You are on page 1of 29

z

y Cx lx = 2.90 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.90 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 1.05 m 1.225
Fy Net Safe Bearing Capacity of Soil = 124.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 2.450 x
Mx Grade of Concrete = M- 25.00 Cz 2.90 0.30
Fx lz lz1
x x Width of pedestal = 0.30 m 0.45
Cx = 0.45 m lx1 1.05
0.65
0.287
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.574 0.30
lx
Weight of Footing = 10%
Mz 2.90
z

z 2.90
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 40
(DL+WL+LL)(SUPPORT REACTION)
34.375 638.582 -8.777 -11.592 -0.101 -84.693 1.00 5.15 2.90 2.90 8.41 OK 4.06 4.06 63.86 50.86 101.51 55.71 107.21 OK OK Size of Footing = 2.90 x 2.90 m
Area of Footing = 8.41 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 638.58 kN
Unfactored Load = 638.58 kN

Pressure Intensity = p0 = 75.94 kN/m2 p0 = Load/Area


FOS = 1.45

Maximum Bending Moment = Mux = 958.39 kN-m drequired = 524.00 mm OK


Maximum Bending Moment = Muz = 239.60 kN-m drequired = 310.00 mm OK
D= 580.00 mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 650.00 mm 26.00
lx1 = 0.75 m d= 574.00 mm
lz1 = 1.05 m
9.51 9.51
Check for Shear

Two way shear One way shear

Perimeter = 3.07 m Factored Bearing Pressure = 110.11 kN/m2


Area = 0.75 sqm
Punching Shear = 581.34 kN (lx-Cx-d) = 1.88 m B= 2.90 m
τv = 0.474 N/mm2 (Along L) OK (lz-Cz-d) = 0.65 m L= 2.90 m
τv = 0.474 N/mm2 (Along B) OK
Shear Along L = Vu 599.06 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 207.88 kN
ks = 1.00 β = 1.00
Width at N.A. = 2.59 m d' = 470.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.18 m d' = 470.00

τv = 0.585 OK Along L
Parallel to L τv = 0.171 OK Along B

Steel required = 5004.00 mm2 Spacing = 182.00 mm


Parallel to B Allowable shear stress τc = 0.593 N/mm 2

Steel required = 993.00 mm2 Spacing = 330.00 mm ks = 1.00 pt 0.83

Dia of Bar 20 φ @ 100 c/c OK Allowable shear stress = 0.593 N/mm2


Dia of Bar 12 φ @ 125 c/c OK

20 φ &100 c/c
lz = 2.90

12 φ &125 c/c

lx = 2.9

0
z

y Cx lx = 2.30 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.30 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.68 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.98 m 0.963
Fy Net Safe Bearing Capacity of Soil = 108.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 2.660 x 1.925 x
Mx Grade of Concrete = M- 20.00 Cz 2.30 0.30
Fx lz lz1
x x Width of pedestal = 0.30 m 0.38
Cx = 0.38 m lx1 0.98
0.50
0.216
Fz
Cz = 0.38 m 0.38
cover = 50.00 mm 0.68 0.432 0.28
lx
Weight of Footing = 10%
Mz z 2.30

z 2.30
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 39
(DL+WL+LL)(SUPPORT REACTION)
11.362 294.4 7.136 3.272 -0.015 -4.717 1.00 2.73 2.30 2.30 5.29 OK 2.03 2.03 29.44 60.50 65.16 57.28 61.93 OK OK Size of Footing = 2.30 x 2.30 m
102 52
(DL+WL+LL)(SUPPORT REACTION)
-12.648 381.41 7.701 1.606 0.268 7.673 1.00 3.54 2.10 3.00 6.30 OK 3.15 2.21 38.14 70.59 63.63 69.57 62.61 OK OK Area of Footing = 5.29 sqm Load case #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 1.00 #NAME? 2.10 3.00 6.30 #NAME? 3.15 2.21 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Maximum Vertical Reaction = Fuy = #NAME? kN
Unfactored Load = #NAME? kN

Pressure Intensity = p0 = #NAME? kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = #NAME? kN-m drequired = #NAME? mm #NAME?


Maximum Bending Moment = Muz = #NAME? kN-m drequired = #NAME? mm #NAME?
D= #NAME? mm
Cx = 0.38 m
Cz = 0.38 m Provide depth = D= 500.00 mm 20.00
lx1 = 0.68 m d= 432.00 mm
lz1 = 0.98 m
7.54 7.54
Check for Shear

Two way shear One way shear

Perimeter = 2.42 m Factored Bearing Pressure = #NAME? kN/m2


Area = 0.48 sqm
Punching Shear = #NAME? kN (lx-Cx-d) = 1.49 m B= 2.30 m
τv = #NAME? N/mm2 (Along L) #NAME? (lz-Cz-d) = 0.53 m L= 2.30 m
τv = #NAME? N/mm2 (Along B) #NAME?
Shear Along L = Vu #NAME? kN
Allowable shear stress τc = 1.12 N/mm2 Shear Along B = Vu #NAME? kN
ks = 1.00 β = 1.00
Width at N.A. = 2.15 m d' = 387.00
Allowable shear stress = 1.12 N/mm2 Length at N.A. = 1.93 m d' = 387.00

τv = #NAME? #NAME? Along L


Parallel to L τv = #NAME? #NAME? Along B

Steel required = #NAME? mm2 Spacing = #NAME? mm


Parallel to B Allowable shear stress τc = 0.499 N/mm 2

Steel required = #NAME? mm2 Spacing = #NAME? mm ks = 1.00 pt 0.56

Dia of Bar 12 φ @ 100 c/c #NAME? Allowable shear stress = 0.499 N/mm2
Dia of Bar 12 φ @ 100 c/c #NAME?

12 φ &100 c/c
lz = 2.30

12 φ &100 c/c

lx = 2.3

0
z

y Cx lx = 3.30 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.30 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 1.05 m 1.425
Fy Net Safe Bearing Capacity of Soil = 124.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 2.850 x
Mx Grade of Concrete = M- 25.00 Cz 3.30 0.30
Fx lz lz1
x x Width of pedestal = 0.30 m 0.45
Cx = 0.45 m lx1 1.05
0.85
0.387
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.774 0.30
lx
Weight of Footing = 10%
Mz z 3.30

z 3.30
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
10245(DL+WL+LL)(SUPPORT
37 REACTION)
40.682 1012.685 13.621 74.318 -1.776 -22.547 1.00 8.17 3.30 3.30 10.89 OK 5.99 5.99 101.27 94.29 118.46 73.20 93.65 OK OK Size of Footing = 3.30 x 3.30 m
Area of Footing = 10.89 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 1012.69 kN
Unfactored Load = 1012.69 kN

Pressure Intensity = p0 = 93.00 kN/m2 p0 = Load/Area


FOS = 1.45

Maximum Bending Moment = Mux = 1807.28 kN-m drequired = 720.00 mm OK


Maximum Bending Moment = Muz = 451.82 kN-m drequired = 426.00 mm OK
D= 776.00 mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 850.00 mm 34.00
lx1 = 0.75 m d= 774.00 mm
lz1 = 1.05 m
10.82 10.82
Check for Shear

Two way shear One way shear

Perimeter = 3.67 m Factored Bearing Pressure = 134.85 kN/m2


Area = 1.02 sqm
Punching Shear = 917.49 kN (lx-Cx-d) = 2.08 m B= 3.30 m
τv = 0.496 N/mm2 (Along L) OK (lz-Cz-d) = 0.65 m L= 3.30 m
τv = 0.496 N/mm2 (Along B) OK
Shear Along L = Vu 923.83 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 289.70 kN
ks = 1.00 β = 1.00
Width at N.A. = 2.89 m d' = 542.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.23 m d' = 542.00

τv = 0.765 NOT OK Along L


Parallel to L τv = 0.185 OK Along B

Steel required = 7115.00 mm2 Spacing = 146.00 mm


Parallel to B Allowable shear stress τc = 0.542 N/mm 2

Steel required = 1391.00 mm2 Spacing = 268.00 mm ks = 1.00 pt 0.66

Dia of Bar 20 φ @ 100 c/c OK Allowable shear stress = 0.542 N/mm2


Dia of Bar 12 φ @ 200 c/c OK

20 φ &100 c/c
lz = 3.30

12 φ &200 c/c

lx = 3.3

0
z

y Cx lx = 2.80 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.80 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.90 m one way
z Load factor = Load factor used in load case in load data input lz1 = 1.05 m 1.175
Fy Net Safe Bearing Capacity of Soil = 124.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 2.200 x
Mx Grade of Concrete = M- 25.00 Cz 2.80 0.30
Fx lz lz1
x x Width of pedestal = 0.30 m 0.45
Cx = 0.60 m lx1 1.05
0.65
0.289
Fz
Cz = 0.45 m 0.60
cover = 50.00 mm 0.90 0.578 0.45
lx
Weight of Footing = 10%
Mz z 2.80

z 2.80
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
10234(DL+WL+LL)(SUPPORT
38 REACTION)
-77.095 673.637 19.704 92.557 -2.498 21.835 1.00 5.44 2.80 2.80 7.84 OK 3.66 3.66 67.36 106.91 113.85 63.91 63.25 OK OK Size of Footing = 2.80 x 2.80 m
Area of Footing = 7.84 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 673.64 kN
Unfactored Load = 673.64 kN

Pressure Intensity = p0 = 85.93 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 873.40 kN-m drequired = 501.00 mm OK


Maximum Bending Moment = Muz = 249.14 kN-m drequired = 289.00 mm OK
D= 557.00 mm
Cx = 0.60 m
Cz = 0.45 m Provide depth = D= 650.00 mm 26.00
lx1 = 0.90 m d= 578.00 mm
lz1 = 1.05 m
9.18 9.18
Check for Shear

Two way shear One way shear

Perimeter = 3.38 m Factored Bearing Pressure = 128.90 kN/m2


Area = 0.91 sqm
Punching Shear = 595.16 kN (lx-Cx-d) = 1.62 m B= 2.80 m
τv = 0.454 N/mm2 (Along L) OK (lz-Cz-d) = 0.60 m L= 2.80 m
τv = 0.454 N/mm2 (Along B) OK
Shear Along L = Vu 585.39 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 215.46 kN
ks = 1.00 β = 0.75
Width at N.A. = 2.80 m d' = 514.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.80 m d' = 509.00

τv = 0.411 OK Along L
Parallel to L τv = 0.150 OK Along B

Steel required = 4132.00 mm2 Spacing = 136.00 mm


Parallel to B Allowable shear stress τc = 0.444 N/mm 2

Steel required = 1027.00 mm2 Spacing = 308.00 mm ks = 1.00 pt 0.41

Dia of Bar 16 φ @ 125 c/c OK Allowable shear stress = 0.444 N/mm2


Dia of Bar 12 φ @ 200 c/c OK

16 φ &125 c/c
lz = 2.80

12 φ &200 c/c

lx = 2.8

0
z

y Cx lx = 3.30 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.80 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.90 m one way
z Load factor = Load factor used in load case in load data input lz1 = 1.05 m 1.175
Fy Net Safe Bearing Capacity of Soil = 124.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 2.700 x
Mx Grade of Concrete = M- 25.00 Cz 2.80 0.30
Fx lz lz1
x x Width of pedestal = 0.30 m 0.45
Cx = 0.60 m lx1 1.05
0.65
0.289
Fz
Cz = 0.45 m 0.60
cover = 50.00 mm 0.90 0.578 0.38
lx
Weight of Footing = 10%
Mz z 3.30

z 3.30
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 39
(DL+WL+LL)(SUPPORT REACTION)
51.567 648.758 -12.915 -15.493 2.148 -205.698 1.00 5.24 3.30 2.80 9.24 OK 4.31 5.08 64.88 28.19 114.12 34.30 121.30 OK OK Size of Footing = 3.30 x 2.80 m
Area of Footing = 9.24 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 648.76 kN
Unfactored Load = 648.76 kN

Pressure Intensity = p0 = 70.22 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 1075.00 kN-m drequired = 555.00 mm OK


Maximum Bending Moment = Muz = 239.95 kN-m drequired = 284.00 mm OK
D= 611.00 mm
Cx = 0.60 m
Cz = 0.45 m Provide depth = D= 650.00 mm 26.00
lx1 = 0.90 m d= 578.00 mm
lz1 = 1.05 m
10.82 9.18
Check for Shear

Two way shear One way shear

Perimeter = 3.38 m Factored Bearing Pressure = 105.33 kN/m2


Area = 0.91 sqm
Punching Shear = 584.66 kN (lx-Cx-d) = 2.12 m B= 2.80 m
τv = 0.446 N/mm2 (Along L) OK (lz-Cz-d) = 0.60 m L= 3.30 m
τv = 0.446 N/mm2 (Along B) OK
Shear Along L = Vu 625.83 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 207.51 kN
ks = 1.00 β = 0.75
Width at N.A. = 2.80 m d' = 491.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.94 m d' = 505.00

τv = 0.421 OK Along L
Parallel to L τv = 0.151 OK Along B

Steel required = 5398.00 mm2 Spacing = 123.00 mm


Parallel to B Allowable shear stress τc = 0.510 N/mm 2

Steel required = 987.00 mm2 Spacing = 321.00 mm ks = 1.00 pt 0.56

Dia of Bar 16 φ @ 100 c/c OK Allowable shear stress = 0.510 N/mm2


Dia of Bar 12 φ @ 125 c/c OK

16 φ &100 c/c
lz = 2.80

12 φ &125 c/c

lx = 3.3

0
z

y Cx lx = 5.30 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.30 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.95 m one way
z Load factor = Load factor used in load case in load data input lz1 = 1.50 m 1.200
Fy Net Safe Bearing Capacity of Soil = 124.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 4.650 x
Mx Grade of Concrete = M- 25.00 Cz 3.30 0.30
Fx lz lz1
x x Width of pedestal = 0.30 m 0.90
Cx = 0.65 m lx1 1.50
1.15
0.541
Fz
Cz = 0.90 m 0.65
cover = 50.00 mm 0.95 1.082 0.30
lx
Weight of Footing = 10%
Mz z 5.30

z 5.30
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 36
(DL+WL+LL)(SUPPORT REACTION)
10.727 1736.361 206.671 715.781 -3.786 -19.71 1.00 14.01 5.30 3.30 17.49 OK 9.62 15.45 173.64 154.99 184.89 28.49 36.07 NOT OK OK Size of Footing = 5.30 x 3.30 m
Area of Footing = 17.49 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 1736.36 kN
Unfactored Load = 1736.36 kN

Pressure Intensity = p0 = 99.28 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 5313.04 kN-m drequired = 1033.00 mm OK


Maximum Bending Moment = Muz = 568.28 kN-m drequired = 425.00 mm OK
D= 1089.00 mm
Cx = 0.65 m
Cz = 0.90 m Provide depth = D= 1150.00 mm 46.00
lx1 = 0.95 m d= 1082.00 mm
lz1 = 1.50 m
17.38 10.82
Check for Shear

Two way shear One way shear

Perimeter = 5.45 m Factored Bearing Pressure = 148.92 kN/m2


Area = 2.36 sqm
Punching Shear = 1502.05 kN (lx-Cx-d) = 3.57 m B= 3.30 m
τv = 0.422 N/mm2 (Along L) OK (lz-Cz-d) = 0.12 m L= 5.30 m
τv = 0.484 N/mm2 (Along B) OK
Shear Along L = Vu 1753.44 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 93.13 kN
ks = 1.00 β = 0.72
Width at N.A. = 3.30 m d' = 343.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 3.28 m d' = 754.00

τv = 0.710 NOT OK Along L


Parallel to L τv = 0.082 OK Along B

Steel required = 16759.00 mm2 Spacing = 36.00 mm


Parallel to B Allowable shear stress τc = 0.473 N/mm 2

Steel required = 1227.00 mm2 Spacing = 304.00 mm ks = 1.00 pt 0.47

Dia of Bar 12 φ @ 100 c/c NOT OK Allowable shear stress = 0.473 N/mm2
Dia of Bar 12 φ @ 100 c/c OK

12 φ &100 c/c
lz = 3.30

12 φ &100 c/c

lx = 5.3

0
z

y Cx lx = 2.40 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.40 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.68 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.68 m 1.013
Fy Net Safe Bearing Capacity of Soil = 100.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.013 x
Mx Grade of Concrete = M- 25.00 Cz 2.40 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.38
Cx = 0.38 m lx1 0.68
0.60
0.266
Fz
Cz = 0.38 m 0.38
cover = 50.00 mm 0.68 0.532 0.30
lx
Weight of Footing = 10%
Mz z 2.40

279.99
z 2.40
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 48
(DL+WL+LL)(SUPPORT REACTION)
-10.553 465.749 -11.245 -7.206 -0.066 6.641 1.00 4.66 2.40 2.40 5.76 OK 2.30 2.30 46.57 88.70 82.94 94.96 89.19 OK OK Size of Footing = 2.40 x 2.40 m
Area of Footing = 5.76 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 465.75 kN
Unfactored Load = 465.75 kN

Pressure Intensity = p0 = 80.86 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 149.21 kN-m drequired = 258.00 mm OK


Maximum Bending Moment = Muz = 149.21 kN-m drequired = 258.00 mm OK
D= 314.00 mm
Cx = 0.38 m
Cz = 0.38 m Provide depth = D= 600.00 mm 24.00
lx1 = 0.68 m d= 532.00 mm
lz1 = 0.68 m
7.87 7.87
Check for Shear

Two way shear One way shear

Perimeter = 3.63 m Factored Bearing Pressure = 121.29 kN/m2


Area = 0.82 sqm
Punching Shear = 399.23 kN (lx-Cx-d) = 0.48 m B= 2.40 m
τv = 0.335 N/mm2 (Along L) OK (lz-Cz-d) = 0.48 m L= 2.40 m
τv = 0.335 N/mm2 (Along B) OK
Shear Along L = Vu 139.87 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 139.87 kN
ks = 1.00 β = 1.00
Width at N.A. = 2.36 m d' = 399.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.36 m d' = 399.00

τv = 0.149 OK Along L
Parallel to L τv = 0.149 OK Along B

Steel required = 671.00 mm2 Spacing = 405.00 mm


Parallel to B Allowable shear stress τc = 0.456 N/mm 2

Steel required = 671.00 mm2 Spacing = 405.00 mm ks = 1.00 pt 0.43

Dia of Bar 12 φ @ 125 c/c OK Allowable shear stress = 0.456 N/mm2


Dia of Bar 12 φ @ 125 c/c OK

12 φ &125 c/c
lz = 2.4

12 φ &125 c/c

lx = 2.4

0
z

y Cx lx = 2.60 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 4.00 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.95 m one way
z Load factor = Load factor used in load case in load data input lz1 = 1.20 m 1.852
Fy Net Safe Bearing Capacity of Soil = 120.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 2.100 x
Mx Grade of Concrete = M- 25.00 Cz 4.00 0.45
Fx lz lz1
x x Width of pedestal = 0.45 m 0.30
Cx = 0.50 m lx1 1.20
0.75
0.338
Fz
Cz = 0.30 m 0.50
cover = 50.00 mm 0.95 0.676 0.30
lx
Weight of Footing = 10%
Mz z 2.60

z 2.60
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 43
(DL+WL+LL)(SUPPORT REACTION)
-7.406 403.98 2.131 -0.221 0.563 3.509 1.50 2.25 2.60 4.00 10.41 OK 6.95 4.51 40.40 28.95 27.92 29.00 27.96 OK OK Size of Footing = 2.60 x 4.00 m
1.2 (DL+LL) -3.131 1098.65 6.239 3.454 -0.671 -3.726 1.20 7.63 2.60 4.00 10.41 OK 6.95 4.51 109.87 96.47 97.84 95.64 97.01 OK OK Area of Footing = 10.41 sqm Load case 1.5 (DL+ LL - EQZ)
1.2 (DL+ LL + EQX) -52.284 954.624 5.37 1.745 -1.361 166.759 1.20 6.63 2.60 4.00 10.41 OK 6.95 4.51 95.46 115.07 53.46 114.65 53.04 OK OK Maximum Vertical Reaction = Fuy = 1486.69 kN
1.2 (DL+ LL + EQZ) 0.591 924.391 -28.935 -74.015 -1.35 -15.91 1.20 6.42 2.60 4.00 10.41 OK 6.95 4.51 92.44 69.58 75.46 87.33 93.21 OK OK Unfactored Load = 991.13 kN
1.2 (DL+ LL - EQX) 46.022 1242.68 7.108 5.162 0.019 -174.212 1.20 8.63 2.60 4.00 10.41 OK 6.95 4.51 124.27 77.86 142.22 76.62 140.98 OK OK
1.2 (DL+ LL - EQZ) -6.852 1272.92 41.413 80.922 0.008 8.457 1.20 8.84 2.60 4.00 10.41 OK 6.95 4.51 127.29 123.35 120.23 103.94 100.82 OK OK Pressure Intensity = p0 = 95.21 kN/m2 p0 = Load/Area
1.5 (DL) -3.218 1268.86 8.132 4.562 -0.765 -4.401 1.50 7.05 2.60 4.00 10.41 OK 6.95 4.51 126.89 89.17 90.47 88.29 89.59 OK OK FOS = 1.50
1.5 (DL+ LL + EQX) -64.659 1088.83 7.045 2.426 -1.628 208.706 1.50 6.05 2.60 4.00 10.41 OK 6.95 4.51 108.88 107.78 46.09 107.31 45.62 OK OK
1.5 (DL+ LL + EQZ) 1.434 1051.03 -35.836 -92.274 -1.614 -19.63 1.50 5.84 2.60 4.00 10.41 OK 6.95 4.51 105.10 62.28 68.08 79.99 85.79 OK OK Maximum Bending Moment = Mux = 1260.89 kN-m drequired = 563.00 mm OK
1.5 (DL+ LL - EQX) 58.224 1448.9 9.218 6.697 0.097 -217.507 1.50 8.05 2.60 4.00 10.41 OK 6.95 4.51 144.89 70.56 134.85 69.28 133.56 OK OK Maximum Bending Moment = Muz = 636.80 kN-m drequired = 449.00 mm OK
1.5 (DL+ LL - EQZ) -7.87 1486.69 52.099 101.397 0.084 10.829 1.50 8.26 2.60 4.00 10.41 OK 6.95 4.51 148.67 116.06 112.86 96.60 93.40 OK OK D= 621.00 mm
0.9DL + 1.5 EQX -63.372 581.28 3.792 0.601 -1.322 210.466 1.10 4.41 2.60 4.00 10.41 OK 6.95 4.51 58.13 98.33 13.50 98.17 13.34 OK OK Cx = 0.50 m
0.9DL + 1.5 EQZ 2.721 543.489 -39.089 -94.098 -1.308 -17.87 1.10 4.12 2.60 4.00 10.41 OK 6.95 4.51 54.35 36.29 43.49 60.92 68.12 OK OK Cz = 0.30 m Provide depth = D= 750.00 mm 30.00
0.9DL - 1.5 EQX 59.511 941.355 5.966 4.873 0.403 -215.747 1.10 7.14 2.60 4.00 10.41 OK 6.95 4.51 94.14 47.58 134.54 46.31 133.26 OK OK lx1 = 0.95 m d= 676.00 mm
0.9DL - 1.5 EQZ -6.583 979.146 48.846 99.572 0.39 12.589 1.10 7.42 2.60 4.00 10.41 OK 6.95 4.51 97.91 109.62 104.55 83.56 78.49 OK OK lz1 = 1.20 m
8.53 13.13
Check for Shear

Two way shear One way shear

Perimeter = 3.33 m Factored Bearing Pressure = 142.82 kN/m2


Area = 0.82 sqm
Punching Shear = 913.30 kN (lx-Cx-d) = 1.42 m B= 4.00 m
τv = 0.542 N/mm2 (Along L) OK (lz-Cz-d) = 1.18 m L= 2.60 m
τv = 0.578 N/mm2 (Along B) OK
Shear Along L = Vu 814.29 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 436.67 kN
ks = 1.00 β = 0.60
Width at N.A. = 3.16 m d' = 603.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 1.92 m d' = 507.00

τv = 0.837 NOT OK Along L


Parallel to L τv = 0.230 OK Along B

Steel required = 5101.00 mm2 Spacing = 102.00 mm


Parallel to B Allowable shear stress τc = 0.521 N/mm 2

Steel required = 2297.00 mm2 Spacing = 350.00 mm ks = 1.00 pt 0.60

Dia of Bar 16 φ @ 100 c/c OK Allowable shear stress = 0.521 N/mm2


Dia of Bar 16 φ @ 150 c/c OK

16 φ &100 c/c
lz = 4.00

16 φ &150 c/c

lx = 2.6

0
z

y Cx lx = 2.20 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.20 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.68 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.68 m 0.913
Fy Net Safe Bearing Capacity of Soil = 100.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 0.913 x
Mx Grade of Concrete = M- 25.00 Cz 2.20 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.38
Cx = 0.38 m lx1 0.68
0.45
0.191
Fz
Cz = 0.38 m 0.38
cover = 50.00 mm 0.68 0.382 0.30
lx
Weight of Footing = 10%
Mz z 2.20

z 2.20
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 52
(DL+WL+LL)(SUPPORT REACTION)
-12.648 381.41 7.701 1.606 0.268 7.673 1.00 3.82 2.20 2.20 4.84 OK 1.77 1.77 38.14 91.91 83.27 90.10 81.46 OK OK Size of Footing = 2.20 x 2.20 m
Area of Footing = 4.84 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 381.41 kN
Unfactored Load = 381.41 kN

Pressure Intensity = p0 = 78.81 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 108.28 kN-m drequired = 220.00 mm OK


Maximum Bending Moment = Muz = 108.28 kN-m drequired = 220.00 mm OK
D= 276.00 mm
Cx = 0.38 m
Cz = 0.38 m Provide depth = D= 450.00 mm 18.00
lx1 = 0.68 m d= 382.00 mm
lz1 = 0.68 m
7.22 7.22
Check for Shear

Two way shear One way shear

Perimeter = 3.03 m Factored Bearing Pressure = 118.22 kN/m2


Area = 0.57 sqm
Punching Shear = 336.28 kN (lx-Cx-d) = 0.53 m B= 2.20 m
τv = 0.445 N/mm2 (Along L) OK (lz-Cz-d) = 0.53 m L= 2.20 m
τv = 0.445 N/mm2 (Along B) OK
Shear Along L = Vu 137.97 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 137.97 kN
ks = 1.00 β = 1.00
Width at N.A. = 2.20 m d' = 336.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.20 m d' = 336.00

τv = 0.187 OK Along L
Parallel to L τv = 0.187 OK Along B

Steel required = 689.00 mm2 Spacing = 361.00 mm


Parallel to B Allowable shear stress τc = 0.453 N/mm 2

Steel required = 689.00 mm2 Spacing = 361.00 mm ks = 1.00 pt 0.43

Dia of Bar 12 φ @ 150 c/c OK Allowable shear stress = 0.453 N/mm2


Dia of Bar 12 φ @ 150 c/c OK

12 φ &150 c/c
lz = 2.2

12 φ &150 c/c

lx = 2.2

0
z

y Cx lx = 3.00 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.00 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.75 m 1.275
Fy Net Safe Bearing Capacity of Soil = 109.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.275 x
Mx Grade of Concrete = M- 25.00 Cz 3.00 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.45
Cx = 0.45 m lx1 0.75
0.45
0.191
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.382 0.30
lx
Weight of Footing = 10%
Mz z 3.00

z 3.00
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 1.00 #NAME? 3.00 3.00 9.00 #NAME? 4.50 4.50 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Size of Footing = 3.00 x 3.00 m
Area of Footing = 9.00 sqm Load case #NAME?
Maximum Vertical Reaction = Fuy = #NAME? kN
Unfactored Load = #NAME? kN

Pressure Intensity = p0 = #NAME? kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = #NAME? kN-m drequired = #NAME? mm #NAME?


Maximum Bending Moment = Muz = #NAME? kN-m drequired = #NAME? mm #NAME?
D= #NAME? mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 450.00 mm 18.00
lx1 = 0.75 m d= 382.00 mm
lz1 = 0.75 m
9.84 9.84
Check for Shear

Two way shear One way shear

Perimeter = 3.33 m Factored Bearing Pressure = #NAME? kN/m2


Area = 0.69 sqm
Punching Shear = #NAME? kN (lx-Cx-d) = 0.89 m B= 3.00 m
τv = #NAME? N/mm2 (Along L) #NAME? (lz-Cz-d) = 0.89 m L= 3.00 m
τv = #NAME? N/mm2 (Along B) #NAME?
Shear Along L = Vu #NAME? kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu #NAME? kN
ks = 1.00 β = 1.00
Width at N.A. = 3.00 m d' = 351.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 3.00 m d' = 351.00

τv = #NAME? #NAME? Along L


Parallel to L τv = #NAME? #NAME? Along B

Steel required = #NAME? mm2 Spacing = #NAME? mm


Parallel to B Allowable shear stress τc = 0.446 N/mm 2

Steel required = #NAME? mm2 Spacing = #NAME? mm ks = 1.00 pt 0.42

Dia of Bar 12 φ @ 150 c/c #NAME? Allowable shear stress = 0.446 N/mm2
Dia of Bar 12 φ @ 150 c/c #NAME?

12 φ &150 c/c
lz = 3

12 φ &150 c/c

lx = 3

0
z

y Cx lx = 3.00 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 4.25 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.90 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.75 m 1.900
Fy Net Safe Bearing Capacity of Soil = 109.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.200 x
Mx Grade of Concrete = M- 25.00 Cz 4.25 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.45
Cx = 0.60 m lx1 0.75
0.65
0.291
Fz
Cz = 0.45 m 0.60
cover = 50.00 mm 0.90 0.582 0.38
lx
Weight of Footing = 10%
Mz z 3.00

z 3.00
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 51
(DL+WL+LL)(SUPPORT REACTION)
3.683 464.779 1.062 -0.804 0.52 0.548 1.00 4.27 3.00 4.25 12.75 OK 9.03 6.38 46.48 40.10 39.92 40.27 40.10 OK OK Size of Footing = 3.00 x 4.25 m
Area of Footing = 12.75 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 464.78 kN
Unfactored Load = 464.78 kN

Pressure Intensity = p0 = 36.46 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 167.36 kN-m drequired = 260.00 mm OK


Maximum Bending Moment = Muz = 296.15 kN-m drequired = 315.00 mm OK
D= 371.00 mm
Cx = 0.60 m
Cz = 0.45 m Provide depth = D= 650.00 mm 26.00
lx1 = 0.90 m d= 582.00 mm
lz1 = 0.75 m
9.84 13.94
Check for Shear

Two way shear One way shear

Perimeter = 4.43 m Factored Bearing Pressure = 54.69 kN/m2


Area = 1.22 sqm
Punching Shear = 420.39 kN (lx-Cx-d) = 0.62 m B= 4.25 m
τv = 0.261 N/mm2 (Along L) OK (lz-Cz-d) = 1.32 m L= 3.00 m
τv = 0.254 N/mm2 (Along B) OK
Shear Along L = Vu 143.64 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 216.24 kN
ks = 1.00 β = 0.75
Width at N.A. = 4.23 m d' = 514.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 3.00 m d' = 469.00

τv = 0.102 OK Along L
Parallel to L τv = 0.099 OK Along B

Steel required = 679.00 mm2 Spacing = 500.00 mm


Parallel to B Allowable shear stress τc = 0.423 N/mm 2

Steel required = 1241.00 mm2 Spacing = 387.00 mm ks = 1.00 pt 0.37

Dia of Bar 12 φ @ 150 c/c OK Allowable shear stress = 0.423 N/mm2


Dia of Bar 12 φ @ 100 c/c OK

12 φ &150 c/c
lz = 4.25

12 φ &100 c/c

lx = 3

0
z

y Cx lx = 3.20 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 4.80 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.75 m 2.175
Fy Net Safe Bearing Capacity of Soil = 109.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.375 x
Mx Grade of Concrete = M- 25.00 Cz 4.80 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.45
Cx = 0.45 m lx1 0.75
0.75
0.341
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.682 0.38
lx
Weight of Footing = 10%
Mz z 3.20

z 3.20
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
102 52
(DL+WL+LL)(SUPPORT REACTION)
-12.648 381.41 7.701 1.606 0.268 7.673 1.00 3.50 3.20 4.80 15.36 OK 12.29 8.19 38.14 28.38 26.51 28.12 26.25 OK OK Size of Footing = 3.20 x 4.80 m
Area of Footing = 15.36 sqm Load case 102 (DL+WL+LL)(SUPPORT REACTION)
Maximum Vertical Reaction = Fuy = 381.41 kN
Unfactored Load = 381.41 kN

Pressure Intensity = p0 = 24.84 kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = 169.07 kN-m drequired = 261.00 mm OK


Maximum Bending Moment = Muz = 282.03 kN-m drequired = 337.00 mm OK
D= 393.00 mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 750.00 mm 30.00
lx1 = 0.75 m d= 682.00 mm
lz1 = 0.75 m
10.50 15.74
Check for Shear

Two way shear One way shear

Perimeter = 4.53 m Factored Bearing Pressure = 37.26 kN/m2


Area = 1.28 sqm
Punching Shear = 349.71 kN (lx-Cx-d) = 0.69 m B= 4.80 m
τv = 0.186 N/mm2 (Along L) OK (lz-Cz-d) = 1.49 m L= 3.20 m
τv = 0.179 N/mm2 (Along B) OK
Shear Along L = Vu 123.94 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 178.01 kN
ks = 1.00 β = 1.00
Width at N.A. = 4.33 m d' = 583.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 3.17 m d' = 519.00

τv = 0.075 OK Along L
Parallel to L τv = 0.070 OK Along B

Steel required = 584.00 mm2 Spacing = 620.00 mm


Parallel to B Allowable shear stress τc = 0.402 N/mm 2

Steel required = 990.00 mm2 Spacing = 548.00 mm ks = 1.00 pt 0.33

Dia of Bar 12 φ @ 150 c/c OK Allowable shear stress = 0.402 N/mm2


Dia of Bar 12 φ @ 100 c/c OK

12 φ &150 c/c
lz = 4.8

12 φ &100 c/c

lx = 3.2

0
z

y Cx lx = 3.20 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.20 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.75 m 1.375
Fy Net Safe Bearing Capacity of Soil = 109.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.375 x
Mx Grade of Concrete = M- 25.00 Cz 3.20 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.45
Cx = 0.45 m lx1 0.75
0.50
0.216
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.432 0.30
lx
Weight of Footing = 10%
Mz z 3.20

z 3.20
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 1.00 #NAME? 3.20 3.20 10.24 #NAME? 5.46 5.46 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Size of Footing = 3.20 x 3.20 m
Area of Footing = 10.24 sqm Load case #NAME?
Maximum Vertical Reaction = Fuy = #NAME? kN
Unfactored Load = #NAME? kN

Pressure Intensity = p0 = #NAME? kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = #NAME? kN-m drequired = #NAME? mm #NAME?


Maximum Bending Moment = Muz = #NAME? kN-m drequired = #NAME? mm #NAME?
D= #NAME? mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 500.00 mm 20.00
lx1 = 0.75 m d= 432.00 mm
lz1 = 0.75 m
10.50 10.50
Check for Shear

Two way shear One way shear

Perimeter = 3.53 m Factored Bearing Pressure = #NAME? kN/m2


Area = 0.78 sqm
Punching Shear = #NAME? kN (lx-Cx-d) = 0.94 m B= 3.20 m
τv = #NAME? N/mm2 (Along L) #NAME? (lz-Cz-d) = 0.94 m L= 3.20 m
τv = #NAME? N/mm2 (Along B) #NAME?
Shear Along L = Vu #NAME? kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu #NAME? kN
ks = 1.00 β = 1.00
Width at N.A. = 3.20 m d' = 386.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 3.20 m d' = 386.00

τv = #NAME? #NAME? Along L


Parallel to L τv = #NAME? #NAME? Along B

Steel required = #NAME? mm2 Spacing = #NAME? mm


Parallel to B Allowable shear stress τc = 0.466 N/mm 2

Steel required = #NAME? mm2 Spacing = #NAME? mm ks = 1.00 pt 0.45

Dia of Bar 12 φ @ 125 c/c #NAME? Allowable shear stress = 0.466 N/mm2
Dia of Bar 12 φ @ 125 c/c #NAME?

12 φ &125 c/c
lz = 3.2

12 φ &125 c/c

lx = 3.2

0
z

y Cx lx = 2.75 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 2.75 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.75 m 1.150
Fy Net Safe Bearing Capacity of Soil = 109.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.150 x
Mx Grade of Concrete = M- 25.00 Cz 2.75 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.45
Cx = 0.45 m lx1 0.75
0.40
0.166
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.332 0.30
lx
Weight of Footing = 10%
Mz z 2.75

z 2.75
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 1.00 #NAME? 2.75 2.75 7.56 #NAME? 3.47 3.47 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Size of Footing = 2.75 x 2.75 m
Area of Footing = 7.56 sqm Load case #NAME?
Maximum Vertical Reaction = Fuy = #NAME? kN
Unfactored Load = #NAME? kN

Pressure Intensity = p0 = #NAME? kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = #NAME? kN-m drequired = #NAME? mm #NAME?


Maximum Bending Moment = Muz = #NAME? kN-m drequired = #NAME? mm #NAME?
D= #NAME? mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 400.00 mm 16.00
lx1 = 0.75 m d= 332.00 mm
lz1 = 0.75 m
9.02 9.02
Check for Shear

Two way shear One way shear

Perimeter = 3.13 m Factored Bearing Pressure = #NAME? kN/m2


Area = 0.61 sqm
Punching Shear = #NAME? kN (lx-Cx-d) = 0.82 m B= 2.75 m
τv = #NAME? N/mm2 (Along L) #NAME? (lz-Cz-d) = 0.82 m L= 2.75 m
τv = #NAME? N/mm2 (Along B) #NAME?
Shear Along L = Vu #NAME? kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu #NAME? kN
ks = 1.00 β = 1.00
Width at N.A. = 2.75 m d' = 314.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.75 m d' = 314.00

τv = #NAME? #NAME? Along L


Parallel to L τv = #NAME? #NAME? Along B

Steel required = #NAME? mm2 Spacing = #NAME? mm


Parallel to B Allowable shear stress τc = 0.471 N/mm 2

Steel required = #NAME? mm2 Spacing = #NAME? mm ks = 1.00 pt 0.46

Dia of Bar 12 φ @ 150 c/c #NAME? Allowable shear stress = 0.471 N/mm2
Dia of Bar 12 φ @ 150 c/c #NAME?

12 φ &150 c/c
lz = 2.75

12 φ &150 c/c

lx = 2.75

0
z

y Cx lx = 3.00 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.00 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.75 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.75 m 1.275
Fy Net Safe Bearing Capacity of Soil = 109.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.275 x
Mx Grade of Concrete = M- 25.00 Cz 3.00 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.45
Cx = 0.45 m lx1 0.75
0.65
0.291
Fz
Cz = 0.45 m 0.45
cover = 50.00 mm 0.75 0.582 0.38
lx
Weight of Footing = 10%
Mz z 3.00

z 3.00
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 1.00 #NAME? 3.00 3.00 9.00 #NAME? 4.50 4.50 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? Size of Footing = 3.00 x 3.00 m
Area of Footing = 9.00 sqm Load case #NAME?
Maximum Vertical Reaction = Fuy = #NAME? kN
Unfactored Load = #NAME? kN

Pressure Intensity = p0 = #NAME? kN/m2 p0 = Load/Area


FOS = 1.50

Maximum Bending Moment = Mux = #NAME? kN-m drequired = #NAME? mm #NAME?


Maximum Bending Moment = Muz = #NAME? kN-m drequired = #NAME? mm #NAME?
D= #NAME? mm
Cx = 0.45 m
Cz = 0.45 m Provide depth = D= 650.00 mm 26.00
lx1 = 0.75 m d= 582.00 mm
lz1 = 0.75 m
9.84 9.84
Check for Shear

Two way shear One way shear

Perimeter = 4.13 m Factored Bearing Pressure = #NAME? kN/m2


Area = 1.07 sqm
Punching Shear = #NAME? kN (lx-Cx-d) = 0.69 m B= 3.00 m
τv = #NAME? N/mm2 (Along L) #NAME? (lz-Cz-d) = 0.69 m L= 3.00 m
τv = #NAME? N/mm2 (Along B) #NAME?
Shear Along L = Vu #NAME? kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu #NAME? kN
ks = 1.00 β = 1.00
Width at N.A. = 3.00 m d' = 476.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 3.00 m d' = 476.00

τv = #NAME? #NAME? Along L


Parallel to L τv = #NAME? #NAME? Along B

Steel required = #NAME? mm2 Spacing = #NAME? mm


Parallel to B Allowable shear stress τc = 0.429 N/mm 2

Steel required = #NAME? mm2 Spacing = #NAME? mm ks = 1.00 pt 0.38

Dia of Bar 12 φ @ 150 c/c #NAME? Allowable shear stress = 0.429 N/mm2
Dia of Bar 12 φ @ 100 c/c #NAME?

12 φ &150 c/c
lz = 3

12 φ &100 c/c

lx = 3

0
z

y Cx lx = 3.05 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.05 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.60 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.90 m 1.225
Fy Net Safe Bearing Capacity of Soil = 100.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.375 x
Mx Grade of Concrete = M- 25.00 Cz 3.05 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.60
Cx = 0.30 m lx1 0.90
0.45
0.191
Fz
Cz = 0.60 m 0.30
cover = 50.00 mm 0.60 0.382 0.20
lx
Weight of Footing = 15%
Mz z 3.05

z 3.05
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
F1 1.5 (DL+LL) -6.719 1156.95 3.297 2.996 0.035 4.71 1.50 7.72 3.05 3.05 9.30 OK 4.73 4.73 173.54 96.44 95.11 95.59 94.26 OK OK Size of Footing = 3.05 x 3.05 m
1.2 (DL+LL) -5.376 925.558 2.638 2.397 0.028 3.768 1.20 7.72 3.05 3.05 9.30 OK 4.73 4.73 138.83 96.44 95.11 95.59 94.26 OK OK Area of Footing = 9.30 sqm Load case 1.5 (DL+LL)
1.2 (DL+ LL + EQX) -24.69 864.927 1.898 0.105 -0.609 59.234 1.20 7.21 3.05 3.05 9.30 OK 4.73 4.73 129.74 99.56 78.68 99.52 78.65 OK OK Maximum Vertical Reaction = Fuy = 1156.95 kN
1.2 (DL+ LL + EQZ) -5.322 920.447 -42.457 -141.487 0.664 3.695 1.20 7.68 3.05 3.05 9.30 OK 4.73 4.73 138.07 70.54 69.24 120.41 119.11 OK OK Unfactored Load = 771.30 kN
1.2 (DL+ LL - EQX) 13.939 986.19 3.378 4.688 0.665 -51.698 1.20 8.22 3.05 3.05 9.30 OK 4.73 4.73 147.93 93.31 111.53 91.66 109.88 OK OK
1.2 (DL+ LL - EQZ) -5.429 930.669 47.732 146.28 -0.608 3.841 1.20 7.76 3.05 3.05 9.30 OK 4.73 4.73 139.60 122.33 120.98 70.78 69.42 OK OK Pressure Intensity = p0 = 82.92 kN/m2 p0 = Load/Area
1.5 (DL) -4.692 1037.5 3.611 3.444 0.015 3.143 1.50 6.92 3.05 3.05 9.30 OK 4.73 4.73 155.62 86.43 85.55 85.46 84.58 OK OK FOS = 1.50
1.5 (DL+ LL + EQX) -28.835 961.706 2.686 0.58 -0.781 72.476 1.50 6.42 3.05 3.05 9.30 OK 4.73 4.73 144.26 89.56 69.12 89.40 68.96 OK OK
1.5 (DL+ LL + EQZ) -4.624 1031.11 -52.757 -176.41 0.81 3.052 1.50 6.88 3.05 3.05 9.30 OK 4.73 4.73 154.67 60.54 59.68 110.28 109.42 OK OK Maximum Bending Moment = Mux = 358.62 kN-m drequired = 347.00 mm OK
1.5 (DL+ LL - EQX) 19.451 1113.28 4.536 6.309 0.811 -66.189 1.50 7.43 3.05 3.05 9.30 OK 4.73 4.73 166.99 83.31 101.97 81.53 100.19 OK OK Maximum Bending Moment = Muz = 284.64 kN-m drequired = 378.00 mm OK
1.5 (DL+ LL - EQZ) -4.759 1043.88 59.98 183.299 -0.78 3.234 1.50 6.96 3.05 3.05 9.30 OK 4.73 4.73 156.58 112.33 111.42 60.65 59.73 OK OK D= 434.00 mm
0.9DL + 1.5 EQX -26.958 546.708 1.242 -0.798 -0.787 71.218 1.10 4.98 3.05 3.05 9.30 OK 4.73 4.73 82.01 74.98 47.60 75.29 47.90 OK OK Cx = 0.30 m
0.9DL + 1.5 EQZ -2.748 616.108 -54.202 -177.788 0.804 1.795 1.10 5.61 3.05 3.05 9.30 OK 4.73 4.73 92.42 35.41 34.72 103.77 103.07 OK OK Cz = 0.60 m Provide depth = D= 450.00 mm 18.00
0.9DL - 1.5 EQX 21.328 698.286 3.092 4.931 0.805 -67.447 1.10 6.35 3.05 3.05 9.30 OK 4.73 4.73 104.74 66.46 92.39 64.56 90.49 OK OK lx1 = 0.60 m d= 382.00 mm
0.9DL - 1.5 EQZ -2.882 628.886 58.535 181.921 -0.786 1.977 1.10 5.72 3.05 3.05 9.30 OK 4.73 4.73 94.33 106.03 105.27 36.08 35.32 OK OK lz1 = 0.90 m
10.00 10.00
Check for Shear

Two way shear One way shear

Perimeter = 3.33 m Factored Bearing Pressure = 124.38 kN/m2


Area = 0.67 sqm
Punching Shear = 715.83 kN (lx-Cx-d) = 0.99 m B= 3.05 m
τv = 0.863 N/mm2 (Along L) OK (lz-Cz-d) = 0.84 m L= 3.05 m
τv = 0.867 N/mm2 (Along B) OK
Shear Along L = Vu 376.70 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 319.80 kN
ks = 1.00 β = 0.50
Width at N.A. = 2.49 m d' = 328.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.38 m d' = 335.00

τv = 0.473 OK Along L
Parallel to L τv = 0.391 OK Along B

Steel required = 2887.00 mm2 Spacing = 119.00 mm


Parallel to B Allowable shear stress τc = 0.506 N/mm 2

Steel required = 1931.00 mm2 Spacing = 179.00 mm ks = 1.00 pt 0.55

Dia of Bar 12 φ @ 100 c/c OK Allowable shear stress = 0.506 N/mm2


Dia of Bar 12 φ @ 150 c/c OK

12 φ &100 c/c
lz = 3.05

12 φ &150 c/c

lx = 3.05

0
z

y Cx lx = 3.05 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.05 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.60 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.90 m 1.225
Fy Net Safe Bearing Capacity of Soil = 100.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.375 x
Mx Grade of Concrete = M- 25.00 Cz 3.05 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.60
Cx = 0.30 m lx1 0.90
0.45
0.191
Fz
Cz = 0.60 m 0.30
cover = 50.00 mm 0.60 0.382 0.20
lx
Weight of Footing = 15%
Mz z 3.05

z 3.05
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
F1 1.5 (DL+LL) -3.131 905.72 -0.504 -0.209 -0.015 2.719 1.50 6.04 3.05 3.05 9.30 OK 4.73 4.73 135.86 75.00 74.23 75.06 74.29 OK OK Size of Footing = 3.05 x 3.05 m
1.2 (DL+LL) -2.504 724.576 -0.403 -0.167 -0.012 2.176 1.20 6.04 3.05 3.05 9.30 OK 4.73 4.73 108.69 75.00 74.23 75.06 74.29 OK OK Area of Footing = 9.30 sqm Load case 1.5 (DL+ LL + EQX)
1.2 (DL+ LL + EQX) -25.133 827.585 0.404 2.196 -0.856 60.564 1.20 6.90 3.05 3.05 9.30 OK 4.73 4.73 124.14 96.32 74.97 95.54 74.20 OK OK Maximum Vertical Reaction = Fuy = 946.74 kN
1.2 (DL+ LL + EQZ) -2.393 721.222 -38.141 -119.327 -0.954 2.04 1.20 6.02 3.05 3.05 9.30 OK 4.73 4.73 108.18 53.63 52.91 95.69 94.97 OK OK Unfactored Load = 631.16 kN
1.2 (DL+ LL - EQX) 20.124 621.566 -1.21 -2.53 0.832 -56.213 1.20 5.18 3.05 3.05 9.30 OK 4.73 4.73 93.23 53.68 73.49 54.57 74.39 OK OK
1.2 (DL+ LL - EQZ) -2.616 727.929 37.335 118.993 0.93 2.311 1.20 6.07 3.05 3.05 9.30 OK 4.73 4.73 109.19 96.37 95.55 54.43 53.61 OK OK Pressure Intensity = p0 = 67.85 kN/m2 p0 = Load/Area
1.5 (DL) -3.135 817.975 0.022 0.543 -0.018 2.734 1.50 5.46 3.05 3.05 9.30 OK 4.73 4.73 122.70 67.88 67.10 67.72 66.95 OK OK FOS = 1.50
1.5 (DL+ LL + EQX) -31.421 946.737 1.031 3.496 -1.074 75.719 1.50 6.32 3.05 3.05 9.30 OK 4.73 4.73 142.01 89.19 67.84 88.21 66.86 OK OK
1.5 (DL+ LL + EQZ) -2.996 813.784 -47.15 -148.407 -1.196 2.565 1.50 5.43 3.05 3.05 9.30 OK 4.73 4.73 122.07 46.51 45.78 88.35 87.63 OK OK Maximum Bending Moment = Mux = 293.44 kN-m drequired = 314.00 mm OK
1.5 (DL+ LL - EQX) 25.15 689.213 -0.986 -2.411 1.037 -70.251 1.50 4.60 3.05 3.05 9.30 OK 4.73 4.73 103.38 46.56 66.37 47.24 67.05 OK OK Maximum Bending Moment = Muz = 232.91 kN-m drequired = 342.00 mm OK
1.5 (DL+ LL - EQZ) -3.275 822.167 47.195 149.493 1.159 2.903 1.50 5.49 3.05 3.05 9.30 OK 4.73 4.73 123.33 89.24 88.43 47.09 46.27 OK OK D= 398.00 mm
0.9DL + 1.5 EQX -30.167 619.547 1.022 3.279 -1.066 74.626 1.10 5.64 3.05 3.05 9.30 OK 4.73 4.73 92.93 84.60 55.91 83.34 54.65 OK OK Cx = 0.30 m
0.9DL + 1.5 EQZ -1.742 486.594 -47.159 -148.624 -1.189 1.471 1.10 4.43 3.05 3.05 9.30 OK 4.73 4.73 72.99 26.40 25.83 83.54 82.98 OK OK Cz = 0.60 m Provide depth = D= 450.00 mm 18.00
0.9DL - 1.5 EQX 26.404 362.023 -0.995 -2.628 1.044 -71.345 1.10 3.30 3.05 3.05 9.30 OK 4.73 4.73 54.30 26.46 53.90 27.48 54.91 OK OK lx1 = 0.60 m d= 382.00 mm
0.9DL - 1.5 EQZ -2.021 494.977 47.186 149.276 1.167 1.81 1.10 4.50 3.05 3.05 9.30 OK 4.73 4.73 74.25 84.67 83.98 27.28 26.58 OK OK lz1 = 0.90 m
10.00 10.00
Check for Shear

Two way shear One way shear

Perimeter = 3.33 m Factored Bearing Pressure = 101.78 kN/m2


Area = 0.67 sqm
Punching Shear = 585.73 kN (lx-Cx-d) = 0.99 m B= 3.05 m
τv = 0.706 N/mm2 (Along L) OK (lz-Cz-d) = 0.84 m L= 3.05 m
τv = 0.710 N/mm2 (Along B) OK
Shear Along L = Vu 308.24 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 261.68 kN
ks = 1.00 β = 0.50
Width at N.A. = 2.49 m d' = 328.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.38 m d' = 335.00

τv = 0.387 OK Along L
Parallel to L τv = 0.320 OK Along B

Steel required = 2183.00 mm2 Spacing = 158.00 mm


Parallel to B Allowable shear stress τc = 0.506 N/mm 2

Steel required = 1541.00 mm2 Spacing = 224.00 mm ks = 1.00 pt 0.55

Dia of Bar 12 φ @ 100 c/c OK Allowable shear stress = 0.506 N/mm2


Dia of Bar 12 φ @ 150 c/c OK

12 φ &100 c/c
lz = 3.05

12 φ &150 c/c

lx = 3.05

0
z

y Cx lx = 3.35 m
Fux,Fuy,Fuz = Factored Forces in X,Y,Z direction acting at top of footing lz = 3.35 m two way
My Mux,Muy,Muz = Factored Moments @X,Y,Z direction acting at top of footing lx1 = 0.60 m one way
z Load factor = Load factor used in load case in load data input lz1 = 0.90 m 1.375
Fy Net Safe Bearing Capacity of Soil = 100.00 Kn/m2
Grade of Steel = Fe- 500.00 Ru = 3.325 x 1.525 x
Mx Grade of Concrete = M- 25.00 Cz 3.35 0.15
Fx lz lz1
x x Width of pedestal = 0.15 m 0.60
Cx = 0.30 m lx1 0.90
0.50
0.216
Fz
Cz = 0.60 m 0.30
cover = 50.00 mm 0.60 0.432 0.20
lx
Weight of Footing = 15%
Mz z 3.35

z 3.35
STAAD OUTPUT Horizontal Vertical Horizontal Moment Load Area Provided Wt of Base Pressure Check Max Base Min Base
Length Width
Node LOAD CASE Fux kN Fuy kN Fuz kN Mux kN-m Muy kN-m Muz kN-m Factor Required Area Check Zx Zz Footing Check-1 Check-2 Check-3 Check-4 Pressure Pressure
F1 1.5 (DL+LL) 6.606 665.723 1.714 2.216 0.079 -6.691 1.50 4.44 3.35 3.35 11.22 OK 6.27 6.27 99.86 45.00 46.43 44.53 45.96 OK OK Size of Footing = 3.35 x 3.35 m
1.2 (DL+LL) 5.285 532.578 1.371 1.772 0.063 -5.353 1.20 4.44 3.35 3.35 11.22 OK 6.27 6.27 79.89 45.00 46.43 44.53 45.96 OK OK Area of Footing = 11.22 sqm Load case 1.5 (DL+ LL - EQZ)
1.2 (DL+ LL + EQX) -29.405 511.149 1.488 2.286 -0.172 66.228 1.20 4.26 3.35 3.35 11.22 OK 6.27 6.27 76.67 52.76 35.15 52.15 34.54 OK OK Maximum Vertical Reaction = Fuy = 936.14 kN
1.2 (DL+ LL + EQZ) 7.869 284.12 -51.884 -156.455 -1.466 -10.429 1.20 2.37 3.35 3.35 11.22 OK 6.27 6.27 42.62 2.07 4.84 43.68 46.46 OK OK Unfactored Load = 624.09 kN
1.2 (DL+ LL - EQX) 39.975 554.008 1.254 1.259 0.299 -76.934 1.20 4.62 3.35 3.35 11.22 OK 6.27 6.27 83.10 37.24 57.71 36.91 57.37 OK OK
1.2 (DL+ LL - EQZ) 2.701 781.037 54.626 160 1.592 -0.277 1.20 6.51 3.35 3.35 11.22 OK 6.27 6.27 117.16 87.94 88.01 45.38 45.45 OK OK Pressure Intensity = p0 = 55.62 kN/m2 p0 = Load/Area
1.5 (DL) 6.522 625.566 1.725 2.069 0.064 -6.508 1.50 4.18 3.35 3.35 11.22 OK 6.27 6.27 93.83 42.26 43.65 41.82 43.21 OK OK FOS = 1.50
1.5 (DL+ LL + EQX) -36.841 598.779 1.871 2.711 -0.23 82.969 1.50 4.00 3.35 3.35 11.22 OK 6.27 6.27 89.82 50.02 32.37 49.44 31.79 OK OK
1.5 (DL+ LL + EQZ) 9.752 314.993 -64.843 -195.715 -1.847 -12.853 1.50 2.10 3.35 3.35 11.22 OK 6.27 6.27 47.25 -0.67 2.06 40.97 43.71 OK NOT OK Maximum Bending Moment = Mux = 325.00 kN-m drequired = 330.00 mm OK
1.5 (DL+ LL - EQX) 49.885 652.353 1.579 1.428 0.358 -95.985 1.50 4.35 3.35 3.35 11.22 OK 6.27 6.27 97.85 34.51 54.93 34.20 54.63 OK OK Maximum Bending Moment = Muz = 264.21 kN-m drequired = 364.00 mm OK
1.5 (DL+ LL - EQZ) 3.292 936.139 68.293 199.854 1.975 -0.163 1.50 6.25 3.35 3.35 11.22 OK 6.27 6.27 140.42 85.20 85.23 42.67 42.71 OK OK D= 420.00 mm
0.9DL + 1.5 EQX -39.45 348.553 1.181 1.883 -0.256 85.572 1.10 3.17 3.35 3.35 11.22 OK 6.27 6.27 52.28 45.16 20.33 44.61 19.78 OK OK Cx = 0.30 m
0.9DL + 1.5 EQZ 7.143 64.766 -65.533 -196.543 -1.873 -10.249 1.10 0.59 3.35 3.35 11.22 OK 6.27 6.27 9.71 -23.97 -21.00 33.06 36.04 OK NOT OK Cz = 0.60 m Provide depth = D= 500.00 mm 20.00
0.9DL - 1.5 EQX 47.276 402.126 0.889 0.6 0.333 -93.381 1.10 3.66 3.35 3.35 11.22 OK 6.27 6.27 60.32 24.00 51.10 23.83 50.92 OK OK lx1 = 0.60 m d= 432.00 mm
0.9DL - 1.5 EQZ 0.683 685.913 67.603 199.026 1.95 2.44 1.10 6.24 3.35 3.35 11.22 OK 6.27 6.27 102.89 93.13 92.42 35.38 34.67 OK OK lz1 = 0.90 m
10.99 10.99
Check for Shear
7.6176 15.24 5.52 18.11
10.6929 Two way shear One way shear
18.3105 5.60 18.37
Perimeter = 3.53 m Factored Bearing Pressure = 83.43 kN/m2
Area = 0.76 sqm
Punching Shear = 582.18 kN (lx-Cx-d) = 1.09 m B= 3.35 m
τv = 0.592 N/mm2 (Along L) OK (lz-Cz-d) = 0.94 m L= 3.35 m
τv = 0.595 N/mm2 (Along B) OK
Shear Along L = Vu 305.48 kN
Allowable shear stress τc = 1.25 N/mm2 Shear Along B = Vu 263.56 kN
ks = 1.00 β = 0.50
Width at N.A. = 2.65 m d' = 363.00
Allowable shear stress = 1.25 N/mm2 Length at N.A. = 2.52 m d' = 370.00

τv = 0.328 OK Along L
Parallel to L τv = 0.274 OK Along B

Steel required = 2057.00 mm2 Spacing = 184.00 mm


Parallel to B Allowable shear stress τc = 0.458 N/mm 2

Steel required = 1527.00 mm2 Spacing = 248.00 mm ks = 1.00 pt 0.44

Dia of Bar 12 φ @ 125 c/c OK Allowable shear stress = 0.458 N/mm2


Dia of Bar 12 φ @ 150 c/c OK

12 φ &125 c/c
lz = 3.35

12 φ &150 c/c

lx = 3.35

0
Horizontal Vertical Horizontal Moment
Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
39 11.362 294.4 7.136 3.272 -0.015 -4.717
40 -2.782 786.193 23.76 46.109 -0.242 2.08
41 -1.128 722.898 21.683 42.338 0.478 1.067
42 1.391 681.825 17.675 33.423 0.908 -0.284
43 -7.406 403.98 2.131 -0.221 0.563 3.509
44 -17.08 413.399 7.798 1.551 -0.064 7.605
45 14.089 442.035 -5.875 -6.08 0.112 -6.587
46 5.945 421.009 -3.083 -1.424 0.5 -11.266
47 1.506 464.498 -1.66 -2.029 0.15 1.35
48 -10.553 465.749 -11.245 -7.206 -0.066 6.641 4335.837
49 2.555 425.518 -6.945 -6.872 0.112 0.655
50 5.644 400.437 1.204 0.512 -0.441 -10.83
51 3.683 464.779 1.062 -0.804 0.52 0.548
52 -12.648 381.41 7.701 1.606 0.268 7.673
53 6.561 605.383 26.992 8.58 0.426 -1.017
54 10.36 281.653 -4.626 -2.183 0.126 -4.196
55 -42.006 497.42 -7.021 -5.171 0.217 17.633
56 -1.965 790.567 -24.778 -48.666 0.726 -0.246 1287.987
57 -0.483 719.187 -22.915 -45.734 0.075 -0.922 1391.336
58 1.654 672.149 -19.264 -39.289 -0.292 -1.89
59 31.303 666.766 -9.729 -5.872 -0.01 -15.084
1 fx 2.782 fy -786.193 fz -23.76 Mx -46.109
2 fx 1.128 fy -722.898 fz -21.683 Mx -42.338
3 fx -1.391 fy -681.825 fz -17.675 Mx -33.423
1 fx 7.406 fy -403.98 fz -2.131 Mx 0.221
1 fx 17.08 fy -413.399 fz -7.798 Mx -1.551
1 fx -14.089 fy -442.035 fz 5.875 Mx 6.08
7 fx -5.945 fy -421.009 fz 3.083 Mx 1.424
2 fx -1.506 fy -464.498 fz 1.66 Mx 2.029
2 fx 10.553 fy -465.749 fz 11.245 Mx 7.206
2 fx -2.555 fy -425.518 fz 6.945 Mx 6.872
10 fx -5.644 fy -400.437 fz -1.204 Mx -0.512
3 fx -3.683 fy -464.779 fz -1.062 Mx 0.804
3 fx 12.648 fy -381.41 fz -7.701 Mx -1.606
3 fx -6.561 fy -605.383 fz -26.992 Mx -8.58
11 fx -10.36 fy -281.653 fz 4.626 Mx 2.183
1 fx 42.006 fy -497.42 fz 7.021 Mx 5.171
2 fx 1.965 fy -790.567 fz 24.778 Mx 48.666
1 fx 0.483 fy -719.187 fz 22.915 Mx 45.734
2 fx -1.654 fy -672.149 fz 19.264 Mx 39.289
1 fx -31.303 fy -666.766 fz 9.729 Mx 5.872
My 0.242 Mz -2.08
My -0.478 Mz -1.067
My -0.908 Mz 0.284
My -0.563 Mz -3.509
My 0.064 Mz -7.605
My -0.112 Mz 6.587
My -0.5 Mz 11.266
My -0.15 Mz -1.35
My 0.066 Mz -6.641
My -0.112 Mz -0.655
My 0.441 Mz 10.83
My -0.52 Mz -0.548
My -0.268 Mz -7.673
My -0.426 Mz 1.017
My -0.126 Mz 4.196
My -0.217 Mz -17.633
My -0.726 Mz 0.246
My -0.075 Mz 0.922
My 0.292 Mz 1.89
My 0.01 Mz 15.084
Horizontal Vertical Horizontal Moment
Node L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
34 1 SEISMIC -30.799 -80.402 9.803 16.888 1.161 68.868
2 SEISMIC -1.608 -61.006 -24.108 -57.39 -0.243 3.279
3 DEAD LO 2.718 141.891 2.918 3.147 0.316 -1.731
4 WALL LO 15.055 223.895 21.614 12.007 0.784 -4.161
5 LIVE LOA 0.831 29.657 -0.874 -0.262 -0.009 -1.19
103 1.0(D -13.026 285.384 34.336 32.042 2.26 62.976
104 1.0(D 48.572 446.188 14.73 -1.734 -0.062 -74.761
105 1.0(D 16.165 304.78 0.425 -42.236 0.856 -2.613
106 1.0(D 19.381 426.792 48.641 72.544 1.342 -9.171
107 1.0(D -12.195 315.041 33.461 31.781 2.251 61.786
108 1.0(D 49.403 475.844 13.856 -1.996 -0.071 -75.951
109 1.0(D 16.996 334.436 -0.449 -42.497 0.847 -3.803
110 1.0(DL 20.211 456.449 47.766 72.282 1.333 -10.361 1988.151
35 1 SEISMIC -97.004 80.714 -14.178 -49.131 -18.197 374.403
2 SEISMIC -5.608 -109.049 -142.767 -602.233 4.854 18.013
3 DEAD LO 3.909 851.173 40.213 72.524 1.77 -5.228
4 WALL LO 14.416 295.668 -3.914 -10.884 2.436 2.651
5 LIVE LOA 1.304 235.902 19.615 52.826 0.474 -5.343
103 1.0(D -78.678 1227.556 22.121 12.509 -13.992 371.826
104 1.0(D 115.329 1066.127 50.478 110.771 22.402 -376.979
105 1.0(D 12.718 1037.792 -106.468 -540.594 9.06 15.436
106 1.0(D 23.934 1255.891 179.066 663.873 -0.649 -20.589
107 1.0(D -77.374 1463.458 41.735 65.334 -13.518 366.483
108 1.0(D 116.633 1302.03 70.092 163.597 22.876 -382.323
109 1.0(D 14.022 1273.695 -86.853 -487.768 9.534 10.092
110 1.0(DL 25.237 1491.793 198.681 716.699 -0.175 -25.933
36 1 SEISMIC -91.25 -4.476 -3.835 -10.927 -20.196 372.226
2 SEISMIC -5.384 -90.925 -132.225 -557.39 7.638 19.764
3 DEAD LO 1.308 993.87 49.591 91.757 1.701 3.553
4 WALL LO 3.223 353.319 -0.949 -3.195 1.519 -5.586
5 LIVE LOA 0.811 298.247 25.803 69.829 0.632 2.088
103 1.0(D -86.718 1342.713 44.807 77.635 -16.976 370.192
104 1.0(D 95.781 1351.665 52.478 99.489 23.416 -374.26
105 1.0(D -0.853 1256.264 -83.582 -468.828 10.857 17.73
106 1.0(D 9.916 1438.114 180.868 645.952 -4.418 -21.798
107 1.0(D -85.908 1640.96 70.61 147.464 -16.344 372.28
108 1.0(D 96.592 1649.912 78.281 169.318 24.048 -372.172
109 1.0(D -0.042 1554.511 -57.779 -398.999 11.49 19.818
110 1.0(DL 10.727 1736.361 206.671 715.781 -3.786 -19.71
37 1 SEISMIC -36.365 -9.326 0.042 0.471 -1.249 70.842
2 SEISMIC -2.313 -16.532 -13.313 -75.845 2.433 4.174
3 DEAD LO 5.251 329.312 1.603 0.106 0.042 -1.242
4 WALL LO 33.286 586.563 -1.946 -1.993 0.638 -18.188
5 LIVE LOA -0.169 80.278 0.651 0.359 -0.024 1.057
103 1.0(D 2.172 906.549 -0.301 -1.416 -0.569 51.412
104 1.0(D 74.902 925.2 -0.386 -2.357 1.929 -90.273
105 1.0(D 36.224 899.343 -13.656 -77.731 3.113 -15.257
106 1.0(D 40.851 932.407 12.97 73.958 -1.753 -23.604
107 1.0(D 2.003 986.827 0.35 -1.056 -0.592 52.468
108 1.0(D 74.734 1005.479 0.266 -1.998 1.905 -89.216
109 1.0(D 36.055 979.621 -13.005 -77.372 3.089 -14.2
110 1.0(DL 40.682 1012.685 13.621 74.318 -1.776 -22.547
38 1 SEISMIC -23.736 46.015 2.465 10.44 -1.672 65.211
2 SEISMIC -1.566 -22.566 -17.418 -93.026 1.899 3.935
3 DEAD LO -10.335 205.251 1.384 -0.04 -0.004 5.148
4 WALL LO -67.996 418.592 0.487 -0.46 -0.604 19.291
5 LIVE LOA -0.33 27.228 0.414 0.031 0.009 1.332
103 1.0(D -102.067 669.858 4.337 9.94 -2.281 89.65
104 1.0(D -54.595 577.828 -0.594 -10.941 1.064 -40.772
105 1.0(D -79.897 601.277 -15.547 -93.527 1.291 28.374
106 1.0(D -76.766 646.409 19.29 92.526 -2.507 20.504
107 1.0(D -102.397 697.087 4.751 9.97 -2.271 90.982
108 1.0(D -54.925 605.056 -0.18 -10.91 1.073 -39.44
109 1.0(D -80.227 628.506 -15.133 -93.496 1.3 29.706
110 1.0(DL -77.095 673.637 19.704 92.557 -2.498 21.835
39 1 SEISMIC -39.667 -53.576 17.307 25.294 -0.896 180.088
2 SEISMIC 2.007 11.061 -43.692 -82.196 0.052 -4.563
3 DEAD LO 6.213 280.752 2.884 3.765 0.304 -12.507
4 WALL LO 0.862 236.642 0.987 6.05 0.896 -3.533
5 LIVE LOA 4.826 77.787 0.52 -0.014 0.052 -9.57
103 1.0(D -32.593 463.818 21.178 35.108 0.304 164.047
104 1.0(D 46.742 570.97 -13.436 -15.479 2.096 -196.128
105 1.0(D 9.081 528.456 -39.82 -72.381 1.252 -20.603
106 1.0(D 5.068 506.333 47.563 92.01 1.147 -11.478
107 1.0(D -27.767 541.605 21.698 35.095 0.356 154.477
108 1.0(D 51.567 648.758 -12.915 -15.493 2.148 -205.698
109 1.0(D 13.907 606.243 -39.3 -72.395 1.304 -30.173
110 1.0(DL 9.893 584.12 48.083 91.996 1.199 -21.048
40 1 SEISMIC -23.92 -63.924 18.595 23.409 1.257 80.313
2 SEISMIC -0.842 -18.237 -43.777 -68.308 -0.146 -1.139
3 DEAD LO 14.824 271.94 1.834 2.989 0.39 -2.888
4 WALL LO 0.95 229.991 8.253 9.267 0.761 -3.253
5 LIVE LOA -5.319 72.727 -0.27 -0.438 0.006 1.761
103 1.0(D -8.145 438.007 28.682 35.664 2.407 74.172
104 1.0(D 39.694 565.855 -8.507 -11.154 -0.107 -86.454
105 1.0(D 14.933 483.694 -33.689 -56.053 1.004 -7.28
106 1.0(D 16.616 520.168 53.864 80.563 1.296 -5.002
107 1.0(D -13.464 510.734 28.412 35.227 2.414 75.933
108 1.0(D 34.375 638.582 -8.777 -11.592 -0.101 -84.693
109 1.0(D 9.614 556.421 -33.959 -56.491 1.01 -5.519
110 1.0(DL 11.297 592.895 53.594 80.126 1.303 -3.24
41 1 SEISMIC -9.146 -310.247 26.641 30.896 3.518 77.956
2 SEISMIC -3.196 -94.269 -81.329 -88.95 1.258 -4.812
3 DEAD LO 4.452 409.88 3.256 4.114 -0.114 -5.983
4 WALL LO 1.856 348.971 21.233 17.213 -0.006 -5.919
5 LIVE LOA 1.778 74.55 -0.498 -0.695 -0.012 -2.508
103 1.0(D -2.838 448.604 51.13 52.222 3.398 66.054
104 1.0(D 15.454 1069.098 -2.152 -9.569 -3.638 -89.858
105 1.0(D 3.112 664.582 -56.84 -67.623 1.138 -16.715
106 1.0(D 9.504 853.119 105.818 110.276 -1.377 -7.09
107 1.0(D -1.059 523.154 50.633 51.527 3.386 63.545
108 1.0(D 17.232 1143.648 -2.649 -10.264 -3.65 -92.367
109 1.0(D 4.89 739.132 -57.337 -68.318 1.126 -19.223
110 1.0(DL 11.283 927.669 105.321 109.581 -1.39 -9.598
42 1 SEISMIC -113.151 -363.65 9.107 32.318 3.699 124.773
2 SEISMIC -9.755 152.696 -4.725 -76.849 -1.827 -4.1
3 DEAD LO -2.492 340.839 -1.471 2.474 -1.321 1.012
4 WALL LO 5.628 328.619 -27.768 0.427 -0.721 2.52
5 LIVE LOA 0.319 43.526 0.6 -0.435 -0.208 0.038
103 1.0(D -110.015 305.808 -20.132 35.22 1.657 128.305
104 1.0(D 116.287 1033.109 -38.346 -29.416 -5.742 -121.241
105 1.0(D -6.619 822.154 -33.964 -73.947 -3.869 -0.569
106 1.0(D 12.891 516.763 -24.514 79.751 -0.216 7.632
107 1.0(D -109.696 349.334 -19.532 34.784 1.449 128.343
108 1.0(D 116.607 1076.635 -37.746 -29.851 -5.95 -121.203
109 1.0(D -6.3 865.68 -33.364 -74.383 -4.077 -0.531
110 1.0(DL 13.211 560.289 -23.914 79.316 -0.423 7.67
43 1 SEISMIC -45.983 45.667 0.19 0.728 -2.235 107.14
2 SEISMIC 0.073 47.318 -27.701 -81.375 2.42 -2.147
3 DEAD LO -4.128 215.96 -2.018 -1.705 -0.316 4.221
4 WALL LO -43.19 316.097 -29.982 -9.58 -0.296 13.845
5 LIVE LOA 1.68 62.546 1.503 -0.454 -0.122 1.898
103 1.0(D -93.3 577.725 -31.809 -10.558 -2.847 125.206
104 1.0(D -1.335 486.39 -32.189 -12.014 1.622 -89.074
105 1.0(D -47.245 579.376 -59.7 -92.661 1.808 15.919
106 1.0(D -47.39 484.739 -4.298 70.089 -3.033 20.213
107 1.0(D -91.621 640.271 -30.306 -11.012 -2.969 127.104
108 1.0(D 0.345 548.937 -30.686 -12.468 1.5 -87.177
109 1.0(D -45.565 641.922 -58.197 -93.115 1.686 17.816
110 1.0(DL -45.711 547.286 -2.795 69.636 -3.155 22.111
44 1 SEISMIC -91.506 319.081 -18.885 -21.237 12.327 141.038
2 SEISMIC -5.138 123.949 -37.936 -71.04 -15.748 0.929
3 DEAD LO -4.73 470.353 -12.178 -11.093 1.754 3.757
4 WALL LO 13.908 333.287 -6.523 -5.937 4.034 -0.088
5 LIVE LOA -1.691 104.49 -2.582 -5.111 0.481 0.822
103 1.0(D -82.328 1122.72 -37.586 -38.268 18.114 144.707
104 1.0(D 100.684 484.559 0.184 4.207 -6.54 -137.369
105 1.0(D 4.04 927.589 -56.637 -88.07 -9.961 4.598
106 1.0(D 14.316 679.69 19.235 54.009 21.535 2.74
107 1.0(D -84.02 1227.21 -40.168 -43.379 18.595 145.53
108 1.0(D 98.993 589.049 -2.398 -0.904 -6.058 -136.547
109 1.0(D 2.349 1032.078 -59.219 -93.182 -9.479 5.421
110 1.0(DL 12.625 784.18 16.653 48.898 22.016 3.563
45 1 SEISMIC -72.058 -1.291 -0.386 -0.949 -3.322 121.983
2 SEISMIC 0.097 36.258 -24.871 -54.072 2.461 -1.924
3 DEAD LO -2.71 361.403 -7.861 -9.368 -0.415 2.998
4 WALL LO -1.425 359.625 -0.023 -0.227 -0.746 0.846
5 LIVE LOA -1.692 126.775 -3.852 -6.916 -0.07 1.944
103 1.0(D -76.192 719.737 -8.269 -10.543 -4.483 125.828
104 1.0(D 67.924 722.318 -7.497 -8.646 2.161 -118.139
105 1.0(D -4.037 757.285 -32.754 -63.667 1.3 1.92
106 1.0(D -4.232 684.77 16.988 44.478 -3.622 5.769
107 1.0(D -77.885 846.513 -12.122 -17.459 -4.553 127.772
108 1.0(D 66.231 849.094 -11.35 -15.562 2.091 -116.195
109 1.0(D -5.73 884.061 -36.607 -70.583 1.23 3.864
110 1.0(DL -5.924 811.546 13.135 37.562 -3.692 7.713
46 1 SEISMIC -151.534 303.044 -49.277 -89.965 18.759 441.794
2 SEISMIC 17.813 -3.727 -174.939 -627.943 9.052 -31.337
3 DEAD LO 9.301 1296.03 -35.245 -72.745 5.795 -27.543
4 WALL LO 9.242 33.904 -10.841 -18.102 4.153 -32.704
5 LIVE LOA 1.678 355.173 -16.518 -50.28 1.381 -11.536
103 1.0(D -132.992 1632.977 -95.363 -180.812 28.707 381.548
104 1.0(D 170.076 1026.889 3.19 -0.882 -8.811 -502.041
105 1.0(D 36.356 1326.206 -221.025 -718.79 19 -91.584
106 1.0(D 0.729 1333.66 128.852 537.096 0.896 -28.91
107 1.0(D -131.313 1988.151 -111.882 -231.092 30.089 370.012
108 1.0(D 171.755 1382.062 -13.329 -51.162 -7.429 -513.577
109 1.0(D 38.034 1681.379 -237.544 -769.07 20.382 -103.119
110 1.0(DL 2.408 1688.834 112.334 486.816 2.277 -40.446
47 1 SEISMIC -106.213 -6.987 -0.92 -8.278 16.518 402.957
2 SEISMIC 9.114 54.823 -134.626 -552.512 2.847 -21.757
3 DEAD LO 2.325 1285.634 -41.777 -82.063 2.698 -11.55
4 WALL LO 8.77 3.474 -0.652 -2.399 2.98 -31.475
5 LIVE LOA -2.922 438.502 -21.276 -64.64 0.127 2.979
103 1.0(D -95.118 1282.121 -43.348 -92.741 22.196 359.933
104 1.0(D 117.308 1296.095 -41.509 -76.184 -10.84 -445.982
105 1.0(D 20.209 1343.931 -177.055 -636.974 8.526 -64.781
106 1.0(D 1.98 1234.285 92.197 468.05 2.831 -21.268
107 1.0(D -98.04 1720.622 -64.624 -157.381 22.324 362.912
108 1.0(D 114.386 1734.597 -62.785 -140.824 -10.712 -443.003
109 1.0(D 17.287 1782.433 -198.33 -701.615 8.653 -61.802
110 1.0(DL -0.942 1672.786 70.921 403.41 2.959 -18.289
48 1 SEISMIC -26.133 44.901 0.318 0.738 -0.839 70.724
2 SEISMIC 1.912 15.312 -48.001 -89.501 1.289 -3.688
3 DEAD LO 0.287 328.336 -0.087 -0.424 -0.105 0.161
4 WALL LO 2.191 269.091 14.235 6.737 -0.068 -5.531
5 LIVE LOA 4.295 113.671 -1.908 -1.139 -0.018 1.168
103 1.0(D -23.655 642.327 14.466 7.051 -1.012 65.354
104 1.0(D 28.611 552.526 13.829 5.575 0.666 -76.095
105 1.0(D 4.39 612.738 -33.853 -83.188 1.116 -9.058
106 1.0(D 0.566 582.115 62.149 95.813 -1.462 -1.683
107 1.0(D -19.359 755.998 12.558 5.912 -1.03 66.522
108 1.0(D 32.906 666.196 11.921 4.436 0.648 -74.927
109 1.0(D 8.686 726.409 -35.762 -84.327 1.098 -7.89
110 1.0(DL 4.862 695.786 60.241 94.674 -1.48 -0.515
50 1 SEISMIC -46.827 -32.234 0.169 0.727 -2.63 175.691
2 SEISMIC 2.121 -62.822 -37.855 -109.128 3.21 -3.765
3 DEAD LO 6.045 468.28 -1.318 -0.628 -0.013 8.364
4 WALL LO 79.983 502.107 16.301 5.176 -0.494 -32.052
5 LIVE LOA -3.613 137.84 -1.87 -0.473 -0.114 9.559
103 1.0(D 39.201 938.153 15.152 5.274 -3.137 152.002
104 1.0(D 132.855 1002.622 14.813 3.821 2.123 -199.38
105 1.0(D 88.149 907.565 -22.872 -104.58 2.703 -27.454
106 1.0(D 83.907 1033.21 52.838 113.676 -3.717 -19.924
107 1.0(D 35.588 1075.993 13.283 4.801 -3.252 161.561
108 1.0(D 129.242 1140.462 12.944 3.348 2.009 -189.821
109 1.0(D 84.536 1045.406 -24.742 -105.054 2.589 -17.895
110 1.0(DL 80.294 1171.05 50.968 113.203 -3.832 -10.365
51 1 SEISMIC -31.649 57.248 2.458 10.437 -1.733 79.387
2 SEISMIC 0.884 24.105 -17.131 -92.94 1.712 -1.748
3 DEAD LO -15.623 198.791 -1.259 -0.807 0.092 9.838
4 WALL LO -77.992 402.828 -0.636 -0.813 0.625 24.782
5 LIVE LOA -3.79 26.238 -0.215 -0.152 0.003 4.55
103 1.0(D -125.264 658.866 0.564 8.817 -1.016 114.007
104 1.0(D -61.966 544.37 -4.353 -12.057 2.45 -44.768
105 1.0(D -92.731 625.723 -19.026 -94.56 2.428 32.871
106 1.0(D -94.499 577.513 15.237 91.319 -0.995 36.368
107 1.0(D -129.054 685.104 0.349 8.665 -1.013 118.557
108 1.0(D -65.756 570.608 -4.568 -12.209 2.453 -40.217
109 1.0(D -96.521 651.961 -19.241 -94.711 2.431 37.422
110 1.0(DL -98.289 603.751 15.022 91.168 -0.992 40.918
55 1 SEISMIC -23.255 29.443 0.385 0.72 0.777 79.345
2 SEISMIC 1.388 13.611 -53.781 -92.038 1.074 -2.106
3 DEAD LO -16.616 313.732 -0.47 -0.464 0.249 9.092
4 WALL LO 1.233 230.621 0.121 -0.468 0.396 -3.402
5 LIVE LOA 2.003 102.891 0.757 0.213 -0.008 4.69
103 1.0(D -38.638 573.796 0.036 -0.211 1.422 85.035
104 1.0(D 7.872 514.91 -0.734 -1.652 -0.131 -73.656
105 1.0(D -13.995 557.964 -54.13 -92.969 1.72 3.584
106 1.0(D -16.771 530.742 53.432 91.106 -0.428 7.795
107 1.0(D -36.634 676.686 0.793 0.001 1.415 89.725
108 1.0(D 9.876 617.801 0.023 -1.44 -0.139 -68.966
109 1.0(D -11.991 660.855 -53.373 -92.757 1.712 8.274
110 1.0(DL -14.768 633.633 54.189 91.318 -0.436 12.485