CONTRACT REVIEW DVIATION

DRAFT NEW CONTRACT VS EXISTING CONTRACT (NO.40/K/PRESDIR/IAS/II/2017)


REVIEW POINTS :

1. Draft kontrak baru yang ditawarkan oleh Dviation memiliki ruang lingkup yang secara garis besar sama dengan kontrak awal (No.
04/K/Presdir/IAS/II/2017) tanggal 27 Februari 2017 pada ANNEX A Sub B. Part 145-Readiness Preparation.
2. Perbedaan utama draft kontrak baru dengan kontrak awal adalah sebagai berikut :
a. Scope of Services
b. Contract Value
c. Term of Payment
d. Secondment Proposal
e. Penalty
3. Rincian penjelasan review draft kontrak baru dviation dapat dilihat pada tabel dibawah ini.
Contract
No. Description Draft New Contract Recommendation
No.04/K/Presdir/IAS/II/2017
1. Scope of Services Pada document drafting meliputi Pada document drafting Agar SOP Manual masuk
EASA MOE dan Form & Labels. meliputi EASA MOE, QA dalam document drafting.
&SMS Manual, SOP Manual,
Form&labels.
Penambahan document review & - Agar SOP Manual
recommendation terhadap (Department level 2
Department level 2 document. document) masuk dalam
document drafting.
Pada quality system readiness Pada quality system readiness Agar tetap memasukkan
mencakup Authorization System mencakup Authorization ERP&SAT Preparation dan
Preparation and Internal & System Preparation, Internal SMS Implementation
External Audits. & External Audits, ERP & SAT workshop.
Preparation, and SMS
implementation workshop.
Pada maintenance production Pada maintenance Agar IT system evaluation
planning mencakup Manpower production planning tetap dimasukkan dalam
Planning, Task Card & Work mencakup IT System lingkup kerja.
Order Preparation. Evaluation, Manpower
Planning, Task Card and
Work Order Preparation.
2. Contract Value Nilai kontrak sebesar 50,000 USD Nilai kontrak sebesar 68,000 -
USD
3. Term of Payment  USD 40,000 Advance prior to  USD 25,000 DP prior to Term of Payment yang
commencement of works. commencement of direkomendasikan adalah
 Balance USD 10,000 upon readiness preparation sebagai berikut :
Customer achieving part-  USD 15,000 upon  USD 10,000 advance
145 accreditation or end of completion of phase 5 prior to
current phase cycle. as per Annex B commencement of
 USD 20,000 upon works.
completion of phase 11  USD 30,000 upon
as per Annex B completion of all
 USD 8,000 balance upon phases (ready to be
completion of Phase 13 audited).
as per Annex B  USD 10,000 upon
 Additional work beyond IAS achieving part-
work scope as listed in 145 accreditation.
para B.1 will be charged
USD 65.00 per man
hour.
4. Secondment Diajukan QAM dengan kondisi - Agar diusulkan On site
Proposal sebagai berikut : representation dari 10 hari
 USD 6,000 per month. kerja per bulan menjadi 20
Inclusive of the following : hari kerja per bulan.
o On-site
representation of 10
working days per
month.
o Consultant’s flight,
lodging, and
transport.
5. Penalty If any payment due to DSSB is not If any payment due to DSSB is Agar diusulkan penalti tetap
received on the due date, not received on the due date, 1% per bulan sesuai kontrak
without prejudice to DSSB’s other without prejudice to DSSB’s awal.
rights (including but not limited other rights (including but not
to the right to claim for payment limited to the right to claim
of any outstanding amount and for payment of any
to cease work carried out for outstanding amount and to
CUSTOMER), DSSB shall be cease work carried out for
entitled to interest for late CUSTOMER), DSSB shall be
payment calculated on the entitled to interest for late
amount due from and including payment calculated on the
the due date of payment up to amount due from and
and including the date when the including the due date of
payment is received by DSSB at a payment up to and including
rate of 2% per month. the date when the payment is
received by DSSB at a rate of
1% per month.
Bagan 1 Phase and Time Line Kontrak No.04/K/Presdir/IAS/II/2017

Reviewed by :

 Donny Adrianto
 Slamet Supriyadi
 Achmad Ryan Mulyanto