RATE ANALYSIS

Norms Code Item Code Code Description of Works


1 HT Electrical Poles(11 KV)
Making H-Poles structure of Pre-stressed concrete with length 10.4m
for electricity line incl. supply of materials,cutting timber & iron , drilling
20_4_a 1.1
holes as needed,fitting, fixing,&tying as per drawing and applying
three layers of bitumen lining up to 1.83m from bottom.(For 11KV)

2 LT Electrical Poles
Erecting steel pole for electricity line incl. fixing in the ground as per
20_1.2_a 2.1 drawig & applying three cast lining of bitumen complete. Length of
pole 8.5m (bitumen lining up to 1.68m. From the bottom)

3 Current Transformer
Connecting Busbar Strips in metal box panel board of single or three
phase according to the drawings to incoming and outgoing lines by
26_2_a 3.1
cable shoe & also connecting ampere volumeter,C.T
tansformer,Sector switches etc. (300-100A)
Quantity Unit Type Detail Quantity Unit Rate Amount

1 each Labour Unskilled 1 M-day Err:508 675.00

Labour Skilled 3.76 M-day Err:508 3,496.80


Equipment Pre-stressed 0.00
concrete 4 Nr.

Equipment Iron notbolt of 0.00


16mm*200mm long 20 Nr.
Iron angels
Equipment 50*50*5mm.3.8kg.p 0.00
erm.&235mlong 2 Nr.

Equipment Romale Nut 16mm 0.00


dia.,200m long 20 Nr.

Equipment Iron channel 0.00


45*100*5mm 5.8kg.
Per m.&200cm.long 1 Nr.
U-clamp
Equipment 150*150*5m.from 0.00
600*50*5mm plate 2 Nr.

Equipment Iron nutbolt 16mm 0.00


sia.&70mm long 5 Nr.

Equipment Iron Plate 15*5- 0.00


90mm. 4 Nr.
Equipment Bitumen 10 kg 0.00

Labour M-day
1 each Spvsr 0.33
Labour line man 0.66 M-day
Labour Unskilled 3.33 M-day Err:508
Equipment Bitumen 4 kg 0.00

Labour Skilled M-day Err:508


1 Per 1
Job Labour Semiskilled 2 M-day
Remarks