BUILDING COST INDEX ON PAR-2020 (As on 01.04.

2021)
ANNEXURE –IV
SI. Description Unit %age Rates as on Proportio- Weightage Weight- age Rates at the Proportio- nate Weightage rates Cost Index
No 01.04.2020 nate value rates of Compo- time of value at the time at the time of
nent revision of of revision of revision of cost
cost index cost index index

1 Bricks (Fly Ash) 1000 100% 4300.00 4300.00 4300.00 8.00 4900 4900.00
4900.00 9.12
Nos.
2 Cement (OPC) Qtl. 100% 484.00 484.00 484.00 14.50 485 485.00 485.00 14.53
3 TMT Steel
a. 8 & 10 mm dia Qtl. 50% 4250.00 2125.00 4250.00 19.50 5150 2575.00
5100.00 23.40
b. 12 & 16 mm dia 50% 4250.00 2125.00 5050 2525.00
4 Aggregates 20 mm 75% 1380.00 1035.00 1650 1237.50
a) Natural sources
Cum 1297.50 6.50 1637.50 8.20
b) Aggregates 20mm (RCA) 25% 1050.00 262.50 1600 400.00

5 Sand (Coarse Sand) 75% 1400.00 1050.00 1650 1237.50


(a) Natural Sources Cum 1192.50 3.00 1462.50 3.68
(b) Sand (Coarse Sand) RA 25% 570.00 142.50 900 225.00
6 Flooring Items
a. Vitrified tiles Sqm 50% 515.00 257.50 610 305.00
b. Ceramic Tiles 20% 290.00 58.00 330 66.00
707.50 5.00 764.00 5.40
c. Kota Stone 10% 320.00 32.00 330 33.00
d. Granite Stone 20% 1800.00 360.00 1800 360.00
7 Paints
a. Synthetic Enamel Paint Litre 33.33% 170.00 56.66 160 53.33
b. Acrylic Washable 33.33% 40.00 13.33 40 13.33
136.65 3.00 133.32 2.93
distemper
c. Premium acrylic paint 33.33% 200.00 66.66 200 66.66
8 Door/Windows-Wooden/ uPVC/Aluminium/Steel

a. 35mm thick flush door 30.00% 1000.00 300.00 1000 300.00


shutters both side
commercial veneering
b. Factory made, standard Sqm 15.00% 1750.00 262.50 2057.50 7.00 2200 330.00 2100.00 7.14
Z-section steel windows
c. uPVC windows 20.00% 3450.00 690.00 3500 700.00
d. Aluminium Window 35.00% 2300.00 805.00 2200 770.00
SI. Description Unit %age Rates as on Proportio- Weightage Weight- age Rates at the Proportio- nate Weightage rates Cost Index
No 01.04.2020 nate value rates of Compo- time of value at the time at the time of
nent revision of of revision of revision of cost
cost index cost index index

9 Pipes
a. 15 mm GI Pipe Metre 10.00% 90.00 9.00 120 12.00
b. 100 mm CI Pipes 40.00% 665.00 266.00 725 290.00
312.60 2.50 341.50 2.73
c. 20 mm Black Conduits 20.00% 68.00 13.60 70 14.00
d. 20mm CPVC pipes 30.00% 80.00 24.00 85.00 25.50
11 Lamps & Fans
a. Ceiling Fans 1200 mm 50% 1550.00 775.00 2200.00 1100.00
b. 1200 mm LED tube 40% 625.00 250.00 850.00 340.00
lights with fittings Each 1033.50 4.50 1452.00 6.32
c. LED bulbs 10% 85.00 8.50 120.00 12.00

12 Electrical Machinery, Motor Each 100% 22500.00 22500.00 22500.00 2.50 36000.00 36000.00
7.5 HP (Pump set) 1500
36000.00 4.00
RPM
(Kirloskar)
13 Wires & Cables
a. Copper Wire 1.5 Sq. 100 70% 1300.00 910.00 1200.00 840.00
mm Metre
1843.00 4.00 1590.00 3.45
b. Copper Wire 4.0 Sq. 30% 3110.00 933.00 2500.00 750.00
mm
14 Labour
a. Skilled Each 50% 764.00 382.00 696.50 20.00 714.00 357.00
626.50 17.99
b. Unskilled 50% 629.00 314.50 539.00 269.50
Total 100.00 108.89