You are on page 1of 4

RE-MEASUREMENT SHEET

FOR

UNIT 216 FOR FOUNDATION D-216-107

MTO REF. MTO-C-216-D-107

A
J//
( -Th }L
04 16-JULY-15 lssued for Approval L 'SK'%, pU
Rev. Date Checked k Ap}oved By
Description Originator
'%,/

Clean Fuels ProleCt l =,s,A'ffl€'4;Il,2I,;- 4


Kuwait Nalional Petroleum Company (K.S.C.)

Kuwait : -' KNPC,

Petrofac / Samsung / CB&I Petrofac : . $ SEANMGISNUENERGING b.


PSCJ Job No. Jl-2025

CONTRACT NO. CONTRACTOR JOB NO. DOCUMENTNO. REV

CFP/EPC/0054-MAB1 Jl-2025 P6012MAB.216.19.1.A416 04


I
RE-MEASUREMENT CONTRACT NO. CFP/EPC/0054-MAB1

CONSOLIDATED CONTRACTORS COMPANY Rev MTO Ref


CFP Project - Kuwait - Contract Number JI-2025/03-001
PROJECT:- JI-2025/03-001 - Subcontract For CMEI, EPC of Buildings and Temp. Facilities Discipline:- Civil OA C-216-D-107
PORTION-:- QUANTITY TAKE-OFF AS PER AFC DRAWINGS Date Issued :- ……./….... /2015
DRAWING NO. UNIT-216 (DHT), ( FDN D-216-107) Date Agreed :-____/____/2015
S.No BOQ Code Discipline Description Size AFC Qty Unit Remarks
Inch
1 EQUIPMENT FOUNDATION D-216-107
2 GREEN FIELD
3 2.4.1 Excavation in Normal Soil & Sand:
4 2.4.1.2 Machine excavation
5 2.4.1.2-V01 Civil 0 to 1.5m depth 12.615 m3

6 2.4.1.2-V02 Civil 1.5 to 3.0m depth 2.103 m3

7 2.4.1.2-V03 Civil 3.0 to 4.5m depth - m3

8 2.4.1.2-V04 Civil 4.5 to 6.0m depth - m3

9 2.4.1.2-V05 Civil > 6.0m depth - m3

10 2.6 Backfilling and Compaction


Backfilling with approved excavated soil at site available from foundation, pits, trenches
11 2.6.1 Civil 4.800 m3
etc.

12 2.7 Disposal
Disposal of excess earth (suitable/unsuitable) from excavation of
13 2.7.2 Civil 9.918 m3
foundation/pits/trenches etc. under item no. 2.4 above
14 4 BLINDING CONCRETE / MASS CONCRETE
15 4.1 Civil Blinding Concrete for all foundation, sump, pits etc.. 0.481 m3

AGREED FOR AND ON BEHALF OF PSC-JV


QUANTITY SURVEYOR - CCC Page 1 of 2
RE-MEASUREMENT CONTRACT NO. CFP/EPC/0054-MAB1

CONSOLIDATED CONTRACTORS COMPANY Rev MTO Ref


CFP Project - Kuwait - Contract Number JI-2025/03-001
PROJECT:- JI-2025/03-001 - Subcontract For CMEI, EPC of Buildings and Temp. Facilities Discipline:- Civil OA C-216-D-107
PORTION-:- QUANTITY TAKE-OFF AS PER AFC DRAWINGS Date Issued :- ……./….... /2015
DRAWING NO. UNIT-216 (DHT), ( FDN D-216-107) Date Agreed :-____/____/2015
S.No BOQ Code Discipline Description Size AFC Qty Unit Remarks
Inch
16 5 REINFORCED CEMENT CONCRETE (RCC)
17 Substructure/Foundation
18 5.1.1 Civil Each individual item volume < 2 M3 - m3

19 5.1.2 Civil Each individual item volume > 2 M3 & < 10 M3 - m3

20 5.1.3 Civil Each individual item volume > 10 M3 & < 50 M3 12.143 m3

21 10 REINFORCEMENT STEEL
22 10.1 Civil Without Epoxy coating - mt

23 11 ANCHOR BOLTS & EMEBEDDED ITEMS


24 11.1 Galvanized Anchor Bolts
25 11.1.1 Civil Supply of all material, fabricating and Installing Galvanized Anchor bolts 0.040 mt

26 Embedded Steel
Supply of all material, fabrication and fixing Galvanized Insert plates/pipe sleeve etc.
made from plates, angles, steel pipe etc. to true line and levels with fixing of suitable
27 11.2 Civil - mt
MS lugs on insert plate/sleeve, including Chromate treatment (if applicable) in addition
to galvanizing and all associated work, all complete as per project specifications,
26 12 GROUTING
27 12.4 Civil Non Shrink Cement Grout 0.027 m3
NOTE: REMAINING ITEMS QUANTITY TAKE OFF WILL BE INCORPORATED WITH THE REVISION OF DRAWING

AGREED FOR AND ON BEHALF OF PSC-JV


QUANTITY SURVEYOR - CCC Page 2 of 2
DETAILED QUANTITY TAKE-OFF

PROJECT:- CFP Project - Kuwait - Contract Number JI-2025/03-001


DETAILS OF QUANTITY TAKE-OFF AS PER AFC DRAWINGS

Total
Location / Remar
S.No BOQ Ref Description REQ / MTO Rev Drawing no Rev Description of BOQ Item Item Name/Location Unit Nos Length Width Depth Measured
Area ks
Qty
Code BOQ No (L) (B) (H) AFC
a b c d f g h j k l m n o p q s
1

2 2.4.1.2-V01 Excavation C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Machine Excavation 0 to 1.5m depth For Foundation 216-D-107 m3 1 2.900 2.900 1.500 12.615

3 2.4.1.2-V02 Excavation C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Machine Excavation 1.5 to 3.0m depth For Foundation 216-D-107 m3 1 2.900 2.900 0.250 2.103

4 2.6.1 Backfilling C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Backfilling and Compaction with excavated materials Total Excavation 216-D-107 m3 1 14.718 1.000 1.000 14.718

5 2.6.1 Backfilling C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Backfilling and Compaction with excavated materials Less Blinding m3 -1 2.900 2.900 0.050 -0.421

6 2.6.1 Backfilling C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Backfilling and Compaction with excavated materials Less Foundation Footing m3 -1 2.900 2.900 0.500 -4.205

7 2.6.1 Backfilling C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Backfilling and Compaction with excavated materials Less Foundations Pedestal m3 -1 2.100 2.100 1.200 -5.292
Disposal of excess earth (suitable/unsuitable) from
8 2.7.2 Disposal C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Total Excavation Quantities 216-D-107 m3 1 14.718 1.000 1.000 14.718
excavation of foundation
Disposal of excess earth (suitable/unsuitable) from
9 2.7.2 Disposal C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Less Backfilled Quantities m3 -1 4.800 1.000 1.000 -4.800
excavation of foundation
10 4.1 Blinding C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Blinding Concrete for all foundation, sump, pits etc.. Blinding Foundation216-D-107 m3 1 3.100 3.100 0.050 0.481
Reinforced Cement Concrete, Each individual item
11 5.1.3 RCC-Fdn C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Foundation216-D-107 m3 1 2.900 2.900 0.500 4.205
volume > 10 M3 & < 50 M3
Reinforced Cement Concrete, Each individual item
12 5.1.3 RCC-Fdn C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Foundations Pedestal 216-D-107 m3 1 2.100 2.100 1.800 7.938
volume > 10 M3 & < 50 M3
Supply of all material, fabricating and Installing
13 11.1.1 Anchor Bolts C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 anchor bolts 8- D 30-810-A Kg 8 4.970 39.760
Galvanized Anchor bolts
14 12.4 Grouting C-216-D-107 OA Unit-216 1-4-216-19-F-110-001 S1 Non Shrink Grout 50mm Thick Foundations Pedestal 216-D-107 m3 1 3.548 0.300 0.025 0.027

Page 1 of 1