Professional Documents
Culture Documents
2 LT Electrical Poles
Erecting steel pole for electricity line incl. fixing in the ground as per
20_1.2_a 2.1 drawig & applying three cast lining of bitumen complete. Length of
pole 8.5m (bitumen lining up to 1.68m. From the bottom)
3 Current Transformer
Connecting Busbar Strips in metal box panel board of single or three
phase according to the drawings to incoming and outgoing lines by
26_2_a 3.1
cable shoe & also connecting ampere volumeter,C.T
tansformer,Sector switches etc. (300-100A)
Quantity Unit Type Detail Quantity Unit Rate Amount
Labour M-day
1 each Spvsr 0.33
Labour line man 0.66 M-day
Labour Unskilled 3.33 M-day Err:508
Equipment Bitumen 4 kg 0.00