Professional Documents
Culture Documents
MINUTES OF MEETING
Title of Meeting/Activity:
COORDINATION MEETING ON THE PROPOSED NPC PROJECTS IN BASILAN
AND SULU UNDER 2024-2028 MEP
Purpose: Attendees:
To discuss the proposed NPC 1. Y. H. Dayaran – Manager, SPUG-MOD
Projects in Basilan and Sulu under 2. C. D. Isahac- Manager, SPUG/WMOD
2024-2028 MEP 3. E. T. Mallare- OIC Manager, PMD
4. L. S. Laraño- OIC Manager, PMD/PICC
5. G. B. Magpoc, Jr. – Manager, DDD
6. C. Z. C. Lugod- Manager, EEICD/DDD
7. R. U. Mamañgun- Manager, CPD
8. M.C. B. Bencio – Manager, SPD/CPD
Date: Time: Venue:
14 February 2024 10:00 AM Google Meet
https://meet.google.com/jsc-jgfw-irj
Please tick where appropriate:
MANCOM Meeting Operational Planning Management Review Meeting
Mr. Z. Q. Tancongco presented the projects under the 2024-2028 MEP, for Basilan
and Jolo (see attached Annex A):
During the Meeting, the following matters were discussed and agreed upon:
2. Mr. C. D. Isahac, Manager, SPUG WMOD informed the group the following
updates based on the area assessment conducted by SPUG which was
held January 2024:
For Option (2), SPUG also informed that they have identified a possible
area within the existing Jolo DPP which will cater the additional 2MW
gensets. However it will require cutting of mango trees in order to fit the
gensets including the additional transformers.
According to Mr. Isahac this option is more favourable to NPC since this will
resolve issues on the tapping point and other issues relative to the
connection. This option was also recommended by Mr Isahac to the
department, until the entry of the NPP.
For Option (3) the Construction of the New Power Facility for the relocation
of the existing gensets including the Associated Tie Line.
4. Mr. N. I. Castro Jr.,- Principal Engr. B of EEICD, DDD, PES discussed the
status of the TOR for the following projects in Jolo:
5. M. C. B. Bencio inquired if there is a need to construct the tie line given the
difficulty of PES-DDD in completing the TOR due to difficulty of PES-PMD in
establishing the final route. Mr. Isahac recommended that there is no need
NPC-005.F03
Rev. No. 1
Sheet 2 of 5
since there is an on-going CSP which will commence by 2025 yet this is still
subject to Management Approval.
6. As per PMD-PICC, in order to finalize the line route for the Tie-Line, they
are still awaiting for CAAP’s approval to NPC’s submitted requirements. To
date, there is still no decision from CAAP yet.
7. Mr. Z. Q. Tancongco inquired what will happen to the acquired lot intended
for the New Jolo DPP, and the concern if the scheduled SULECO’s CSP will
be delayed to which Mr. Isahac responded that by the time that the CSP is
delayed, SPUG may consider option three (3) the provision a new DPP for
Jolo to provide space to accommodate the new gensets.
8. With this, Ms. Bencio and Mr. Isahac, recommends the cancellation of the
Construction of Jolo Tie Line given the circumstances on the status of the
ROW and the consideration for Option 2 which was recommended by
SPUG.
1. Mr. Isahac gave a briefer on SPUG’s long term and short term solution to the
frequent power interruption in Basilan. For the short term plan, to obtain
supply from Rose Power Plant or to rent additional 2MW diesel gensets for
the PB108 in Maluso. As for the long term plan, NPC to construct 69 kV
Transmission Line.
2. Mr. Z. Q. Tancongco presented the projects in Basilan including the letter to
PES which discusses the significant changes in the line length for Isabela-
Lamitan 69 kV TL and request for the confirmation of PES whether the
proposed location of the substation sites have been coordinated with SPUG
and BASELCO. (see attached Annex B)
3. While awaiting for PES’ confirmation, Ms. M. C. B. Bencio informed Mr.
Isahac that CAG will consider the proposed short and long term plans of
SPUG in Basilan.
4. The status of the existing feeder loadings in Basilan were also discussed
and the comments/remarks of SPUG are as follows:
NPC-005.F03
Rev. No. 1
Sheet 3 of 5
Per M.C.B.B, CAG to determine which portion of the line are needed to be
replaced to ensure that there will be no overloading in the Lamitan Feeder.
She instructed Mr. M. J. M. Diaz, CSS-B, CPD-CAG, to secure the data on the
complete distribution system map and to validate the details on the Lamitan
Feeder, Power interruption report, among others. Mr. M.J.M.D. will visit
Basilan on 20 February 2024 per instruction.
Ms. Bencio also added that BASELCO and/or the Local Government of
Basilan be requested to upgrade their distribution system in Basilan.
5. For the status of CSP in Basilan per Sir C. Isahac, the CSP is much more
problematic compared to Jolo. Therefore, the start date of the CSP cannot be
confirmed/ determined as there is a major revision in the TOR, following its
pre-bidding process.
6. Ms. M.C.B.B. instructed Mr. M.J.M.D to prepare a letter to the ManCom
informing the movement of the planned projects in Basilan and Jolo.
C. M. T. AQUINO M. C. B. BENCIO
Corporate Staff Date Manager, SPD-CAG Date
Specialist B, SPD-
CAG
Concurred By:
Y. H. DAYARAN C. D. ISAHAC
Dept.Manager, SPUG- Date Manager, SPUG- Date
MOD WMOD
NPC-005.F03
Rev. No. 1
Sheet 4 of 5
E.T. MALLARE L. S. LARAÑO
OIC, PMD Date OIC, PICC Date
G. B. MAGPOC, JR C. Z. C. LUGOD
Dept. Manager, DDD Date Manager, EEICD Date
R. U. MAMAÑGUN
Dept. Manager, CPD Date
NPC-005.F03
Rev. No. 1
Sheet 5 of 5