Overall progress of the project for the package – 4A from Ranip to Motera End.
20.29%
20.00%
15.00%
10.00%
4.52% 4.75%
5.00%
1.29%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00%
Pile Pile Cap Pier Pier Cap Portal pier Segment Segment Parapet Parapet Shear Key
Casting Launching Casting Launching & Pedestal
% Complete
P a g e 3 | 84
Project status (26-Oct-16 to 25-Nov-16)
Table shows the planned to actual progress for the current month and the cumulative planned to actual up
to current month
CUM. ACHIVED
CUM. PLAN UP
UP TO 25-Nov-
ACHIEVED UP
To 25-Nov-16
To 25-Nov-16
NO. AL
% CUM.
SCOP
achieved
achieved
16
Planned
E
%
1 PILE NOS. 626 65 24 36.92 263 127 48.28
P a g e 4 | 84
Piling (Actual v/s Planned)
80
68 68
70 64 65
60 61
60
50
Numbers
40 40
36
40 34 32 36
31
30 23 24
19 20
20 15 15
10
00 00 00 00 00 0 0 0 0 00 00 0 0 0 00 00 00 00 00 00 00 00 00 00 00
0
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Oct-16
Nov-16
Dec-16
Jan-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Aug-17
Oct-17
Nov-17
Dec-17
Jan-18
Mar-18
Apr-18
May-18
Jun-18
Sep-16
Feb-17
Sep-17
Feb-18
Jul-18
Month
40 35
25
20
20
7
3 2
0
P a g e 5 | 84
2.2 EARNED VALUE ANALYSIS
SPI means (Schedule performance index). On basis of SPI, we can know the current project status according
to plan. If SPI value is less than 1, we are behind the schedule and if SPI is greater than 1, we are ahead of
schedule.
As we have SPI value upto 25-Nov-16 is 0.32
we are behind of schedule. The critical issue that hinders the project progress are:
P a g e 6 | 84
PROGRAMME DELAYS AND OTHER ISSUES
GFC of Pier cap P 443, GFC not issued Not issued form MEGA/ GEC
P a g e 7 | 84
14.4 EARNED VALUE ANALYSIS
The Cost Performance Index (CPI) is a measure of the cost efficiency of budgeted resources, expressed as a ratio of earned value to actual cost.”
The Cost Performance Index helps you analyze the efficiency of the cost utilized by the project. It measures the value of the work completed compared to the actual cost spent
on the project.
Activity Type Panned Value (upto Actual Done BCWS (Planned BCWP (Earned CPI CV
Current month) (upto Current Value) Value)
month)
Page 8 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
Unit of Remarks /
Total Planned Actual SPI
Physical Progress Item Description Measur Lev.5 Lev.4 Lev.3 Lev.2 Lev.1 Lev.5 Lev.4 Lev.3 Lev.2 Lev.1
Quantity Quantity Quantity
e
22.19 7.08
Package-4A of North-South Corridor 0.32
% %
56.79 37.79
General (Section-A)
% % 0.67
100.00 100.00
Surveying KM 6.3 6.3 6.3
% %
100.00 100.00
Final Bill on Surveying LS 1 1 1
% %
21.61
Construction (Section-B to K) 6.56%
% 0.30
55.05 28.65
Load Tests
% %
60.11 35.19
Pile load tests
% %
Page 9 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
36.50
Other Test 4.66%
%
33.15 12.59
SUB-STRUCTURE
% %
38.09 16.14
Foundation
% %
16.81
Structures above Foundation 0.82%
%
Page 10 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
18.05
PRECAST CONCRETE 2.87%
%
23.08
PRECAST CONCRETE PRODUCTION 4.07%
%
Page 11 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
Deployment of adequate manpower for Traffic Management Rm 4,135 186 4.50% 70 1.69%
11.73
ROAD WORKS LS 10,545 1,237 0 0.00%
%
30,000,00 3,000,00
WORK UNDER GUJARAT SOR LS 10,000,000.0 0.00% 0.00%
0 0
Unit of Remarks /
Total Planned Actual SPI
Physical Progress Item Description Measur Lev.5 Lev.4 Lev.3 Lev.2 Lev.1 Lev.5 Lev.4 Lev.3 Lev.2 Lev.1
Quantity Quantity Quantity
e
Page 12 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
5.47
Package-4A of North-South Corridor 15.53% 0.35
%
36.31
General (Section-A) 52.16%
% 0.70
45.16
Pile load tests 35.19%
%
29.32
Other Test 3.78%
%
Page 13 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
27.09
Foundation 13.00%
%
16.09
PRECAST CONCRETE PRODUCTION 2.09%
%
Page 14 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
Page 15 of 84
Earned Value Management - Package-4A Viaduct
12-
Project Commencement Project Completion 10-Jul-18 Project Status as of 26-Nov-16
Jan-16
11.73
ROAD WORKS LS 10,545 1,237 0 0.00%
%
30,000,00 10,000,00
WORK UNDER GUJARAT SOR LS 0.00% 3,000,000 0.00%
0 0