in work centre :
End time is 17
Break 1 hour so remaining hour left is 9 (a person can work 9 hour per a day )
If I will not maintain formula in the capacity tab then capacity planning will not calculate in CM01
despite of utilising this work centre in the operation of maintenance order .
In the above figure I have used this work centre in two operation for first one this work centre has
utilised for 10 hour and second for 20 hour so total has been used 30 hour .If I have not used
formula in the capacity tab then in cm01 it will show 225 in the availability and in utilization it will
show 0 .
225 means per day utilization is 45 (this is 100% utilization ) so for 5 days 45*5=225
Despite of not assigning the factory calender in the work centre it is taking for 5 days in a week .
Then make a maintenance order a used this work centre in the operation
Run CM01 tranasction for know about the availability of that work centre
If user want to know in which work orders operation has contained this work centre for this week 19
.2021
Operations start date time and end date time in a maintenance order operation
Generally the start time is picking from work centre start time but we can change it by selecting this
operation and click on date tab here we can choose must start on then give the date
End time will be after 2 hour from the start time (here I have taken 2 hour )
The more 13 minute with the end time is coming due to the break (60 minute divided by 4 =
13minute something (9/2=4 still one hour left ))
Then select that operation where user want to maintain the performance person wise
Here user select the person which he has maintained in the work centre hrms data and that work
centre must be used with this operation
Give his contribution work that should be less in the operational total work
After give the work duration and number person and total work in the operation this tab will be
active otherwise it will be not active .
If the work centre will be utilised with in 9 hour per a day then it will take the work centre start time
and the operation finish time
I made this work order in the date 11.05 2021 but in the operation it took 12.05.2021
Because in 11.05.2021 the work centre has already booked for 11.05.2021
Start date is first operation satart date and start time
Supposer I have 5 operation so the scheduling finish date is the finish date and time of the 5 th
number operation .