Professional Documents
Culture Documents
Audit Plan
Audit Plan
Lead Auditor: Mark B Kwan Audit type: Transition
0956 516 5472; markbkwan@gmail.com Audit start date: 02 Aug 2021
Audit end date: 04 Aug 2021
Audit Standards:
FSSC 22000 v.5.1 (ISO 22000:2018 + FSSC 22000
Additional requirements)
ISO/TS 22002-3
ISO/TS 22002-1:2009
ISO/TS 22002-6:2016
ISO/TS 22002-2:2013
BSI/PAS 221:2013
ISO/TS 22002-5:2019
ISO/TS 22002-4:2013
Other criteria:
a) Documentation established by the organization for the
management system.
b) Statutory, regulatory, and contractual requirements
Company Name Contract Number
San Miguel Yamamura Packaging Corporation – Metal
Closure & Lithography Plant Cebu
Objectives: Scope of Certification:
To confirm the management system conforms with all Manufacture of Lithographed Sheets and Metal Crown
the requirements of the audit standard Caps for Food Industries
To confirm that the organization has effectively
implemented its planned arrangements
To confirm that the management system is capable of
achieving the organizations policies objectives
Site’s Full Address: Management Representative:
SMC Mandaue Complex, M.C. Briones St., Hi-Way Wilfredo G. Gutierrez
Tipolo, Mandaue City, Cebu 6014, Philippines wgutierrez@smypc.sanmiguel.com.ph
Audit Report Language: Specific safety requirements, if any:
English Government and plant COVID-19 protocol will be observed
Audit Plan
MINOR NC´s
1) The organization shall provide the CB with objective evidence of the correction, evidence of an investigation
into causative factors, exposed risks, and the proposed corrective action plan (CAP);
2) The CB shall review the corrective action plan and the evidence of correction and approve it when acceptable.
The CB approval shall be completed within 28 calendar days after the last day of the audit. Exceeding this
timeframe shall result in a suspension of the certificate
MAJOR NC´s
1) The organization shall provide the CB with objective evidence of an investigation into causative factors,
exposed risks, and evidence of effective implementation;
2) The CB shall review the corrective action plan and conduct an on-site follow-up audit to verify the
implementation of the CA to close the major nonconformity. This follow-up shall be done within 28 calendar
days from the last day of the audit;
3) The major nonconformity shall be closed by the CB within 28 calendar days from the last day of the audit.
When the major cannot be closed in this timeframe (28 days), the certificate shall be suspended.