Professional Documents
Culture Documents
Dear Sir
with reference to the recent discussions with Sir Aaron G. Oracion, we submit our technical and eco-
nomical proposal for the readings and interpretation of the piezometer data of Tayabasan Weir 2.
A) Scope of work
- Treatment of the raw data of the piezometers and conversion to usable format, including test-
ing;
- Elaboration of relevant graphs and data analysis;
- Comparison with other relevant parameters such as water-level;
- Interpretation of the data and elaboration of a short interpretation report;
- Elaboration of a short memo with the instructions for future data treatment;
- Training of personnel for data treatment (via Teams, 1-2h workshop).
In case the data analysis concludes that there might be other relevant actions to be taken, these might
be treated separately.
B) Schedule
A total delivery time of 1 month can be expected for the complete documentation.
C) Exclusions
D) Prices
The prices are based on the daily rates of the Lombardi staff as given in the original Agreement for
Design Services between Prime Metro BMD Corporation and Lombardi SA Ingegneri Consulenti.
The following Table provides the time input and responsible specialist for each task of the present
offer.
Time
Rate Amount
Item Task Responsible Position input
[days] USD/day USD
1 Coordination and interpreta- F. Blasi PM
4 1’500 6’000
tion of the data, workshop
2 Data treatment, elaboration of Tbd. Dam-sa-
graphs, etc. fety engi- 6 1’150 6’900
neer
SUBTOTAL excl. VAT USD 12’900
Discount 20% -2’580
TOTAL excl. VAT USD 10’320
E) Offer Validity
Conditions and prices of this offer shall be considered valid for a period of 30 days.
F) Payments
Fabio Blasi
Project Manager
Co-Head of Energy&Water Department