Material: Name Count Length(m) Breadth(m) Area (m2) Material: Volume (m3) Total Quantity Unit
Structural Column
Type Count Material: Volume (m3) Total Quantity Unit
Concrete Column
300 x 300 47 0.186 8.742 Cum
Toe Wall
Material: Name Count Area Material: Volume Total Quantity Unit
BRACING
SHS91.5x3.6 14 6.79 9.67 919.2302 kg
BRACING
SHS91.5x3.6 14 8.04 9.67 1088.4552 kg
Connection Plates
Total
Plate Type Count Length Breadth Thickness Volume Weight (Kg) Quantity Unit
16mm Anchor-Bolt
for Base Plate - M8 282
2. Chord-Column
Connection Plate 15 0.28 0.16 0.01 0.000448 3.5168 52.752 kg
Structural Column
Structural
Foundation
Footing Area
Rebar Bar: 12M Reinforcement 12M 1.1 7 1 47 361.9 31
Footing Area
Rebar Bar: 12M Reinforcement 12M 1.107 7 1 47 364.203 31
Structural Framing
Beam Top
X-Direction (For four bay)
Beam Top
Y- Direction (For two bay)
Conclusion
Total Length of 6mm
dia bar 1491.084 m
Total Length of 8mm
dia bar 4274.83 m
Total Length of
12mm dia bar 1325.259 m
Total Length of
16mm dia bar 2816.744 m
Roof Schedule
Gutter Schedule
Total Length
Family Length (m) Count (m) Unit
Gutter 144.2 m
Bill of Quantity
S.N. Items of Quantity Unit Rate Cost
A. Earthwork
Excavation
Foundation 70.5 cum
Toe wall 102.60432 cum
B. Structural Foundation
C. Structural Column
D. Toe Wall
F. Steel Works
H. Roofing Works
Tin Roof ..…. Gauge 2052.797 Sq. m
I. Miscellaneous
Gutter 144.2 m