This document contains a pro-forma implementation schedule for a local government project. It outlines the key activities and timelines for procurement, construction/implementation, and equipment delivery. The schedule includes original estimated durations and start/finish dates as well as space to note any revised timelines. It requires approval from the municipal engineer and local chief executive.
This document contains a pro-forma implementation schedule for a local government project. It outlines the key activities and timelines for procurement, construction/implementation, and equipment delivery. The schedule includes original estimated durations and start/finish dates as well as space to note any revised timelines. It requires approval from the municipal engineer and local chief executive.
This document contains a pro-forma implementation schedule for a local government project. It outlines the key activities and timelines for procurement, construction/implementation, and equipment delivery. The schedule includes original estimated durations and start/finish dates as well as space to note any revised timelines. It requires approval from the municipal engineer and local chief executive.
LOCAL GOVERNMENT SUPPORT FUND-ASSISTANCE TO MUNICIPALITIES
(LGSF-AM) F.Y. 2018 BUDGET ___________________________________ Name of Local Government Unit
Project Implementation Schedule
Project Title: ________________________
Timelines (Original) Timelines (Revision No.__)
Sn Activity Duration Start Finish Duration Start Finish PROCUREMENT 1.00 PROCESS 1.01 Bid Preparation Pre-Procurement 1.02 Conference 1.03 Ad/ Posting ITB 1.04 Pre-bid Conference Submission and 1.05 Receipts of Bids 1.06 Opening of Bids 1.07 Bid Evaluation 1.08 Post Qualification Issuance of BAC 1.09 Resolution w/ BER Issuance of Notice 1.10 of Award 1.11 Contract Signing Issuance of Notice 1.12 to Proceed CONSTRUCTION/ IMPLEMENTATION 2.00 (Indicative Duration based on approved POW) 2.01 Mobilization 2.02 Implementation Pre-Final 2.03 Inspection/ Punch-listing 2.04 Final Inspection Acceptance 2.04 3.00 FOR DRR- RELATED Annex C Pro-forma Implementation Schedule