Usuk 5/7 ; 4/6 (Klass B) M3 10,727,000 10,772,000 10,727,000
412 Kayu Jati Papan 2/20 ; 3/30 ; 4/20 (Klass B) M3 14,204,000 14,250,000 14,204,000
413 Kayu Jati Reng 2/3 ; 3/5 (Klass C) M3 8,727,000 8,772,000 8,727,000
414 Kayu Kamper 8/12 ; 6/12 M3 10,510,000 10,556,000 11,363,000
415 Kayu Kamper Usuk 5/7 ; 4/6 M3 9,090,000 9,136,000 10,795,000
416 Kayu Kamper Papan 2/20 ; 3/30 ; 4/20 M3 11,079,000 11,124,000 11,931,000
417 Kayu Kamper Reng 2/3 ; 3/5 M3 8,181,000 8,227,000 10,636,000
418 Kayu Bengkirai 8/12 ; 6/12 m3 xxx xxx xxx
419 Kayu Bengkirai Usuk 5/7 ; 4/6 ; 3/5 m3 xxx xxx xxx
420 Kayu Bengkirai Papan 2/20 ; 3/30 ; 4/20 m3 xxx xxx xxx
421 Kayu Meranti 8/12 ; 6/12 M3 5,454,000 5,500,000 6,250,000
422 Kayu Meranti Usuk 5/7 ; 4/6 M3 3,977,000 4,022,000 5,681,000
423 Kayu Meranti Papan 2/20 ; 3/30 ; 4/20 M3 6,000,000 6,045,000 10,909,000
424 Kayu Meranti Reng 2/3 ; 3/5 M3 3,977,000 4,022,000 5,681,000
425 Kayu Papan Sapen m3 xxx xxx xxx
426 Kayu Kruing 5/7 ; 6/12 ; 8/12 ; 8/15 M3 xxx xxx xxx
427 Kayu Ulin 8/12 ; 6/12 m3 xxx xxx xxx
428 Kayu ( Bekisting ) M3 1,989,000 2,034,000 1,989,000
429 Bambu Lj 28,000 28,000 32,000
430 Kayu List 1/5 Meranti Lj 4,000 4,000 4,000
431 Sesek Bambu Lbr 38,000 38,000 39,000
432 Triplek 122 x 244 x 2 mm Lbr 40,000 41,000 45,000
433 Triplek 122 x 244 x 3 mm Lbr 54,000 56,000 56,000
434 Triplek 122 x 210 x 4 mm Lbr 70,000 72,000 73,000
435 Triplek 92 x 210 x 9 mm lembar xxx xxx xxx
436 Multiplek 122 x 244 x 9 mm Lbr 125,000 127,000 152,000

Halaman 76
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
437 Multiplek 92 x 210 x 9 mm lembar xxx xxx xxx
438 TeakWood 122 x 244 x 3 mm Lbr 139,000 140,000 141,000
439 TeakWood 92 x 210 x 3 mm Lbr 92,000 94,000 147,000
440 Triplek 92 x 210 x 3 mm lapis aluminium Lbr 109,000 110,000 110,000
441 Triplek 92 x 210 x 3 mm lapis aluminium garis Lbr 103,000 105,000 110,000
442 Teak bloks (lapis jati) Lbr 238,000 240,000 266,000
443 Parquite Jati m2 xxx xxx xxx
444 Plamir Tembok Kg 16,000 17,000 30,000
445 Plamir Kayu Kg 25,000 26,000 30,000
446 Cat Genteng Kg 39,000 40,000 39,000
447 Cat Tembok (Setara Cathilac) Kg 27,000 28,000 25,000
448 Minyak Cat Ltr 27,000 28,000 28,000
449 Meni Kayu Kg 25,000 26,000 30,000
450 Cat Kayu (Setara Emco) Kg 73,000 74,000 66,000
451 Cat Brown Kg 48,000 49,000 50,000
452 Ter 1 Blek = 10L Blek 170,000 170,000 190,000
453 Kaca polos 3 mm M2 61,000 70,000 61,000
454 Kaca polos 5 mm M2 90,000 100,000 79,000
455 Kaca Ryban 3 mm M2 72,000 81,000 73,000
456 Kaca Ryban 5 mm M2 106,000 115,000 90,000
457 Kerangka Kaca Nako Ukr. 10 x 100 Daun XXX XX XX
458 Glass Block Bj 29,000 31,000 29,000
459 Kunci 2 x putar Bh 109,000 110,000 96,000
460 Engsel jendela nylon arch asli Bh 27,000 28,000 38,000
461 Engsel pintu nylon arch asli Bh 40,000 41,000 49,000
462 Engsel singapur Bh 51,000 52,000 65,000
463 Grendel Jendela Bh 5,000 6,000 6,000
464 Grendel Tanam Bh 61,000 62,000 84,000
465 Hak angin biasa Bh 7,000 8,000 8,000
466 Kunci Bulat Bh 45,000 46,000 90,000
467 Buis Beton bulat diameter 1,00 x 0,5 Bj 197,000 252,000 168,000
468 Buis Beton bulat diameter 0,90 x 0,50 biji xxx xxx xxx
469 Buis Beton bulat diameter 0,80 x 0,50 Bj 149,000 193,000 125,000
470 Buis Beton bulat diameter 0,70 x 0,50 Bj 134,000 179,000 110,000
471 Buis Beton bulat diameter 0,60 x 0,50 Bj 111,000 145,000 93,000
472 Buis Beton bulat diameter 0,50 x 0,50 Bj 100,000 130,000 82,000
473 Buis Beton bulat diameter 0,50 x 1 biji xxx xxx xxx
474 Buis Beton bulat diameter 0,40 x 1 Bj 107,000 131,000 93,000
475 Buis Beton bulat diameter 0,30 x 1 Bj 84,000 109,000 70,000
476 Buis Beton bulat diameter 0,25 x 1 biji xxx xxx xxx

Halaman 77
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
477 Buis Beton bulat diameter 0,20 x 1 Bj 70,000 90,000 60,000
478 Buis Beton Sigaran diameter 0,20 x 1 Bj 35,000 45,000 30,000
479 Buis Beton Sigaran diameter 0,30 x 1 Bj 41,000 54,000 35,000
480 Paving Stone Kotak tebal 8 cm (warna) kasar M2 84,000 97,000 78,000
481 Paving Stone Kotak tebal 8 cm (warna) halus M2 82,000 92,000 78,000
482 Paving Stone Kotak tebal 7 cm (warna) kasar M2 74,000 84,000 69,000
483 Paving Stone Kotak tebal 7 cm (warna) halus M2 73,000 83,000 69,000
484 Paving Stone Kotak tebal 6 cm (warna) kasar M2 70,000 80,000 64,000
485 Paving Stone Kotak tebal 6 cm (warna) halus M2 68,000 77,000 64,000
486 Paving Stone Kotak tebal 8 cm (abu-abu) kasar M2 78,000 90,000 72,000
487 Paving Stone Kotak tebal 8 cm (abu-abu) halus M2 75,000 85,000 70,000
488 Paving Stone Kotak tebal 7 cm (abu-abu) kasar M2 66,000 76,000 61,000
489 Paving Stone Kotak tebal 7 cm (abu-abu) halus M2 69,000 80,000 64,000
490 Paving Stone Kotak tebal 6 cm (abu-abu) kasar M2 59,000 69,000 54,000
491 Paving Stone Kotak tebal 6 cm (abu-abu) halus M2 60,000 70,000 57,000
492 Pav. Stone Segi 8 t = 7 cm (warna) halus M2 82,000 93,000 78,000
493 Pav. Stone Segi 8 t = 6 cm (warna) halus M2 76,000 86,000 70,000
494 Pav. Stone Segi 8 t = 7 cm (abu-abu) halus M2 76,000 86,000 70,000
495 Pav. Stone Segi 8 t = 6 cm (abu-abu) halus M2 69,000 80,000 64,000
496 xxx xxx xxx xxx xxx
497 xxx xxx xxx xxx xxx
498 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (warna) halus M2 78,000 89,000 73,000
499 Pav. Stone 3 Berlian/Segi 6 t = 6 cm (warna) halus M2 71,000 81,000 66,000
500 Pav. Stone 3 Berlian/Segi 6 t = 5 cm (warna) halus M2 64,000 75,000 60,000
501 Pav. Stone 3 Berlian/Segi 6 t = 7 cm (abu-abu) halus M2 71,000 81,000 66,000
502 Pav. Stone Segi 6 t = 6 cm (abu-abu) halus M2 64,000 75,000 60,000
503 xxx xxx xxx xxx xxx
504 Kanstein uk. 10 x 30 x 50 Bj 23,000 30,000 20,000
505 Kanstein uk. 15 x 30 x 50 Bj 27,000 34,000 25,000
506 Kanstein Trotoar uk. 10 x 40 x 50 biji xxx xxx xxx
507 Batako Uk.10 x 20 x 40 Bj 4,000 5,000 3,000
508 NYA 1,5 mm M' 3,000 3,000 3,000
509 NYA 2,5 mm M' 6,000 6,000 6,000
510 NYA 4 mm M' 5,000 5,000 5,000
511 NYA 6 mm M' 9,000 9,000 9,000
512 Twistel kabel 2 x 10 mm m' xxx xxx xxx
513 Twistel kabel 2 x 16 mm m' xxx xxx xxx
514 Kabel Turin NYA 3 x 4 mm ( NYM 3 x 4 ) m' xxx xxx xxx
515 Kabel NYY. LMK uk. 2 x 1 1/2" m' xxx xxx xxx
516 Kabel NYY. LMK uk.4 x 16 mm m' xxx xxx xxx

Halaman 78
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
517 Kabel NYY. LMK uk.2 x 2,5" mm m' xxx xxx xxx
518 Kabel NYAF uk. 6 mm m' xxx xxx xxx
519 Kabel Tanah uk.3 x 6 mm m' xxx xxx xxx
520 Kabel NYY.LMK 2 x 4 mm m' xxx xxx xxx
521 Kabel NYY.LMK 2 x 6 mm m' xxx xxx xxx
522 Kabel NYMHY.LMK 2 x 4 mm m' xxx xxx xxx
523 Kabel NYA.LMK uk. 10 mm m' xxx xxx xxx
524 Kabel NYAF.LMK. Uk. 10 mm m' xxx xxx xxx
525 Kabel NYAF.LMK. Uk. 6 mm m' xxx xxx xxx
526 Kabel NYM 2 x 1,5 mm M' 7,000 7,000 7,000
527 Kabel NYM 2 x 2,5 mm M' 10,000 10,000 10,000
528 Kabel NYM 3 x 2,5 mm M' 13,000 13,000 13,000
529 Kabel T.C 3 x 3,5 + 1 x 35 m' xxx xxx xxx
530 Kabel T.C 4 x 25 m' xxx xxx xxx
531 Lampu TL 20 Watt (merk setara Philip) komplit buah xxx xxx xxx
532 Lampu TL 2 x 20 Watt (merk setara Philip) komplit buah xxx xxx xxx
533 Lampu Dop Pijar (merk setara Philip) 5 Watt buah xxx xxx xxx
534 Lampu Dop Pijar (merk setara Philip) 10 Watt buah xxx xxx xxx
535 Lampu Dop Pijar (merk setara Philip) 15 Watt buah xxx xxx xxx
536 Lampu Dop Pijar (merk setara Philip) 25 Watt buah xxx xxx xxx
537 Lampu Dop Pijar (merk setara Philip) 40 Watt buah xxx xxx xxx
538 Lampu Dop Pijar (merk setara Philip) 60 Watt buah xxx xxx xxx
539 Lampu Dop Pijar (merk setara Philip) 75 Watt buah xxx xxx xxx
540 Lampu Dop Pijar (merk setara Philip) 100 Watt buah xxx xxx xxx
541 Lampu PLC (merk setara Philip) 65 Watt buah xxx xxx xxx
542 Lampu PLC (merk setara Philip) 8 Watt buah xxx xxx xxx
543 Lampu PLC (merk setara Philip) 14 Watt buah xxx xxx xxx
544 Lampu PLC (merk setara Philip) 18 Watt buah xxx xxx xxx
545 Lampu PLC (merk setara Philip) 23 Watt Bh 54,000 54,000 54,000
546 Dop LED 3 Watt (merk setara Philip) buah 39,000 39,000 39,000
547 Dop LED 5 Watt (merk setara Philip) buah 54,000 54,000 54,000
548 Dop LED 7 Watt (merk setara Philip) buah 70,000 70,000 70,000
549 Dop LED 10 Watt (merk setara Philip) buah 92,000 92,000 92,000
550 Dop LED 15 Watt (merk setara Philip) buah 120,000 120,000 120,000
551 Dop Halogen 500 Watt ( HPIT ) buah xxx xxx xxx
552 Trafo Mercury HF 250 Watt ( GS ) buah xxx xxx xxx
553 Trafo Mercury HF 125 Watt ( GS ) buah xxx xxx xxx
554 Trafo Mercury HC 400 Watt / 220 Volt ( GS ) buah xxx xxx xxx
555 Neon WD Komplit 40 Watt / 220 Volt buah xxx xxx xxx
556 Dop Natrium NH 220 E buah xxx xxx xxx

Halaman 79
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
557 Sakelar Tunggal (merk setara Brocco) Bh 10,000 10,000 10,000
558 Sakelar Ganda (merk setara Brocco) Bh 14,000 14,000 14,000
559 Stop Kontak (merk setara Brocco) Bh 12,000 12,000 12,000
560 Zekering buah xxx xxx xxx
561 Kap T.O 2 buah xxx xxx xxx
562 Kap Mercury Cobra Kecil buah xxx xxx xxx
563 Kap Mercury Cobra Besar buah xxx xxx xxx
564 Kap Terbuka E. 27 (hijau) buah xxx xxx xxx
565 Kap Taman Type Cristolite TO. 10 buah xxx xxx xxx
566 Time Switch buah xxx xxx xxx
567 Magnetic Contractor 220 V buah xxx xxx xxx
568 MCB 40 Ampere Bh 60,000 60,000 60,000
569 MCB 40 A ( Dobel ) buah xxx xxx xxx
570 Panel kontrol 30 x 40 x 15 cm buah 245,000 245,000 245,000
571 Time Switch buah 397,000 397,000 397,000
572 Terminal buah xxx xxx xxx
573 Lidah Buaya set xxx xxx xxx
574 Perching Connector 1 B buah xxx xxx xxx
575 Kabel NYAF 16 mm m' xxx xxx xxx
576 Elemen + Kop + Sekring 63 A buah xxx xxx xxx
577 Elemen + Kop + Sekring 10 A buah xxx xxx xxx
578 Skoen 25 buah xxx xxx xxx
579 Isolasi Kertas Besar buah xxx xxx xxx
580 Stank Ampera Yang Besar buah xxx xxx xxx
581 Lampu Selang Warna buah xxx xxx xxx
582 Silkon / Foto Sensor 6 A buah xxx xxx xxx
583 Silkon / Foto Sensor 3 A buah xxx xxx xxx
584 Ornamen Pipa BSA uk. 1m (2") + 1m (1,5") / 2m buah xxx xxx xxx
585 Ornamen Pipa BSA uk. 2m (2") + 1m (1,5") / 3m buah xxx xxx xxx
586 Ornamen Pipa BSA uk. 3m (2") + 1m (1,5") / 4m buah xxx xxx xxx
587 Ornamen Pipa BSA uk. 4m (2") + 1m (1,5") / 5m buah xxx xxx xxx
588 Ornamen Pipa BSA uk. 5m (2") + 1m (1,5") / 6m buah xxx xxx xxx
589 Ornamen Pipa BSA uk. 5m (2") + 2m (1,5") / 7m buah xxx xxx xxx
590 Ornamen Pipa BSA uk. 6m (2") + 2m (1,5") / 8m buah xxx xxx xxx
591 Ornamen Pipa BSA uk. 6m (2") + 3m (1,5") / 9m buah xxx xxx xxx
592 Ornamen Pipa BSA uk. 1m (1,5") + 1m (1,25") / 2m buah xxx xxx xxx
593 Ornamen Pipa BSA uk. 2m (1,5") + 1m (1,25") / 3m buah xxx xxx xxx
594 Ornamen Pipa BSA uk. 3m (1,5") + 1m (1,25") / 4m buah xxx xxx xxx
595 Ornamen Pipa BSA uk. 4m (1,5") + 1m (1,25") / 5m buah xxx xxx xxx
596 Ornamen Pipa BSA uk. 5m (1,5") + 1m (1,25") / 6m buah xxx xxx xxx

Halaman 80
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
597 Ornamen Pipa BSA uk. 5m (1,5") + 2m (1,25") / 7m buah xxx xxx xxx
598 Ornamen Pipa BSA uk. 6m (1,5") + 2m (1,25") / 8m buah xxx xxx xxx
599 Ornamen Pipa BSA uk. 6m (1,5") + 3m (1,25") / 9m buah xxx xxx xxx
600 Klem Begel 45 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx xxx
601 Klem Begel 30 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx xxx
602 Klem Begel 24 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx xxx
603 Klem Begel 12 cm 0,005 x 0,05 (4 PS)/set buah xxx xxx xxx
604 Led High Power 5 mm buah xxx xxx xxx
605 IC Shift Register buah xxx xxx xxx
606 IC Buffer buah xxx xxx xxx
607 IC Current Source buah xxx xxx xxx
608 IC Microcontroller set xxx xxx xxx
609 Memory set xxx xxx xxx
610 IC RTC ( Real Time Clock ) set xxx xxx xxx
611 PCB 35 cm x 380 cm set xxx xxx xxx
612 Power Supply buah xxx xxx xxx
613 PC Interface ( USB to RS485 ) set xxx xxx xxx
614 Software set xxx xxx xxx
615 Acrylic 3 mm lembar xxx xxx xxx
616 Alumunium Siku 1 x 1 cm lonjor xxx xxx xxx
617 Plat Alumunium 2 mm 1,5 x 4 cm lembar xxx xxx xxx
618 Alumunium Kotak 2 x 4 mm lonjor xxx xxx xxx
619 Silicon Kaca buah xxx xxx xxx
620 PC Interface ( USB to Wireles ) set xxx xxx xxx
621 NoteBook ( Downloder ) buah xxx xxx xxx
622 Timah, Kabel dan Komponen Pasif set xxx xxx xxx
623 Rumah Led buah xxx xxx xxx
624 Sensor Suhu buah xxx xxx xxx
625 Wireles set xxx xxx xxx
626 Spirtus Ltr 14,000 16,000 18,000
627 Sirlak India Kg 190,000 192,000 227,000
628 Pewarna Plitur Bh xxx xxx xxx
629 Amplas Lbr 3,000 4,000 4,000
630 Minyak Tanah Ltr 14,000 14,000 14,000
631 Solar Ltr 6,000 6,000 6,000
632 Bensin Ltr 6,000 6,000 6,000
633 Kayu Bakar M3 113,000 113,000 136,000
634 Pelumas Ltr 33,000 33,000 34,000
635 Gemuk/Stempet 1/2Kg 20,000 20,000 20,000
636 Kusen Aluminium warna putih 4 " M' 81,000 81,000 84,000

Halaman 81
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
637 Kusen Aluminium warna coklat 4 " M' 92,000 92,000 92,000
638 Rangka Jendela Aluminium warna putih M1 81,000 81,000 109,000
639 Rangka Jendela Aluminium warna coklat M1 98,000 98,000 120,000
640 Rangka Pintu Aluminium warna putih M1 136,000 136,000 150,000
641 Rangka Pintu Aluminium warna coklat M1 147,000 147,000 161,000
642 Rolling Door Aluminium warna Putih M2 409,000 409,000 425,000
643 Rolling Door Aluminium Warna Coklat M2 490,000 490,000 510,000
644 Pintu Harmonika M2 1,254,000 1,254,000 1,533,000
645 Oker Kg 28,000 28,000 43,000
646 Lem Kayu Kg 13,000 13,000 15,000
647 Dempul Kayu (untuk plitur) Bj 2,000 2,000 5,000
648 Tandon Fiber Glass 550 ltr Bh 948,000 993,000 1,250,000
649 Tandon Fiber Glass 1100 ltr Bh 1,771,000 1,844,000 1,818,000
650 Tandon Fiber Glass 3200 ltr Bh 4,363,000 4,409,000 4,363,000
651 Tandon Steinless Stel 500 ltr Bh 2,442,000 2,515,000 2,556,000
652 Tandon Steinless Stel 1000 ltr Bh 2,727,000 2,863,000 3,692,000
653 Batu Alam (Piring) uk. 10x20 cm Biji 3,000 9,000 1,000
654 Batu Palimanan Halus (10 x 20) M2 96,000 98,000 95,000
655 Batu Palimanan Kasar (10 x 20) M2 96,000 98,000 95,000
656 Batu Susun Sirih M2 65,000 68,000 64,000
657 Batu Hijau Sukabumi M2 116,000 117,000 111,000
658 Batu Andesit Bakar M2 159,000 160,000 157,000
659 Batu Bali Green (polos) M2 105,000 106,000 95,000
660 Roster Karang Pilang Besar Bj 10,000 11,000 10,000
661 Roster Beton uk.30 Bj 9,000 10,000 9,000
662 Roster Karang Pilang Kecil Bj 5,000 6,000 5,000
663 Aqua Proof Kg 53,000 55,000 51,000
664 Chladianplast 100 x 80 lembar 76,000 81,000 84,000
665 Chladianplast 210 x 80 lembar 89,000 94,000 99,000
666 Chladianplast 240 x 80 lembar 101,000 109,000 113,000
667 Chladianplast 300 x 80 lembar 127,000 129,000 141,000
668 Pipa Besi Kotak 1,4 mm uk. 4 x 4 Stainless Steel M1 28,250 30,500 28,250
669 Pipa Besi Kotak 1,4 mm uk. 2 x 4 m' 16,333 17,833 16,333
670 Pipa Besi Kotak 1,4 mm uk. 2 x 2 Lj 57,000 66,000 65,000
671 Pipa Besi Kotak 1,6 mm uk. 5 x 5 Stainless Steel M1 8,375 8,750 8,375
672 Cangkul buah xxx xxx xxx
673 Gancu buah xxx xxx xxx
674 Sekrop buah xxx xxx xxx
675 Kuas 3 " Bh 10,000 11,000 10,000
676 Kuas 4 " Bh 14,000 15,000 19,000

Halaman 82
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
677 Pagar BRC m 450,000 472,500 486,000
678 Tiang Pagar BRC buah xxx xxx xxx
679 Poly Carbonat (P= 11,80 m, L = 2,10, Tebal 6 mm) m2 236,363 236,363 319,050
680 Kalsiplank uk. 8 mm x 20 cm x 4 m M1 65,000 68,000 68,000
681 Kalsiplank uk. 8 mm x 30 cm x 4 m m' 107,000 110,000 107,000
682 Kalsiplank uk. 12 mm x 20 cm x 4 m m' xxx xxx xxx
683 Kalsiplank uk. 12 mm x 20 cm x 4 m m' xxx xxx xxx
684 Kalsibot/Silikabot Lbr 76,000 79,000 51,000
685 Air liter 50 50 50
686 Sewa alat pengelasan jam 250,000 250,000 250,000
687 Bronjong 2.0 x 1.0 x 0.5 ( 2.7 mm ) Unit xxx xxx xxx
688 Bronjong 3.0 x 1.0 x 0.5 ( 2.7 mm ) Unit xxx xxx xxx
689 Bronjong 3.0 x 1.5 x 0.5 ( 2.7 mm ) Unit xxx xxx xxx
690 Bronjong 4.0 x 1.0 x 0.5 ( 2.7 mm ) Unit xxx xxx xxx
691 Bronjong 1.5 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx xxx
692 Bronjong 2.0 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx xxx
693 Bronjong 3.0 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx xxx
694 Bronjong 4.0 x 1.0 x 1.0 ( 2.7 mm ) Unit xxx xxx xxx
695 Bronjong 2.0 x 1.0 x 0.5 ( 3.0 mm ) Unit xxx xxx xxx
696 Bronjong 3.0 x 1.0 x 0.5 ( 3.0 mm ) Unit xxx xxx xxx
697 Bronjong 3.0 x 1.5 x 0.5 ( 3.0 mm ) Unit xxx xxx xxx
698 Bronjong 4.0 x 1.0 x 0.5 ( 3.0 mm ) Unit xxx xxx xxx
699 Bronjong 1.5 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx xxx
700 Bronjong 2.0 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx xxx
701 Bronjong 3.0 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx xxx
702 Bronjong 4.0 x 1.0 x 1.0 ( 3.0 mm ) Unit xxx xxx xxx
703 Plitur Jadi Ltr 40,000 40,000 40,000
704 Pernis kayu Ltr 60,000 60,000 60,000
705 Batu Precash M2 150,000 150,000 150,000
706 Batu Sisir M2 150,000 150,000 150,000
707 Tegel Galar Merah 30 x 30 M2 xxx xxx xxx
708 Truck Bak Terbuka Jam 163,249 163,249 163,249
709 Rangka hollow ( galvalum ) M 7,500 7,500 7,500
710 Paku gypsum Kg 21,000 21,000 21,000
711 Jointing Kg 12,900 12,900 12,900
712 Cotton tape Roll 18,900 18,900 18,900
713 Cat Besi Kg 43,000 44,000 50,400
714 Meni Besi Kg 26,500 26,500 26,500
715 Cat Eksterior ( Setara Dulux Eksterior ) Kg 88,000 88,000 88,000
716 Cat Besi Dof ( setara Dulux ) Kg 80,000 80,000 80,000

Halaman 83
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
717 Prototipe Ikan Ls 2,950,000 2,950,000 2,625,000
718 Batu Andesit Bakar M2 159,000 160,000 157,000
719 Huruf Stainless Steel Cm 12,500 12,500 12,500
720 Coating Batu Alam Ltr 55,000 55,000 55,000
721 Acrylic Tbl 5mm m2 700,000 700,000 -
722 Lampu LED Acrylic Unit 450,000 450,000 -
723 Penyambungan Unit 150,000 150,000 -
724 Kap Lampu Sorot untuk HPI-T 400 Watt Bh 381,000 381,000 381,000
725 Dop Lampu HPI-T 400 Watt Bh 240,000 240,000 240,000
726 Kaca Shower tbl 12mm ( ryban ) M2 750,000 810,000 750,000
727 Kunci Pintu (underlock) Bh 300,000 300,000 300,000
728 Pas. Engsel Pintu Kaca Shower Bh 315,000 315,000 315,000
729 Handle Pintu Set 180,000 180,000 180,000
730 Door Closer Dekson Bh 240,000 240,000 240,000
731 Patch Fitting Bh 540,000 540,000 540,000

Halaman 84
ASEMBAGUS SITUBON
NO SATUAN
KOTA PEGUNUNGAN KOTA
732 Engsel Pintu tanam (Floor /Top hinges) Pegas Bh 780,000 780,000 780,000
733 - - - - -

UPAH TENAGA
735 Mandor Org/Hr 73,000 78,000 73,000
736 Kepala Tukang Org/Hr 69,000 73,000 69,000
737 Tukang Kayu Org/Hr 69,000 73,000 69,000
738 Tukang Batu Org/Hr 64,000 69,000 64,000
739 Tukang Besi Org/Hr 64,000 69,000 64,000
740 Tukang Cat Org/Hr 64,000 69,000 64,000
741 Tukang Acrylic Ls 50,000 55,000 50,000
742 Pekerja Org/Hr 55,000 60,000 55,000
743 Tukang Listrik Org/Hr 64,000 69,000 64,000
744 Mekanik Org/Hr 69,000 73,000 69,000
745 Pembantu Mekanik Org/Hr 60,000 64,000 60,000
746 Operator Terampil Org/Hr 91,000 96,000 91,000
747 Pembantu Operator Org/Hr 69,000 73,000 69,000
748 Sopir Terampil Org/Hr 91,000 96,000 91,000
749 Pembantu Sopir Org/Hr 69,000 73,000 69,000
750 Penjaga Org/Hr 50,000 55,000 50,000
751 Buruh Terampil Org/Hr 60,000 64,000 60,000
752 Penganyam Org/Hr 60,000 64,000 60,000
753 Pekerja Pengisi Org/Hr 50,000 55,000 50,000
754 0 0 - - -

Halaman 85
ARGA SATUAN DASAR
ANGUNAN DAN UPAH
SITUBONDO TAHUN 2009
7 8 9
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


170,000 107,000 175,000
151,000 84,000 152,000
170,000 107,000 175,000
210,600 135,000 210,600
113,000 79,000 124,000
xxx xxx xxx
313,000 206,000 274,000
313,000 177,000 245,000
294,000 170,000 238,000
270,000 170,000 238,000
270,000 170,000 238,000
204,000 118,000 186,000
245,000 189,000 257,000
600 500 600
331,000 331,000 331,000
322,000 322,000 322,000
314,000 314,000 314,000
283,000 283,000 283,000
xxx xxx xxx
296,000 296,000 296,000
xxx xxx xxx
12,000 12,000 12,000
12,000 12,000 12,000
xxx #VALUE! #VALUE!
1,725 1,600 1,725
2,400 2,300 2,400
292,000 291,000 336,000
9,500 9,000 9,500
47,000 50,000 52,000
52,000 55,000 57,000
53,000 52,000 54,000
63,000 68,000 70,000
55,000 55,000 57,000
57,750 57,750 57,750
37,000 37,000 43,000
41,000 41,000 49,000

Halaman 86
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


43,000 43,000 50,000
413,000 510,000 512,000
30,000 45,000 47,000
160,000 175,000 177,000
200,000 198,000 200,000
439,000 510,000 512,000
507,000 596,000 598,000
xxx xxx xxx
297,000 327,000 329,000
30,000 27,000 30,000
2,000 3,000 3,000
8,000 7,000 8,000
2,000 1,000 1,000
3,000 3,000 3,000
xxx xxx xxx
xxx xxx xxx
1,000 1,000 1,000
4,000 4,000 4,000
xxx xxx xxx
xxx xxx xxx
4,000 3,000 4,000
4,000 4,000 4,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
12,900 12,400 12,900
13,400 13,000 13,400
17,400 17,000 17,400
14,600 14,000 14,600
80,400 77,200 77,700
16,800 19,000 19,500

Halaman 87
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


16,800 19,000 19,500
13,400 13,400 13,400
13,400 13,400 13,400
13,400 13,400 13,400
xxx xxx xxx
11,400 12,000 11,400
xxx xxx xxx
xxx xxx xxx
11,900 12,400 11,900
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
217,000 200,000 210,000
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
xxx xxx xxx
xxx xxx xxx
12,200 11,800 12,200
12,200 11,800 12,200
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 88
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
128,000 110,000 110,000
77,000 68,000 69,000
24,000 19,000 22,000
28,000 25,000 29,000
34,000 29,000 33,000
47,000 42,000 48,000
100,000 96,000 96,000
80,000 72,000 73,000
70,000 63,000 64,000
60,000 54,000 55,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
34,000 30,000 31,000
xxx xxx xxx
140,000 130,000 140,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
12,000 13,000 14,000
79,000 73,000 74,000
17,500 15,000 17,500
13,000 17,000 17,000

Halaman 89
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


13,000 14,000 14,000
21,000 22,000 22,000
22,000 28,000 28,000
xxxx xxxx xxxx
xxxx xxxx xxxx
xxxx xxxx xxxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
23,667 23,500 23,667
30,500 30,167 30,500
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
135,000 134,333 135,000
135,000 134,333 135,000
250,000 248,667 250,000
171,833 171,000 171,833
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 90
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 91
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
18,000 17,000 18,000
25,000 24,000 25,000
51,000 50,000 51,000
74,000 73,000 74,000
85,000 84,000 85,000
130,000 130,000 130,000
219,000 218,000 219,000
296,000 295,000 296,000
471,000 470,000 471,000
1,602,000 1,601,000 1,602,000
#VALUE! #VALUE! #VALUE!

90,000 87,750 90,000


#VALUE! #VALUE! #VALUE!

Halaman 92
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


#VALUE! #VALUE! #VALUE!

xxx #VALUE! #VALUE!


#VALUE!
xxx
#VALUE!

#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!

xxx xxx xxx


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 93
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 94
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 95
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
13,681,000 13,636,000 13,681,000
10,772,000 10,727,000 10,772,000
14,250,000 14,204,000 14,250,000
8,772,000 8,727,000 8,772,000
11,409,000 10,510,000 10,556,000
10,840,000 9,090,000 9,136,000
11,977,000 11,079,000 11,124,000
10,681,000 8,181,000 8,227,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
6,295,000 5,454,000 5,500,000
5,727,000 3,977,000 4,022,000
10,954,000 6,000,000 6,045,000
5,727,000 3,977,000 4,022,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
2,034,000 1,989,000 2,034,000
32,000 38,000 38,000
4,000 4,000 4,000
39,000 38,000 38,000
47,000 45,000 47,000
58,000 61,000 63,000
75,000 73,000 75,000
xxx xxx xxx
154,000 147,000 149,000

Halaman 96
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
143,000 107,000 109,000
149,000 79,000 80,000
111,000 103,000 105,000
111,000 103,000 105,000
268,000 234,000 236,000
xxx xxx xxx
30,000 18,000 19,000
30,000 30,000 31,000
40,000 43,000 44,000
26,000 28,000 29,000
29,000 22,000 23,000
31,000 30,000 31,000
67,000 65,000 66,000
51,000 81,000 82,000
191,000 147,000 148,000
64,000 51,000 54,000
81,000 70,000 73,000
76,000 57,000 60,000
93,000 84,000 87,000
XX XX XX
31,000 29,000 31,000
97,000 96,000 97,000
39,000 20,000 21,000
50,000 39,000 40,000
66,000 51,000 52,000
7,000 7,000 8,000
85,000 68,000 69,000
9,000 9,000 10,000
91,000 68,000 69,000
197,000 197,000 252,000
xxx xxx xxx
149,000 149,000 193,000
134,000 134,000 179,000
111,000 111,000 145,000
100,000 100,000 130,000
xxx xxx xxx
107,000 107,000 131,000
84,000 84,000 109,000
xxx xxx xxx

Halaman 97
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


70,000 70,000 90,000
35,000 35,000 45,000
41,000 41,000 54,000
84,000 84,000 97,000
82,000 82,000 92,000
74,000 74,000 84,000
73,000 73,000 83,000
70,000 70,000 80,000
68,000 68,000 77,000
78,000 78,000 90,000
75,000 75,000 85,000
66,000 66,000 76,000
69,000 69,000 80,000
59,000 59,000 69,000
60,000 60,000 70,000
82,000 82,000 93,000
76,000 76,000 86,000
76,000 76,000 86,000
69,000 69,000 80,000
xxx xxx xxx
xxx xxx xxx
78,000 78,000 89,000
71,000 71,000 81,000
64,000 64,000 75,000
71,000 71,000 81,000
64,000 64,000 75,000
xxx xxx xxx
23,000 23,000 30,000
26,000 27,000 34,000
xxx xxx xxx
4,000 4,000 5,000
3,000 3,000 3,000
6,000 6,000 6,000
5,000 5,000 5,000
9,000 9,000 9,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 98
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
7,000 7,000 7,000
10,000 10,000 10,000
13,000 13,000 13,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
54,000 54,000 54,000
39,000 39,000 39,000
54,000 54,000 54,000
70,000 70,000 70,000
92,000 92,000 92,000
120,000 120,000 120,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 99
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


10,000 10,000 10,000
14,000 14,000 14,000
12,000 12,000 12,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
60,000 60,000 60,000
xxx xxx xxx
245,000 245,000 245,000
397,000 397,000 397,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx

Halaman 100
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
20,000 16,000 18,000
229,000 340,000 342,000
xxx xxx xxx
5,000 4,000 5,000
14,000 14,000 14,000
6,000 6,000 6,000
6,000 6,000 6,000
136,000 113,000 113,000
34,000 33,000 33,000
20,000 20,000 20,000
84,000 81,000 81,000

Halaman 101
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


92,000 92,000 92,000
109,000 101,000 101,000
120,000 113,000 113,000
150,000 141,000 141,000
161,000 152,000 152,000
425,000 409,000 409,000
510,000 490,000 490,000
1,533,000 1,420,000 1,420,000
44,000 68,000 68,000
16,000 13,000 14,000
5,000 5,000 5,000
1,295,000 965,000 1,010,000
1,863,000 1,418,000 1,463,000
4,409,000 4,363,000 4,409,000
2,601,000 1,909,000 1,954,000
3,738,000 2,840,000 2,886,000
3,000 3,000 9,000
97,000 96,000 98,000
97,000 96,000 98,000
66,000 65,000 68,000
113,000 116,000 117,000
159,000 159,000 160,000
97,000 105,000 106,000
12,000 10,000 11,000
10,000 9,000 10,000
7,000 5,000 6,000
53,000 60,000 61,000
87,000 84,000 87,000
101,000 89,000 91,000
117,000 101,000 105,000
148,000 127,000 133,000
30,500 35,250 37,500
17,833 17,833 19,333
74,000 65,000 74,000
52,500 50,250 52,500
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
11,000 10,000 11,000
19,000 19,000 19,000

Halaman 102
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


508,500 450,000 472,500
xxx xxx #VALUE!
319,050 236,363 2,101,000
70,000 68,000 70,000
110,000 73,000 76,000
xxx xxx xxx
xxx xxx xxx
54,000 56,000 59,000
50 50 50
250,000 250,000 250,000
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
xxx xxx xxx
40,000 40,000 40,000
60,000 60,000 60,000
150,000 150,000 150,000
150,000 150,000 150,000
xxx xxx xxx
163,249 163,249 163,249
7,500 7,500 7,500
21,000 21,000 21,000
12,900 12,900 12,900
18,900 18,900 18,900
44,000 43,000 44,000
26,500 26,500 26,500
88,000 88,000 88,000
80,000 80,000 80,000

Halaman 103
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


2,625,000 2,625,000 2,625,000
159,000 159,000 160,000
12,500 4,500 12,500
55,000 55,000 55,000
- - -
- - -
- - -
381,000 381,000 381,000
240,000 240,000 240,000
810,000 750,000 810,000
300,000 300,000 300,000
315,000 315,000 315,000
180,000 180,000 180,000
240,000 240,000 240,000
540,000 540,000 540,000

Halaman 104
SITUBONDO BESUKI

PEGUNUNGAN KOTA PEGUNUNGAN


780,000 780,000 780,000
- - -

78,000 73,000 78,000


73,000 69,000 73,000
73,000 69,000 73,000
69,000 64,000 69,000
69,000 64,000 69,000
69,000 64,000 69,000
55,000 50,000 55,000
60,000 55,000 60,000
69,000 64,000 69,000
73,000 69,000 73,000
64,000 60,000 64,000
96,000 91,000 96,000
73,000 69,000 73,000
96,000 91,000 96,000
73,000 69,000 73,000
55,000 50,000 55,000
64,000 60,000 64,000
64,000 60,000 64,000
55,000 50,000 55,000
- - -

Halaman 105
A N A L I S A B I AYA P E K E R J AA N KODE
Wilayah Situbondo Kota LAPIS PENETRASI / PERMUKAAN MACADAM 5 CM ( LAPEN )
( MENGGUNAKAN BURUH ) K618
Engginer Estimate (EE)

PROPINSI KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :


JAWA T I M U R ( 35 ) SITUBONDO ( 12 )
URAIAN : ANGGAPAN :

1. Semprotkan aspal tack coat 0.8 l / m2 1. Menggunakan tenaga buruh


2. Hamparan agregat kasar 20 m2 / m 3 2. Agregat pecah tersaring dikirim kelokasi pekerjaan oleh pemasok
3. Digilas & dipadatkan dengan mesin gilas 3. Digunakan agregat pecah tersaring yang termurah ( agregat kasar < 50 mm,
roda baja 8 - 10 ton agregat pengunci < 25 mm, agregat penutup < 12,5 mm )
4 Semprotkan aspal 4.5 l / m 2 4. Agregat dimuat ulang ke truk dengan tenaga manusia dan dihampar dengan
5. Hamparan agregat pengunci 64 m 2 / m 3 mesin penghampar agregat.
6. Hamparan lapis seal dengan 12.5 mm 5. Tebal padat pekerasan 5 cm
chip 80 m2 / m3 & cutback 1.25 l / m 2 6. Sesuai Spek . Umum B.M Maret '89 - Buku 3

TOTAL VOL. U PA H B IAYA SUB TOTAL


PE K E R JA VOL. HARI KODE
( org.hari ) ( Rp./org/hari ) ( Rp.) ( Rp.)

P Mandor 2 3 L061 6 73,000 438,000

E Operator terampil 2 3 L081 6 91,000 546,000

K Pembantu Operator 2 3 L083 6 69,000 414,000

E Supir terampil 1 3 L091 3 91,000 273,000

R Pembantu supir 1 3 L099 3 69,000 207,000

J Pekerja 66 3 L101 198 55,000 10,890,000

A Buruh terampil 2 3 L106 6 60,000 360,000

PEKERJA 13,128,000
VOLUME HARGA B IAYA SUB TOTAL
MAT E R IAL JUMLAH KODE
SATUAN (Rp./Unit) (Rp.) (Rp.)

M Batu pecah 3 - 5 ( manual ) 56 m3 M023 170,000 9,520,000


A Batu pecah 2 - 3 ( manual ) 31.11 m3 M024 177,000 5,506,470
T Batu 1 - 2 ( grosok ayak ) 15.55 m3 M025A 206,000 3,203,300
E Pasir ayak 3.50 m3 M041 296,000 1,036,000
R Aspal 6,270 kg M061 12,000 75,240,000
I Minyak bakar 450 ltr M065 14,000 6,300,000
A Alat bantu ( set @ 3 alat ) 8.16 set M170 0 0
L

MATERIAL 100,805,770
P E R A LAT A N JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA (Rp./jam) (Rp.) (Rp.)

E Mesin gilas 3 roda 6 - 8 ton 1 3 E080 15 381,000 5,715,000

R Truk bak terbuka 3,5 ton / 115 HP 1 3 E221 15 163,249 2,448,735

N
PERALATAN 8,163,735
TOTAL (Rp.) 122,097,505

VOLUME : 1400,00 SATUAN m2 HARGA SATUAN Rp. 87,212.50 per m2


HITUNGAN VOLUME

KEGIATAN : REHABILITASI TROTOAR


PEKERJAAN Err:509
LOKASI : JALAN PB. SUDIRMAN KE

Panjang (m)
NO PEKERJAAN Code
P
Hitungan P atas bawah

Pekerjaan Persiapan
Pembersihan Lokasi
Pengukuran/Bowplank

A PEKERJAAN TANAH DAN URUGAN

1 Bongkaran Paving Lama Lama

2 Urugan Pasir Untuk Peninggian

3 Galian Tanah

B PEKERJAAN PASANGAN

1 Pasangan Paving Lama

2 Pasangan Kanstin

3 Pasngan Paving

4 Pasangan Keramik
Pasangan Bata Kanstin

Plesteran

Paving

Urugan Pasir Peninggian


EHABILITASI TROTOAR JALAN PB. SUDIRMAN

ALAN PB. SUDIRMAN KECAMATAN SITUBONDO KABUPATEN SITUBONDO

Panjang (m) Lebar (m) Tinggi (m)


Jumlah Item ( VOLUME SATUAN
n)
L T
P rata L atas bawah L rata T atas bawah T rata

1 1 1 1.00 M2
1 1 1.00 m

- M2

268.07 0.02 1 5.36 M3

57.80 0.15 0.18 1 1.56 M3

0 0 1 - M2

44.5 1 44.50
13.3 1 13.30
20.6 0 -
57.80 M1

50 5.5 1 275.00 M2

-
6.93
- 6.93 M2

268.07 M2

3.3 2.1 1 6.93 M2


8.3 0.3 1 2.49
20.6 0.3 1 6.18
22.1 0.3 1 6.63
22.2 0.3 1 6.66
8.3 0.3 1 2.49
24.45

8.3 0.15 1 1.25


20.6 0.15 1 3.09
22.1 0.15 1 3.32
22.2 0.15 1 3.33
8.3 0.15 1 1.25
12.23 M2

50 5.5 1 275.00
-
-
-
-
275.00 M2

275.00 0.02 5.50 M3


DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA

NO. JENIS BAHAN DAN UPAH SAT HARGA SATUAN

BAHAN
1 Pasir Pasang M3 Rp 107,000.00
2 Pasir Urug/Sirtu M3 Rp 84,000.00
3 Batu Merah Bj Rp 500.00
4 Semen 40 Kg kg Rp 1,600.00
5 Pav. Stone Segi 6 t = 6 cm (abu-abu) halus M2 Rp 64,000.00

UPAH KERJA
1 Mandor Org/Hr Rp 73,000.00
2 Kepala Tukang Org/Hr Rp 69,000.00
3 Tukang Batu Org/Hr Rp 64,000.00
4 Pekerja Org/Hr Rp 55,000.00
ANALISA HARGA SATUAN BAHAN DAN UPAH

JENIS PEKERJAAN SAT INDEKS HARGA SATUAN JUMLAH HARGA

Pekerjaan Tanah dan Urugan


Galian Tanah Biasa sedalam 1 Meter M3
Upah Pekerja Org/Hr 0.750 Rp 55,000.00 Rp 41,250.00
Mandor Org/Hr 0.025 Rp 73,000.00 Rp 1,825.00
Jumlah A Rp 43,075.00
Overhead & Provit 10% x Jumlah A Rp 4,307.50
Haga Satuan Pekerjaan Rp 47,382.50
Urugan Pasir M3
Bahan Pasir Urug/Sirtu M3 1.200 Rp 84,000.00 Rp 100,800.00
Upah Pekerja Org/Hr 0.300 Rp 55,000.00 Rp 16,500.00
Mandor Org/Hr 0.010 Rp 73,000.00 Rp 730.00
Jumlah A Rp 118,030.00
Overhead & Provit 10% x Jumlah A Rp 11,803.00
Haga Satuan Pekerjaan Rp 129,833.00
Pekerjaan Pasangan Batu Merah
Dinding batu merah camp. 1 : 4 tbl 1/2 batu M2
Bahan Batu Merah Bj 70.000 Rp 500.00 Rp 35,000.00
Semen 40 Kg kg 11.500 Rp 1,600.00 Rp 18,400.00
Pasir Pasang M3 0.043 Rp 107,000.00 Rp 4,601.00
Upah Pekerja Org/Hr 0.300 Rp 55,000.00 Rp 16,500.00
Tukang Batu Org/Hr 0.100 Rp 64,000.00 Rp 6,400.00
Kepala Tukang Org/Hr 0.010 Rp 69,000.00 Rp 690.00
Mandor Org/Hr 0.015 Rp 73,000.00 Rp 1,095.00
Jumlah A Rp 82,686.00
Overhead & Provit 10% x Jumlah A Rp 8,268.60
Haga Satuan Pekerjaan Rp 90,954.60
Pekerjaan Plesteran
Plesteran camp. 1 : 4 tbl 15 mm M2
Bahan Semen 40 Kg kg 6.240 Rp 1,600.00 Rp 9,984.00
Pasir Pasang M3 0.024 Rp 107,000.00 Rp 2,568.00
Upah Pekerja Org/Hr 0.300 Rp 55,000.00 Rp 16,500.00
Tukang Batu Org/Hr 0.150 Rp 64,000.00 Rp 9,600.00
Kepala Tukang Org/Hr 0.015 Rp 69,000.00 Rp 1,035.00
Mandor Org/Hr 0.015 Rp 73,000.00 Rp 1,095.00
Jumlah A Rp 40,782.00
Overhead & Provit 10% x Jumlah A Rp 4,078.20
Haga Satuan Pekerjaan Rp 44,860.20
Pekerjaan Lantai dan Perkerasan Jalan
Paving stone M2
Bahan Pav. Stone Segi 6 t = 6 cm (abu-abu) halus M2 1.200 Rp 64,000.00 Rp 76,800.00
Pasir Pasang M3 0.100 Rp 107,000.00 Rp 10,700.00
Upah Pekerja Org/Hr 0.500 Rp 55,000.00 Rp 27,500.00
Tukang Batu Org/Hr 0.250 Rp 64,000.00 Rp 16,000.00
Kepala Tukang Org/Hr 0.025 Rp 69,000.00 Rp 1,725.00
Mandor Org/Hr 0.025 Rp 73,000.00 Rp 1,825.00
Jumlah A Rp 134,550.00
Overhead & Provit 10% x Jumlah A Rp 13,455.00
Haga Satuan Pekerjaan Rp 148,005.00
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : PERKERASAN HALAMAN SEKOLAH SDN 3 SUMBERANYAR
PEKERJAAN : PAVINGISASI SDN 3 SUMBERANYAR
LOKASI : SDN 3 SUMBERANYAR KABUPATEN SITUBONDO
TAHUN :

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA


1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Bh Rp 350,000.00 Rp 350,000.00
2 Pembersihan Lokasi 1.00 Ls Rp 400,000.00 Rp 400,000.00
JUMLAH TOTAL Rp 750,000.00
II PEKERJAAN TANAH DAN URUGAN
1 Pek. Galian Tanah Kanstin 1.56 M3 Rp 47,382.50 Rp 73,945.13
2 Pek. Urugan Pasir ( Peninggian ) 5.50 M3 Rp 129,833.00 Rp 714,081.50
JUMLAH TOTAL Rp 788,026.63
III PEKERJAAN PASANGAN
1 Pasangan Bata Kanstin tbl 1/2 bt Camp. 1 : 4 24.45 M2 Rp 90,954.60 Rp 2,223,839.97
2 Pekerjaan Plesteran camp. 1 : 4 12.23 M2 Rp 44,860.20 Rp 548,415.95
3 Pasangan Paving Segi 6 Tbl 6cm ( abu abu ) halus 275.00 M2 Rp 148,005.00 Rp 40,701,375.00
JUMLAH TOTAL Rp 43,473,630.92
REKAPITULASI RAB
KEGIATAN : PERKERASAN HALAMAN SEKOLAH SDN 3 SUMBERANYAR
PEKERJAAN : PAVINGISASI SDN 3 SUMBERANYAR
LOKASI : SDN 3 SUMBERANYAR KABUPATEN SITUBONDO
TAHUN :

NO URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN TANAH DAN URUGAN

III PEKERJAAN PASANGAN

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : Empat puluh sembilan juta lima ratus dua belas ribu rupiah

Diperiksa Oleh : Situbondo, 2016


PEJABAT PEMBUAT KOMITMEN KONSULTAN PERENCANA

Mengetahui
REKAPITULASI RAB

JUMLAH HARGA

Rp 750,000.00

Rp 788,026.63

Rp 43,473,630.92

Rp 45,011,657.54
Rp 4,501,165.75
Rp 49,512,823.30
Rp 49,512,000.00

Empat puluh sembilan juta lima ratus dua belas ribu rupiah

Situbondo, 2016
KONSULTAN PERENCANA
PEMERINTAH KABUPATEN SITUBONDO
DINAS PENDIDIKAN
JLN. MADURA No.55 A (0338) 671120-671951
S I T U B O N D O

RENCANA ANGGARAN BIAYA ( RAB )

KEGIATAN
: PERKERASAN HALAMAN SEKOLAH SDN 3 SUMBERANYAR

PEKERJAAN
: PAVINGISASI SDN 3 SUMBERANYAR

LOKASI
: SDN 3 SUMBERANYAR KABUPATEN SITUBONDO

CV. JAYA MULYA


CONSULTANT