PROJECT ADDRESS:
ACTIVITY DESCRIPTION:
YOUR LOGO HERE
APPLICABLE WORK AREA:
.
3
.
4
RISK ASSESMENT
Step 1 Determine Likelihood – What is the possibility of the event happening? Step 2 Determine Consequence - What will be the result if it happens?
Step 3 Determine the risk score Step 4 Record risk score against the job sequence steps
Score Action
CONSEQUENCE
4 ACT NOW – Urgent – do something about the risks immediately. Will
LIKELIHOOD Insignificant Minor Moderate Major Catastrophic
A: Acute require detailed pre-planning. Actions will be recorded on a Safe Work
Almost Certain 3 High 3 High 4 Acute 4 Acute 4 Acute Method Statement
Likely 2 Medium 3 High 3 High 4 Acute 4 Acute 3 Highest management decision is required urgently.
H: High Will require detailed pre-planning. Actions will be recorded on a Safe
Possible 1 Low 2 Medium 3 High 4 Acute 4 Acute Work Method Statement
Unlikely 1 Low 1 Low 2 Medium 3 High 4 Acute 2 Follow management instructions.
Rare 1 Low 1 Low 2 Medium 3 High 3 High M: Medium Will require operational planning. Actions will be recorded on a Safe
Work Method Statement
1 OK for now. Record and review if any equipment/ people/ materials/
L: Low work processes or procedures change.
Will require localised control measures