No.

SP Name Province Municipality status

Access Road
A
Construction

B. Tire Path Construction

Construction of Jayubo
Waiting for contractors detailed estimates waiting for updated
B.1 Cabatangan Proper Ilo ilo Lambunao
Pathway for variation Performance Security

Construction of Quipot To
B.2 Ilo ilo Janiuay for 1st billing
Baralon Pathway

Construction of Caratagan
B.3 Ilo ilo Calinog BAC Concerns for finalization of NTP Date
to Maranding Pathway

Construction of Panuran
B.4 Ilo ilo Janiuay for opening of Bid
Pathway w/ RCBC

Done RSAC last March 16, 2020


Contruction of Barasalon for signatory of Plan and
B.5 Ilo ilo Janiuay
Canauillian Pathway
for Philgeps posting POW (C/o Jan rey)

Concreting of Brgy. Proper


Done RSAC last March 16, 2020
Panuran – Sitio Agilan –
B.6 Ilo ilo Lambunao
Tabulwang Access Road
for Philgeps posting

Construction of Binolosan Done RSAC last March 16, 2020


for signatory of Plan and
B.7 Pequeῆo Pathway Ilo ilo Calinog
for Philgeps posting POW (C/o Jan rey)

C Bridge Construction Ilo ilo


D Hanging Bridge Construction

Waiting for signatory of Variation oreder


D.1 Constructtion of Hilwan Han Ilo ilo Calinog
(C/o Jan Rey)

Waiting for approval of Tree cutting


permit
Construction of Aglonok The contructor initially delivered
D.2 Ilo ilo Calinog
Hanging Bridge steelbars at the area and the delivery of
cement will follow.
Waiting for Computation and
Construction of
quantification needed for variation order
D.3 Bagongbong Hanging Ilo ilo Lambunao
of the contractor.(Contructors
Bridge
computation)

Cosntruction of Marandig For Signatory of Revised Plan (C/o Jan


D.4 Ilo ilo Calinog
Hanging Bridge Rey)

Construction of Supanga For Signatory of Revised Plan (C/o Jan No Accomplishment since
D.5 Ilo ilo Calinog
Hanging Bridge Rey) NTP

Pre Bid (March 19, 2020)


Construction of Barasalon
D.6 Ilo ilo Janiuay Differed opening of bid due to covid 19
Hanging Bridge 1
issue

Waiting for instruction from central office


Construction of Barasalon
D.7 Ilo ilo Janiuay due to WFP concern
Hanging Bridge 2
for Philgeps posting

Waiting for instruction from central office


Contruction of Canauillian
D.8 Ilo ilo Janiuay due to WFP concern
hanging Bridge
for Philgeps posting

E Construction of Irrigation Pipeline System

Construction of Done Pre Bid (March 20, 2020)


E.1 Atimonan Irrigation Janiuay Differed opening of bid due to covid 19
Pipeline System issue

Construction of Done Pre Bid (March 19, 2020)


E.2 Aglobong Irrigation Janiuay Differed opening of bid due to covid 19
Pipeline System issue

Construction of Done Pre Bid (March 19, 2020)


E.3 Cabatangan Irrigation Lambunao Differed opening of bid due to covid 19
Pipeline System issue

Construction of Done Pre Bid (March 20, 2020)


E.4 Marandig Irrigation Calinog Differed opening of bid due to covid 19
Pipeline System issue

Construction of Done RSAC last March 16, 2020


for signatory of Plan and
E.5 Bagongbong Irrigation Lambunao
Pipeline System for Philgeps posting POW (C/o Jan rey)

Construction of Done RSAC last March 16, 2020


for signatory of Plan and
E.6 Caratagan Irrigation Calinog
Pipeline System for Philgeps posting POW (C/o Jan rey)
Other Proposals Location Status target

Constructionof
Waiting for DED and
Atimonan-Aglobong- Janiuay 2020
POW of EDCOP
Panuran Pathway

Construction of Quipot Waiting for DED and


Janiuay 2021
Concrete Bridge POW of EDCOP

Construction of
Barasalon Proper Janiuay DEDand POW Preparation (C/O PPMO)
pathway

Construction of Brgy.
Panuran, Lambunao - Waiting for DED and
Lambunao 2021
Brgy. Aglobong Janiuay POW of EDCOP
Pathway

Construction of Hilwan
Waiting for DED and
Irrigation Pipeline Calinog 2021
POW of EDCOP
System

Construction of Purok 6,
Waiting for DED and
Brgy. Garangan Access Calinog 2021
POW of EDCOP
Road

Construction of
Binulosan Pequeno to Waiting for DED and
Calinog 2021
Guinbunyugan Access POW of EDCOP
Road with Pathway

Construction of Masaroy Waiting for DED and


Calinog 2021
Access road POW of EDCOP
NO. Project Title Physical Target Contractor Project Cost NOA Date
Roads And Pathways

Construction of Jayubo
Cabatangan Proper
1 Pathway
Construction of Quipot To
2 Baralon Pathway

Construction of Caratagan
3 to Maranding Pathway

Construction of Panuran
4 Pathway w/ RCBC

Contruction of Barasalon
5 Canauillian Pathway

Concreting of Brgy.
Proper Panuran – Sitio
Agilan – Tabulwang
Access Road
6

Construction of Binolosan
Pequeῆo Pathway
7

Hanging Bridge
Construction
Constructtion of Hilwan
8 Hanging Bridge

Construction of Aglonok
9 Hanging Bridge

Construction of
Bagongbong Hanging
10 Bridge

Cosntruction of Marandig
11 Hanging Bridge

Construction of Supanga
12 Hanging Bridge
Construction of Barasalon
13 Hanging Bridge 1

Construction of Barasalon
14 Hanging Bridge 2

Contruction of Canauillian
15 hanging Bridge

Construction of Irrigation
Pipeline System

Construction of Atimonan
16 Irrigation Pipeline System

Construction of Aglobong
17 Irrigation Pipeline System

Construction of
Cabatangan Irrigation
18 Pipeline System

Construction of Marandig
19 Irrigation Pipeline System

Construction of
Bagongbong Irrigation
20 Pipeline System

Construction of Caratagan
21 Irrigation Pipeline System
Contract Agreement NTP Completion Date Revised Completion Date
Bank Account Number Status