Professional Documents
Culture Documents
DILG-AS-HRMD VN:1012015 Rev. No. Eff. Date Page No. PLEASE COPY THIS
0 10.01.15 Page1 of ___ PORTION
I, (Name) ______________, ___________(Position)_________________ of (Region/Bureau/Service) commit to deliver and agree to be rated on the attainment of the
following targets in accordance with the indicated measures for the period________________________.
Date:
Ratings: 5 - Outstanding (5.00) 4 - Very Satisfactory (4.00-4.99) 3 - Satisfactory (3.00-3.99) 2 - Unsatisfactory (2.00-2.99) 1 - Poor (1.00-1.99)
MAJOR FINAL ALLOTTED RATING (6) REMARKS
SUCCESS INDICATORS DIVISION/INDIVIDUAL ACTUAL
OUTPUT BUDGET (7)
(Targets + Measures) ACCOUNTABLE ACCOMPLISHMENTS/ Q1 E2 T3 Ave4
(1) (3) (4) EXPENSES (5)
(2)
Strategic Priorities
Core Function
MFO 1:
MFO 2:
Support Function
TOTAL RATING
FINAL AVERAGE RATING
ADJECTIVAL RATING:
Assessed by PMT Secretariat Reviewed by PMT Chairman Final Rating by:
Start of rating period End of rating period Start of rating period End of rating period
I, ROMIE M. POTOT, LGOO VI of DILG Region VI commit to deliver and agree to be rated on the attainment of the
following targets in accordance with the indicated measures for the period January - June 2017.
Date:
Ratings: 5 - Outstanding (5.00) 4 - Very Satisfactory (4.00-4.99) 3 - Satisfactory (3.00-3.99) 2 - Unsatisfactory (2.00-2.99) 1 - Poor (1.00-1.99)
MAJOR FINAL OUTPUT SUCCESS INDICATORS ALLOTTED ACTUAL RATING (6) REMARKS (7)
BUDGET DIVISION/INDIVIDUAL ACCOUNTABLE
(1) (Targets + Measures) (4) ACCOMPLISHMENTS/EXPENS Q1 E2 T3 Ave4
(2) (3) ES (5)
ACCOUNTABLE,
TRANSPARENT,
PARTICIPATIVE, AND
EFFECTIVE LOCAL
GOVERNANCE
Environment
RAY
Valderrama (9)
LGOO III Sean Botavara
Engr III William Pillora
138 RAY 2 completed by end of June 2017 Engr III Edward Pagayona Dumarao (18), Panay (10), Panit-an (4),
Engr III Ronelo Gabayoyo Jamindan (1), Pres. Roxas (6), Mambusao (7),
Tapaz (16)
162 RAY subproject monitoring/final inspection report submitted Engr III William Pillora
Engr III Edward Pagayona
with 2 minor revisions by the end of June 2017 Engr III Ronelo Gabayoyo
162 subproject physical completion documents reviewed and Engr III William Pillora
Engr III Edward Pagayona
approved with 2 minor errors by June 2017 Engr III Ronelo Gabayoyo
162 subproject financial completion documents reviewed and FA II Eleanor Sta. Ana
approved with 2 minor errors by June 2017
2 Bimonthly status report submitted with 2 minor errors within ISA I Franklin Terunez
ISA I Benjamin Ko
the on 15th and 30th day of the month
5 RAY completed subproject documented with 2 minor revisions LGOO II Aizel Padilla / LGOO II Marlon Ladia
by end of June 2017
AdA Jenefer Bitalac
10 RAY documents/emails/letters received/endorsed with no AdA Jovel Carreon
negative feedback by end of June 2017 ISA I Franklin Terunez
ISA I Benjamin Ko
TOTAL RATING
FINAL AVERAGE RATING
ADJECTIVAL RATING:
Rater: Approved Rating by:
Position: (Director III /ARD, Provincial/City Director) Position: (Director/RD)
Date: Date:
I, EDWARD N. PAGAYONA, Engineer III of DILG Region VI commit to deliver and agree to be rated on the attainment of the
following targets in accordance with the indicated measures for the period January - June 2017
Signature of Employee/Ratee
Date:
Ratings: 5 - Outstanding (5.00) 4 - Very Satisfactory (4.00-4.99) 3 - Satisfactory (3.00-3.99) 2 - Unsatisfactory (2.00-2.99) 1 - Poor (1.00-1.99)
MAJOR FINAL ACTUAL ACCOMPLISHMENTS/EXPENSES RATING (6) REMARKS (7)
SUCCESS INDICATORS
OUTPUT (3)
(Targets + Measures) Q1 E2 T3 Ave4
(1)
(2)
Altavas (4), Buruanga (3), Libacao (7), Malinao (19),
New Washington (2)
Sebaste (1), Tibiao (2), Valderrama (11)
Cuartero (3), Dumalag (2), Dumarao (18), Panay
(11), Panitan (4), Pilar (2), Pontevedra (2), Pres.
Roxas (6), Roxas City (1), Mambusao (9), Tapaz (16)
Ajuy (7), Balasan (18), Banate (12), Barotac Viejo
311 RAY 2 completed by end of March 2017 271 RAY 2 completed by end of June 2017 2 2 2.00000 (5), Batad (23), Carles (10), Concepcion (13),
Dumangas (1), Janiuay (5), Lemery (14), Passi City
(6), San Dionisio (29), Sara (5)
162 RAY subproject monitoring/final inspection report submitted with 2 292 RAY subproject monitoring/final inspection report submitted 5 5 5 5.00000
minor revisions by the end of June 2017 with no minor revisions by the end of April 2017
162 subproject physical completion documents reviewed and approved 292 subproject physical completion documents reviewed and 5 5 5 5.00000
with 2 minor errors by June 2017 approved with 0 minor errors by April 2017
10 LGUs provided with TA within 5 days after receipt/query with 2 20 LGUs provided with TA within 3 days after receipt/query with 5 5 4 4.66667
negative feedbacks by end of June 2017 no negative feedbacks by end of June 2017
I, EDWARD N. PAGAYONA, Engineer III of DILG Region VI commit to deliver and agree to be rated on the attainment of the
following targets in accordance with the indicated measures for the period January - June 2017
Signature of Employee/Ratee
Date:
Ratings: 5 - Outstanding (5.00) 4 - Very Satisfactory (4.00-4.99) 3 - Satisfactory (3.00-3.99) 2 - Unsatisfactory (2.00-2.99) 1 - Poor (1.00-1.99)
MAJOR FINAL ACTUAL ACCOMPLISHMENTS/EXPENSES RATING (6) REMARKS (7)
SUCCESS INDICATORS
OUTPUT (3)
(Targets + Measures) Q1 E2 T3 Ave4
(1)
(2)
64 RAY 2 completed by the end of March 2017 43 RAY 2 completed by the end of March 2017 2 2 2.00 Carles (9), Concepcion (7), Dumangas (1), Janiuay
(3), Lemery (14), Passi City (3), San Dionisio (6)
47 RAY 2 completed by the end of June 2017 25 RAY 2 completed by the end of June 2017 2 2 2.00 Dumarao (18), Ajuy (7)
1 RAY 2A completed by end of March 2017 1 RAY 2A completed by end of March 2017 5 5 5.00 Pilar (1)
2 RAY 2A completed by end of June 2017 1 RAY 2A completed by end of June 2017 2 2 2.00 Barotac Viejo(1)
3 LGU's provided with TA within 5 days after receipt/query with 2 negative 5 LGU's provided with TA within 5 days after receipt/query with no
5 5 4 4.67
feedbacks by end of June 2017 negative feedbacks by end of June 2017
54 RAY subproject monitoring/final inspection report submitted with 2 152 RAY subproject monitoring/final inspection report submitted
5 5 5 5.00
minor revisions by the end of June 2017 with no revisions by the end of June 2017
54 subproject physical completion documents reviewed and approved 63 subproject physical completion documents reviewed and
4 4 4 4.00
with 2 minor errors by June 2017 approved with no errors by June 2017
Prepared 6 Back To Office Reports (BTOR) 5 working days after the travel Prepared 9 Back To Office Reports (BTOR) 3 working days after the
completed with 2 minor revisions by the end of June2017 travel completed with no revisions by the end of June2017 5 5 4 4.67
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: JANUARY 1-31, 2017
EFFECTIVENESS /
QUALITY TIMELINESS
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
1 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz
Prepared Travel Plan, Travel Order and Request for Vehicle January 16, 20117 January 17, 2017 Banate, Batad, Balasan, Carles, Concepcion
Final Inspection and Monitoring of RAY Batch 2 Completed January 24, 2017 January 27, 2017 Banate, Batad, Balasan, Carles, Concepcion
Projects
Update the status of RAY Batch 2 Subprojects on database January 3, 2017 January 31, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying January 3, 2017 January 31, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: FEBRUARY 1-28, 2017
EFFECTIVENESS /
TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
1 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz
PDMU Meeting February 6, 2017 February 27, 2017 DILG Locally Funded Projects
Prepared Travel Plan, Travel Order and Request for Vehicle February 1, 2017 , February 2, 2017 , Lemery, Barotac Viejo,San Dionisio, San
February 23, 2017 February 24, 2017 Rafael, Ajuy
Final Inspection and Monitoring of RAY Batch 2 Completed February 9, 2017 , February 10, 2017 , Lemery, Barotac Viejo & San Dionisio, Iloilo
Projects February 28, 2017 February 28, 2017
3 LGU's provided with TA within the day of receipt/query February 9, 2017 , February 10, 2017 , Lemery, Barotac Viejo & San Dionisio, Iloilo
with no negative feedbacks February 28, 2017 February 28, 2017
Update the status of RAY Batch 2 Subprojects on database February 1, 2017 February 28, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying February 1, 2017 February 28, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: MARCH 1-31, 2017
EFFECTIVENESS /
QUALITY TIMELINESS
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed March 31, 2017 January 1, 2017 June 30, 2017 3 3 Pilar, Capiz & Barotac Viejo, Iloilo
PDMU Meeting March 6, 2017 March 13, 2017 DILG Locally Funded Projects
March 1, 2017 & March 2, 2017 & Tapaz, Capiz, Dumarao, Capiz & Passi City,
Prepared Travel Plan, Travel Order and Request for Vehicle
March 16, 2017 March 17, 2017 Iloilo
Final Inspection and Monitoring of RAY Batch 2 Completed March 1, 2017 , March 1, 2017 Tapaz, Capiz , San Dionisio, San Rafael,
March 9, 2017 March 9, 2017 & Ajuy, Iloilo & Dumarao, Capiz Passi City,
Projects Iloilo
March 22, 2017 March 24, 2017
6 LGU's provided with TA within the day of receipt/query March 1, 2017 , March 1, 2017 Tapaz, Capiz , San Dionisio, San Rafael,
March 9, 2017 March 9, 2017 & Ajuy, Iloilo & Dumarao, Capiz Passi City,
with no negative feedbacks Iloilo
March 22, 2017 March 24, 2017
March 6, 2017 , March 7, 2017 , Tapaz, Capiz , San Dionisio, San Rafael,
Prepared Back To Office Report (BTOR) 3 working daysafter
March 13, 2017 , March 15, 2017 , Ajuy, Iloilo & Dumarao, Capiz Passi City,
travel completed withno revisions Iloilo
March 27, 2017 March 29, 2017
Update the status of RAY Batch 2 Subprojects on database March 1, 2017 March 31, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying March 1, 2017 March 31, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: MARCH 16-31, 2017
EFFECTIVENESS /
TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed March 31, 2017 January 1, 2017 June 30, 2017 3 3 Pilar, Capiz & Barotac Viejo, Iloilo
Prepared Travel Plan, Travel Order and Request for Vehicle March 16, 2017 March 17, 2017 Dumarao, Capiz & Passi City, Iloilo
Final Inspection and Monitoring of RAY Batch 2 Completed March 22, 2017 March 24, 2017 Dumarao, Capiz & Passi City, Iloilo
Projects
2 LGU's provided with TA within the day of receipt/query March 22, 2017 March 24, 2017 Dumarao, Capiz & Passi City, Iloilo
with no negative feedbacks
Prepared Back To Office Report (BTOR) 3 working daysafter March 27, 2017 March 29, 2017 Dumarao, Capiz & Passi City, Iloilo
travel completed withno revisions
Update the status of RAY Batch 2 Subprojects on database March 16, 2017 March 31, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying March 16, 2017 March 31, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: APRIL 1-30, 2017
EFFECTIVENESS / TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz & Barotac Viejo, Iloilo
Prepared Travel Plan, Travel Order and Request for Vehicle April 5, 2017 April 7, 2017 Concepcion, Batad, Carles, San Enrique
Final Inspection and Monitoring of RAY Batch 2 & 2A April 18, 2017 April 21, 2017 Concepcion, Batad, Carles, San Enrique
Completed Projects
4 LGU's provided with TA within the day of receipt/query April 18, 2017 April 21, 2017 Concepcion, Batad, Carles, San Enrique
with no negative feedbacks
Prepared Back To Office Report (BTOR) 3 working daysafter April 24, 2017 April 26, 2017 Concepcion, Batad, Carles, San Enrique
travel completed withno revisions
Update the status of RAY Batch 2 Subprojects on database April 3, 2017 April 28, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying April 3, 2017 April 28, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: APRIL 16-30, 2017
EFFECTIVENESS /
TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz & Barotac Viejo, Iloilo
Final Inspection and Monitoring of RAY Batch 2 & 2A April 18, 2017 April 21, 2017 Concepcion, Batad, Carles, San Enrique
Completed Projects
4 LGU's provided with TA within the day of receipt/query April 18, 2017 April 21, 2017 Concepcion, Batad, Carles, San Enrique
with no negative feedbacks
Prepared Back To Office Report (BTOR) 3 working daysafter April 24, 2017 April 26, 2017 Concepcion, Batad, Carles, San Enrique
travel completed withno revisions
Prepared and Issue Letter based on findings reflected in April 27, 2017 April 28, 2017 Concepcion, Batad, Carles, San Enrique
BTOR
Update the status of RAY Batch 2 Subprojects on database April 17, 2017 April 28, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying April 17, 2017 April 28, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: MAY 1-31 2017
EFFECTIVENESS /
TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz & Barotac Viejo, Iloilo
May 2,2017 & May 10, 2017 & Janiuay, Iloilo & Province of Capiz
Prepared Travel Plan, Travel Order and Request for Vehicle (Pontevedra, Jamindan, Tapaz, Dumarao),
May 22,2017 May 23, 2017 Banate, Iloilo
Final Inspection and Monitoring of RAY Batch 2 Completed May 4,2017 & May 4,2017 & Janiuay, Iloilo & Province of Capiz
Projects May 16, 2017 May 19, 2017 (Pontevedra, Jamindan, Tapaz, Cuartero)
6 LGU's provided with TA within the day of receipt/query May 4,2017, May 4,2017, Janiuay, Iloilo & Province of Capiz
May 16, 2017 & May 16-19, 2017 (Pontevedra, Jamindan, Tapaz, Dumarao),
with no negative feedbacks Banate, Iloilo
May 31, 2017 & May 31, 2017
Prepared Back To Office Report (BTOR) 3 working daysafter May 8, 2017 & May 9, 2017 & Janiuay, Iloilo & Province of Capiz
travel completed withno revisions May 22, 2017 May 24, 2017 (Jamindan, Pontevedra, Tapaz, Cuartero)
Prepared and Issue Letter based on findings reflected in May 15, 2017 & May 15, 2017 & Janiuay, Iloilo & Province of Capiz
BTOR May 29, 2017 May 30, 2017 (Jamindan, Pontevedra, Tapaz, Cuartero)
Update the status of RAY Batch 2 Subprojects on database May 2,2017 May 30, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying May 2,2017 May 30, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: MAY 16-31, 2017
EFFECTIVENESS /
TIMELINESS
QUALITY (4)
WORK/ACTIVITY (2) EFFICIENCY REMARKS
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz & Barotac Viejo, Iloilo
Prepared Travel Plan, Travel Order and Request for Vehicle May 22,2017 May 23, 2017 Banate, Iloilo
Final Inspection and Monitoring of RAY Batch 2 Completed Province of Capiz (Jamindan, Pontevedra,
May 16,2017 May 19,2017
Projects Tapaz, Cuartero)
5 LGU's provided with TA within the day of receipt/query Province of Capiz (Jamindan, Pontevedra,
May 16,2017 May 31,2017
with no negative feedbacks Tapaz, Cuartero), Banate, Iloilo
Prepared Back To Office Report (BTOR) 3 working daysafter Province of Capiz (Jamindan, Pontevedra,
May 8, 2017 May 9, 2017
travel completed withno revisions Tapaz, Cuartero)
Prepared and Issue Letter based on findings reflected in Province of Capiz (Jamindan, Pontevedra,
May 22,2017 May 24,2017
BTOR Tapaz, Cuartero)
Update the status of RAY Batch 2 Subprojects on database May 22,2017 May 30,2017 RAY Batch 2 Subprojects
Office works, printing and photocopying May 22,2017 May 30,2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: JUNE 1-30, 2017
EFFECTIVENESS /
TIMELINESS
QUALITY (4)
WORK/ACTIVITY (2) EFFICIENCY REMARKS
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 2 2 Pilar, Capiz & Barotac Viejo, Iloilo
PDMU Meeting June 19, 2017 June 19, 2017 Targets on Q1 & Q2
Update the status of RAY Batch 2 Subprojects on database June 1, 2017 June 30, 2017 RAY Batch 2 Subprojects
Office works, printing and photocopying June 1, 2017 June 30, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: JUNE 16-30, 2017
EFFECTIVENESS / TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 2 2 Pilar, Capiz & Barotac Viejo, Iloilo
PDMU Meeting June 19, 2017 June 19, 2017 Targets on Q1 & Q2
Update the status of RAY Batch 2 Subprojects on database June 22, 2017 June 29, 2017 RAY Batch 2 Subprojects
Finalized Targets on SPCR for Q1 & Q2 for the month of June 30, 2017 June 30, 2017 RAY Batch 2 & 2A Subprojects
January 2017 to June 2017
Office works, printing and photocopying June 16, 2017 June 30, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: JULY 1-15, 2017
EFFECTIVENESS / TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
PDMU Meeting July 4, 2017 July 4, 2017 ADM Subprojects & Orientation
Update the status of RAY Batch 2 Subprojects on database July 3, 2017 July 14, 2017 RAY Batch 2 Subprojects
Finalized Targets on SPCR for Q1 & Q2 for the month of July 3, 2017 July 14, 2017 RAY Batch 2 & 2A Subprojects
January 2017 to June 2017
Office works, printing and photocopying July 3, 2017 July 14, 2017 Various documents
OFFICE: DILG REGION VI DIVISION: PDMU (OFFICE OF THE REGIONAL DIRECTOR) COVERED PERIOD: JUNE 16-30, 2017
EFFECTIVENESS / TIMELINESS
QUALITY
WORK/ACTIVITY EFFICIENCY (4) REMARKS
(2)
(1) (3) (5)
No. of Ratings Target Started Finished Result Rating
Errors
2 RAY Batch 2A completed June 30, 2017 January 1, 2017 June 30, 2017 Pilar, Capiz & Barotac Viejo, Iloilo
PDMU Meeting June 19, 2017 June 19, 2017 Targets on Q1 & Q2
Update the status of RAY Batch 2 Subprojects on database June 22, 2017 June 29, 2017 RAY Batch 2 Subprojects
Finalized Targets on SPCR for Q1 & Q2 for the month of June 30, 2017 June 30, 2017 RAY Batch 2 & 2A Subprojects
January 2017 to June 2017
Office works, printing and photocopying June 16, 2017 June 30, 2017 Various documents
QUARTERLY
Director/Division Chief/Head: MA. LYNETTE P. URQUIOLA 2nd
Number of Personel in the Office/Division: 11 3rd
4th
MECHANISM/S (2)
Others
ACTIVITY (1) REMARKS (3)
Meeting (a) MEMO (b) (Pls. Specify)
One-on-One Group ( c)
MONITORING
COACHING
Please indicate the date in the appropriate box when the monitoring was conducted.
Conducted by: (DC/CLGOO/CTL/PM) Date: Noted by: Date:
Note: Whenever necessary, the USEC/ASEC/Head of Office may conduct monitoring and coaching to his/her immediate subordinate.
COACHING REPORT FORM FORM 6: FM-QP-AS-HRMD-04-06
DILG-AS-HRMD VN:1012015 Rev. No. Eff. Date Page No.
0 10.01.15 Page____ of ___
4. Coaching
7. Committed Action
13. Process Observatio of the coach (Observable behavior of the Coachee/Team/Group being coached, General Disposition, Change in Attitude since the last Coaching, level of coping with the Demands of Work)
PROFESSIONAL DEVELOPMENT PLAN FORM 7: FM-QP-AS-HRMD-04-07
DILG-AS-HRMD VN:1012015 Rev. No. Eff. Date Page No.
0 10.01.15 Page 1 of _1__
MA. LYNETTE P. URQUIOLA JOHN ACE A. AZARCON ATTY. ANTHONY C. NUYDA, CESO III
Supervisor's Name & Regional Director
Date Date Date
Employee's Name & Signature Signature Signature
INDIVIDUAL DEVELOPMENT PLAN (IDP) FORM 8: FM-QP-AS-HRMD-04-08
DILG-AS-HRMD VN:1012015 Rev. No. Eff. Date Page No. PLEASE COPY
0 10.01.15 Page 1 of ___ THIS PORTION
DIVITSION A RATING
(1) (2)
Numerical Adjectival
(a) (b)
DIVISION B RATING
Numerical Adjectival
AVERAGE RATING:
DIVISION C RATING
Numerical Adjectival
AVERAGE RATING:
SUMMARY: Division A
Division B
(include provincical/city field offices
AVERAGE RATING:
CRITICAL INCIDENT JOURNAL FORM FORM 10: FM-QP-AS-HRMD-04-010
DILG-AS-HRMD VN:1012015 Rev. No. Eff. Date Page No.
0 10.01.15 Page 1 of 1