You are on page 1of 2

COLLABORATIVE INDUSTRIAL REVOLUTION INC.

Unit 12, Tristar Building, Angliongto Sr. Road


Lanang, Davao City

SUPPLIER
ACCREDITATION REQUIREMENTS CHECKLIST

1. SUPPLIER ACCREDITATION FORM


2. SUPPLIER INFORMATION SHEET
3. LETTER OF INTENT (Supplier will provide)
4. SIGNED CODE OF ETHICS (Supplier will provide)
5. SIGNED DISCLOSURE FORM
6. COMPANY PROFILE INCLUDING AFFILIATE COMPANIES
7. ARTICLES OF INCORPORATION/PARTNERSHIP AND BY LAWS
8. DTI/SEC REGISTRATION
9. AUDITED FINANCIAL STATEMENT (LAST TWO YEARS)
10. B.I.R. CERTIFICATE OF REGISTRATION (FORM 2303 OR 1556)
11. 2018 MAYOR’S PERMIT/BUSINESS PERMIT
12. RECENT OFFICE/WAREHOUSE LOCATION MAP
13. LIST OF PRODUCTS AND DESCRIPTIONS
14. DOLE 18-A CERTIFICATE OF REGISTRATION
(FOR MANPOWER OUTSOURCING SERVICES AND SECURITY AGENCIES)
15. UPDATED ORGANIZATIONAL CHART
16. NOTARIZED STATEMENT OF “NON-BLACKLISTED OR BARRED”
17. PHOTOCOPY OF THE SUPPLIER’S AUTHORIZED REPRESENTATIVE’S VALID ID
18. LONG BLUE EXPANDABLE ENVELOP
19. ACCREDITATION FEE – 3,900.00USD
20. INSPECTION FEE – PHP20,000.00

INSTRUCTIONS:

THE LETTER OF INTENT SHOULD BE ADDRESSED TO THE PROJECT DIRECTOR:


HANS B. PULIDO, RCE
Project Director
COLLABORATIVE INDUSTRIAL REVOLUTION INC.

THE FINANCIAL STATEMENT SHOULD BE IN TWO COMPARATIVE YEARS, SUBMITTED IN COMPLETE


PAGES AS AUDITED BY A CPA FOR BOTH YEARS AND STAMPED RECEIVED BY THE B.I.R. OR ITS
AUTHORIZED BOARD BANK REPRESENTATIVES.

THE ACCREDITATION DOCUMENTS SHALL BE SUBMITTED IN A LONG PRESS BOARD FOLDER AND BE
ARRANGED WITH TAB ACCORDING TO THE ORDER INDICATED IN THE CHECKLIST.

NOTE:

Failure to fill-up all the fields on the Supplier Information Sheet and to submit the necessary
documents may delay the processing and/or may be ground for denial of your
application/accreditation.