BEFORE
Process Activity PIC R N Hazard Consequence L S RPN Current Recommended Legal Ref.
Flow Risk Risk Control &
Control Opportunity
AFTER
Process Activity PIC R N Hazard Consequence Current Recommended L S RPN Legal
Flow Risk Risk Control & Ref.
Control Opportunity
Likelihood
How Likely Description
Very The event is very likely to occur at anytime or the event has happened
4
likely more than once in the past
The event will probably occur at some time in the near future or the
3 Likely
event has happened in the past
2 Unlikely There is some chance could occur but it is not expected to happen
Consequences 4 3 2 1
Severe / Catastrophic 4 16 12 8 4
Major 3 12 9 6 3
Moderate 2 8 6 4 2
Minor / Negligible 1 4 3 2 1
GREEN
Low Risk Tolerable Risk. No immediate action required.
1 to 3
PRINSIP KAWALAN /
HIERARCHY OF CONTROLS
2. SUBSTITUTE 5. ADMINISTRATION
CONTROL
3. ISOLATE
13
Environmental aspect (cause )
◦ element of organizations activities, products, or services which can interact
with the environment.
INPUTS: OUTPUTS:
Raw material Finished product
Electricity
Activity Exhaust
Water Waste products
3 4 4
1
Activity / Product / Category
Process Flow PIC Aspect Impact
Service
In Out
• In – use of resources
• Out – emission, disposal, discharge
2 Ben.
Occur./Freq. Detect Severity
Impact Impact
N A E Score*
Type*
(Yes/No) (a) (b) ( c)
1 Very low Annually or less 1 Depletion of Renewable Natural Resources. Solar, Wind, Hydro, Volcano (Hot spring) etc.
Depletion of Renewable Natural Resources. Commercially cultivated flora and fauna, such
2 Low Monthly 2
as palm oil, natural rubber etc.
3 Moderate Weekly 3 Depletion of Renewable Natural Resources. Natural flora, fauna and water.
4 High Daily 4 Depletion of Non-Renewable Natural Resources (non critical) Such as non-precious metal.
Depletion of Non-Renewable Natural Resources (critical) Such as petroleum, Precious
5 Very high Hourly or more 5 metal. Depletion of Renewable Natural Resources of endangered species of flora and
fauna.
RISK MATRIX 19
WHAT TO DO NOW?
TARGET
DATE: 1ST
APRIL 21
SUBMIT
SUBMIT SOFT
HARD COPY TO
SIGN COPY TO EHS
FORM EHS
PRINT
FORM
REVISE
FORM