You are on page 1of 31

Description of Unit Rate

Item No. Unit Quantity


Item
In Figures In Words
Structural Work
100 Earth Work

Taka Seven
101 Layout & Marking for earthwork in excavation in foundation accepted by the Engineer sqm 143 Tk. 7.00
Only

102 Earthwork in excavation in foundation trenches upto minimum 1.2 m depth in medium stiff cum 59 Tk. 59.00 Taka fifty nine
clayey soil only

Taka Four
Sand filling in foundation trenches and plinth with sand having F.M. 0.5 to 0.8 in 75mm layers Hundred &
103 including leveling, watering and compaction to achieve minimum dry density of 90% as per cum 3.5 Tk. 476.00
seventy six
design supplied by the design office only all complete and accepted by the Engineer.
Only

Sub-total of 100 for Earth Work

200 RCC Works


Reinforced cement concrete works using wooden shutter with minimum cement content
relates to mix ratio 1:1.5:3 having minimum f'cr=26 Mpa, and satisfying a specified
compressive strength f’c=21 Mpa at 28 days on standard cylinders as per standard practice of
CodeACI/BNBC/ASTM & Cement conforming to BDS EN-197-1- CEM 1 (32.5 to 52.5 N) / ASTM-
C 150 Type – I, best quality Sylhet sand or coarse sand [F.M. 2.2] and 20 mm down well
graded picked jhama brick chips conforming to ASTM C-33, including breaking chips and
screening, making, placing shutter in position and maintaining true to plumb, making
shutterwater-tight properly, placing reinforcement in position; mixing in standard mixer
machine with hoper and fed by standard measuring boxes, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing centering-shuttering including cost
of water, electricity,testing and other charges etc. all complete approved and accepted by the
Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding,welding and
placing)

Taka Two
Hundred &
F1 sqm 8 Tk. 239.00 Thirty nine
Only

Taka Two
Hundred &
Fromwork in Footing F2 sqm 19.5 Tk. 239.00
Thirty nine
Only

Taka Two
Hundred &
F5 sqm 9 Tk. 239.00
Thirty nine
Only

Taka Six
201 Thousand, One
F1 cum 2.5 Tk. 6,195.00 Hundred &
Ninety five
Only
Taka Six
Thousand, One
Concrete in Footing F2 cum 8 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Six
Thousand, One
F5 cum 4 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Two
Hundred &
GB1 sqm 29 Tk. 230.00 Thirty
Only

Taka Two
Hundred &
GB2 sqm 15 Tk. 230.00
Thirty
Only

Taka Two
Hundred &
Fromwork in Grade Beam GB3 sqm 25 Tk. 230.00
Thirty
Only

Taka Two
Hundred &
GB4 sqm 24.5 Tk. 230.00
Thirty
Only

Taka Two
Hundred &
GB5 sqm 28 Tk. 230.00
Thirty
Only

Taka Six
Thousand, One
202 GB1 cum 3 Tk. 6,195.00 Hundred &
Ninety five
Only
Taka Six
Thousand, One
GB2 cum 1.5 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Six
Thousand, One
Concrete in Grade Beam GB3 cum 2.4 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Six
Thousand, One
GB4 cum 2.4 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Six
Thousand, One
GB5 cum 1.6 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Two
Hundred &
C1 sqm 8.2 Tk. 279.00
Seventy nine
Only

Taka Two
Hundred &
C2 sqm 8.8 Tk. 279.00
Seventy nine
Only

Taka Two
Hundred &
Fromwork in Column C3 sqm 10 Tk. 279.00
Seventy nine
Only

Taka Two
Hundred &
C4 sqm 19.7 Tk. 279.00
Seventy nine
Only
Taka Two
C5 sqm 11.5 Tk. 279.00 Hundred &
Seventy nine
Only

Taka Six
Thousand, Two
203 C1 cum 0.5 Tk. 6,283.00 Hundred &
Eighty three
Only

Taka Six
Thousand, Two
C2 cum 0.7 Tk. 6,283.00 Hundred &
Eighty three
Only

Taka Six
Thousand, Two
Concrete in Column C3 cum 0.8 Tk. 6,283.00 Hundred &
Eighty three
Only

Taka Six
Thousand, Two
C4 cum 1.6 Tk. 6,283.00 Hundred &
Eighty three
Only

Taka Six
Thousand, Two
C5 cum 1.1 Tk. 6,283.00 Hundred &
Eighty three
Only

Taka Three
Hundred &
RB1 sqm 30.8 Tk. 322.00
Twenty two
Only

Fromwork in Beam
Taka Three
RB2 sqm 15.4 Tk. 322.00 Hundred &
Twenty two
Only
Fromwork in Beam
Taka Three
Hundred &
RB3 sqm 24.4 Tk. 322.00
Twenty two
Only

Taka Three
Hundred &
RB4 sqm 24.4 Tk. 322.00
Twenty two
Only

Taka Six
204 Thousand, One
RB1 cum 3 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Six
Thousand, One
RB2 cum 1.5 Tk. 6,195.00 Hundred &
Ninety five
Only
Concrete in Beam
Taka Six
Thousand, One
RB3 cum 2.5 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Six
Thousand, One
RB4 cum 2.5 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Three
Hundred &
5" thick Slab sqm 57 Tk. 315.00
Fifteen
Only
Fromwork in Slab
Fromwork in Slab
Taka Three
Hundred &
6" thick Slab sqm 85 Tk. 315.00
Fifteen
Only

205
Taka Six
Thousand, One
5" thick Slab cum 7 Tk. 6,195.00 Hundred &
Ninety five
Only
Concrete in Slab
Taka Six
Thousand, One
6" thick Slab cum 12 Tk. 6,195.00 Hundred &
Ninety five
Only

Taka Three
Hundred &
Over Doors sqm 7 Tk. 315.00
Fifteen
Only
Fromwork in Lintel
Taka Three
Hundred &
Over windows sqm 5 Tk. 315.00
Fifteen
Only

206
Taka Six
Thousand, One
Over Doors cum 0.3 Tk. 6,195.00 Hundred &
Ninety five
Only
Concrete in Lintel
Taka Six
Thousand, One
Over windows cum 0.4 Tk. 6,195.00 Hundred &
Ninety five
Only
Sub-total of 200 for RCC Works

300 Reinforcement

400-grade deformed bar with minimum fy = 400 MPa & tensile strength at least 460 MPa
Supplying, fabrication and fixing to details as per design deformed bar reinforcement in
concrete in accordance with BDS 1313 : 1991 standard including straightening and cleaning
rust, if any, bending and binding in position including supply of G.I. wires etc. complete in all
respects and accepted by the Engineer.

Taka Eight
Thousand, Six
per
F1 58 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
per Thousand, Six
301 In Footing F2 292 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
Thousand, Six
per
F5 274 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
Thousand, Six
GB1 per 293 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only
Taka Eight
Thousand, Six
per
GB2 168 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
per Thousand, Six
302 In Grade Beam GB3 100kg 296 Tk. 8,699.00 Hundred &
Ninety nine
Only

Taka Eight
Thousand, Six
per
GB4 313 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
Thousand, Six
per
GB5 150 Tk. 8,699.00 Hundred &
100kg Ninety nine
Only

Taka Eight
Thousand, Six
per
C1 102 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
Thousand, Six
per
C2 100kg 140 Tk. 8,699.00 Hundred &
Ninety nine
Only

Taka Eight
Thousand, Six
per
303 In Column C3 133 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only
Taka Eight
Thousand, Six
per
C4 291 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
per Thousand, Six
C5 100kg 189 Tk. 8,699.00 Hundred &
Ninety nine
Only

Taka Eight
Thousand, Six
per
RB1 405 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
Thousand, Six
per
RB2 241 Tk. 8,699.00 Hundred &
100kg Ninety nine
Only
304 In Beam
Taka Eight
Thousand, Six
per
RB3 387 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only

Taka Eight
Thousand, Six
per
RB4 100kg 578 Tk. 8,699.00 Hundred &
Ninety nine
Only

Taka Eight
Thousand, Six
per
305 In Slab 2,365 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only
Taka Eight
Thousand, Six
per
Over Windows 54 Tk. 8,699.00 Hundred &
100kg
Ninety nine
Only
306 In Lintel
Taka Eight
per Thousand, Six
Over Doors 100kg 49 Tk. 8,699.00 Hundred &
Ninety nine
Only

Sub-total of 300 for Reinforcement

Non-Structural Work
400 Bricksoling, CC, DPC

Taka Two
One layer of brick flat soling in foundation and in floor with first class or picked jhama bricks
Hundred &
401 including preparation of bed and filling the interstices with local sand, leveling etc. complete sqm 185 Tk. 234.00
and accepted by the Engineer. Thirty Four
Only

Taka Four
Mass concrete (1:3:6) in foundation with cement, sand (F.M. 1.2)
Thousand,
and picked jhama chips including breaking chips, screening, mixing, laying, compacting to
cum 3.5 Tk. 4,749.00 Seven Hundred
levels and curing for at least 7 days including the supply of water, electricity and other charges & Forty Nine
and costs of tools and plants etc. all complete and accepted by the Engineer.
Only

402

Taka Four
Mass concrete (1:3:6) in floor with cement, sand (F.M. 1.2)
Thousand, Six
and picked jhama chips including breaking chips, screening, mixing, laying, compacting to
levels and curing for at least 7 days including the supply of water, electricity and other charges cum 12.2 Tk. 4,693.00 Hundred &
Ninety Three
and costs of tools and plants etc. all complete and accepted by the Engineer.
Only
75 mm or 3" thick Damp proof course (DPC) (1:1.5:3) with Sylhet sand (F.M. 2.2) and stone
chips in cement concrete with cement, sand (F.M. 1.2) and picked jhama or stone chips Taka Eight
403 including breaking chips, screening, centering, shuttering, casting, curing and finished with a sqm 8.9 Tk. 801.00 Hundred & One
coat of bitumen including the supply of water, electricity and other charges and costs of tools Only
and plants etc. all complete and accepted by the Engineer.

Sub-total of 400 for Bricksoling, CC, DPC

500 Brickwork, Plastering & Floorfinish

Brick works of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6) in superstructure Taka Three
including raking out joints, filling the interstices with mortar, cleaning and soaking the bricks Thousand Eight
501 at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for cum 32 Tk. 3,831.00 Hundred &
7 days etc. all complete Thirty One
(measurement to given as 250 mm width for one brick length and 375 mm for one brick and a Only
half brick length) and accepted by the Engineer.

Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
Taka One
cement to wall both inner-and outer surface, finishing the corner and edges including
Hundred & Fifty
502 washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, sqm 412 Tk. 151.00
One
electricity and other charges etc. all complete in all respect as per drawing and accepted by Only
the Engineer.
Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh Taka One
cement to ceiling and finishing the corners and edges including washing of sand cleaning the Hundred &
503 sqm 144 Tk. 125.00
surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges Twenty Five
etc. all complete in all respect as per drawing and accepted by the Engineer. Only

Supplying, fitting and fixing glazed GP (homogeneous) 300 x 300 mm floor tiles floor tiles Taka One
(local made) with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with Thousand &
504 sqm 144 Tk. 1,044.00
white cement including cutting and laying the tiles in proper way and finishing with care etc. Forty Four
all complete and accepted by the Engineer. Only

Sub-total of 500 for Brickwork, Plastering & Floorfinish

600 Door and Window Materials

Taka Eighty One


Supplying and making door and window frames (Chowkat) for all floors with matured
natural seasoned Mehgoni wood of required size including painting two coats of coal tar to Thousand Eight
601 cum 0.6 Tk. 81,844.00 Hundred &
the surface in contact with wall, fitting and fixing in position etc. complete and accepted by
Forty Four
the Engineer Only

Supplying, fitting and fixing M.S. flat bar clamp of 225 x 38 x 6 mm size
Taka Sixty Eight
602 having bifurcated ends to door and window frames with necessary screws and encasing inside each 138 Tk. 68.00
the wall with cement concrete (1:2:4) etc. complete and accepted by the Engineer. Only
Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide plank) solid
Gamari wood single leaf door shutter having top rail style of sections 100 mm x 38 mm, lock Taka Four
rail 125 x 38 mm and bottom rail 225 x 38 mm. Closed joints with 25 mm x 12 mm size Thousand Five
603 wooden peg and provided with best quality 4 Nos. 100 mm iron hinges 2 (two) Nos. best sqm 27 Tk. 4,598.00 Hundred &
quality 12 mm dia 300 mm and 200 mm long iron tower and socket bolts, 2 (two) Nos. heavy Ninty Eight
type nickel plated handle, hinged cleats, buffer blocks and finished by sand papering etc. all Only
complete in all floors and accepted by the Engineer.

Supplying, fitting and fixing of Aluminium sliding window(Silver colour) as per the
U.S.Architectural Aluminium Manufacturer’s Association (AAMA) standard specification
having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top (size 75.50
mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thick shutter
bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size 75.50 mm,19.90 mm), 1.2 mm Taka Two
thick sliding fixed side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size 49.20 mm 26.20 Thousand One
604 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm) sections all aluminium members sqm 18 Tk. 2,120.00 Hundred &
(total weight kg/sqm) will be anodized to aluminium bronze/silver colour with a coat not less Twenty
than 15 micron in thickness and density of 4 mg per square cm etc. including all accessories Only
like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts
and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour
charge for fitting of accessories, making grooves and mending good damages, carriage, and
electricity complete in all respect as per drawing and accepted by the Engineer.

Sub-total of 600 for Door and Window Materials


700 Washing & Painting

Plastic emulsion paint of approved best quality and colour delivered from authorized local
agent of the manufacturer in a sealed container, applying to wall and ceiling in two coats over
lime putty of specified brand applied on primer or sealer elapsing specified time for
Taka One
drying/recoating including cleaning drying, making free from dirt, grease, wax, removing all
701 chalked and scaled materials, fungus, mending good the surface defects, sand papering the sqm 370 Tk. 161 Hundred & Sixty
One
surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all
Only
floors accepted by the Engineer.
Lime putty to be applied as per manufacturer instructions approved and accepted by the
Engineer.

Jensoline chlorinated rubber paint of approved quality and colour delivered from authorized
local agent of the manufacturer in a sealed container, applying to concrete surfaces and walls
in three coats elapsing specified time for drying and re-coating including cleaning, drying, Taka Two
making free from dirt, grease, wax, removing all chalked and scaled materials, fungus (if Hundred &
702 sqm 186 Tk. 204
required must be treated with fungicidal solution) flaking paints, washing the surface with Four
soap water/caustic soda, mending good the surface defects, smoothening the surface by Only
putty sand papering the surface and necessary scaffolding, applied by brush/roller/spray etc.
all complete in all floors and accepted by the Engineer.

Sub-total of 700 for Washing & Painting

Grand Summary
Name of Works: Construction of an One Storey Building

General Summary Reference Amount


1. 100 Earth Work 6,148.00
2. 200 RCC Works 499,784.00
3. 300 Reinforcement Schedule of Rates 589,621.00
of Civil Works:
4. 400 Bricksoling, CC, DPC 124,295.00
Twelfth Edition
5. 500 Brickwork, Plastering & Floorfinish 01 June, 2008 353,140.00
6. 600 Door and Window Materials 220,796.00
7. 700 Washing & Painting 97,514.00
In Figures 1,891,298.00

Taka One
Million, eight
Hundred ninety
Total Contract Price for the Works(1-7) one
In Words
Thousand, two
Hundred &
Ninty eight
Only
Amount

In Figures In Words

Taka One
1,001.00 Thousand & One
Only

Taka Three
3,481.00 Thousand Four
Hundred & Eighty
One Only

Taka One
Thousand Six
1,666.00
Hundred & Sixty Six
Only

Taka Six Thousand,


6,148.00 One Hundred &
Fourty Eight Only
Taka One
Thousand, Nine
1,912.00 Hundred, Twelve
Only

Taka Four
Thousand, Six
4,660.50
Hundred Sixty &
Paisa Fifty Only

Taka Two
Thousand, One
2,151.00
Hundred & Fifty
One Only

Taka Fifteen
Thousand, Four
15,487.50 Hundred Eighty
Seven & Paisa Fifty
Only
Taka Forty Nine
Thousand, Five
49,560.00
Hundred & Sixty
Only

Taka Twenty Four


Thousand, Seven
24,780.00 Hundred & Eighty
Only

Taka Six Thousand,


6,670.00 Six Hundred &
Seventy Only

Taka Three
Thousand,Four
3,450.00
Hundred & Fifty
Only

Taka Five
Thousand, Seven
5,750.00
Hundred & Fifty
Only

Taka Five
Thousand, Six
5,635.00
Hundred & Thirty
Five Only

Taka Six Thousand,


6,440.00 Four Hundred &
Fourty Only

Taka Eighteen
Thousand, Five
18,585.00 Hundred & Eighty
Five
Only
Taka Nine
Thousand, Two
9,292.50 Hundred Ninty
Two & Paisa Fifty
Only

Taka Fourteen
Thousand,Eight
14,868.00 Hundred, & Sixty
Eight Only

Taka Fourteen
Thousand,Eight
14,868.00
Hundred, & Sixty
Eight Only

Taka Nine
Thousand, Nine
9,912.00
Hundred & Twelve
Only

Taka Two
Thousand, Two
2,288.00
Hundred Eighty
Eight Only

Taka Two
Thousand, Four
2,455.00
Hundred Fifty Five
Only

Taka Two
Thousand Seven
2,790.00
Hundred & Ninty
Only

Taka Five
Thousand, Four
5,496.00
Hundred Ninty Six
Only
Taka Three
3,208.50 Thousand, Two
Hundred Eight &
Paisa Fifty Only

Taka Three
Thousand, One
3,141.50 Hundred Fourty
One & Paisa Fifty
Only

Taka Four
Thousand, Three
4,398.00
Hundred & Ninety
Eight Only

Taka Five Thousand


5,026.50 Twenty Six & Paisa
Fifty Only

Taka Ten
10,053.00 Thousand, & Fifty
Three Only

Taka Six Thousand,


6,911.00 Nine Hundred &
Eleven Only

Taka Nine
Thousand, Nine
9,918.00
Hundred &
Eighteen Only
Taka Four
4,959.00 Thousand, Nine
Hundred & Fifty
Nine Only

Taka Seven
Thousand, Eight
7,857.00
Hundred & Fifty
Seven Only

Taka Seven
Thousand, Eight
7,857.00
Hundred & Fifty
Seven Only

Taka Eighteen
Thousand, Five
18,585.00 Hundred & Eighty
Five Only

Taka Nine
Thousand, Two
9,292.50 Hundred Ninety
Two & Paisa Fifty
Only

Taka Fifteen
Thousand, Four
15,487.50 Hundred, Eighty
Seven & Paisa Fifty
Only

Taka Fifteen
Thousand, Four
15,487.00 Hundred, Eighty
Seven Only

Taka Seventeen
Thousand, Nine
17,955.00
Hundred & Fifty
Five Only
Taka Twenty Six
Thousand, Seven
26,775.00
Hundred & Seventy
Five Only

Taka Fourty Three


Thousand, Three
43,365.00
Hundred & Sixty
Five Only

Taka Seventy Four


Thousand, Three
74,340.00 Hundred & Forty
Only

Taka Two
Thousand, Two
2,205.00
Hundred & Five
Only

Taka One
Thousand, Five
1,575.00
Hundred & Seventy
Five Only

Taka One
Thousand, Eight
1,859.00
Hundred & Fifty
Nine Only

Taka Two
Thousand, Four
2,478.00
Hundred & Seventy
Eight Only
Taka Four Hundred
ninety nine
499,784.00 Thousand, seven
hundred & eighty
four Only

Taka Five Thousand


5,046.00
& Fourty Six Only

Taka Twenty Five


Thousand, Four
25,401.00
Hundred & One
Only

Taka Twenty Three


Thousand, Eight
23,835.00
Hundred & Thirty
Five Only

Taka Twenty Five


25,488.00 Thousand, Four
Hundred & Eighty
Eight Only
Taka Fourteen
Thousand, Six
14,615.00
Hundred & Fifteen
Only

Taka Twenty Five


Thousand, Seven
25,749.00 Hundred & Fourty
Nine Only

Taka Twenty Seven


Thousand, Two
27,228.00
Hundred & Twenty
Eight Only

Taka Thirteen
13,049.00 Thousand & Fourty
Nine Only

Taka Eight
Thousand,Eight
8,873.00
Hundred & Seventy
Three Only

Taka Twelve
Thousand, One
12,179.00 Hundred & Seventy
Nine Only

Taka Eleven
Thousand, Five
11,570.00
Hundred & Seventy
Only
Taka Twenty Five
Thousand, Three
25,314.00
Hundred & Forteen
Only

Taka Sixteen
Thousand,Four
16,441.00 Hundred & Forty
One Only

Taka Thirty Five


Thousand, Two
35,231.00
Hundred & Thirty
One Only

Taka Twenty
Thousand, Nine
20,965.00
Hundred & Sixty
Five Only

Taka Thirty Three


Thousand, Six
33,665.00
Hundred & Sixty
Five Only

Taka Fifty
Thousand, Two
50,280.00 Hundred & Eighty
Only

Taka Two Hundred


Five Thousand,
205,731.00
Seven Hundred &
Thirty One Only
Taka Four
Thousand, Six
4,698.00
Hundred & Ninty
Eight Only

Taka Four
Thousand, Two
4,263.00 Hundred & Sixty
Three Only

Taka Five Hundred


Eighty Nine
589,621.00 Thousand, Six
Hundred & Twenty
One Only

Taka Forty Three


Thousand, Two
43,290.00
Hundred & Ninty
Only

Taka Sixteen
Thousand,Six
16,621.00
Hundred & Twenty
One Only

Taka Fifty Seven


Thousand, Two
57,255.00 Hundred & Fifty
Five Only
Taka Seven
Thousand, One
7,129.00
Hundred & Twenty
Nine Only

Taka One Hundred


Twenty Four
124,295.00 Thousand, Two
Hundred & Ninty
Five Only

Taka One Hundred


Twenty Two
122,592.00 Thousand, Five
Hundred & Ninty
Two Only

Taka Sixty Two


Thousand, Two
62,212.00
Hundred & Twelve
Only
Taka Eighteen
18,000.00
Thousand Only

Taka One Hundred


Fifty
150,336.00 Thousand,Three
Hundred & Thirty
Six Only

Taka Three
Hundred Fifty
353,140.00 Three Thousand,
One Hundred &
Fourty Only

Taka Forty Nine


Thousand, One
49,106.00
Hundred & Six
Only

Taka Nine
Thousand Three
9,384.00
Hundred & Eighty
Four Only
Taka One Hundred
Twenty Four
124,146.00 Thousand, One
Hundred & Forty
Six Only

Thirty Eight
Thousand, One
38,160.00 Hundred & Sixty
Only

Taka Two Hundred


Twenty Thousand,
220,796.00
Seven Hundred &
Ninty Six only
Taka Fifty Nine
59,570.00 Thousand, Five
Hundred &
Seventy Only

Taka Thirty Seven


Thousand,Nine
37,944.00
Hundred & Fourty
Four Only

Taka Ninety Seven


Thousand, Five
97,514.00
Hundred &
Fourteen Only